HomeMy WebLinkAboutNC0023442_Authorization to Construct_20170127"ELF 6`t ego Z 2 - Boise .Cascade .Wood Products,' LLC ' Moncure Plywood WWTP Authorization to Construct_ No. 023442A02 Issued April 20, 2616 is Certification I, as a duly registered essional Engineer in the State of No C ins, having been authorized to observe eriodicall eekly1f ill time) the construction of the modifications and improvements to the Moncure ywood Wastewater Treatment Plant, located in Chatham County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of four (4) new 4,000 gal in ground concrete tanks with above ground manway access, internal filters, piping, and other controls to support operation of new treatment plant; installation of four (4) new submersible 29 GPM at 65 ft TDH dosing tank pumps, piping, and controls; installation of eight (8) new 7.5ft x 7.5 it x 3 ft E -Z Treat Treatment Pods each with a media mattress and buoyancy anchoring, piping, auto dialer, and controls; installation of one (1) new UV disinfection system consisting of dual two bulb units, one unit is back up, with monitoring/control system to switch to backup unit and provide alarm when low intensity is detected, enclosed riser housing with concrete foundation, two (2) W spare bulbs, and piping; installation of one (1)pew 2,000 gal in ground concrete effluent pump task with above ground manway access; installation of two (2) new submersible 29 GPM at 65 ft TDH effluent pumps, piping, and controls; installation one (1) new effluent meter; installation of new, 2 in diameter effluent force mean. installation of one (1) new floating 51 GPM at 13 ft TDH lagoon decant pump, piping, flow meter, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Envi tel ual't ronmen Q n y. " Rio (1 �Q� 1X V Lam- i � • �lr`e/ & 0 / r x:(11 � Note: Upon startup of this new treatrnent facility compliance with the new treatment NPDES limits commence and no direct discharge from the facultative pond are allowed. Receipt of the POOP Engineer's Certificate confirm the new treatment facility is in service. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and outer supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. n/l. Date�/�_Z�y Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DEQ/DWRJWater Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617