Loading...
HomeMy WebLinkAboutNC0005266_316(b) Preliminary Determination_20150313 Certified Mail—7012 1010 0002 5668 2393 Return Receipt Requested LP March 9, 2015 BUILDING PRODUCTS NPDES Complex Permitting Unit 1617 Mail Service Center Raleigh,NC 27699-1617 RECEIVED/DENR/DWR RE: 316(b) Preliminary Determination Permit No.NC0005266 MAR 1. 3 2015 Louisiana-Pacific Corporation Water Quality Ms. Rodriguez, Permitting Sectior In response to your letter dated February 25, 2015, Louisiana Pacific does not believe that it is subject to the new cooling water intake rule and provides the following data in support: 1. Design intake flow for your facility. Pumping Capacity of LP's intake pumps—4.0 MGD(million gallons per day) 2. Actual intake for your facility(average volume of water withdrawn on an annual basis over the past three years) Year Avg. Daily Withdrawal Days per year 2014 2.64 MGD 332 2013 2.61 MGD 333 2012 2.45 MGD 303 Average daily withdrawal over last three years-2.57 MGD for an average of 323 days/year. 3. Percent of the water withdrawn on an actual intake flow basis used exclusively for cooling purposes. LP uses virtually all of the water withdrawn for use in its hardboard manufacturing process. LP has only 1 small,closed loop cooling tower. Make-up water usage for this tower is less than 1%of the water withdrawn. As you can see from the above, LP's water use for cooling purposes if well below the minimum threshold to be subject to this rule. Please call me at 336 696-3464 if you have any additional questions. Sincerely, 4/ Ro .H ESH Manager ADDRESS P.O.Box 98 Roaring River,NC 28869 TEL 338.898.2751 FAx 338.898.3443 WEB www Ipcorp corn