HomeMy WebLinkAboutNC0003433_Permit Application Update_20160805 r� DUKE Harry K.Sideris
Senior Vice President
ENERGY® Environmental,Health&Safety
526 S.Church Street
Mail Code:EC3XP
Charlotte,NC 28202
(704)382-4303
August 3, 2016
Mr.Jeffrey Poupart
North Carolina Division of Water Resources
1617 Mail Service Center
Raleigh,NC 27699-1617
Re: NPDES Wastewater Permit Application Update RECEIVEMCDEOIDWR
Duke Energy Progress,LLC.
Cape Fear Steam Electric Plant AUG ® 2Q16
Permit#: NCNC0003433 VfVator Quality
Chatham County Permitting suction
Dear Mr.Poupart,
Duke Energy Progress, LLC (Duke Energy) is submitting herewith supplemental information in support
of the NPDES renewal application submitted in 2014 for the subject facility. Please include this
supplemental information in those packages for your review.
The area of wetness in the table below was discovered since the last permit application update. Since its
discovery,the area of wetness has had insufficient flow for a water quality sample to be taken.
t Location C,00rdinike"s "`
Station OAOW ID'- — h Description
Latitudes ion`�it-
(� (�. g
' The S-18 AOW is characterized by wet,reddish mineral deposit
Cape Fear S-18 35.5902476 i -79.0514107 staining on the exposed river bank soils which contrast with the
otherwise tan colored soils along the bank.
Should you have any questions regarding this letter or require additional information,please
contact Mr. Steve Cahoon at(919) 546-7547 or at steve.cahoon@duke-energy.com.
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that-there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations. "
Yarry
ly,
deris
SVP-Environmental,Health&Safety
Mr. Poupart
Cape Fear NPDES Permit Update
August 2, 2016
Page 2
NCDEQ cc: Sergei Chernikov
Duke Energy cc: Steve Cahoon,Jeremy Pruett,Richard Baker,Jim Wells, Ross Hartfield