HomeMy WebLinkAbout20161083 Ver 1_RE EDB YR 4 - BR 254 Revised Buffer Impact Permit drawings and summary table_20170127 (2)Carpenter,Kristi
From: Wanucha,�ave
Sent: Friday,Danuary�7,�017�:04�M
To: Carpenter,Kristi
Subject: RE:[�DB[�'RC�1D�R�54[B;evised�uffer[Dmpact�ermit@Irawingsf�ndDummary@able
Follow Up Flag: Follow[�p
Flag Status: Completed
Sounds good. Thanks.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
.•d �t31'�6 ��� �p��S�..
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Carpenter,Kristi
Sent: Friday, January 27, 2017 1:38 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: RE: EDB YR 4- BR 254 Revised Buffer Impact Permit drawings and summary table
If you don't need to issue a revised permit then I can just put everything under version 1.
From: Wanucha, Dave
Sent: Friday, January 27, 2017 12:55 PM
To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.�ov>
Subject: RE: EDB YR 4- BR 254 Revised Buffer Impact Permit drawings and summary table
On second thought, this does not need to be a version 2, unless you think it does.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha(a�ncdenr.qov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
r �� �$��I��'Iq �OY�"��Y�`� . . ,-
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Carpenter,Kristi
Sent: Wednesday, January 25, 2017 12:24 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.�ov>
Subject: RE: EDB YR 4- BR 254 Revised Buffer Impact Permit drawings and summary table
Dave,
Would this be a version 2?
Thanks,
klc
From: Thomson, Nicole J
Sent: Wednesday, January 25, 2017 11:21 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.�ov>; David.E.Bailey2@usace.army.mil
Cc: Carpenter,Kristi <I<ristilynn.carpenter@ncdenr.�ov>
Subject: FW: EDB YR 4- BR 254 Revised Buffer Impact Permit drawings and summary table
Good morning Dave!
I've attached some documents to this email regarding Bridge 254 in Guilford County on Ferguson Road. While we were
at the preconstruction site meeting yesterday, we discovered that in the northeast quadrant of the project there is not
enough room to construet the wing wall. Therefore, after an emergency meeting with the designer and the team
members, we have pulled together a revised set of buffer drawings and updated the summary sheet to show this
additional area need for construction (263 square feet in Zone 1). The design engineer has offered the below narrative
(based upon our onsite discussions yesterday) as to the need for this slight increase.
It is my hope that we can handle this via email — however, if you need me to resubmit everything, please let me
know. I've also included the original DWR authorization.
Thank you so much!
Nikki
From: Tracy Parrott [mailto:tracyparrott@summitde.net]
Sent: Tuesday, January 24, 2017 5:54 PM
To: Thomson, Nicole J; 'Randy Chandler'; Lorenz, Kris
Cc: 'Nancy Scott'; 'Michael Wood'; 'Dan Duffield'; 'brandon. johnson'
Subject: EDB YR 4- BR 254 Revised Buffer Impact Permit drawings and summary table
N,
Per our filed meeting and discussion today, please find attached revised Buffer Impact Permit drawings and updated
summary table. You will note the additional buffer impact area has been added as a separate line in the summary. Below
is the accompanying narrative for the additional area:
On the NE quadrant of the subject project, existing ground is approximately 8-10' higher than the bottom of footing
elevation for the proposed culvert wing wall. Excavation for the wing wall must be sloped back for worker safety, thus
resulting in buffer impacts beyond those initially anticipated for the project. Consideration was given to utilizing sheet
piling to contain the excavation and limit buffer impacts, however the presence of aerial power and
telecommunication lines directly over the end of the proposed culvert precludes the installation of sheet piling. Upon
completion of the construction of the culvert and wing wall, the areas excavated within the buffer will be backfilled,
restored to natural contours and seeded with native grasses per the project special provisions.
Please advise if you have any questions or need additional information. We greatly appreciate your help in submitting
this information to the agencies and coordinating their review and approval. Thanks, TNP
Tracy N. Parrott, PE
Project Manager
504 Meadowland Drive
Hillsborough, NC 27278
Phone: 919.732.3883
Facsimile: 919.732.6676
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.