Nikki,
The explanations for the revisions are acceptable. We approve the additional impacts as described. To keep it simple, we’ll
approve the revisions using this email. I’ll place the information you sent including the revised drawings in the file for future
reference. Thanks.
Kristi,
Make this version 2 in BIMs. I’ll enter the additional impacts. Thanks.
Dave W.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Thomson, Nicole J
Sent: Wednesday, January 25, 2017 11:21 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; David.E.Bailey2@usace.army.mil
Cc: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: FW: EDB YR 4 - BR 254 Revised Buffer Impact Permit drawings and summary table
Good morning Dave!
I’ve attached some documents to this email regarding Bridge 254 in Guilford County on Ferguson Road. While we were at the
preconstruction site meeting yesterday, we discovered that in the northeast quadrant of the project there is not enough room
to construct the wing wall. Therefore, after an emergency meeting with the designer and the team members, we have pulled
together a revised set of buffer drawings and updated the summary sheet to show this additional area need for construction
1
(263 square feet in Zone 1). The design engineer has offered the below narrative (based upon our onsite discussions yesterday)
as to the need for this slight increase.
It is my hope that we can handle this via email – however, if you need me to resubmit everything, please let me know. I’ve also
included the original DWR authorization.
Thank you so much!
Nikki
From: Tracy Parrott \[mailto:tracy.parrott@summitde.net\]
Sent: Tuesday, January 24, 2017 5:54 PM
To: Thomson, Nicole J; 'Randy Chandler'; Lorenz, Kris
Cc: 'Nancy Scott'; 'Michael Wood'; 'Dan Duffield'; 'brandon. johnson'
Subject: EDB YR 4 - BR 254 Revised Buffer Impact Permit drawings and summary table
N,
Per our filed meeting and discussion today, please find attached revised Buffer Impact Permit drawings and updated summary
table. You will note the additional buffer impact area has been added as a separate line in the summary. Below is the
accompanying narrative for the additional area:
On the NE quadrant of the subject project, existing ground is approximately 8-10’ higher than the bottom of footing elevation
for the proposed culvert wing wall. Excavation for the wing wall must be sloped back for worker safety, thus resulting in
buffer impacts beyond those initially anticipated for the project. Consideration was given to utilizing sheet piling to contain
the excavation and limit buffer impacts, however the presence of aerial power and telecommunication lines directly over the
end of the proposed culvert precludes the installation of sheet piling. Upon completion of the construction of the culvert and
wing wall, the areas excavated within the buffer will be backfilled, restored to natural contours and seeded with native
grasses per the project special provisions.
Please advise if you have any questions or need additional information. We greatly appreciate your help in submitting this
information to the agencies and coordinating their review and approval. Thanks, TNP
Tracy N. Parrott, PE
Project Manager
504 Meadowland Drive
Hillsborough, NC 27278
Phone: 919.732.3883
Facsimile: 919.732.6676
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2