HomeMy WebLinkAbout20131052_Site Visit_20160202 Hood, Donna From:Beam, Patricia Sent:Tuesday, February 02, 2016 1:59 PM To:Hood, Donna Subject:Boone Gap Road site visit Attachments:downstream.jpg; outlet.jpg; upstream.jpg; inlet.jpg; permit_plan_sheet.png; js_ditchline.jpg Donna, Boone Gap project look good overall. They still has some matting to put down and some seeding to do, but the main channel work looked good. The one thing I did notice was that they had essentially blocked a pre existing jurisdictional ditch with riprap. A spring seeps out of the hillside approximately 75 feet upstream and enters the ditchline. According to plans the ditchline was to remain undisturbed and was not permitted for any fill. I instructed the contractor to shift the rocks aside to create a channel to allow flow to flow across the floodplain bench and into the main channel. Let me know if this is adequate or is you want them to do something else. Thanks Trish Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1