Loading...
HomeMy WebLinkAbout20160410 Ver 2_More Info Received - Email_20170123 Strickland, Bev From:Kevin Martin <kmartin@sandec.com> Sent:Monday, January 23, 2017 12:52 PM To:Smith, Cherri L Subject:RE: Tryon subdivision PCN wake forest Great let me know if you have any questions, this does not really relate to DWR but the DMS acceptance letter for wetland mitigation has been revised (copy attached) the total in the previous was too low. Kevin C. Martin Principal Soil & Environmental Consultants, PA We’ve moved to: North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 846-9467 Fax (919) 270-7941 Mobile kmartin@sandec.com Visit us at SandEC.com! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you From: Smith, Cherri L \[mailto:cherri.smith@ncdenr.gov\] Sent: Monday, January 23, 2017 9:24 AM To: Kevin Martin <kmartin@sandec.com> Subject: RE: Tryon subdivision PCN wake forest Thanks Kevin – my plan is to get to this application today. Cherri From: Kevin Martin \[mailto:kmartin@sandec.com\] Sent: Sunday, January 22, 2017 10:31 AM To: Smith, Cherri L <cherri.smith@ncdenr.gov>; 'James.C.Lastinger@usace.army.mil' <James.C.Lastinger@usace.army.mil> Subject: Tryon subdivision PCN wake forest Importance: High FYI, the ownership has changed somewhat since the PCN was submitted, Tryon Investment Partners, LLC is the sole owner. Tryon WF, LLC is no longer involved in the ownership Kevin C. Martin Principal Soil & Environmental Consultants, PA 1 We’ve moved to: North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 846-9467 Fax (919) 270-7941 Mobile kmartin@sandec.com Visit us at SandEC.com! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you 2 F Mitig tion Services ENVIRONMENTAL QUALITY Joe Lassiter Tryon Investment Partners, LLC 8310 Bandford Way Raleigh, NC 27615 Project: Tryon Subdivision PAT MCCRORY DONALD R. VAN DER VAART s,c„rcu, December 30, 2016 Expiration of Acceptance: June 30, 2017 County: Wake The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in -lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit 401 Certification CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed at http://portal.ncdenr.org/web/eep. Based on the information supplied by you in your request to use the DMS, the impacts that may require compensatory mitigation are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. Impact River Basin CU Location (8 -digit HUC) Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer II (Sq. Ft.) Cold Cool Warm Riparian I Non -Riparian Coastal Marsh Neuse 03020201 0 0 0 0.3635 0 0 0 0 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010 and 15A NCAC 02B .0295 as applicable. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly Williams at (919) 707-8915. cc: Kevin Martin, agent Sincerely, James. tanfill Asset Management Supervisor State of North Carolina Environmental Quality I Mitigation Services 1652 Mail Service Center I Raleigh, NC 27699-1652 1 217 W. Jones Street, Suite 3000 919 707 8976 T