HomeMy WebLinkAbout20160410 Ver 2_More Info Received - Email_20170123
Strickland, Bev
From:Kevin Martin <kmartin@sandec.com>
Sent:Monday, January 23, 2017 12:52 PM
To:Smith, Cherri L
Subject:RE: Tryon subdivision PCN wake forest
Great let me know if you have any questions, this does not really relate to DWR but the DMS
acceptance letter for wetland mitigation has been revised (copy attached) the total in
the previous was too low.
Kevin C. Martin
Principal
Soil & Environmental Consultants, PA
We’ve moved to:
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
(919) 846-5900 Office Phone
(919) 846-9467 Fax
(919) 270-7941 Mobile
kmartin@sandec.com
Visit us at SandEC.com!
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic
communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a
matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you
are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic
communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you
From: Smith, Cherri L \[mailto:cherri.smith@ncdenr.gov\]
Sent: Monday, January 23, 2017 9:24 AM
To: Kevin Martin <kmartin@sandec.com>
Subject: RE: Tryon subdivision PCN wake forest
Thanks Kevin – my plan is to get to this application today.
Cherri
From: Kevin Martin \[mailto:kmartin@sandec.com\]
Sent: Sunday, January 22, 2017 10:31 AM
To: Smith, Cherri L <cherri.smith@ncdenr.gov>; 'James.C.Lastinger@usace.army.mil'
<James.C.Lastinger@usace.army.mil>
Subject: Tryon subdivision PCN wake forest
Importance: High
FYI, the ownership has changed somewhat since the PCN was submitted, Tryon Investment
Partners, LLC is the sole owner. Tryon WF, LLC is no longer involved in the ownership
Kevin C. Martin
Principal
Soil & Environmental Consultants, PA
1
We’ve moved to:
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
(919) 846-5900 Office Phone
(919) 846-9467 Fax
(919) 270-7941 Mobile
kmartin@sandec.com
Visit us at SandEC.com!
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic
communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a
matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you
are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic
communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you
2
F
Mitig tion Services
ENVIRONMENTAL QUALITY
Joe Lassiter
Tryon Investment Partners, LLC
8310 Bandford Way
Raleigh, NC 27615
Project: Tryon Subdivision
PAT MCCRORY
DONALD R. VAN DER VAART
s,c„rcu,
December 30, 2016
Expiration of Acceptance: June 30, 2017
County: Wake
The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept
payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the
table below. Please note that this decision does not assure that participation in the DMS in -lieu fee mitigation
program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility
of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must
also comply with all other state, federal or local government permits, regulations or authorizations associated with
the proposed activity including G.S. § 143-214.11.
This acceptance is valid for six months from the date of this letter and is not transferable. If we have not
received a copy of the issued 404 Permit 401 Certification CAMA permit within this time frame, this
acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS
receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and
payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an
applicant is calculated based upon the Fee Schedule and policies listed at http://portal.ncdenr.org/web/eep.
Based on the information supplied by you in your request to use the DMS, the impacts that may require
compensatory mitigation are summarized in the following table. The amount of mitigation required and assigned
to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below.
Impact
River
Basin
CU Location
(8 -digit HUC)
Stream (feet) Wetlands (acres)
Buffer I
(Sq. Ft.)
Buffer II
(Sq. Ft.)
Cold Cool Warm Riparian I Non -Riparian Coastal Marsh
Neuse
03020201
0 0 0 0.3635 0 0
0
0
Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation
will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010 and 15A NCAC
02B .0295 as applicable. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any
questions or need additional information, please contact Kelly Williams at (919) 707-8915.
cc: Kevin Martin, agent
Sincerely,
James. tanfill
Asset Management Supervisor
State of North Carolina Environmental Quality I Mitigation Services
1652 Mail Service Center I Raleigh, NC 27699-1652 1 217 W. Jones Street, Suite 3000
919 707 8976 T