HomeMy WebLinkAbout20160149 Ver 2_Email_20160118 (2)Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Follow Up Flag:
Flag Status:
Hello,
Peele, Catherine D
Sunday, January 15, 2017 7:07 AM
Wheeler, Tracey L CIV USARMY CESAW (US); Daisey, Greg; Ward, Garcy
Brittingham, Cathy; Carpenter,Kristi
Southdock Dredging Project
Follow up
Completed
In our original request for the Southdock dredging project we stated that we would only be working on the "hump" in
the approach channel resulting in the removal of 5,000 cubic yards of material. After speaking with captains of the
ferries the shoaling has gotten worse inside the basin making it hard for them to turn around; therefore, we will be
removing an additional 8,000 cubic yards from the basin. If you have any questions or concerns please feel free to
contact me
Thank you,
Catherine Peele
Environmental Specialist
Ferry Division
252 305 7288 mobile
cdpeele@ncdot.gov
159 Lucinda Drive
Powells Point, NC 27966
*�.. �- � / .IFi �l�.j i
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
6,=,nail correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third partie:-s.