HomeMy WebLinkAbout20160149 Ver 2_401 Application_20160118Carpenter,Kristi
From: Peele,[3�atherine�
Sent: Tuesday,DanuaryCl7,�017[�:01�M
To: Ward,QSarcy
Cc: Carpenter,Kristi
Subject: FW:�outhdock�redging�roject
Attachments: SouthdockDPCN�017�igned.pdf;[�OUTHDOCK�ASIN_LS_SSG_170103.pdf
Follow Up Flag: FollowQap
Flag Status: Completed
-----Original Message-----
From: Peele, Catherine D
Sent: Tuesday, January 17, 2017 2:08 PM
To: 'Wheeler, Tracey L CIV USARMY CESAW (US)'
Cc: Biddlecome, William J JR CIV USARMY CESAW (US); Winslow, Lancelot D
Subject: RE: Southdock Dredging Project
Tracey,
Attached is the PCN for the maintenance project at Southdock along with the most recent survey. The area is an
emergency need to have the sediment removed, ferries are having difficult passing through the channel and also turning
around in the basin. We are looking to start dredging operations this weekend, do you think you could have approval to
us by then? This would allow us to not have to shut down the route from Hatteras to Ocracoke.
Just for everyone's information we are meeting with the National Park Service to look at adding rip rap at the base spoil
site berm. The rip rap was previously approved and we are meeting to discuss installation. The erosion from the berm is
causing material to settle into the channel and basin.
We will work towards applying for an Individual Permit for this area.
I emailed you the Stumpy Point PCN on Wednesday, have you not received it?
Thank you,
Cat Peele
-----Original Message-----
From: Wheeler, Tracey L CIV USARMY CESAW (US) [mailto:Tracey.L.Wheeler@usace.army.mil]
Sent: Tuesday, January 17, 2017 12:40 PM
To: Peele, Catherine D
Cc: Biddlecome, William J JR CIV USARMY CESAW (US); Winslow, Lancelot D
Subject: RE: Southdock Dredging Project
Hey Cat,
I just talked to Bill about the maintenance dredging you guys are doing. Years ago, USACE had a permit that
mirrored the NCDCM permit in the area. Unfortunately, our regulations only allow us to continue approving
maintenance excavation under an individual permit for up to 10 years. We did automatic approvals for as long as we
were able. Now, we have to issue new authorizations through NWP 35 whenever you need to do maintenance. That
means that we need a permit application and details about each excavation event that you need. (So yes, I need an
application form for Southdock and for Stumpy Point) I have to issue a separate NWP 35 for each action, if what you
propose meets the terms and conditions for the permit.
I know that it is work up front, but you might want to think about requesting a new individual permit for the
Southdock area, including the channel. You could ask for a 10 year maintenance clause, and that way, as long as you
were working within the permit area and were consistent with any permit conditions, you could work. It would be like
the way we used to do things. It's just a thought. I think it would save you time since things seem very dynamic within
the basin and channel.
Either way, I need a permit application from you for the work you need to get done now. Thanks! Tracey
Tracey L. Wheeler
Regulatory Project Manager
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
(910) 251-4627
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Peele, Catherine D [mailto:cdpeele@ncdot.gov]
Sent: Tuesday, January 17, 2017 9:27 AM
To: Wheeler, Tracey L CIV USARMY CESAW (US) <Tracey.L.Wheeler@usace.army.mil>; Daisey, Greg
<Greg.Daisey@ncdenr.gov>; Ward, Garcy <garcy.ward@ncdenr.gov>
Cc: Brittingham, Cathy <cathy.brittingham@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: [EXTERNAL] RE: Southdock Dredging Project
AI I,
I hope that the attached survey is ok, we are having some computer troubles at the office today. I have hand drawn an
outline of the basin area that we will be dredging.
-----Original Message-----
From: Wheeler, Tracey L CIV USARMY CESAW (US) [mailto:Tracey.L.Wheeler@usace.army.mil]
Sent: Tuesday, January 17, 2017 8:06 AM
To: Peele, Catherine D; Daisey, Greg; Ward, Garcy
Cc: Brittingham, Cathy; Carpenter,Kristi
Subject: RE: Southdock Dredging Project
Cat,
I need to know where the dredging will occur. Can you just add it to the drawing you submitted earlier? Or is it the
whole basin?
Tracey L. Wheeler
Regulatory Project Manager
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
(910) 251-4627
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Peele, Catherine D [mailto:cdpeele@ncdot.gov]
Sent: Sunday, January 15, 2017 7:07 AM
To: Wheeler, Tracey L CIV USARMY CESAW (US) <Tracey.L.Wheeler@usace.army.mil>; Daisey, Greg
<Greg.Daisey@ncdenr.gov>; Ward, Garcy <garcy.ward@ncdenr.gov>
Cc: Brittingham, Cathy <cathy.brittingham@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: [EXTERNAL] Southdock Dredging Project
Hello,
In our original request for the Southdock dredging project we stated that we would only be working on the "hump" in
the approach channel resulting in the removal of 5,000 cubic yards of material. After speaking with captains of the
ferries the shoaling has gotten worse inside the basin making it hard for them to turn around; therefore, we will be
removing an additional 8,000 cubic yards from the basin. If you have any questions or concerns please feel free to
contact me
Thank you,
Catherine Peele
Environmental Specialist
Ferry Division
252 305 7288 mobile
cdpeele@ncdot.gov
159 Lucinda Drive
Powells Point, NC 27966
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
pa rties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
��^F WATFyO` pry��¢ Use Only:
o/��€ CorPs action ID no.
` DWQ project no.
Form Version 1.0 NwemDer2008
Pre-Construction Notifiication (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: ❑ Section 404 Permit � Secfion 10 Permit
1 b. Specify Nationwitle Pertnit (NWP) number. 35 or Gerveral Permh (GP) number.
1c. Has the NWP or GP number been venfietl by the Corps? � Yes ❑ No
td. Type(s) of approval sought from the DWQ (check all that apply);
� 401 Water Quality Certification—Regular ❑ Non.404 Jurisdictional Genersl Permfl
❑401WaterQualityCertificatlon—F�press ❑RipananBufFerAuthorization
1 e. Is this notification solely for the record For the record 0nly for DWQ 401 For Ne record only for Corps Pertnit:
because written approval is not required? Cerdfication:
❑ Yes I� No ❑ Yes ❑ No
if. Is paymeM into a mitigation bank or in-lieu fee pragrem proposetl for mitigation � Y� � No
of impacts? If so, attach the acceplance lerier from mitigation benk or in-lieu
fee progrem.
ig. Is the project located in eny W NC's Mrenty coastal cour�des. If yes, answer 1 h � Yes ❑ No
below.
1 h. Is the project located within a NC DCM Area of EmrironmeMal Concem (AEC)? � Yes ❑ No
2. ProJect Informatlon
2a. Name of project: Southdock Fefry Basin and Channel Dredging
2b. County: Hyde
2c. Nearest municipaliry / Mwri: Ocrecoke
2d. Subtlivision name: N/A
2e. NCDOT only, T.I.P. or steM 16 71080
project no:
3. Owner IMormatlon
3a. Name on Recortletl Deed: NCDOT Ferty Division
3b. Deed Book antl Page No. N/A
3c. Responsible Party (for LLC if Catherine Peele
appliwble):
3d. Sheet address: 159 Lucintla Lane
3e. City, state, zip: Powells Point, NC 27966
3f. Telephone no.: 2523057288
3g. Faz no.: 252-491-2782
3h. Email address: ctlpeele�ncdot.gov
Page 1 of 12
PCN Fortn — Version 1.0 November 2008 Version
Section A. Applicant IMormatlon, continued
4. Applicant Infofmatlon (if dffrerent from owne�
4a. ApplicaM is: � AgeM ❑ Other,
4b. Name: CaMerine Peele
name I N/A
4d. Street eddress: 159 Lucinda Lane
4e. Ciry, state, zip: Powells Pant, NC 27966
4f. Telephone no.: 25230b7288
4g. Fax no.: 252491-2782
4h. Email address: cdpeele(�ncdot.gov
8. AgentlConsultant Information (H appllcable)
5a. Name: N/A
Sb. Business name
5c. SUeetatltlress:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email eddress:
Page 2 bf tl2
PCN Form — November 2008 Version
B. ProJect Informatlon antl Prior Projeet HisMry
1. Property IOentHlcatlon
1 a. Property identification na (tax PIN or parcel ID): NIA
7 b. Site coordinates (in decimal tlegrees): 35.190085'N - 75.781092'W
1 c. Property size: 7.4 acres
2. Surtace Watefs
2a. Name of nearest body of water (stream, river, etc.) to pamlico Sountl / Hatteras Inlet
proposed project:
2b. Water �uality Classification of nearest receiving water. Sountl
2c. Riverbasin: TarPamlico
3. ProJect Description
3a. Describe fhe exisdng conditions on the site and the general lentl use in the vicinity of the project at the time of this
application:
The Southdock Ferry Terminai is usetl by the NCDOT Ferry pivision to VanspoR lhe public back antl forth from Ocracoke
to Hatteras Islantl antl vice versa. Since Hurricane Matthew Me channel and basin have filletl in with material very quickly
making it unsafe for Me ferties to t2vel fhrough the channel end into the basin without potentially running aground. This
are is experienang a very dynamic change in shoaling since�this hurcicane. This area is permitted ro a depth of -72 ket
and currently in some areas the depM is only 5.5 feet. As of now we are at a critical need to get Nis area dredged antl
open for safe passage.
3b. List Me total esUmated acreage of all ezisting wetlands on the properly:
0 acres
3a List the total estima[ed linear feet of all epsdng streams (intermiGeM and perennial) on the property:
0
3d. E�lain fhe purpose of the proposed projecl:
' jhe purpose of this project is to dear the channel antl basin from sedimeM accumulation ro allow for the safe passage of
ferries to antl from SoufhdoGc ro Hatteres Islantl.
3e. Descnbe the overell project in detail, induding Me rype of eqpipment to be used:
The NC Ferry Division Dredge Manteo will perform maiMenance dredging io allow Me safe passage of the public in
particular the resideMs of Hatte2s Islantl. There is approximetely 15,000 cubic yards of material to be removetl. The
ezcavation will follow the curteM permitted tlimensions of 150' wide by a-12' tlepth. Dredged material will be pumped
through the pipeline and inlo the Southdock Spoil Site. The spoil site is lacated on Nallonal Park Service land which
requires us W obtain a Special Use Permit, which we have in hantl. A dredge, excevator, barges, tug boel, booster pump,
pipeline antl bulltlozer will be used for site preparatlon and ta pertorm Me tlredging ac[iviUes.
4. JuAsdlctlonal Determinadons
4a. HeVe Junstlictianal wetlend or streem tleterminati0ns by Ne
Corps or State bcen requested or obtainetl for Mis property / ❑ Ves � No ❑ Unknown
project (including all prior phases) in die past?
4b. If the Corps made thejurisdictional determination, what rype � prelimina Final
of determination was made? ry�
4c. If yes, who delineated thejuristlictlonal areas? Agency/ConsultaM Company:
Name (if knownj: Other
4tl. If yes, list the dates of the Corps jurisdictional determinations or State tleterminations antl attach documentation.
6. ProJect Xistory
Sa. Have permfts or certificadons been requested or obtainetl for
this project (induding all prior phases) in the past? � Yes ❑ No ❑ Unknown
Sb. If yes, explain in de[ail accortling to "�elp flle' inswctions.
CAMA maior oermit 224-87 E�ires 12-31-2021
Page 3 of 12
PCN Form — Version 1.0 November 2008 Version
Page4 1IR
PCN Form — November 2008 Version
C. Proposetl Impaets InveMory
7. Impacts Summary
1 a. Which sedions were wmpleted below for your project
❑Wetlantls ❑Streams-Vibutaries
� Open Watere ❑ Pond ConsVuction
4. WetlanA Impacts
that apply):
❑ Buffere
If there are wetlantl impacts pioposed on the site, then completg th'rs question for each wetland area impacted.
2a. 2b. 2c 2tl. �� 2e. 2f.
Wetlantl impact 7ype ofjurisdiction
number— Type of Type of wedand ForestEtl I (Corps - 404, 10 Area of impaG (acres)
Permanerrt (P) or Impact (N kriown) I DWQ — non-404, other)
Tem ore
W1 ❑ P � T ❑ Yes [;I No � �0�
❑ DWQ
W2 0 P O T ❑ Yes [� NP � Corps
❑ DWQ
W3 ❑ P❑ T ❑ Yes [] No � Corps
❑ DWQ
W4 ❑ P❑ T ❑ Yes [� No � Corps
❑ DWQ
WS ❑ P❑ T ❑ Yes d No � Corys
❑ DWQ
WB ❑ P❑ T ❑ Yes [] NO � �orys
2g. Tofal wetland impac[s �
2h. CommeMs:
3. Stream Impacts
If there are perennial or iMermittent sheam impacts (including temporery impects) proposed on the site, then complete this
questlon for all sVeam sites impacted.
3a. 3b. 3c. 3d. 3e. 3f.
Stream impact Type of Sheam name Perennial (PER) or Aveiage stream width (feet) Impact
number- impact intermitterrt(IN'�? length
Pertnanent (P) or (linear feet)
Temporary (n
S1 ❑ P � T ❑ PER ❑ INf
32 OPOT ❑PER OfMT
S3 � P❑ T ❑ PER � IMT
S4 � P❑ T ❑ PER 0 INT
SS ❑ P❑ T ❑ PER � INT
SB ❑P�T ❑PER ❑INT
Sg. Total stream antl tributary Impacts
3h. Comments:
Page 5 Of 12 �
PCN Form — Version 1.0 November 2008 Vereion
C. Proposed Impaels Inventory, coMinued
4. Open Water Impacts
If there ere or000setl imoa
Open water Name of
impact number waterbody
—Permanent (if
(P) or applicable)
• ■ ' E�
02 ❑P❑T
03 ❑P�T
04 ❑P�T
lakes, ponds, esWanes, Mbufer�
�pen water imDacts below. I
4c. '
Type of impact
Soil Removal from dretlpinC
Commen[s: This area will be impactetl from dredging the
sounds, the Atlar�c Ocean, or any other open water W
Page 6 of 1�
Waterbody type
Sauntl
Area of impact (acres)
7.4
open water Impacts � 7.4
erry Tertninal basin antl channel
PCN Fortn — November 2008 Version
C. Proposed Impacts InveMory, continuad
5. Pond or Lake Constructlon
If nd or lake consWction osed, then wm lete the chart tielow.
Sa. 5b. 5c. Sd. Se.
Wetland Impacts (acres) Stream Impacis (feet) Upland
Pond ID proposed use or (acres)
number purpose of pond
Flootletl Filled Ezcavstep Flooded Filled Excavated Flooded
P1
P2
Sf. Total
5g. Comments:
5h. Is a dam high hazard pertnit requiretl?
❑ Yes ❑ No If yes, pertnit ID no:
Si. Expectetl pond surtace area (acres):
5. Size of pontl watershed (acres):
5k. Method of cons6vdion:
8. Buifer Impacb (for DWQ)
If project will impact a protectetl riparian buffer, then complete the chart below. If yes, then individualty list all buffer impacts
below. If an im re uire miti ation then ou MUST fill'.ouf Section D of this foim.
6a.
❑ Neuse ❑ TarvPamliw ❑ Other:
Project is in which protec[ed basin? ❑ Catawba ❑ Rantlleman
Bb. Bc. 6tl. Be. Bf. Bg.
Bufferimpact
number— Reason Buffef Zone t impact (square Zone 2 impact
Permanent (P) for impact Stream name midga6on feet) (square feet)
orTemporary requiretl?
61 ❑P❑T ❑Yes [;]No
B2 �P❑T ❑Yes QNo
B3 ❑P❑T ❑Ves �No
6h. Total bufFer impacts
Bi. Commenb:
Page 7 of 12
PCN Fortn — November 2008 Version
D. Impact JustlFlcatlon and Mitlgation
1. Avoitlance and MlnimltaHon
1a. Specifically describe measures taken M avad or minimize the proposetl impacts in designing project.
1 b. Specifically describe measures taken ro avoid or minimize trye proposetl impacGs throu0h canstruction techniques.
2. CompensaMry MlHgatlon for Impacts W Waters of the U;S. or Waters of the State
2a. Does the projea require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigadon is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitlgation bank
2c. H yes, which midgadon option will be usetl for Nis
project? ❑ Payment to in-lieu tee program
❑ Pertnittee Responsible Mitigation
3. Complete it Using a Mklgation Bank
3a. Name of Mitlgatlon Bank N/A
3b. CreAits Purchased (attach receipt and letter) Type Quarrtity
3c. Comments:
4. Complete if Making a Payment to In-Iteu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream miUgation requested: linearfeet
4c. If using sVeam mitigation, sVeam temperature: wartn, cool, cold
4d. Buffer mttigatlon requested (DWQ only): square feet
4e. Riparian wetland mitlgation requested: acres
4f. Non-riparian wetlantl mitigation requested: acres
4g. Coastal (tidal) wetland miGgation requestetl: acres
4h.. Commerrts:
5. Complete If Using a Permittee Responsible MkfgaGon Plan
5a. If using a pertnittee responslble mitlgation plan, provide a description of the proposed miGgation plan.
N/A
Page 8 Of 12
PCN Form — Version 1.0 November 2008 Version
D. Impact Justifieation and Mitlgation, contlnued
8. BuBer M@igatlon (Stam Regulated Ripadan Buffer Rules�—roquiretl by DWO
Ba. Will the project result in an impact within a protecled riparian ���butfer that requires ❑ Yes � No
buffer mitigalionT
Bb. If yes, then identity the square teel of impact to each zone of the riparian buffer that requires mkigation. Calculate the
amouM of mitigation required.
Zone Reason for impact Total impact p�uttiplier Required mitigffiion
(square teet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
Total buffer mitigatlon requiretl:
Bc. If buffer mitigatio� is requiretl, tlixuss what type of mitigation ia proposed (e.g., paymeM to privete mitigation bank,
permittee responsible riparian buffer restoratloq payment irno an approved iMieu fee tuntl).
6tl. CommeMs:
Page 9 of 12
PCN Form — November 2008 Version
E. Stormwater Managemen! and Dlffuse Flow Plan (required by DWQ)
t. DHfuse Flow Plan
1 a. Does Ihe projeG inclutle or is k adjaceM to protected nparian buffers itlenlified � Yes � No
within one of the NC Riparian Buffer Protection Rules9
7 b. If yes, then is a difFuse flow plan indutletl? ❑ Yes ❑ No
2. De[ermination If the Pro'eet Ra uires a Stormwater Mana emant Plan
2a. Does the project require a Non404 JurisdicUonal General Permit? ❑ Yes � No
2b. Is the project subject to Generel Cewflcation 3704 or 3705? ❑ Yes ❑ No
3. Detarmination of Stommvater Review Jurisdictlon
3a. Is this project subject to any of the following sfstaimplemented stormwater ❑ Coastal couMies
management programs (check all that apply)? ❑❑ RW
If so, attach one copy of Ne approval letler from the DWQ antl one copy of the
approved stormwater management plan. ❑ Sassion Law 2006-246
❑ Other
3b. In which local govemmeM's junsdiction is this project7
3c. Is this local government certifie0 to implemerrt a state stormwater program7 ❑ Yes ❑ No
If so, attach one copy of the approval letter from the local govemmeM and one copy
of Ne approved stormwater management plan (or one copy of the approved
Stormwater management plan stampetl as approved).
4. Information R ulred for DWQ 407 Unit Stommvater Revlew
4a. What is the overell rcent im rviousness accordin to the most current site lan? NIA
4b. Does this project contain any areas tha[ meet the cnteria for "high tlensity' per � yes � No
General Certfiwtions 3704 and 3705?
4c. If the site is aver 24% impervious and/or contains high density areas, then provitle a brief narrative Cescription of Me
stormwater management plan.
N/A
4d. Has a wmpletetl BMP SupplemeM Form with all requi�ed Items been submiried
for each stormwater BMP? ❑ Yes � No
Page 10 of 12
PCN Form — Version 1.0 November 2008 Version
F. Supplementary Informallon
1. Environmental DocumenfaUon (DWQ Requlremenq
ta. Dces the project involve an expenditure of public (federel/statellocal) funtls or the � yes ❑ No
use M public (federaVstate) land?
1 b. If you answeretl'yes° to the above. does Ne prqect require preperation of an
environmental tlocumeM pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)7
tc. If you a�swereC °yes'to the above, has the document review heen finalized by the
State Cleari�g House7 (If so, attach a copy of the NEPA or 6EPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWf1 Requlrement)
2a. Is the site in violffiion of �WQ Wetland Rules (15A NCAC 2H .0600), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland SqndaMs, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)7
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answeretl'yes° W one or both of the above questions, provide an explanation of the violation(s): NIA
3. Cumulative Impacts (DWQ Requirement)
3a. Will this projec[ (6ased on past antl reasonably anticipatetl future impacts) result in � Yes � No
adtli6onal development, which coultl impact nearby downstream water quality?
3b. tt yau answered "yes" to the above, submit a qualitative or quan6tative wmulative impact analysis in accordance with fhe
most recen[ DWQ policy. If you answe2d "no,° proviCe a shOrt narrative tlescription.
N/A
4. Sewage Disposal (DWQ Requlrement)
4a. Clearly tletail fhe ultimate treatment methods and tlisposition (nan-discharge or discharge) of westewater generated fiom
the proposed project, or available capacity of the subjeQ faciiity.
WA
Page 11 of 12
PCN Form — Version 1.0 November 2008 Version
F. Supplamentary Information, contlnued
5. Endangered Species antl Designated Crltical Habltat (Corps Requlrement)
5a. Will this project occur in or near an area with fetlerally prote¢ted spedes or
habitat7 � Yes ❑ No
5b. Have you checketl with fhe USFWS conceming Entlangered Species Act � Yes � No
impacts7
5c. If yea, intlicate the USFVJS Feld Ofice ❑ Raleigh
you have contaded.
❑ Asheville
Sd. What data sources did you use to detertnine whether your site would impact Endangered Species or Designated Critiwl
Habitet7
Previous permits obtained for Mis area, fhese issues were already atltlressed. We are staying wiMin our moratorium
dates.
8. Essentlal Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designatetl as essemial fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site vrould impact Essendal Fish Habitat?
7. Historic or Prehistoric CWtural Resoumxs (Corps Requlroment)
7a. Will this project occur in or near an area that Me state, federgl or Mbal
govemmeMs have designated as having histonc or culwral preservation � yes � No
status (e.g., National Histotic 7rust designation or properGes��,signihcant in
North Carolina hisMry and archaeology)7 -
7b. What data sources tlid you use to detertnine whether your site would impact histonc or archeological resources?
8. Flood Zone Designa0on (Corps Requiremenq
Ba. Will this project occur in a FEMA-designatetl 100-yearfloodplain? � Yes ❑ No
Sb. If yes, ezplain how project meets FEMA requirements:
Sc. What source(s) tlitl you use to make the flootlplain determination?
Catherine Peele / �—,(� . , ���
l, �(/1// wt�+ January 17,
ApplicantlPyenYs Printed Name ApplicanVqqenYs Signature 2017
(AgenCsstgneWreisval7donly'rfanauthoriza6onkt[erfromihaapP�icem Date
u roviEetl.
Page 12 of 12
PCN Form — November 2008 Version
DEPTHS IN FEET
MLLW
_ < Q00
� 0.00 - 099
I .00 - 1.99
2.00 - 2.99
_ 3.00 - 3.99
_ 4.00 - 4.99
_ 5.00 - 5.99
6.00 - 699
zoo - z99
s.00 - x.9y
9.00 - 9.99
10.00 - 10.99
I 1.00 - 11.99
12.00 - 12.99
13.00 - 1399
14.00 - 14.99
�= 1 �.00
NAVIGATION AIDS
� CAN
�
1 vuN
b
�GRE�N L1GHT�D
BUOY
RLD LIGHTED
BUOY
� NNCTiOtQ MARKER
� GREEN L[GHT
� RED LIGF-IT
� GREEN DAY BEACON
� RED DAY BEACON
• INFLATABLE BUOY
• WAYPOINT
� DANGER SIGN
ALL DEPTHS
ARE MLLW
+�,
�.,� ti
111 13 5
S01
9.6
I 1+593
7,� 7J
.
: .
10+00
1�.9 17.7 19.3
�oi
.9 1 .8 18.3
� ��� .._ •
_ /
�, _ �
. , --
� I :
3 / 10.0 / 11.2
10.� 12.7/ 11.0
OCRACOKE/SOUTNDOCK
DATUM : PROPOSED'I'YPICALSEC'fION
GRIDS = STATE PLANE NAD-83 MeaN �owtia �ow ��.�rEa
ZONE = NG3200 NORTH CAROLINA
DISTANCE IJNIT - US SURVEY FOOT � iz� oerrH
DF.PTH UNIT = US SURVF.Y FOOT
ELLIPSOID = WGSR4 i p
GFOIDMODEL=G2012aCONUS , i�i�,
V DATUM = NORTH CAROL[NA, PAMLIC SOUNU
VERSION01(1983-2001) MLLW rvorroscn�F
N 02
NO3 _. " ;a; ������"
p .� � - �a�a'��'.}s� 4 -..
-�A'� " '� -
8.9 13..� 12.4 9.
S�Z
9.1 13.7
�
)7 4 13.9
14.7 15.
z
a
�
�
w
N
O
� .. �. � A.� � _ �. ;�,.
_ • � � w�r � , _ ....� � �
�rr � � � ' . �
a � .
.� 4 »3� `�1r. y ' I . c.tti. � �,.�. ,
.'� � r'�s va. .
5 ,, b,, a v' �', ..�
~� � ,
�-�„< ; � � � r
���� 'i:-y.,.. v.��
4,'�
2 9. S S, 3 •- '`t �� �, ..
� �04 � ::�,,. � .: �
17,2 \ 18,5 15.3 16.1
� I1.0 16.0 18.7 16.5 9.4 10.6
��
So3 5.8 9.9 - � 7.�
� 0 5.6 6,6
� �
_ ?� �.�i4� .. - .
� . �� . ,�
� ":, ��" ���'' ° ��_�
� ��� .,.'�
��'�C;� S ..,.
'g't y '.. -'. �
� L
i "�`�. R �
Z' '
. ��'
� � Y � .
��
,� R:
��., ._Is. � .. �
�-��i,,'��, 4��
r��M�
�� Yxy
SO4 ���� �� � * � + . ,'
. 3F'� �,y�
I � � • .���� �'�C � lE',+M�
i
µ �
�, � y � ;4 �
h '�``y.ti - - :,�, . _ a , :, •'�
s. �' , � - Q- _
❑ - -�- - . . . . . .. . � � � � - � �
.M; -� �' � �� ., �
�,..��� { ' �
' R
. MTLEBOAR� "� '� W NAVIGATION AIDS 2017-01-03
'r�+:.�i^ r
•. « $r - . - ' ��� r � �I r �
� �'�� � � ?�"• � ` � k � � ° ��� Type & Number Latitude Longitude NC SPC 83/2011
Tmr�ua�r = � '�, .
� � `� �� -�.+K 'y�`��'� `. CAN "SF7" 35.191431874 N 75.780645466 W N 540193. E 29616589.
M,aTcn �.ire - � � �ai .`� t � +��t �;;,�., �� � �. �a"� '����,��..�+� }'� � .�
�' �'i
. � "' v
. .
MLLW 0.0'
_ • ya� ��t ��.�� ,� }�' •�.,� ?•+��� ,y s td =� a�• WAYPOINTS ALONG BASIN AND CHANNH.L BO f TOM 2U74-10-14
* s;� ' i�.o'�'� "� �� ``� � ��'ti �� r} � Waypoint Latitude Longitude NC SPC 83/2011 �
:� i
,�� -- � � � - a� . .�. J���v n�
�4 ^ � � `�s', NO1 35.1 9020 1 7 3 0 N 75.779760226 W N 539754.3103 E 2961938.0595
' � `' NO2 35.190917417 N 75J80972650 W N 540002.8962 E 2961567.5710
�;e : .�, �� NO3 35.190951784 N 75.780964839 W N 540015.4730 E 2961569.4979
- •� N04 35.191813758 N 75.780562974 W N 540332.9103 E 2961679.3262
January 3, 2017 Survey m Channel Design Tota! amowit of Fil1= 39,693 Cu6ic Yards � SO 1 35.18919�108 N 75.780218120 W N 539384.4408 E 2961813.1840 �
S02 35. ] 89770366 N 75.781661196 W N 539578.9858 E 2961375.4965 ��:
CROSS SECTIONNOT TO SCALE S03 35 190425592 N 75 781747727 W N 539816 4874 E 2961341 9278 °�
� i i+s9.3
l�� �_ '��� � -�.
. -.'-'S
<
�. `;-������� _ : �
_.," ' ,�, �.
200' ���' �� 200' 400 ��
, � � ,��
GRAPHIC SCALE
��' !� � ..� /'
SO4 35.191961077 N 75.781031877 W N 540381.9554 E 2961537.5708
DESIGN CENTERLINE ALIGNMENT 2014-]0-14 ��
Station Latitude Longitude NC SPC 83/2011 ����
10+00.00 35.1 9 1 8874 1 8 N 75.780797425 W N 540357.4328 E 29(1608.4485 ��
14+70.61 35.190679746 N 75.781360454 W N 539912.6867 E 2961454.5733 ��
` 15+93.83 35.190343165 N 75.781316006 W N 539790.6856 E 2961471.8170 �.�:'
r. - 17+75.61 35.189996874 N 75.780877542 W N 539668.9687 E 2961606.8334
�` 20+24.62 35189783178 N 75.780156579 W N 539598.2209 E 296182�}.6440 `-��
��
� NOTES: w.',
� HORIZONTAL DATUM NAD 1983 / NA20ll. �'
PROJECT SURVEYED WITH THE NCDOT LOCATION AND SURVEYS BOAT, �
;w " USING VRS AND GNSS WITH EDGETECH 6205 SONAR AND CODA F175 T2 IMU. '�
r,. �
��'' DATA SHOWN ON THIS MAP REPRESENTS THE RESULT OF THE SURVEYS y
��� MADE ON THE DATES INDICATED AND REPRESENT CONDITIONS EX[STING �7'�
! AT TFIAT TIME. n"� a
�,+!, � NAVIGATION AID WAS LOCATED ON JANUARY 3, 2017 (+/- 30 SFT). ��,
�:
,�� � ARLAS INSID� DGSIGN CHANNLL WITH NO SURV�Y DATA AR� TOO SHALLOW �
.�`�' FOR SURVEY BOAT ACCESS. � :'�
SOUTHDOCK at OCRACOKE Nortli Carolina Dept of Transpartation �aTEs oF sUavEY:
BASIN AND Location & Surveys Unit 1ANuaaY 3, zoi�
1020 Birch Ridge Drive
CHANNEL ENTRANCE Raleigh, NC 27610 suRVEYE� sY :
�919�-%O%-6HOO KRD, MQH, MGW
MAP DATE : Janua� 4, 2017 c.w. sxowN. eE, P�s
-Y STATE LOCATION & SURVEYS ENGWEER MAPPED QY :
K. E. HONFYCUTT PE, PL5 KKB
RN.GIONAI. LOCATION & SURVEYS ENGINEER
Map Produced By NCDOT, Location & Surveys tvtatuc a. wna�, rt s FILE NAME :
soNnRONeani'ioNs e�aN�elt SOUTHDOCK BASIN LS_SSG_I70103.PDF
��
� � -
: , ,�. }
. _;;� ;
r�
�
Kevin R. Barefoot, PLS ,"