HomeMy WebLinkAbout20161269 Ver 1_Beaufort 149 Attachment G and L signed_20161222Attachment L: Low Impact Bridge Replacement Process
Low Impact Bridge Project No.: 17BP.2.R.70 County Beaufort
Bridge No. 149 over Acre Swamp WBS Element Number 176P.2.R.70
This project is subject to the Low Impact Bridge Process as agreed to on October 6,
2009. This project meets the documentation requirements and approval procedures
under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project
meets the standards of NCDOT's Minimum Criteria Rules.
Date:
Applicant Name:
Applicant Address:
December 21. 2016
North Carolina Department of Transportation
P.O. Box 1584
Greenville NC 27835
Primary Contact for Project: Maria Rocaerson
Phone No.:
252-439-2800
Is this an after-the-fact application: Yes X No
River Basin:
Stream Classification:
Tar-Pamlico
C; Sw.NSW
Regulatory Authorization Options for this Activity
Federal: USACE Nationwide General Permit 3— Maintenance
State: General Water Quality Certification #3687 and/or Buffer Authorization
Local: None
P1'Oj@Ct D@SC�Ipt10I1 — State project 17BP.2.R.70 involves the replacement of Beaufort County Bridge #060149
on SR 1508 (Long Ridge Rd.) over Acre Swamp. The existing bridge consists of 1@ 17' - 3", 1@ 17'-0", and 1@
18' - 0" Reinforced concrete deck spans on timber joists and is to be replaced with a 1@ 30' - 0", 1@ 40' - 0" and 1
@ 30' - 0", 21" cored slab bridge (100' total length, 33' total width) north (upstream) of the existing bridge. In
accordance with Tar-Pamlico River Buffer Regulations, the proposed bridge does not contain deck drains, all
stormwater from the bridge and approaches will be collected by a concrete flume and discharged inio a class 'B' Rip-
Rap pad within the proposed special lateral 'V' ditch al -L- 22+64 RT . Proposed ditch in the northwest quadrant is
replaced with 3:1 front and back slopes which transition to a variable width base ditch to replicate existing drainage
patterns. The proposed ditch in the northeast quadrant is replaced with 3:1 front and back slopes and ties to existing
ditches that dissipate prior to tying to Acre Swamp. Proposed ditch in the southeast quadrant is replaced with 3:1
front and back slopes and is tied to the existing ditch prior to joining Acre Swamp.
Signature: ! ��- llrL��
Print Name: Maria Roaerson
Title: Proiect Enaineer
Low/Minimal Impact Bridge I
TIP NO
WBS Element No.
Stream
Existing Structure
Proposed Structure
Stream
Wetlands
Stormwater
T8E
Moretorium
Trout Waters
Location
Comments
Basin
Classification
SIN
Type
Size
USACE (LF)
NCDWQ Impacts (LF)
USACE Impacts (AC)
Non 404 Impacts (AC)
Species Present
Native/Hatchery
TroutSpecies Present
Trout Conditions (Y/N)
Tribal Lands
41fl Resources
LAT
Completed by: �J,� �°�(/,�.
Division
Data Sheet
C; Sw, NSW
29-3435-1-1
perennialfinland
10'x3'
Bridge
52'
0
0
ne 1/ 3841 SF Zone 2
Yes
No
No Habitat
N/A
N/A
N/A
No
No
No
N/A