HomeMy WebLinkAbout20151179 Ver 1_Inspection_20161219Wetland Inspection Report
Project Num: 20151179 Version: 1
Project Name: NCDOT - Replace Bridge 208 0
County: Guilford
Location: NCDOT - Replace Bridge 208 on SR 3051 (B-4961)
Latitude: +36° 03'
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 12/19/2016
Reason for Inspection Routine
Inspection Type: Records/File Review (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Title:
Facility Compliance Status: � Compliant ❑ Not Compliant
Program Areas: NPDES SW - Roadway (DOT)
Question Areas:
� SW Measures � Operation and Maintenance
Inspection Summary:
Status: Issued
Project Type: Replace bridge with bridge
Region: Winston-Salem
Longitude: -79° 38' 41"
Phone:
Phone: 336-776-9703
This was a follow-up to a reported sediment loss. The stream was cleaned of roughly two-five gallon buckets of sand that
was eroded from under the bridge.
page: 1
Site Number: 20151179 Owner: Thorpe, Gregory
Inspection Date: 12/19/2016 Inspection Type: Records/File Review (DOT)
SW Measures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: Measures are in place as per the plans.
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Are the inspection and maintenance records complete and available for review?
Comment: Measures are maintained and functional.
Reason for Visit: Routine
Yes No NA NE
� ❑ ❑ ❑
❑ ❑ � ❑
❑ ❑ � ❑
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
page: 2