Loading...
HomeMy WebLinkAbout20161083 Ver 1_Bridge 254 PCN revised_20161207oF wArF9 � i Q�, q� Office Use Only: i,�, i � Y Corps action ID no. 1 fl Y DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. A licant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Replace Bridge No. 254 on SR 3121 over UT to South Prong Stinking Quarter Creek 2b. County: Guilford 2c. Nearest municipality / town: Kimesville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state 17BP.7.R.87 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if Division Engineer NC DOT Division 7, Mr. Mike Mills, PE applicable): 3d. Street address: PO Box 14996 3e. City, state, zip: Greensboro, NC 27415 3f. Telephone no.: (336) 334-3297 3g. Fax no.: (336) 334-3637 3h. Email address: mmills@ncdot.gov Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent � Other, specify: NC DOT Highway Division 7 4b. Name: Division Engineer NC DOT Division 7, Mr. Mike Mills, PE 4c. Business name NC DOT (if applicable): 4d. Street address: PO Box 14996 4e. City, state, zip: Greensboro, NC 27415 4f. Telephone no.: (336) 334-3297 4g. Fax no.: (336) 334-3637 4h. Email address: mmills@ncdot.gov "`note: please also copy Mr. Jerry Parker, Highway Division 7 Environmental Supervisor on all correspondence — jparker@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Mr. Jerry Parker 5b. Business name NC DOT Highway Division 7, Division Environmental Supervisor (if applicable): 5c. Street address: PO Box 14996 5d. City, state, zip: Greensboro, NC 27415 5e. Telephone no.: (336) 256-2063 5f. Fax no.: (336) 334-4149 5g. Email address: jparker@ncdot.gov Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude 35.953471 Longitude: -79.554954 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to South Prong Stinking Quarter Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS-V; NSW; 16-19-8-2-(2) 2c. River basin: Cape Fear (HUC 03030002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project study area is comprised of mostly maintained roadway with hardwood forest along the stream banks and nearby agricultural fields and residences. There are not additional jurisdictional features associated with Bridge 254 other than UT to South Prong Stinking Quarter Creek. 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: — 110 LF of stream within the project boundaries 3d. Explain the purpose of the proposed project: To replace a structurally deficient and functionally obsolete timber bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: Traffic will be detoured off-site. Erosion and sedimentation control measures will be installed. Water will be diverted around the construction area. The old bridge will be removed. The proposed structure will be replaced on its existing alignment. The new culvert structure will be a 2@ 10' by 7' reinforced concrete box culvert with 1' and 2' sills with bevels. The channel will be excavated and realigned for low flow shaping. Water will be gravity flow 24" piped around the work area during construction by installed impervious dikes upstream and downstream of the existing bridge. Special stilling basins will be utilized on an as needed basis to pump effluent trapped between the impervious dikes if a storm even overtops the dikes. Equipment to be used includes a track hoe, dump truck, paving equipment, pumps, various hand tools, possibly a crane to move construction material such as reinforced bars of steel, and concrete buckets to place conrete. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained fo�r this property / � Yes � No ❑ Unknown project (including all prior phases) in the past. Comments: N/A 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): N/A Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. N/A Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams - tributaries � Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T W1 ❑ P❑ T ❑ Yes ❑ Corps p ❑ No ❑ DWQ 2g. Total wetland impacts 0 2h. Comments: N/A 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) South Prong S1 � p� T Double 10'X7' Stinking Quarter � PER � Corps 4-8 P: 56 RCBC Creek Tributary ❑ INT � DWQ #2 South Prong S2 � P❑ T Bank Stabilization Stinking Quarter � PER � Corps 4-8 P: 51 Creek Tributary ❑ INT � DWQ #2 South Prong S3 � P❑ T Impervious Dikes Stinking Quarter � PER � Corps 4-8 T: 3 Creek Tributary ❑ INT � DWQ #2 3h. Total Permanent Stream and Tributary Impacts 110' 3i. Comments: Of the 110 LF of stream impacts, only 56 LF are associated with permanent impacts to the stream for the purpose of stream alignment with respect to the culvert installation. There are also 51 LF of stream impacts that are associated with bank stabilization, however, they are restricted to the banks and will not encroach within the thalweg of the channel. The 3 LF of temporary impacts are associated with the impervious dikes that will be used upstream and downstream of the proposed crossing. The dewatering of the stream will run concurrently with the construction activities (i.e. the temporary impacts associated with dewatering are within the permanent stream impact footprint location). Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 4f. Total open water impacts 4g. Comments: No open water impacts 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: There are no ponds created for this project 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico � Other: Jordan Lake Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for Stream name mitigation (square feet) (square feet) or Temporary impact required? T Roadway UT to South Prong Stinking ❑ Yes 61 � P❑ T Crossing Quarter Creek � No 2,587 970 6i. Comments: The impacts associated with the roadway crossing and culvert installation fall under the "potentially allowable" category per the Jordan Water Supply Buffer Rules Table of Uses {15A NCAC 02B .0267 (9)} D. Impact Justification and Mitigation Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed project is to remove and replace a structurally deficient bridge and replace it with a bottomless culvert. Roadway approach work is minimized as much as is practical to reduce the overall project footprint. Impacts to the associated protected riparian buffers have also been reduced by promoting sheet flow as well as providing grass shoulders to promote infiltration. An off-site detour will be employed to avoid the need for a temporary parallel structure. See attached bridge to culvert justification memo from the Division Bridge Program Manager. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion and sedimentation BMPs will be installed prior to construction. Water will be diverted around the work area to prevent sedimentation of downstream aquatic resources. Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters, restrictions against the staging of equipment in or adjacent to waters of the US and coordination (including a pre-construction meeting) with the Division Environmental Supervisor. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): � DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. � Yes 4b. Stream mitigation requested: 56 LF @ 2:1 ratio 4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Please note that the DMS acceptance letter references 110 LF of stream credits, however, NCDOT is requesting 56 LF at a 2:1 ratio. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes � No While there are impacts to the protected Jordan Riparian area, these impacts are "allowable" per the Table of Uses {15A NCAC 02B.0267(9)} 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: The proposed structure will be a 10' by 7' RCBC. There is a slight ❑ Yes � No increase in impervious surface but treatment is not required. 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Plan is attached. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ SurFace Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Per the NC DWQ April 10, 2004 Version 2.1 Cumulative Impacts policy, small scale public transportation projects — such as widening projects, bridge replacements and intersection improvements — have a"low potential for cumulative impact since little (if any) new impervious surface is added and the projects are usually in already developed locales." This proposed project is within a somewhat developed landscape (i.e. existing residential homes in the vicinity), this is not a road on a new location (i.e. there is an existing road and bridge structure and thus, the area already contains impervious surfaces) and the project drains to UT to South Prong Stinking Quarter Creek which is Class WS-V; Nutrient Sensitive Waters (NSW) (i.e. not ORW, HQW, or 303(d) listed waters). We anticipate the NC DWR will advise us if a qualitative or quantitative analysis is needed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. It is not anticipated that this project will generate any wastewater as it is a roadway project. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No impacts? � Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage Database and onsite investigation. See attached memos from NES, Biological Surveys Unit 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? This bridge replacement project takes place in Guilford County which is not near any coastal or tidal habitat that would support EFH (i.e. salt marshes, oyster reefs, etc.). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? This project was submitted to the North Carolina Department of Transportation's Human Environment Unit for review in 2013. It was determined that no survey was required for historical architecture or archaeological resources and that no cultural resources will be affected by this project. See attached concurrence letters. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? North Carolina Floodplain Mapping Program Mr. Mike Mills, PE Applicant/Agent's Printed Name ApplicanUAgent's Signature Date (AgenYs signature is valid only if an authorization letter from the a licant is rovided. Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version