HomeMy WebLinkAbout20161083 Ver 1_Bridge 254 PCN revised_20161207oF wArF9
� i Q�, q� Office Use Only:
i,�, i � Y Corps action ID no.
1
fl Y DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. A licant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replace Bridge No. 254 on SR 3121 over UT to South Prong Stinking Quarter Creek
2b. County: Guilford
2c. Nearest municipality / town: Kimesville
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 17BP.7.R.87
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if Division Engineer NC DOT Division 7, Mr. Mike Mills, PE
applicable):
3d. Street address: PO Box 14996
3e. City, state, zip: Greensboro, NC 27415
3f. Telephone no.: (336) 334-3297
3g. Fax no.: (336) 334-3637
3h. Email address: mmills@ncdot.gov
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent � Other, specify: NC DOT Highway Division 7
4b. Name: Division Engineer NC DOT Division 7, Mr. Mike Mills, PE
4c. Business name NC DOT
(if applicable):
4d. Street address: PO Box 14996
4e. City, state, zip: Greensboro, NC 27415
4f. Telephone no.: (336) 334-3297
4g. Fax no.: (336) 334-3637
4h. Email address: mmills@ncdot.gov "`note: please also copy Mr. Jerry Parker, Highway Division 7 Environmental
Supervisor on all correspondence — jparker@ncdot.gov
5. Agent/Consultant Information (if applicable)
5a. Name: Mr. Jerry Parker
5b. Business name NC DOT Highway Division 7, Division Environmental Supervisor
(if applicable):
5c. Street address: PO Box 14996
5d. City, state, zip: Greensboro, NC 27415
5e. Telephone no.: (336) 256-2063
5f. Fax no.: (336) 334-4149
5g. Email address: jparker@ncdot.gov
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude 35.953471 Longitude: -79.554954
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: N/A acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to UT to South Prong Stinking Quarter Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: WS-V; NSW; 16-19-8-2-(2)
2c. River basin: Cape Fear (HUC 03030002)
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project study area is comprised of mostly maintained roadway with hardwood forest along the stream banks and
nearby agricultural fields and residences. There are not additional jurisdictional features associated with Bridge 254 other
than UT to South Prong Stinking Quarter Creek.
3b. List the total estimated acreage of all existing wetlands on the property:
N/A
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
— 110 LF of stream within the project boundaries
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functionally obsolete timber bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
Traffic will be detoured off-site. Erosion and sedimentation control measures will be installed. Water will be diverted around the
construction area. The old bridge will be removed. The proposed structure will be replaced on its existing alignment. The new
culvert structure will be a 2@ 10' by 7' reinforced concrete box culvert with 1' and 2' sills with bevels. The channel will be
excavated and realigned for low flow shaping. Water will be gravity flow 24" piped around the work area during construction by
installed impervious dikes upstream and downstream of the existing bridge. Special stilling basins will be utilized on an as
needed basis to pump effluent trapped between the impervious dikes if a storm even overtops the dikes. Equipment to be used
includes a track hoe, dump truck, paving equipment, pumps, various hand tools, possibly a crane to move construction material
such as reinforced bars of steel, and concrete buckets to place conrete.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained fo�r this property / � Yes � No ❑ Unknown
project (including all prior phases) in the past.
Comments: N/A
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A
Name (if known): N/A Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
N/A
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
N/A
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
N/A
Page 4 of 11
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries � Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P❑ T ❑ Yes ❑ Corps p
❑ No ❑ DWQ
2g. Total wetland impacts 0
2h. Comments: N/A
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
South Prong
S1 � p� T Double 10'X7' Stinking Quarter � PER � Corps 4-8 P: 56
RCBC Creek Tributary ❑ INT � DWQ
#2
South Prong
S2 � P❑ T Bank Stabilization Stinking Quarter � PER � Corps 4-8 P: 51
Creek Tributary ❑ INT � DWQ
#2
South Prong
S3 � P❑ T Impervious Dikes Stinking Quarter � PER � Corps 4-8 T: 3
Creek Tributary ❑ INT � DWQ
#2
3h. Total Permanent Stream and Tributary Impacts 110'
3i. Comments: Of the 110 LF of stream impacts, only 56 LF are associated with permanent impacts to the stream for the
purpose of stream alignment with respect to the culvert installation. There are also 51 LF of stream impacts that are
associated with bank stabilization, however, they are restricted to the banks and will not encroach within the thalweg of the
channel. The 3 LF of temporary impacts are associated with the impervious dikes that will be used upstream and
downstream of the proposed crossing. The dewatering of the stream will run concurrently with the construction activities (i.e.
the temporary impacts associated with dewatering are within the permanent stream impact footprint location).
Page 5 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P)
or Temporary
T
01 ❑P❑T
4f. Total open water impacts
4g. Comments: No open water impacts
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose of (acres)
number pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments: There are no ponds created for this project
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico � Other: Jordan Lake
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) for Stream name mitigation (square feet) (square feet)
or Temporary impact required?
T
Roadway UT to South Prong Stinking ❑ Yes
61 � P❑ T Crossing Quarter Creek � No 2,587 970
6i. Comments: The impacts associated with the roadway crossing and culvert installation fall under the "potentially allowable"
category per the Jordan Water Supply Buffer Rules Table of Uses {15A NCAC 02B .0267 (9)}
D. Impact Justification and Mitigation
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed project is to remove and replace a structurally deficient bridge and replace it with a bottomless culvert.
Roadway approach work is minimized as much as is practical to reduce the overall project footprint. Impacts to the
associated protected riparian buffers have also been reduced by promoting sheet flow as well as providing grass shoulders to
promote infiltration. An off-site detour will be employed to avoid the need for a temporary parallel structure. See attached
bridge to culvert justification memo from the Division Bridge Program Manager.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Erosion and sedimentation BMPs will be installed prior to construction. Water will be diverted around the work area to prevent
sedimentation of downstream aquatic resources. Impacts will be minimized by strict enforcement of Best Management
Practices for the protection of surface waters, restrictions against the staging of equipment in or adjacent to waters of the US
and coordination (including a pre-construction meeting) with the Division Environmental Supervisor.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): � DWQ � Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 56 LF @ 2:1 ratio
4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments: Please note that the DMS acceptance letter references 110 LF of stream credits, however, NCDOT is
requesting 56 LF at a 2:1 ratio.
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ❑ Yes � No
While there are impacts to the protected Jordan Riparian area, these impacts are
"allowable" per the Table of Uses {15A NCAC 02B.0267(9)}
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: The proposed structure will be a 10' by 7' RCBC. There is a slight ❑ Yes � No
increase in impervious surface but treatment is not required.
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A %
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Plan is attached.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project?
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ SurFace Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Per the NC DWQ April 10, 2004 Version 2.1 Cumulative Impacts policy, small scale public transportation projects — such
as widening projects, bridge replacements and intersection improvements — have a"low potential for cumulative impact
since little (if any) new impervious surface is added and the projects are usually in already developed locales." This
proposed project is within a somewhat developed landscape (i.e. existing residential homes in the vicinity), this is not a
road on a new location (i.e. there is an existing road and bridge structure and thus, the area already contains impervious
surfaces) and the project drains to UT to South Prong Stinking Quarter Creek which is Class WS-V; Nutrient Sensitive
Waters (NSW) (i.e. not ORW, HQW, or 303(d) listed waters). We anticipate the NC DWR will advise us if a qualitative or
quantitative analysis is needed.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
It is not anticipated that this project will generate any wastewater as it is a roadway project.
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes � No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
� Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
North Carolina Natural Heritage Database and onsite investigation. See attached memos from NES, Biological Surveys
Unit
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
This bridge replacement project takes place in Guilford County which is not near any coastal or tidal habitat that would
support EFH (i.e. salt marshes, oyster reefs, etc.).
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
This project was submitted to the North Carolina Department of Transportation's Human Environment Unit for review in
2013. It was determined that no survey was required for historical architecture or archaeological resources and that no
cultural resources will be affected by this project. See attached concurrence letters.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? North Carolina Floodplain Mapping Program
Mr. Mike Mills, PE
Applicant/Agent's Printed Name
ApplicanUAgent's Signature Date
(AgenYs signature is valid only if an authorization letter from the
a licant is rovided.
Page 11 of 11
PCN Form — Version 1.3 December 10, 2008 Version