From:Thomson, Nicole J
Sent:Wednesday, December 07, 2016 3:31 PM
To:Bailey, David E CIV USARMY CESAW (US)
Cc:Wanucha, Dave
Subject:RE: Bridge No. 254_rev
Attachments:17BP.7.R.87_400254_Permit Drawings Dec 2016.pdf; Bridge 254 NWP 14 Cover Letter revised.docx; Bridge 254 PCN revised.docx
Importance:High
Here you go David! As with Bridge 61, the longitudinal cross section/profile was taken at the centerline of the road. In the “profile along structure” drawing, the culvert elevation
is set such that the low flow barrel sill
matches existing stream bed elevation. Actual survey measurements were taken in the stream to generate the up- and downstream bed elevations and set the culvert profile accordingly.
As such, the permit drawing
has been modified to show the upstream elevation cross section as a red-dashed line.
The impact summary sheet was also updated to differentiate between the culvert and the bank stabilization. I've addressed those changes in the cover letter and the PCN accordingly (as
well as changing up the
mitigation section).
Let me know if you need anything else!
Thanks!
Nik
PS I'll be out of the office until Monday; Ross is going in for Lasik and I've got some things to take care of at home. I'll have my tablet and phone if you need to call/email.
-----Original Message-----
From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\]
Sent: Monday, November 21, 2016 2:03 PM
To: Thomson, Nicole J
Subject: RE: Bridge No. 254 on SR 3121 (Ferguson Rd) over UT to South Prong Stinking Quarter Creek, Guilford; WBS No. 17BP.7.R.87
Nikki,
Hi Nikki. I have a few questions about the above referenced project, the same as those for Bridge 61:
1) This bridge to culvert appears to be similar to the others we've recently permitted, except that the permanent impact amount (110 l.f.) seems to include both the fill required due
to the culvert as well as the fill
required for bank stabilization. Typically you would itemize the impacts due to rip rap separately from the culvert fill, and wouldn't propose compensatory mitigation for the rip rap
component since it only occurs on
the banks. Is this project different than the others? i.e. are they having to realign the channel outside of the footprint of the culvert or place rip rap in the thalweg? If so, then
we may require compensatory mitigation
for the area outside of the culvert fill. Otherwise, can you itemize the rip rap impacts separately from the culvert fill, and resend the portions of the PCN (Sections C.3 and D.2)/cover
letter/Wetland Permit Impact
Summary Sheet that change as a result?
2) The documents state that the culvert structure will have 1' and 2' sills with a beveled inlet. However, the cross section and plan sheets don't appear to show the sills or beveled
inlet. Am I missing something?
1
Thanks, and I hope you're having a good holiday week!
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey
located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Thomson, Nicole J \[mailto:njthomson2@ncdot.gov\]
Sent: Thursday, November 03, 2016 2:41 PM
To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Gary_Jordan@FWS.gov; Wilson, Travis W. <travis.wilson@ncwildlife.org>
Cc: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Parker, Jerry A <jparker@ncdot.gov>; Powers, Tim <tpowers@ncdot.gov>; Nancy Scott (nancy.scott@threeoaksengineering.com)
<nancy.scott@threeoaksengineering.com>; michael.wood@threeoaksengineering.com
Subject: \[EXTERNAL\] Bridge No. 254 on SR 3121 (Ferguson Rd) over UT to South Prong Stinking Quarter Creek, Guilford; WBS No. 17BP.7.R.87
Good afternoon!
Please see the attached Cover letter, PCN and USGS/SS vicinity maps for the above named bridge replacement. Please note this is a bridge to culvert project.
Due to file size, the rest of the supplemental attachments will follow in a few emails.
Dave B - your hard copy is in the mail.
2
Please don't hesitate to call me with any questions or concerns.
Thanks!
Nik
Nicole J. Thomson
Division Environmental Supervisor Assistant
Division Environmental Office
919-754-7806 Mobile
Njthomson2@ncdot.gov
PO Box 14996
Greensboro, NC 27415-4996
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
3
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
4