HomeMy WebLinkAbout20080540 Ver 1_EEP Acceptance Letters_20080421a? f 4VI-
Eco stem
PROGRAM
April 16, 2008
oti.
fit 1 20 . U
Tom, s ?8
Mr. Steven D. DeWitt, P.E., Chief Engineer
North Carolina Turnpike Authority
1578 Mail Service Center
Raleigh, NC 27699-1578 Expiration of Acceptance: October 16, 2008
Project: TIP U-476313, Triangle Parkway Counties: Durham/Wake
The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to
accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that
the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the
applicant to contact these agencies to determine if payment to the NCEEP will be approved.
This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of
the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's
responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be
issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work.
The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies
listed at www.nceep.net.
Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the
followine table.
Cape Fear
03030002 Stream (feet) Wetlands (acres) Buffer
(Sq. Ft.)
Cold Cool Warm Riparian Non-Riparian Coastal Marsh Zone 1 Zone 2
Impacts 0 0 3,718 1.353 0.38 0 0 0
Credits 0 0 7,436 2.71 0.45 0---7 -0 0
Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies
require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional
mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The
mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of
Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998.
If you have any questions or need additional information, please contact Beth Harmon at (919) 715-1929.
Sin ely,
to,-
Williaa . Gilmore, PE
Directo
cc: Brian Wrenn, NCDWQ Wetlands/401 Unit
Eric Alsmeyer, USACE-Raleigh
Cindy Carr, Mulkey Engineers & Consultants
File
KutDYGKg... E ... PYDt'P,",Our Stag
AMR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net