HomeMy WebLinkAbout20161129 Ver 1_05_SMP B-5763_20161116k 11�;11��'<14' North Carolina Department of Transportation ��
SL[�rtl]�YdtPf Highway Stormwater Program
���`
STORMWATER MANAGEMENT PLAN ��--•
(Version 2.05; Released April 2016) FOR NCDOT PROJECTS
WBS Element: B-5763 TIP No.: 750129 County(ies): Randolph Page 1 of 2
General Project Information
WBS Element: B-5763 TIP Number: 750129 Project Type: Bridge Replacement Date: 9/22/2016
NCDOT Contact: Galen Cail Contractor I Designer: Liz DiNatale, PE
Address: 1590 Mail Service Center Address: SEPI En ineerin & Construction
Raleigh, NC 27699-1590 1025 Wade Avenue
Ralei h NC 27605
Phone:919-707-6711 Phone:919-747-5839
Email: cail ncdot. ov Email: LDiNatale se ien ineerin .com
Cit ITown: Near Libert , NC Count ies): Randol h
River Basin s: Ca e Fear CAMA County? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.06 Surroundin Land Use: Rural
Proposed Pro'ect Existin Site
Pro'ect Buiit-Upon Area ac. 02 ac. 0.1 ac.
Typical Cross Section Description: 2@ 10' Travel Lane with 4' Paved Shoulders - Normal Crown 2@ 9' Travel Lane with no shoulders - Normal Crown
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 1080 Year: 2025 Existin : 540 Year: 2011
General Project Narrative: Replace Bridge #129 in Randolph County with 3-Barrel Cast-In-Place Reinforced Concrete Box Culvert (RCBC). Minimal roadway improvements required at existing/proposed
(Description of Minimization of Water crossing as described in the typical cross section descriptions above. Stream impacts due to culvert and channel improvements are approximately 96 Linear Feet.
Quality Impacts)
Waterbody Information
Surface Water Body (1): Sandy Creek Trib 3 NCDWR Stream Index No.: N/A
NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply III (WS-III)
Supplemental Classification: None
Other Stream Classification:
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)