HomeMy WebLinkAbout20080781 Ver 1_Staff Comments_2008061608-0781 Gaston Mall Redevelopment
AML comments
June 16, 2008
Per the requirements of GC 3705, this project must comply with Stormwater
Management Plan (SMP) Requirements for Applicants Other Than the North
Carolina Department of Transportation, available at:
http://h2o.enr.state.nc.us/ncwetIands/documents/SMPRequireinentsforApplicants
othcrthanNCDOT.pdf. Because this project is large and has a high potential to
impact water quality, the DWQ has decided to review and approve the stormwater
management plan at the state level.
Please provide an SMP that removes a minimum of 85 percent TSS from the
stormwater generated by this project. For each proposed BMP, please provide a
completed BMP Supplement Form, with all the required items. The BMP
Supplement Forms are available at the following web site:
http://h2o.crnr.state.nc.us/su/bnip_forms.htm.