Loading...
HomeMy WebLinkAbout20080781 Ver 1_Staff Comments_2008061608-0781 Gaston Mall Redevelopment AML comments June 16, 2008 Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http://h2o.enr.state.nc.us/ncwetIands/documents/SMPRequireinentsforApplicants othcrthanNCDOT.pdf. Because this project is large and has a high potential to impact water quality, the DWQ has decided to review and approve the stormwater management plan at the state level. Please provide an SMP that removes a minimum of 85 percent TSS from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.crnr.state.nc.us/su/bnip_forms.htm.