Loading...
HomeMy WebLinkAbout20160873 Ver 1_CAMA Application_20160908Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Chad Coburn 401 Wetlands DWR-WiRO 6;; � Vlb C0 X /' /- -- 5 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary RECEIVED/NCDENR/DtWA X TON DAVIS Director SEP 0 8 2616 Water Quality Regional Operations Section Wilmington Regional Office FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aD-ncdenr.gov Fax: 395-3964 (Courier 0416-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY:y This agency flas no objection to the project aroposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached omments. SIGNED C, �4t-,t U -C, DATED 0�z2 l(— State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 Recommendations for Britton September 7, 2016 The total square footage of platform and docks was calculated as follows: Shoreline length = 100 ft. x 8 = 800 sq. ft. allowable. Fixed Platform = 14 ft. x 14 ft. = 196 sq. ft. Walkway/Catwalk = 3 ft. x 12 ft. = 36 sq. ft. Floating Dock = 60 ft. x 6 ft. = 360 sq. ft. (not calculated in overall square footage due to alignment) Jet Docks = 10 ft. x 13 ft. = 130 sq. ft. Boatlift = 13 ft. by 13 ft. = 169 sq. ft. (incorporated but no calculated in overall square footage) Total = 722 sq. ft. (362 sq. ft. calculated toward allowable square footage) It appears that the project is CONSISTENT with the use standards set forth in NCAC 07H .0208(b)(6), including the 1/a width rule and the eight square foot rule. The proposed structures would be located entirely over open water. The proposed docking facility would allow for a maximum of three (3) formalized slips. N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date` Name of Property Owner Applying for Permit: Mailing Address: I certify that I have authorized (agent) 6to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (my property located at) This certification is valid thru (date) 14,1? /Z/�7 Property Owner Signature Date RECE f = tf tai; l , , Environmental Quality September 7, 2016 Trip Pippin P.O. Box 11291 Wilmington, NC 28404 Dear Mr. Pippin: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Donald and Barbara Britton, for State approval for development of the property located at on 133 Gazebo Court within the Inlet Point Subdivision and adjacent to Inlet Point Canal in Wilmington, New Hanover County. It was received complete on August 31, 2016, and appears to be adequate for processing at this time. The projected deadline for making a decision is November 14, 2016. An additional 75 - day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from August 31, 2016, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A -119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made; and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Sean Fa yell ' Field Representative Enclosures cc: Doug Huggett, DCM Heather Coats, DCM Debra Wilson, DCM Tyler Crumbley, ACOE Ben Andrea, New Hanover County Donald and Barbara Britton, applicant State d North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910.796-7215 M, v a WE ... ........ PROJEC& ins Ta a -7T -------- ne oa I an IF.: lW77" Trn wAQwA' F2 IFT ra-ral fdfi IF2 a AP -ral 1. 4 L =lp M 11- W, Sound, in WUmington, New Hanover County COMMENTS ACCEPTED THROUGHS APPLICANT: Agent: Trip Pippin (910) 471-2034 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW - MC Div. of coastaB Management 127 Cairdinal Dr. Extension WiNmington, NC 28405 'Taira MacPherson, Neld Spec�aflst ....................... 910-796-7425 � - JR1 � _ t - - } f � �4v .. ft DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Donald & Barbara Britton c/o Trip Pippin 2. LOCATION OF PROJECT SITE: Site is located at 133 Gazebo Court adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County. Photo Index — 2006: 21-7379 J-5 2000: 21-259 J-5 1995: 21-241 J-7 State Plane Coordinates - X: 2335237 Y: 118496 Lat: 34107'12.86" N Long: 7718922.85" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — August 22, 2016 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — August 16, 2016, Complete August 31, 2016 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan— New Hanover County Land Classification From LUP — Resource Protection (B) AEC(s) Involved: PT, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing- Municipal sewer Planned- N/A (F) Type of Structures: Existing- SFR with fixed platform, floating dock, and jet docks Planned- Install boat lift and replace existing fixed platform, floating dock, and jet docks. (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (§404) (B) Non -Vegetated Wetlands (Open 686 sq. ft. Water) (replacement) 205 sq. ft. (new work) (C) Other - Highground disturbance (D) Total Area Disturbed: 891 square feet (.02 acres) (E) Primary Nursery Area: No (F) Water Classification: SA Open: Closed 8. PROJECT SUMMARY: The applicant proposes to install a new boat lift and replace the existing fixed platform, floating dock, and jet docks for an existing private docking facility. Britton Page 2 9. PROJECT DESCRIPTION 09/07/2016 The project site (property) is located at 133 Gazebo Court (off NC Hwy 421), off Inlet Point Canal which is adjacent to the AIWW/Myrtle Grove Sound, in Wilmington, New Hanover County. To locate the property from Market Street travel south on College Road (NC Hwy 132) and continue south for approximately 5 miles on Carolina Beach Rd. (NC Hwy 421). Make a U-turn, take the first right into the Inlet Point Subdivision onto Inlet Point Drive and keep right at the fork to continue on Inlet Point Drive for approximately 0.1 miles. Take a left on Gazebo Court and continue for approximately 0.2 miles. The project site will be located on the left side of the road. There is a gate at the entrance to the subdivision and the gate code is #4633. Existing structures on the project site include a single family residence and private docking facility. The project site is approximately 0.35 acres and is vegetated primarily with domestic grasses and ornamental landscaping. The project site has approximately 245' of shoreline frontage along Inlet Point Canal that has been stabilized by a fiberglass composite bulkhead. Approximately 140' of the property's shoreline frontage is deeded as a community docking easement for the Inlet Point HOA. No wetland vegetation is present water -ward of the existing bulkhead and normal high water (NHW) meets the bulkhead. The existing docking facility consists of an existing octagonal fixed platform measuring approximately 14' x 14' that extends from the northwest corner of the bulkhead. An access ramp leads from the platform onto a floating dock, which measures approximately 60' in length by 6' in width running parallel to the shoreline. Two (2) existing jet docks that together measure approximately 10' x 13' are located at the southeast end of the existing floating dock. The New Hanover County Land Use Plan classifies the adjacent waters as Conservation and the adjacent high ground portion as Developed. The waters of Inlet Point Canal and Myrtle Grove Sound are classified as SA, by the NC Division of Water Resources. These waters are designated as PNA by the NC Division of Marine Fisheries and are closed to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to install a new boat lift and replace the existing fixed platform, floating dock, and jet docks for an existing private docking facility. The applicant states that a boatlift measuring approximately 13' in length by 13' in width would be installed west of the existing octagonal fixed platform. The applicant is proposing to replace the octagonal fixed platform which measures approximately 14' in width by 14' in length. The proposal includes a new walkway measuring approximately 3' in width by 12' in length that would allow for access between the proposed boatlift and fixed platform. The proposal also includes replacement of the existing 6' in width by 60' in length floating dock as well as the replacement of the existing jet docks measuring approximately 10' in width by 13' in length. All of the existing structures would be replace within their existing footprint. The proposed docking facility expansion would provide docking space for up to three (3) vessels within existing water depths of approximately -5' at mean low water (MLW). The community maintains an active CAMA Major Permit (#160-05) for maintenance excavation. 10. ANTICIPATED IMPACTS The proposed new boatlift and walkway would incorporate an additional 205 sq. ft. of Estuarine Waters and Public Trust Area. The replacement of the existing fixed platform, floating dock, and jet docks in the same footprint would continue to incorporate approximately 686 sq, ft. of Estuarine waters and Public Trust Area. The proposed structures appear to conform to the 1/4 width rule and the established pier lengths within the man-made channel. The proposed structures would encroach into the eastward adjacent 15' Riparian Corridor Setback Area requirement with the proposed jet docks. The applicant has received a waiver from the property owner for this encroachment. The Inlet Point Harbor Architectural Review Committee has approved the proposal and the location of the proposed boatlift in regards to the adjacent community docking easement. This proposal would allow for a maximum of three (3) formalized slips. Minor turbidity increases should be expected during construction. Submitted by: Sean Farrell Date: September 7, 2016 Office: Wilmington P. O. Box 11291 Office/Fax 910-270-1290 Wilmington, NC 28404 p Mobile: 910-471-2034 www.pippinmarine.com Mal. � iaaa trip@pippinmarine.com P July 11, 2016 NCDENR 127 N. Cardinal Drive Wilmington, NC 28405 The enclosed CAMA Major Permit application for Donald Britton, 133 Gazebo Ct., Wilmington, NC 28409 is to replace an existing 6 x 60 floating dock with a new 6 x 60 floating dock. The existing deck area is going to be replaced with a 14 x 14 octagon gazebo with a roof. There will also be a new boat lift. There will be 3 boat slips and a Jet Ski dock. This facility will be private and for family use only. Trip Pippin Pippin Marine Construction, LLC ;iV FloatingPiers - Pilings - Boat Lifts, Bulkheads - Docks - Residential & Commercial Marine Construction Since 1984 (fast wafted 12127AN) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Appllcanf/ Landoe€mer 1nf6tmad6n Business Name Business Name Mae /P? Project Name (if applicable) Applicant 1: First Name MI MI Last Name 0�Y'07 Applicant 2: First Name a- Mi ) Last Name A. xg if additional applicants, please attach an additional page(s) wish names listed Mailing Address 133 z' s cityState ,�t� Stae �-i 1//�� PO Box City tri/�/�sf�l� , State dy;eo ZIP a 114 q Country Phone No. 344 4 ext. FAX No. - - Street Address Cif cMrent from above) City State ZIP Email 2. AgerWContraator lriiformation Business Name Mae /P? Agent/ Contractor 1: First Name MI Last Name = 9 // Agent) Contractor 2 First Name Mt Last Name Mailing Address PO Box 112W�/r!' cityState ,�t� Stae �-i 1//�� ZIP Phone No.1 Phone No. 2 FAX No. Contractor# Street Address (if aGfferent from above) Pity State ZIP Emait P <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :; www.nccoasta€management. net Form DCM MP -1 (Page 2 of 4) APPUCATION for Major Development Permit 3 Project Location County (can be multiple) Street Address : a r,13 &ue_.4 -f State Rd. # e� tvo Y Approximate elevation of tract above NHW (normal high water) or NINL (normal walerieveV Subdivision Name f e f ; City rotlmf� d+h State w1dr. Zip 'fid Phone No. Lot No_(s) (n`many, attach add clonal page with !iso ext. , a- In which NC river basin is the project located? b_ Name of body of water nearest to proposed project e.ecc� / c. Is the water body identified in (b) above, natural or manmade? DNatural QUnknown d. Name the closest majorwater body to the proposed project site. A/[, Aem.*? nmade Prb k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. OYes Wo DNA e. is proposed work within city limits or plarming jurisdiction? t If applicable, list the planning jurisdiction or city limit the proposed DYes WNo work falls %within. 4.: Site Desalption a. Total length of shoreline on the tract (ft.) b. Sae of entire tract (sq.fL) t2fS' f- -. . 35" 44,0L4 -/- - c. Size of individual 101(s)d. Ae Approximate elevation of tract above NHW (normal high water) or NINL (normal walerieveV _?,f (ifmanytotsizes, please attach adcomonai page with a list) HW or DNWL e. Vegetation on trail lard i f Man-made features antl uses now on tract �es1�► Ice g. Identity and describe the existing rand uses adiaCeJA to the proposed project sine. i h. How does local government zone the tract I. is the .proposed project consistent with the applicable zoning? { 1 (Attach zoning compliance certificate, if applicable) 0No [INA es j. is the proposed activity part of an urban waterfront redevelopment proposal? Dyes e k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. OYes Wo DNA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a Dyes o DNA National Register listed or eligible property? <Form continues on next pagea 252_808_2848 ., 1-888-4RCOAST .. www.necoastatmanagement.net form DCM MP -1 (Page 3 of 4) ApPLICA11ON for Major Development Permit in. (i) Are there wetlands on the site? Oyes 00 (ii) Are there coastal wetlands on the site? Oyes 00 (ii) If yes to either f ) or (i) above, has a delineation been conducted? OYes ONo (Attach documentation, if available) n. Describe existing wastewaterlreatment faeiG6es. o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment systems. ykr &e -e )%u-44 15' r -f 5. Activi>>jjw and.]Mpaats a. Will the project be for commercial, public, or private use? OCommereiai OPubliclGovemment community ,XN" Ix Give a brief desmiption of purpose, use. and daW opmall ns of the PrDiect when DOMIPMa o" . i"ff c/ t 6 yi;M c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. %p. reoi doh 6evlye doelleed serf f � d. t_ist all development activviiitties you propose. All e. Are the proposed activtiies rJ78ir7tfnr?r1Ce of an exlsft project rlew woWbr I7oM? f. What is the approidmate total disturbed land area resulting from the proposed project? OSq.Ft or QAcres 914040 41. Ar, e - g. Will the proposed project encroach on any public easement, public accessway or other area OYes ANo DNA that the public has established use of? h_ Describe location and type of existing and proposed discharges to waters of the state. L Will wastewater or stomlwater be discharged into a wetland? [lyes No [INA If yes, will this discharged water be ofthe same salinity as the receiving water? OYes ONo ONA j. Is there any mitigation proposed? Dyes No DNA If yes, attach a mitigation proposal. <i+or m continues on back> 252-84$-2808 .., 1-888-4RCO4ST .. www.neconstaimanagement.net tau-4uauta6eueas;e�seoasu-N►Jutan e: LSVODMV-888-6 -' seSZ-808-ZSSZ uopwxwI �-dw inl�c pwidopisa W0ao %IOAlno pm saBPnB 9-dW mao uoqoumWl IRS Pule u0g8M.OX3 Z-dW VOa© •4*ajd posodwd mof.o} 6 qumqwp uoW Wopu1 sw$1d aweN stud fir' al�A 2Bp8i+Y►oLtij lout q etg o4 Inly s1 � �� SeB uI paplAold W. 1$ >� OTOA equo Buuquow dn-MIM Pule uogeu de 4uuad sly % PWOIOJ U04mump, 6ugenpa LRM uopauuoo u! �n21 POW4uautatale a4} uo_j i- % seauaBe ANkMW Ieiepa4 Pue OMS Jo sante a4. uapsuniad 4usA P% u1 OP Pule';ue�B a4 Para-MWO uae 1 Van � u1 UJolpl4M P io3d eql ue suogpuao a44o4�aigns aq {L�+�. a��o IRM& s a4 asuodsaj uI panel �Iuued Aug � puwp spun 1 uogeot(dde ay} u! peguusap 4uautdolaAap s1i fN Dve-rua,ta3ll� oIt t+�a uiradpw - 00 &-quwAmp�+o"pp a v asn �o spin 3a -PV iel�+eutumlAu3 ��} gt'on! � �► ! {�auN►o �edord dq pa�1s ag�+dlll 'sea�eMe Pue Iumlueauo � '0s Iu� �3tl tl - -Amosesaum'uogeata,(aP PuBM 7 'qQWP &*M pue `e,Wmmd gnu jtuu9d epnpuj �efi UO i}saN�m4 P �Ullad Ierapa; to psis su�Aesd 40 ll tl B 'QN suogd -- - , 95of s -HCl F1 ter 0 ell • Vriv-ON OwRd a - :.. uo -luawaBleveW -ON SWqd {u�3Ia umma a n a4 P 6dco a MAW- W M04 WO uls� OE ate{ dstg� Pal+►Ple s4 €�►u►sPu� � '��+ ° �4� Pue a saweu atg� }�!! tl 3 -sN3a a4 spew J-Iw ileum io>petiq -a%uop*kb appdaKWB at{•I- a 'p'ss�sF�s� q3-jR ja (*Ua sW fW) ISP 8900 Edw V P -am s44 4 awe mR 4 mASumiun rA= sled J moft apple c4 P � s1 � dein u�� -10 �b a .� pue paR{duroo Spam uaaM}aq isd�u uoa `1e�ri• � Lpeaslgua�wd hues{ -psa�d P� sI asea{d �p�s o{ ua�egs P i °"n pae..t e* MdPSP utl I a � suis atg _ -aAHRUOU poloid tl e meld.y�uoEepapJojeurafel9eo$dlls�t1?•?�e{�j=(a)swopJ +ttoos9oia6 aorpdale siJ4 _ Rs�l?�uoo sa4 VPS . s� rup aq.�nur.` irA` ► da1: Fl dlgl uo ip? . . 41w9d 4uauidoianga rote yy(i► jo V a6ed) VdW MO w'o-4 �o; NOLLVOrkW Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Applic adon for LAMA Major Permik Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to tris proposed project Please )ndude all supplements) infomlat)on_ 1. DOCKING FACIUTY/MARINA CHARACTERISTICS ❑This section not applicable . a. () Is the docking facility/marina: b. () Will the facility be open to the general public? ❑Commercial ❑Public/Govemmentxprivate/Community QYes YNo c. () Dock(s) and/or piers) (H) Number (iii) Length �d (N) Width (v) Floating Ves ❑No e. (i) Are € latforms included? Wes Oft If yes: (a) Number (iil) Length / (v) Width (v) Floating DYes JVNo Note_ Roofed areas are calculated from dripline dimensions g. (D Number of slips proposed !(iI!)) N—umber of slips existing rxa i. Check the proposed type of sting: ❑ Land cut and access channel ElOpen water; dredging for basin and/or channel []Open water, no dredging required 00ther; alease describe: r . Ic Typical boat length: 02✓ / m. () Will the facility have tie pilings? OYes jjto (l) If yes number of tie pilings? d. (Q Are Finger Piers included? []Yes )No If yes: (R Number fill) Length Qv) Width (v) Floating )]Yes []No f_ {i) Are Boatfftis included?�l'es ONo If yes: ! (u) Number i Length CM Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service © Dockage, fuel, and marine supplies ❑ Dockage (wet slips") only, number of slips: ❑ Drystorage; number of boats: ❑ Boat ramp(s); number of boat ramps: Q Other, please j: Describe the typical boats to be served .g., open runabout, charter boats, sail boats, mbced types). I. 0) Will the facftbe open to the genera) public? ❑Yes KNo 2::2-809-28.08 aG 1-888-411COAST ;; revised.- 12/27106 2. DOCKING FACIUTY/MARINA OPERATIONS AThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. ; Location: ❑ Showers Q Boathording tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake signs proposed. L Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What wig be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? M. Is the ma ina ocking facility proposed within a primary or secondary nursery area? pYes o 252-$,518-:$08 -. 1-g&8-4RCOAST. i".iii,ii.:.Sd':a:� iag33'3 ri Gi@9E'�!�$.?iw revised- 12/27 -tares, Pages 3 of 4) n. Is the ma ina/docking facility proposed within or adjacent to any shellfish harvesting area? ON No o. Is the marina/docking facility proposed within or adjacent to coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. QCW QSAV QSB OWLlone p. Is the proposed marina/docking facility located within or within dose proximity to any shellfish leases? OYes 0V0 If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE Cnduding covered I►fts) his section not applicable a. () Is the boathouse structure(s): QCommercial QPubiic/Govemment QPrivate/Community (ul) Number (iii) Length (iv) Width Note. Roofed areas are calculated from dripline dimensions. 4: GROIN (e:g., wood,- sheetplle, etc. If a rock groin, use MFLZ Excavation and R11): Is section not applicable . a. (i) Number (1i) Length (iii) Width 6. BR15AKWATER (e.g., wood, sheetpile, etc.) his sedion. not applicable a. Length b. Average distance from NNW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYSCis section not applicable a. Is the structure(s): b. Number J \ QCommerciai QPubfmlGovernment QPrivate/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Are of the swing 7. GENERAL 212-StIO-2308 N. 1.883-4'a4COAST :: rev;sed:12/27/06 a. Proximity} of structure(s) to adjacent riparian property lines .�4 tO , Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body e. (i) Will navigational aids be required as a result of the project? 0YesNo ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docldng facilities. d_ Water depth atwaterward end of structure NLW r NWL Si 8. OTHER ❑This section not applicable. a. Give complete description: _ Applicant'Signatur 252.898-28€8 :. -1-3801-MCOAST - %y-mvmccoastal r-evised: s2127,1iii}