Loading...
HomeMy WebLinkAbout20110756 Ver 1_Certification of Completion_20161101 Burdette, Jennifer a From: Robert Lantry <rdlelectricinc@gmail.com> Sent: Tuesday, November 01, 2016 2:03 PM To: Burdette, Jennifer a Subject: [Scan] 2016-11-01 13:59:45 Attachments: 2016-11-01 13-59-45.pdf Sent with Genius Scan for iOS. http://bit.ly/download-genius-scan Sent from my iPhone 1 L'TVA AAO kt. 221 ' A&EWR North ling Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary DWR Project No: County: Applicant: Project Name: DLU 401 Water Quality Certification Issued Date: Certificate of Completion upw completion of all work approved within the 401 Water Quality Certification or applicable Buller Rules,and any subsequent modifications,the applicant is required to return this certificate to the DWR 401 &Buffer Permitting Unit, 1650 Mail Service Center,Raleigh,NC,27699-1650. This form may be returned to DWR by the applicant,the applicant's authorized agent,or the project engineer. It is not necessary to send certificates from all of these. Appti 'a" C tion L hereby state that,to the best of my abilities,due care and diligence was used in the o ation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials. S' Date:_ �&�14 Agent's Certification 1, ,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials. Signature: Date: If this project was designed by a Certified Professional as a duly registered Professional (i.e., ,Landscape Architect,Surveyor,etc.)in the State of North Carolina,having been authorized to obmve(periodically,weekly,full time)the construction of the project,for the Permit"hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Nater Quality Calification and Buffer Rules,the approved plans and specifications,and other supporting materials. Si