Loading...
HomeMy WebLinkAboutWQ0003418_Monitoring - 09-2016_20161101 (2)NON -DISCHARGE APPLICATION REPORT SPRAY IRRIGATION SITE(S) THERE ARE TWO APPLICATION FIELDS PER PAGE. USE ADDITIONAL PAGES AS NEEDED. PERMIT NUMBER: WQ0003418 MONTH: September FACILITY NAME: Durham Mine COUNTY: Formulas: Daily Loading (inches) = [Volume Applied (gallons) x 0.1336 (cubic feet/gallon) x 12 (inches/foot)] /(Area Sprayed (acres) x 43,560 (square feet/acre)] OR = Volume Applied (gallons) / [Area Sprayed (acres) x 27,152 (gallons/acre4noh)] Maximum Hourly Loading (inches) =Daily Loading (inches) /[Time Irrigated (minutes) / 60 (minuteslhour)] Monthly Loading (inches) =Sum of Daily Loadings (inches) 12 Month Floating Total (inches) =Sum of this month's Monthly Loading (inches) and previous 11 month's Monthly Loadings (inches) Average Weekly Loading (inches) = [Monthly Loading (Inches/month) / Number of days in the month (days/monthll x 7 (days/week) Page of YEAR: 2016 Durham Did Irrigation Occur At This Facility: Yes: No: ❑ Did Irrigation Occur On This Field: Yes: 2 No: ❑ Did Irrigation Occur On This Field: Yes: 21 No: ❑ FIELD NUMBER: 1-A AREA SPRAYED (acres): 0.156 COVER CROP: Trees PERMITTED HOURLY RATE (inches): FIELD NUMBER: 1-13 AREA SPRAYED acres : 0.624 COVER CROP: Fescue PERMITTED HOURLY RATE (inches): D A T E WEATHER CONDITIONS Temper- Weather ature at Precipifa- code- application tion Storage Lagoon Free- board PERMITTED YEARLY RATE (inches): Maximum Volume Time Daily Hourly Applied Irrigated Loading Loading PERMITTED YEARLY RATE (inches): Maximum Volume Time Daily Hourly Applied Irriciated Loading Loading ('F) inches feet gallons minutes inches Inches gallons minutes inches inches 1 R 94 0.01 10' 2 R 75 1.13 10' 3 R 81 0.44 10' 4 PC 83 10' 5 PC 84 10' 6 PC 91 10' 7 PC 94 10' s PC 96 10' 9 PC 94 10' 4094 120 0.97 0.48 9821 120 0.58 0.29 10 PC 92 10' 11 PC 91 10' 12 PC 88 10' 13 PC 91 10' 14 PC 91 10' 4094 120 0.97 0.48 9821 120 0.58 0.29 15 PC 90 10' 16 PC 83 10' 17 PC 89 10' 18 R 90 0.06' 10' 19 R 79 1.3 10' 20 R 75 0.02 10' 21 R 75 0.49 10' 1 22 R 83 0.23 10' 23 PC 85 10' 24 PC 92 10' 25 CL 74 10' 26 R 76 0.02 10' 27 CL 80 10' 28 R 86 0.45 10' 29 R 79 0.32 10' 30 R 83 0.14 10' 31 Total Gallons/Monthly Loading (inches) 8188 1.93 19642 1.16 12 Month Floating Total (inches) 31.88 20.30 " Average Weekly Loading (inches)0.4507439 0.2703197: Weather Codes: C -clear, PC -partly cloudy, CI -cloudy, R -rain, Sn-snow, SI -sleet Spray Irrigation Operator in Responsible Charge (ORC): Brian Gardner ORC Certification Number: Mail ORIGINAL and TWO COPIES to: ATTN: Non -Discharge Compliance Unit DENR Division of Water Quality 1617 Mail Service Center RALEIGH, NC 27699-1617 993136 Check Box if ORC Has Changed: Phone: 919-387-9257 (SIGNATURE OF OPERATOR IN RESPONSIBLE CHARGE) BY THIS SIGNATURE, I CERTIFY THAT THIS REPORT IS ACCURATE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. DENR FORM NDAR-1 (5/2003) NON -DISCHARGE APPLICATION REPORT Page SPRAY IRRIGATION SITE(S) Facility Status: Please indicate (by inserting Y(es) or N(o) in the appropriate box) whether the facility has been compliant with the following permit requirements: (Note: if a requirement does not apply to your facilityput (NA) in the compliant box. ) 1. The application rate(s) did not exceed the limit(s) specified in the permit. Com liant N) 2. Adequate measures were taken to prevent wastewater runoff from the site(s). 3. A suitable vegetative cover was maintained on the site(s) in accordance with the permit. 4. All buffer zones as specified in the permit were maintained during each application. 5. The freeboard in the treatment and/or storage lagoon(s) was not less than the limit(s) specified in the permit. If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance with its permit. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ignat a of e i ee) Date Ricky Merritt (Permittee -Please print or type) 6523 NC HWY #55 Durham, NC 27713-9436 (Permittee Address) Ricky Merritt (Name of Signing Official -Please print or type) Director of Engineering (Position or Title) 919-544-1796 2/28/2019 (Phone Number) (Permit Exp. Date) " If signed by other than the permittee, delegation of signatory authority must be on file with the state per 15A NCAC 213.0506 (b)(2)(D). of _,; DENR FORM NDAR-1 (5/2003)