Loading...
HomeMy WebLinkAbout20130477 Ver 4_Sand bags in Channel Site 2_20161026 Wanucha, Dave From:Parker, Jerry A Sent:Wednesday, October 26, 2016 4:34 PM To:Hayes, Meredith D Cc:Ingram, Jonathan P; Fields, Rodney E; White, James C; david.e.bailey2@usace.army.mil; Wanucha, Dave Subject:RE: C203256 - Stream Meredith, Following are my directions on how the water should be released into the re-aligned stream on the parcel just east of Johnson Street on project U-3615B. 1.Place filter cloth, then sandbags in the dry channel immediately upstream of the existing check dam installed at the downstream end of the project. Sandbags should be placed at a height of three to four feet above the stream bed. 2.Remove the existing downstream check dam 3.SLOWLY release the water into the re-aligned channel and allow it to gradually fill the re-aligned channel to the top of the sandbags 4.Remove the sandbags by hand one at a time and then remove the filter cloth Please call me if you have any questions. Jerry Parker From: Hayes, Meredith D Sent: Wednesday, October 26, 2016 2:35 PM To: Parker, Jerry A Cc: Ingram, Jonathan P; Fields, Rodney E; White, James C Subject: C203256 - Stream Jerry, Any word on if we can turn water into the stream? Thanks, Meredith D Hayes, P.E. Assistant Resident Engineer 1 North Carolina Department of Transportation 336-487-0150 (office) 336-266-2463 (cell) 336-256-0206 (fax) mdhayes3@ncdot.gov 1584 Yanceyville Street Greensboro, NC 27405 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2