Loading...
HomeMy WebLinkAbout20130477 Ver 4_Oct inspection_20161028Wetland Inspection Report Project Num: 20130477 Version: 4 Project Name: NCDOT - Road Widening SR18 County: Guilford Location: NCDOT - Road Widening SR1820 & SR1818 (U-3615B) Latitude: +36° 02' SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 10/27/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: Road/Highway Widening Region: Winston-Salem Longitude: -80° 00' 04" Phone: Phone: 336-776-9703 page: 1 Site Number: 20130477 Inspection Date: 10/27/2016 Owner: Thorpe, Gregory Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: This was a visit to Site 2 to review stream channel conditions followinq a bvpass. Jerrv P(DOE Div 7) was concerned that sediment would be flushed downstream to a pond. He directed sand baqs be qlace across the channel prior to returninq the stream to the channel so that water could pool behind it allowinq sediment to settle out vs. transported downstream. Stream flow was extremelv low and was barelv flowinq if at all. I suqqested a turbiditv curtain be installed in the downstream pond to manaqe anv sediment that flushes with the next storm. No determination has been made at this point. page: 2