HomeMy WebLinkAbout20161026 Ver 1_670209_hyd_prm_wet_package_20161026I IIS�] 1�!'il�rr North Carolina Department of Transportation �s �I )1'lY�'�1Jdrf'`I" ' ,...� Highway Stormwater Program �' STORMWATER MANAGEMENT PLAN _ (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.99 TIP No.: SF-670209 County ies): Orange Page 1 of 1 General Project Information WBS Element: 17BP.7.R.99 TIP Number: SF-670209 Project Type: Bridge Replacement Date: 8/15/2016 NCDOT Contact: Matthew Lauffer, PE Contractor / Designer: Fuh, David, PE Address: NCDOT Hydraulics Unit Address: ICA Engineering, Inc. 1590 Mail Services Unit 5121 Kingdom Way, Suite 100 Raleigh, NC 27560 Raleigh, NC 27607 Phone: (919) 707-6703 Phone: (919) 900-1612 Email: mslauffer@ncdot.gov Email: david.fuh@hdrinc.com City/Town: Mebane County(ies): Orange River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles orfeet): 0.047 miles Surrounding Land Use: Wooded, Agricultural Proposed Project Existing Site Project Built-Upon Area (ac.) 0.1 ac. 0.1 ac. Typical Cross Section Description: Atkins Road (SR 1366): 2 paved lanes (total 20' wide), 4' shoulder on each side (7' with Atkins Road (SR 1366): open shoulder section, 2 paved lane (total 20' wide); guardrail). Annual Avg Daily Traffic (veh/hr/day): Design/Future: 140 Year: 2025 Existin : 70 Year: 2000 General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace Orange County Bridge #670209 on Atkins Road (SR 1366) over Frank Creek. The existing (Description of Minimization of Water structure is a two span bridge (2@17'8") and is timber deck on timber joists supported by timber caps, piles, posts, and sill. The proposed structure is a 2@ 12'x7' Reinforced Quality Impacts) Concrete Box Culvert (RCBC). This structure has been designed to have as little environmental and surface water impacts as possible. Channel improvements were made for the proposed RCBC design. Excavation was kept to a minimum to produce as little impact as possible. Where excavation is necessary, geotextile and rip-rap were utilized for bank stabilization in an attempt to reduce stream bank erosion. A low flow barrel on the south side of the culvert was designed to match the stream width to maintain the normal flow width, depth and velocity of the stream. This will maintain sediment transport to provide a stable stream during bankfull discharge. The barrel invert will be a minimum of 1' below the stream bed to consider fish passage. A high flow barrel on the north side of the culvert will provide flood conveyance during high flow storm events. This will reduce shear stress on the stream bottom. There are existing ditches located at all four quadrants of the bridge. The ditch at northwest quadrant daylights and becomes diffuse flow before entering the buffer. It will be retained. The ditch at SW quadrant has outlet to the stream with a non-erosive outlet velocity. It will be retained. At NW and SW quadrant, the roadway is in fill section. This will promote sheet flow of pavement runoff through grassed shoulder and fill slope to remove pollutants via infiltration and settling. At SE quadrant, a proposed grass swale BMP will be installed from 12+50 to 13+50 RT. This swale ends at 13+50 RT and becomes diffuse flow for a distance of 30' before entering the stream. At NE quadrant, a proposed grass swale BMP will be installed from 14+25 to 15+35 RT. This swale ends at 14+25 RT and becomes diffuse flow for a distance of 40' before entering the stream. Waterbod Information Surface Water Bod 1: Frank Creek NCDWR Stream Index No.: 16-18-2-1 NCDWR Surface Water Classification for Water Body Prima Classification: Water Suppl II WS-II Supplemental Classification: Hi h Qualit Waters HQW NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: BufFer Rules in Effect: Jordan Lake Project Includes Bridge Spanning Water Bod ? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? No Deck Drains Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) V Z � z � z �� O yZj �Q P U • � � V W � O � � � � *DESIGN EXCEPTION: SAG VERTICAL CURVE K VERTICAL SSD � " I ' •� " I � I : (�) I � \ (�) i'� " I ' I-I � � . �� i'� (�) I . I \ . •� II�I�'I�I(�)\ (�)I� I-II��I-f\��'.-��'� o��GE cou�TY LOCATION: BRIDGE NO. 209 OVER FRANK CREEK ON SR 1366 (ATKINS ROAD) TYPE OF WORK: GRADING, PAVING, DRAWAGE AND CULVERT WETLAND AND SURFACE WATER IMPACTS PERMIT � , . �� � I- I.� I', I.� '��� ��, 0- DESIGN DATA ADT 2000 = 70 ADT 2025 = 140 V = 55 MPH SUB REGIONAL TIER LOCAL PROJECT LENGTH LENGTH ROADWAY TIP PROJECT = 0.042 MILES LENGTH STRUCTURE TIP PROIECT = 0.005 MILES TOTAL LENGTH TIP PROJECT = 0.047 MILES Prepared !n the Offlce of Hatch MoH,�acDonold for DIVISI011i 7 NORTN CAROLlNA DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPEC/FlCATlONS TIM R�JORDAN � PE LETTING DATE: DAVID FUH PE H3'DRAULICS ENGINF,ER NCDOT CONTACT: TIM POWERS, PE D!!�lSIOA' BRIDGE PROGR9M MANAGER ROADWAY DESIGN ENGINEER P.E. /GN,9TURE: HYDRAULICS ENGINEER GLI PERMIT DRAWING SHEET 1 OF 7 I�7�OMPLETE PII,A�T� DO NOT II9�' AOR R/W AC'Q[]191T[ON PLANS PREPARED BY: � Hatch Mott �` MacDonald PO Box 700 Fuquay-Varina, NC 27526 (919)552-2253 (919)552-2254 (Faxl WWW.hatchmott.com LICENSE NO. F-0669 � � 5121 Kingdom Way, swr� ioo Raleigh, NC 27607 NC i,icenve Vo� I"a_f,d Engineering � � � � � � � PROJECT REFERENCE SHEET NO. 178P.7.R.99 - ORANGE 209 4 DETAIL A WETLAND AND SURFACE WATER IMPACTS PERMIT ROADWAY DESIGN HYDRAULICS TOE PROTECTION ENGINEER ENGINEER �No�to Smle) OR �''�,tt�� SLOPE GxouNAo E CLA55 II RIP RAP ON � � Y: \ � d FLOOD BENCH BORDER � d- 1 Ft. �Eorcxme EST.10 TONS RIP RAP � � \'r� �°� I�7��I�LE E FLAN� EST.10 SY GEOTEXTILE =.r \ � � y� \ o- QU �p �.707' U�& pOA W A�QUI�,ITLON � � \ o? Type of Liner- CLASS B RIP RAP 30 LF OF OUTLET / �V � CHANNEL IMPROVEMENT '� /� DA�D PARImi ��� \i y� FROM STA. 12+70 TO STA. 13+65 LT. EST. 70 TONS CL II RIP RAP �� � � 0 FROM STA.14+55 TO STA.14-80 L7. � EST.75 SY GEOTE%TILE � m �� �� ,��`o� NnrcH moTrmncoannio is E,uc FROM STA.13-50 TO STA.13-70 RT. � I �\� /¢ ucENSE Ho.F-oasa FROM sin. la-o5 io sin. 14-25 ei. N,qO �' � , / ; �� � / DOCUMENT NOT CONSIDERED FINAL 8 TOE PROiECTION �m � � / � UNLESS ALL SIGNATURES COMPLETED � 1 SEE DETAIL A � � repare n t e 0%J . EST. ?? TONS RIP RAP 0 �3� � Office f: EST. d? SY GEOTE%TILE � �'9Cp � �,� Hatch Mott po eoz roo n�o�Us ws �as� c. �,Is �*� ��' �'7 MacDonald wwws��� tt�om,s�` � � BEG/ PROJECT 17BP7.R.99 i i� � � ��' � � � � � � —L— POT SYO.IZ"�'J�O �/� E ISTIN DITCH ENOS HERE � ��,��// '�� il,,�, � BANK ILIZAT N � LOW AT 14+42 // V10= .6 fps (NON-EROSIVE) 00�5 � Q10 0.6 cFs TOE PROTE ION w / Engineering -L- PC S7a. IO+�QAO -- + Woa N SEE DETAIL / // EST. ?? TON RIP RP.P VERTICAL SCALE HORIZONTAL SCALE m EST. ?? SY EOTEXTILE � � 2 2 5 E%I TING ITCH UT T m � \ �M' VE OCITV T ST AM � � � // // f5O.OD � � �'OODS � Vl =1.3 fps ' S ^w; �F / � � PERMIT DRAWING GLI \ cti =z.a �r i — j j? � OF 7 - esj / SHEET 3 � � o' /� � — ��_ _ _ — — —� .�K 5 a%� CLA55 II RIP RAP W/ C �N � �5� � — — — R �3b6 p/ ��P �� GEOTEXTILE ON FLOOD �. �� � � �5 BENCH BORDER W/ NOHI�IAI� D.ATK►�S // ��_-- _ _ _ _i Z`5_ _ _ _ — — � — � CULVER7 BURIED 1' BACKFILL 2:1 SLOPE (7YP.) -- -- WITH NATIVE MATERIAL PER SPEC. '. �� /� U —i— CLA55IIRIPRAP , �' y � � ,. .. .. .. .. _ .. .. . _, .. .. . .. _ . 2'THICK W/ MATfINGE (TYP.) � /� // ' , . 5 � � =EOTEXTILE (NP.) 1' � ' GRASS SWAIE P ' � � (12+50-13+50) ND BECOMES �" ¢� GRA55 SWALE MP�yppp S _ \ / / WOODS DIFFUSE FLOW AT 13+50 (14+25-15+35 ANtl BECOMES — f �— �,P�'� QJ �� V10=1.6 fps (N N-EROSNE) DIFFUSE FLOW AT 14+25 ?'7� �y'�� ,� � �> Q10=1.7 cfs _ V10=1.9 fps �N N-EROSIVE) Mq�-� s Q70-2.5 cfs 2' SILLS BACKFILL WITH ``} � �� � � E D PROJ CT /TBP7.ft.99 NOTE: FOR CUT CONDITION, USE �$1L� NATIVE MATERIAL BANK STF�ILIZA O CLASS II RIP RAP FLOOD BENCH 12'-14' 0'-12' PER SPEC. (TYP.� / � / � : � -L- POT a. l5+OOA0 80RDER WITH NATURAL GROUND CAA// n�As ws a�sA c.�uANs � TOE PROTECTION COVERED WITH COIR FIBER MAT �Q� � �"pl '�OODS TOE PROTECTION � INSI�E BORDER.IN FILL CONDITION, �EXCAVATION-60 CY ,�.r SEE DETAIL A � �'. EST. 22 TONS RIP RAP USE CLASS II RIP RAP FlLL THROWHOUT INLET CHANNEL / EST.?? SY�GSEOTE%TILE � � EST.?? SY GEOTEXTILE HIEHVOIDSVONEDOPATERIAL FlLLING LOOKING DOWNSTREAM ��/ 30 LF OF INLET `� CHANNEL IMPROVEMENT SEE ENLARGED CLA55 IIRIP RAP W/ EST. 45 TONS CASS II RIP RAP EST. 50 SY GEOTEXTILE EN�CHXTBORD R yy/�OD CLA55 IIRIP RAP ON AREA ON Z'LTHICKRW/�P 2:1 SLOPE (TYP.) FLOOD BENCH BORDER � GEOTEXTILE (TVP.) EST. 10 TONS RIP RAP COIR FIBER E5T ,o SY �EOTEXT��E O NEXT SHEET , MPTTING (TYP.) / �. eA�rT �'' 0 0" z:, � B.� �ee`�'�� LEGEND �"�i �� \ ��� � // �ry 2' SILLS BACKFILL WITH DENOTES TEMPORARY 1' SILL NATNE MATERIA� IMPACTS IN SURFACE WATER CULVERT BURIED 1' �2�_�5' 0'-12' PER SPEC. (TYP.) ���9 4 ���� BACKFILL WITH NATIVE � �I MATERIAL PER SPEC. DENOTES PERMANENT EXCAVATION��90 CY 5O IOO � IMPACTS IN SURFACE WATER NOTE: OUTLET CHANNEL � II— / THESINL�ET AND OUTLEfAONLY SCALEo I- 100 HORIZo ���e �L (LOOKING DOWNSTREAM) � C�� � _ .. � � 9I BEGIN PROJECT END PROJECT BEGIN GRADE END GRADE � I STA. 12 + 50.00 STA. 15 + 00.00 E 650 EL = 631.56' EL = 628.08� 650 _G PI = 13+40.00 EL = 624J2' � I 640 vc =�ao� i i CULVERT M'DRAULIC DATA 640 K = 74 � I I DESIGN DISCHARGE = 800 CFS � DES/Gly FREQUENCY = 25 YRS 3 I ��,, REMOVE � DES/GN M�V ELEVATION = 622.3 fT � � EXIS7ING' � _ �, 630 �` BRIDGE /� BASE DISCHARGE l2� CFS 630 y � '�, •,� �� BASE l-lW EULEVAT/ON = 623.47 fT E I OVERTOPPIIyG DISCHARBE = 2200 CFS � � ✓ OyERTOPPIIyG FREQUENCY = 500t YRS 620 NAruan� �Ro OVERTOPPII�G ELEVATlOI� 625.9 fT 620 UPSTREAM FACE O � + CULVERT w � �:rarsr#cat ws '� 2@ 12' x 7' RCBC �,_ ELEV. k 617.6 ? � L � O DATE:2-17-2016 � � DATE �F SURVEY = 2-17-20/6 610 �� � _ —� j Ws.E�tvarioN = sr�.s Fr w � AT DATE �F SURVEY w� : �z� ��� Nz� �w �a� 10 11 12 13 14 15 16 V _---� , , � � � � \ \ - i � � � � � � � � PROJECT REFERENCE SHEET NO. � � � � � � 178P.7.R.99 - ORANGE 209 4 / ROADWAY DESIGN HYDRAULICS ,,_ DETAILA �� WETLAND AND SURFACE WATER IMPACTS PERMIT / ENGINEER ENGINEER TOE PROTECTION / �rm�m s�oia� � / OR � /p � - � a�tite� `siove � . . . . . . . �p � ) � � �� � / J Gaou�o d E _ �.: - .. _ .._ ' � � CL�4SS II'RIP AP ON j� � / �� � � ��� �� / � � � � _ - � I,. � �� � � / � FLbOD/BEN�H QORD�R � � � // Z�i � / ♦ / x� / � Q. i i i � � � � � I�7��1�I�LE E FLA�7@ � a' F` GE�•Ex��E i i ��\ 1 � � / EFT. 10 SY� QEOT,EXTII.� � � I � / � i��1 I ' \k\ �� y� �\� � ��/ oa�`` i Do �rar v�a xoa w wlwv�asox / / J l � -- Type ofLiner- CLASS B RIP RAP � / � � � 36 LF qf OU LET � / / ( I I ' ��+�I I y // �!g \ � m(�� �i. � - / / l / QHANNEL IMP�OVEA}ENTI I I I � I ,O��D P�PofER / � � � � � � ` yP�~ / � � FROM STA.12+70 TO STA.13+65 LT. � � / �� \ / � �i5T.7Q TON5 CL II �IP 11AP � I I I < pi � � Q.0 / � FROM STA.14+55 TO STA.14-80 L7. �9 I Nm i '� / �„oo NnrcH moTrmncoannio is E,uc FROM STA. 13-50 TO STA. 13-70 RT. � � � `S�9 � � / � EST. 7� SY CrEOTE%YILE � I � I � I I �� / � � � � � ucENSE Ho. F-oasa / / \ 1 I / � ee / x '// / FROM sin.la-o5 io sin.14-25 ei. N,qO � i � / � � � / ! � I I I � I T��I �Ii ;� / �� � �c,�� i / \I � � DOCUMENTNOTCONSIDEREDFINAL �-- - � \ \ � � 8 � // \ � � / I � 7� � � m I � � �m V ,,�� � i / �� � /\ . l � � UNLESS ALL SIGNATURES COMPLETED � � / OE PRCITECT ON � � � / / / � � � I � \ "9 10- �� I � � � I � See oerin�� n � � i I �� i � � �� I ,ePa,e in t e � � � � IJ . �cp � I / I I IEST. ??�TON51 RIP IRAP I I / � /� / / �� / � �1 ���y / � � I � Office of: � I 1 \� i/ � � � I I � I EST.zz SY G�OTE7cri�4 I / � /� , � �� i� �� ! /�c� y� � � I , Hatch Mott.�a�ay-�a,,,aN�z,5z6 PO Boz i00 �q � � 1 � i � � i � � ,� �i ii , � , , �' � �� ,� _I � � i � MacDonald Wy/WliatcMnatt.com � � �Y i � � � � nioMAs w s asA c. �w � � i � i l {' � � ' � � i � i � �� � �� � � � �i i � , i , BEG ROJECT /7BP .R i i i � � �Ss� � i i i i i c, � �. i \ \ \ � ` _ _ i I � � � � -Ly P� O.I�'�'� I �,(p E ISTIN DITCH ENDS I�ERE / � / m / � � �',��� / �/� � I '��'.1 '>', \ \ \ � � � - � I � � � � �, � / / � I � B�A.NK ILIZAT N � " \ LOW T 14+42 / / / // �ii _ _ _ - / % / ... F, ,. \ � � � � � � � I / 'ti� V10� .b fps (NON-FAtO51VE) / p � - � � �- � i ` � � � � � i � i � i � � � i � � � , �' m c„o 0.6 <rs � W000s , � � . _ _ — � � — — _ , � En ineerin l� \ � N � ! / '\ � TAE PROTE ION � / - � _ g g � � � \ \ � � � / 1 / � � � � � � � ' � N � ' 'Y /SEE DETAIL � / � //� � _ � / VERTICAL SCALE HORIZONTAL SCALE i\ � - L- F�^ 570. l0-�.� � 1 - i i � \ - �� � � � � � �N � i� � esr. ?� TON �FaaP � �i � i � ii _�_ ' ` i z z s � I 6 C ��W�� � \ � m m / EST. ?? S� EOTE%nLE � / // / /� , I \ � \ � I / / ( � \ 9� \ 1� � � \ K E%I fK1G ITCH �T T � \ � m / / �/ � ��// � / � �J�� J � � I � � � � � 1 \\ ��.VE PC JV T 5Y AM AI� / � / /" �� / ���� � ' - � , � ` �� 000s � � �, � � �� � .. � ���r=TsfPs� � W. F � ' i i��i �� -----_ IT DRAWING � � PERM � � �\ � � / � � �� � � ���� ��` �x =�{a �r � �' � � � ji�i/ �� i �i --et9-- OF 7 GLI � � i � ,_ . , � `� � g.� SHEET 3 �� �\ � � -L .. _ Q� (__� �\� \ __\ �� .� ,\ \ __- ' �- _ --_i ���� 2��0� � i��� /�n ��-- _-_ \ � \ ��\ \' ,�� [_`--_ F�_�_ Y_j _�+�/ � \ �_� � pTK\Nsaj��`Pi .�/ //� / CLASSIIRIPRAPW/ � �_ � � ey � � � � � � ���� 1366 / y (i �� � GEOTEXTILE ON FLOOD i � ,,�1I.,' � �� � � <n� � I � _ _ � � � � � J � / CULVER7 BURIED 1' BACKFILL BENCH BORDER W/ � �ww� D.�T1�S . 1 ' � j/ I ��l—�— - - - - - - - - - - - W � ' J � / / 2:1 SLOPE (TYP.) \ � " i� 07 ---- i ��� %���� -'_� -' � �� � --- �`� �� � . . � // WITH NATIVE MATERIAL PER SPEC. � � I .� � .� �� _�� � - -' \ � � \ -� _ _ _ _, � � �� �� ���� _ _ _ � - -�� � r . / � � � � / / CLA55 II RIP RAP COIR FIBER \��\ �_�i� ,� i� j� /J/' _� � ___. ../ . .. ..\ ..\ .\.. \.. . -, /.. i. ._ J _ i l. l / - .. . / �� �� /� /�/ i ��=EOTEXTI F (NP.) �, MATfING (TYP.) �� � � i - . / � �"eRASb'�1NAlE P � \ ^o / 5 �¢o I / � / / \ V � / � \ l //� � G -/ � � � � � (12jr50-1 +50� ND� BECOM S � � � F / \ + C�R AS{��LE MP�y�pp� _ � � � � � � �0 1 / � j� % i � ' � i , - � '�OODY � D�FFUSE FLOW AT 1�3+50 € � I \ /\ A � /�14+/G5 15+35 trNtl BECP�ES - / "� � i � — �,P�' � \ 99� 1 � � � / �/1� /f- � 6�J � � � � � �V1p=1.d fps (N N-EROSIVE) I � � / 1 r � DIFFUSE�IAW AT 14r25 � i � / 7.�� ,�.�\ � � t / � t� % � 4io=Y.� �r: i � ' / �=ip tPs �N N-ekosive� i � � �Y — � s �/ / / ~ \ � � \ \ I I, J �Q10- 2.5 � � 2' SILLS BACKFILL WITH ! y �� I � I / � / / / / / I N � � I � � �s D- �ROJ CT -1TBP7.R,99' / / � / � 1' SILL NATIVE MATERIAL \\ � � e� '// � \ / / � � I / � / � NOTE: FOR CUT CONDITION, USE / ! I I 1 / _ i B K$TA$1LIZ � I � I PER SPEC. (TYP.1 � � � / m i -� � i� � M / / CLASS II RIP RAP FLOOD BENCH 12'-14' 0'-12' � �,' / , � 1I , i Q i _ i � � i� i M i i i �L— POT b.15-1�9 � \ \ � � / �IOr�AS 14S fLIS��G�Il.I�IS i � / j � � ��' / � m I � � � 80RDER WITH NATURAL GROUND \ � / p9 `� � / i I / / � I I � � ' ( � � {'OE PROTEC ION � '� � � COVERED WITH COIR FIBER MAT C�� � � � / i � � � � � � I � /0 / � i � � INSI�E BORDER. IN FILL CONDITION, � � �p �OODS � / / TPE PRO�iECTION / / �EXCAVATION-60 CY \ \ �� \ � � '�% / ,�.r � � ,,f � � / / ,bEE OEyAIL A I I I I � l �� �EST ?? TOfyS RIP Rq / i � USE CLASS II RIP RAP FlLL THROWHOUT INLET CHANNEL � � �g� � //� � � � `" � � / / EST. ? TONS RIP RAP / � / I � EST �? SY KeoTexr�LE / / WITH NATIVE BED MATERIAL FlLLING � � �b9 � �/ � I l ;o4j i �� �� i / �� esr.f? SY GEOTEXNLE � � I � � � �� � �� � I {� i- i i �� i i rHe voios oN TOP. LOOKING DOWNSTREAM �� / r � i i i i i � J i i � � I i q� / i i \ 1 � �� � � � / � \� I I l / � / / � � / / / / � / / / � � r v/ I I I w CWANNOEL IMPRO�JEMENT I � / � \ 1 /� / G I / / / � / / l m � � CL455 II RIP RAP W/ \ � � � � � � I � / I l � � / � � / � � � / � � � � � � � •� � I I I I ESIT. 45 ONS Cp SS II RyF RAP / � GEOTEXTILE ON FLOOD i � i � � � � / � / / i / l � E5T.50 �Y GEOYEXTILEI , SEE �N RG CLASS 11 RIP R4P \ \ / . I cp // / / / / / / / � I I ! BENCH BORDER W/ 6j / � / CLASS II RfP RAP 6N / / I I � � Ag A O N 2' THICK W/ 2:� SLOPE (TYP.) \ 1 / � < / � / � � � � � / p� / � FLOOq �BENC �BORDFR � � / ' � I I I � / I \ \ I / � / / / / / / / / / / � /6 / � EST. ib TOrJS�RIP 2AP � � � / . � ' � I I I I I � I I � � GEOTEXTILE (TVP.) COIR FIBER � 1 ( / � � / I / / / / / / / / / �/ / % ��10 SYiGEOTFX�ILE / � � � / / � I I I I f I � i � I NEXT $'HEE� MP.T�ING (TYP.) 1 I / \� / , / / / / / / / / / i / � / � " � ro I I � I � 1, \ � I i '/ � / i i / / / i� i i i � � � � /� � � �'i .i 1 ti /�ti / I I I a � l � � � � i � / / i i / � i � C. / � I A 7: m / / / / / / � � l / / / i i / � B. � �, . I I � I I I � � I � i A . A l� � I OO � i �� i i i i ,m i i i i / i� i i � � ' i i �. a�e � �� i I i � � LEGEND � "�i �� �ry 2' SILLS BACKFILL WITH DENOTES TEMPORARY 1' SILL NATNE MATERIA� IMPACTS IN SURFACE WATER CULVERT BURIED 1' �2�_�5' 0'-12' PER SPEC. (TYP.) ���9 4 ���� BACKFILL WITH NATIVE � �I MATERIAL PER SPEC. DENOTES PERMANENT EXCAVATION��90 CY 5O IOO � IMPACTS IN SURFACE WATER NOTE: OUTLET CHANNEL � II- / THESINL�ET AND OUTLEfAONLY SCALEo I— 100 HORIZo ���e �L (LOOKING DOWNSTREAM) � C�� � _ .. � � 9I BEGIN PROJECT END PROJECT BEGIN GRADE END GRADE � I STA. 12 + 50.00 STA. 15 + 00.00 E 650 EL = 631.56' EL = 628.08� 650 _G PI = 13+40.00 EL = 624J2' � I 640 vc =�ao� i i CULVERT M'DRAULIC DATA 640 K = 74 � I I DESIGN DISCHARGE = 800 CFS � DES/Gly FREQUENCY = 25 YRS 3 I ��,, REMOVE � DES/GN M�V ELEVATION = 622.3 fT � � EXIS7ING' � _ �, 630 �` BRIDGE /� BASE DISCHARGE l2� CFS 630 y � '�, •,� �� BASE l-lW EULEVAT/ON = 623.47 fT E I OVERTOPPIIyG DISCHARBE = 2200 CFS � � ✓ OyERTOPPIIyG FREQUENCY = 500t YRS 620 NAruan� �Ro OVERTOPPII�G ELEVATlOI� 625.9 fT 620 UPSTREAM FACE O � + CULVERT w � �:rarsr#cat ws '� 2@ 12' x 7' RCBC �,_ ELEV. k 617.6 ? � L � O DATE:2-17-2016 � � DATE �F SURVEY = 2-17-20/6 610 �� � _ —� j Ws.E�tvarioN = sr�.s Fr w � AT DATE �F SURVEY w� : �z� ��� Nz� �w �a� 10 11 12 13 14 15 16 V WETLAND AND SURFACE WATER IMPACTS PERMIT OODS EXISTING DITCH OUTLET VELOCITY AT THE STREAM V10 =1.3 fps (NON–EROSIVE) Q10 = 2 .4 cfs � -L- - � - _ _ , , � f�-'--�—�� - - - - - GRASS SWALE BMP (12 + 50-13 + 50) AND BECOMES DIFFUSE FLOW AT 13 + 50 V10 =1.6 fps (NON–EROSIVE) Q10 =1. 7 cfs � � GKA55 SWALt DAIA DA= 0.59 AC SLOPE= 2.64% L REQ. = 59 ft. L PRO. = 100 ft. Q2 = 1.3 cfs V2 = 1.5 fps D2 = 0.47 ft. Q10= 1.7 cfs V10 = 1.6 fps D10= 0.52 ft. STA. 12 + 50 TO 13 + 50 RT V Z � z a w z �� sz �Q PV ( � �-�� ,��� r N r m � m � �;_ < � S � , ��,. �s� _ - - _ �� � � ���� N m , m I�IE���][s �]�[]EIE� IF�IE� ���11 A � • � \�)� �✓�� a III �J ., • T \ .i �. . H� 8� q ?p7� � BAN STABILI TION 0 ^ o m N � N � m E ISTING DITCH ENDS HERE ND BECOMES DIFFUSE FLOW AT 14 + 42 V10 =1.6 fps (NON–EROSIVE) Q10 = 0.6 cfs _ _ _ - �,�— - - - c���-v-1— � � \\ < F� �� — � -,_�_ F' ' . 1` • ., \ . . � p � ���'e,,�;;`''''• �' 9 ,��I� ••��. ���� _ ,. .���� .� � J. J ■����eir� �-�i.r■ — $ .� , , ' GRASS SWALE BMP W 0 0 D S (14 + 25-15 + 35) AN D BECOMES DIFFUSE FLOW AT 14 + 25 V10 =1.9 fps (NON–EROSIVE) Q10 = 2 .5 cfs I N � N /� m � r — BAN STABILIZATION STA.14+25 TO 15+35 RT LEGEND �DENOTES PERMANENT IMPACTS IN SURFACE WATER S TS DENOTES TEMPORARY IMPACTS IN SURFACE WATER 30 0 15 30 SCALEo I"= 30' HORIZo V Z � z a w z �� sz �Q PV WETLAND AND SURFACE WATER IMPACTS PERMIT � � / , , , � , , , _� i � � � � � I i �� � � i � �� i � � � I �� j � � � 1 \ � � � \ � `� N . r ^ � � � � � a ob S��, � � ��� m m, , > � �,XISTIN� ��ITCH`� �OUTLET �, �, �� ' � � �.�I�OCf�1��.�T TH� STREAM ,' � �� � Vlb � 1.3 �fps` �,f�J01�1—�,�OSIVE) ,' � �, ; ; � C�10 rt 2�.4 cfs; �, �, , � ' � � � � , , � , �� � . � � � ,_- � � , � � , , � - - � ` � � - -� -_- �-- _-- - �-' _ _ � y , , _ , � , � � ,, , ; � �� ,, , _ , ��,, ------�\ � _�� — -----___ ` `—' \\� �� � � _ � � — � � � � t �� �� � � � � � � III I I � � I I�I I I � � � ��� � I � � � � �` � T ----� _-- �/\ - � ----- ,/ ,_ ' �i ,, � -_,, '-� �-____ — � — —� F .s�..�',:r� ,-�=T � � �. �- _ _ _ ' - - - - - _----- - - _ _, � - � � i- _ _- -- � C3�tASS SV,�GALE Blv)P �`, '� ,,�, , '� ------ ��J � � (1 � + 50-1'3 + 50) AND BE��bY�IESv � � _ D4FFUSE; FLOW AT, 13+5 '�, �,, ,�' A�F ,'� ', V�10 =1.6�, fps (NON �EROSIY�) ; �, ,' ,�' , �� C�10 =1.7�, cfs � � � ; �� ' , i i i � i , , � ,/ � � � � �� � � � � , � �, , � � �, � , � � � � � � , , � � �� � �, ', , ; � � GRASS SWALE DATA �� , � c�' ��,' p� ►b:/ ----� DA= 0.59 AC �� ,�� � Ni � � $LOPE= 2.64% � i � � � r L REQ.= 59 ft. �� �� � mi i 1 � L PRO. = 100 ft. � � i i � � Q2 = 1.3 cfs � i i i \ V2 = 1.5 fps � � i i �1 D2 = 0.47 ft. i i Q10= 1J cfs i � � i � � � V10 = 1.6 fps i � � i I � , I D10= 0.52 ft i r i I I i � � � � I � i i � i I I `� � i STA. 12 + 50 TO 13�+ 50 RT i ' � i i i � • � \�)� �✓�� a III �J ., • T \ .i �. . H� 8� q ?p7� �, , � �� 1�,,' , J BAN ST,��tL� � TION ,'� , -- O , i f, / O �� � � � ^ � � I � �� � IV N ' �m i � N ,� i � m -� ,' ; ; E ISTI�J� DITCH ENDS Fi�I�E ' `r � ,�� ND" BECOMES DIFFU,SrE � ' '� � � F ,' � 'FLOW AT 14 + 42 -' � � � �� • ,'� � V10 =1.6 fps (NOI�I� EROSIVE) � � � � Q10 = 0.6 cfs _ -' - - �;� - - - _ - - - �-����� -� _ _ �� f'F / ��=__ _ �-� J�\ � ---- �------- �\\ ---- — � /�l � � I � � � \ � I / � \ \� � � \ � � ` � - - -�- � - - _ I� ��� -�_ i 1 �� � , �F ; —= --_--- -� � ----_ _ �_ , , _ ---_� - ___------ ----� -� � i � -� __- - - - - _ _ _ � � � _ > ,-� , � S �� ` �� ,' � '� � � , , O� ' ' ' �� , �� � ', ' , '- ,� '� ` ' ' GR���SWALE BMP,-�OODS �' �' ��' �� �' (��4+25-15+3�)�AND BEC4A�CES � � � � �DIFFUSE-FrbW AT 14 � 7� � � ; �� r�, �� �� � �' ,� ; �--;-' ,�' ,�' V10�1:9 fps (NON-�ROSIVE) � , ' � � ,` �' Ql Q�= 2 . 5 c�fs - - - - " - �� , � � , � � __-- �' µ— i i � � `� �i i GRASS SWALE DATA � � �� i i� � � � DA= 1.0 AC i � i � i ��i � �i i SLOPE= 2.64% / � /"` � N i � � � L REQ. = 100 ft. � i i � � i m i � i i L PRO. = 110 ft. � i � � oi i �� i � Q2 = 1.9 cfs V2 = 1.8 <� I ' � � i� �� i � i i D2 = 0.57 ft. ` I - � � � i � � � i i Q10 = 2.5 cfs �, �,,� BaN� S�ABI�IZATuoN i V10= 1.9 fps � I i � � i i � i i D10 = 0.63 ft. � i i � � i � i i � �� � \ i I I I r i�� i� ��' � i �� i i STA. 14 + 25 TO 15 + 35 RT � LEGEND �DENOTES PERMANENT IMPACTS IN SURFACE WATER S TS DENOTES TEMPORARY IMPACTS IN SURFACE WATER I�IE���][s �]�[]EIE� IF�IE� ���11 A � 30 0 15 30 SCALEo I"= 30' HORIZo v z � z a z � c� sw SQ �v PLAN VIEW � (nrP.) FLOW CROSS SECTION 12.0'_�_12.0' AM BED EVATI O N 1' SILL 2' SILL FLOW SILLS DETAIL � STA. 13 + 86 —L— 2@ 12' x 7' RCBC SKEW 85° GP ELEV. = 625.8'. 630 EXISTING LEFT TOP OF BANK 2:1 (NORMAL) � EXISTING RIGHT TOP OF BANK �, � 620 �� �-- �- ='_____—__— __ ---==_�L'r___—��i'� . / i� i'—^��.i �----------- 2' SILL IN RIGHT BARREL, 1' SILL— IN LEFT BARREL, SILLS ARE INSET 1' FROM END OF CULVERT AND PARALLEL TO CULVERT FACE NOTE: FOR CUT CONDITION, USE CLASS II RIP RAP FLOOD BENCH BORDER WITH NATURAL GROUND COVERED WITH COIR FIBER MAT INSIDE BORDER. IN FILL CONDITION, USE CLASS II RIP RAP FILL THROUGHOUT WITH NATIVE BED MATERIAL FILLING THE VOIDS ON TOP. �-- 200 150 100 50 0 2:1 (NORMAL) ' EXISTING LEFT EXISTING RIGHT TOP OF BANK TOP OF BANK - � ''-- '�-�_�_— � _,�.�_— ____�--� �------------__---- _—/� —�'� .�. 4 ELEV SLOPE � — / �_ — \ �— � _ — � � �. — — � NORMAL WS, ELEV. = 617.6 DATE:2-17-2016 STREAM BED -2' SILL IN RIGHT BARREL, 1' SILL IN LEFT BARREL, SILLS ARE INSET 1' FROM END OF CULVERT AND PARALLEL TO CULVERT FACE = 615.44 = 0.003 FTiFT . . � . 50 100 150 200 PROJECT REFERENCE SHEET NO. 17BP.7.R.99 — ORANGE 209 4 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER [�T��IPLE�E PLA�V� DO NOT V� FOA W AG�V1911RON HATCH MOTf MACDONALD 18 E, LL< DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office oE,� Hatch Mott po eox �oo �y� MacDonald «ww.�a:����".:" �m„�` 1�� , Engineering PERMIT DRAWING SHEET b OF 7 iG r��i� 630 �. � 610 �. 1 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 FROM -L- 13+64 TO -L- 13+93 2@ 12' X 7' RCBC 0.02 0.01 40 20 1 FROM -L- 13+64 TO -L- 13+93 BANK STABILIZATION 0.02 60 TOTALS'": 0.04 0.01 100 20 *Rounded totals are sum of actual impacts NOTES: *Total stream length that will temporarily be dewatered to install the culvert in the dry (see construction sequence) = 35' (impervious dike upstream to upstream face of culvert) + 40' (culvert length along the stream) + 33' (downstream face of the culvert to impervious dike downstream) = 108' along Stagg Creek. 2013 10 24 V Z � z � z �� O yZj �Q P U • � � V W � O � � � � *DESIGN EXCEPTION: SAG VERTICAL CURVE K VERTICAL SSD � " I ' •� " I � I : (�) I � \ (�) i'� " I ' I-I � � . �� i'� (�) I . I \ . •� II�I�'I�I(�)\ (�)I� I-II��I-f\��'.-��'� o��GE cou�TY LOCATION: BRIDGE NO. 209 OVER FRANK CREEK ON SR 1366 (ATKINS ROAD) TYPE OF WORK: GRADING, PAVING, DRAWAGE AND CULVERT BUFFER IMPACTS PERMIT . � , . �� � I- I.� I', I.� '��� ��, 0- DESIGN DATA ADT 2000 = 70 ADT 2025 = 140 V = 55 MPH SUB REGIONAL TIER LOCAL PROJECT LENGTH LENGTH ROADWAY TIP PROJECT = 0.042 MILES LENGTH STRUCTURE TIP PROIECT = 0.005 MILES TOTAL LENGTH TIP PROJECT = 0.047 MILES Prepared !n the Offlce of Hatch MoH,�acDonold for DIVISI011i 7 NORTN CAROLlNA DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPEC/FlCATlONS TIM R�JORDAN � PE LETTING DATE: DAVID FUH PE H3'DRAULICS ENGINF,ER NCDOT CONTACT: TIM POWERS, PE D!!�lSIOA' BRIDGE PROGR9M MANAGER ROADWAY DESIGN ENGINEER P.E. /GN,9TURE: HYDRAULICS ENGINEER GLI PERMIT DRAWING SHEET 1 OF 6 I�7�OMPLETE PII,A�T� DO NOT II9�' AOR R/W AC'Q[]191T[ON PLANS PREPARED BY: � Hatch Mott �` MacDonald PO Box 700 Fuquay-Varina, NC 27526 (919)552-2253 (919)552-2254 (Faxl WWW.hatchmott.com LICENSE NO. F-0669 � � 5121 Kingdom Way, swr� ioo Raleigh, NC 27607 NC i,icenve Vo� I"a_f,d Engineering DETAIL A TOE PROTECTION INor�o s�aie� ��0. FILI ti�'(�F' SLOPf GROUND d GFOTE%IILE d= 1 Fe. Type ofL'iner= CLASS B RIP RAP FROM STA.72+70 TO STA.13+65 LT. FROM STA.74+55 TO STA.14+80 LT. FROM STA.14+05 TO STA.14-25 RT. �V,qQ 8y� � ?0 >> . � \ \ Na+�AN o. Ancd�s loo O 50 100 SCALEa I"= 100' HORIZ, c 6' � � 640 � c � 630 ,� � � I 620 w c�� G� 610 �w z� «� � �, ��,� �, � � ��� 600 W000s i WOODS niol,Us w s EvsA c. �ryuAlls BUFFER IMPACTS PERMIT CLASS II RIP RAP ON FLOOD BENCH BORDER EST.10 TONS RIP RAP EST.10 SY GEOTEXTILE 30 LF OF OUTLET CHANNELIMPROVEMENT EST. 70 TONS Cl II RIP RAP EST. 75 5Y GEOTEXTILE TOE PROTECTION SEE DETAIL A EST. zz 7pNS RIP RAP EST. ?? SY GEOTEXTILE BEG/ PROJECT 17BP7.R99 —L— POT Sta.12+50 � �� I VE10CIT �'i, �.;3 �5 GRASS SWALE P W00�5 DIFFUSE�FLOW) qT j3 ES�OMES V10-1.6 fps (N N-EROSNE� 410=1.7 cfs THO�IAS K. 4 ELIS/1 G. �IJJAIIS 10 11 TOE PROTECTION L SEE DEiAIL A — EST. ?? TONS RIP RAP EST. ?R SV GEOTE%TILE CLASS II RIP RAP ON �/ / FLOOD BENCH BORDER �� EST.10 TONS RIP RAP — O EST. 10 SY GEOTEXTILE / 2 NAt�E & �E BEGIN PROJECT I BEGIN GRADE STA. 12 + 50.00 I EL = 631.56' I 12 �//-�j(/�-�� PROIECT REFERENCE SHEET NO. \'� �u � � � 1�� � L I 'ROA�NGIN DROIRGAN GE 209 ENGINEERS y�� �i �7 � � � ♦ � �\ � m � \ � � \\ � � DAyD PARKFA � � � � � > � a �� � / e. � / a°!' / � –ylte– \ i .'/ � � � � — E ISTIN DITCH ENDS HERE / � � � � / LOW AT 14+42 /// ���"/ V10- .6 fps �NON-EROSIVE) / Q10 0.6 cfs 70E PROTE ION V�00�5 / ^ EST. D?TTON RIP RAP / � EST. ?? SY EOTE%TILE � // /�/ _ _ +� a/ / /�/ /� st � � < —/ Zo� �� —� R 13b�ASK% �j 5 P�P I�T�O�vIFLE ]E ]PLA�T� Do Ndf VaB FOA /W Ab¢VI$ITtoN HATCH MOTT MACDONALD 18 E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED repare i 1 e o"'Ce °` � Hatch Mott po eo. ,00 MacDonald ww»s��� t+' �m's�` 1�� �. Engineering VERTICAL SCALE HORIZONTAL SCALE 4' , 9 4, �p, z�, Q z�, sp, '-'-''-'�� �'-'-''-'�� BUFFER DRAWING ��—r--�-=� SHEET 3 OF 6 `�"�;� CL455 II RIP RP.P w/ GEOTEXTILE ON FLOOD �� NLVERT BURIED 7' BACKFILL BENCH 80RDER W/ �/ WITH NATIVE MATERIAL PER SPEC. 2:1 SLOPE �TYP.) y�� `� CLA55 II RIP RAP COIR FIBER `�'' �-� `� - 2'THICK W/ MATfING �NP.) � GRP,55 SW LE BMP ��=EOTE%TILE (NP.) �� � (14+25-15 35 BEC ES � DIFFUSE F W Q10=�295f 5(NON-EROSIVE _L– C . J�'�'ZO � Z,/ �`�N,P�'� �� 2' SILLS BACKFlLL WITH END PROJ CT 17BP7.R.99 NOTE: FOR CUT CONDITION, USE � 5��� NATIVE MATERIAL —L— POT O.IJ�"fOOAO CLASS II RIP RP.P FLOOD BENCH �Z�_iq� p�_�Z� PER SPEC. (TYP.) BORDER WITH NATURAL GROUND TOE PROTECTION COVERED WITH COIR FIBER MAT INSIDE BORDER.IN FILL CONDITION, �EXCAVATION=60 CY �ST.?z 70N5 RIP RAP USE CL4S5 IIRIP RAP FlLLTHROUGHOUT INLET CHANNEL EST.?? SY GEOTEXTILE HIEHVODS ONEDOPATERIAL FlLLING LOOKING DOWNSTREAM 30 LF OF INLET _CHANNEL IMPROVEMENT SEE ENLARGED CLASS IIRIP RAP W/ EST. 45 TONS CASS II RIP RAP GEOTEXTILE ON FLOOD EST. 50 SY GEOTEXTILE CLP,SS II RIP RAP BENCH BORDER W/ AREA ON 2'THICK W/ 21 SLOPE (TYP) N EXT S H E ET GEOTEXTILE �P., COIR FIBER MATfING �TYP.� z, �, LEGEND �"'"ai ,���� � 2' SILLS BACKFILL WITH ALLOWABLE IMPACTS ZONE 1 �� 5��� NATIVE MATERIAL (ROAD CROSSING) CULVERT BURIED 1' 12,_15, p,_12, PER SPEC. (TYP.) � BACKfILL WITH NATIVE MATERIAL PER SPEC. � A��OWABLE IMPAQS ZONE 2 NOTe: OUTLET CHANNEL �EXCAVATION=90 CY (ROAD CROSSING� SILLS TO 8E LOCATED AT rHe iN�er nNo our�er oN�r (LOOKING DOWNSTREAM) PI = 13+40.00 EL = 624.72' VC = 140' K = 14 REMOVE E%ISTING� BRI�GE END PROJECT END GRADE STA. 15 + 00.00 EL = 628.08' � � `— NATURAL GROUND AT UPSTREAM FAGE OF _ CULVERT �–NORryVCCWS.' •'. . ' – ELEV.:=617.6 2�. 12'.x 7' RGBC onTe:z-i �-zm s �I � � � 13 14 15 16 17 CULVERT HYDRAULIC DATA DESIGN D/SCHARGE = 800 CFS DESIGN FREQUEN�1' = 25 YRS DESIGN MN ELEVATION = 6223 fT BASE D/SCHAR�E _ 1200 CFS BASE FREQUEN�' = l� YRS BASE HW ELEVATlOIV = 623.47 fT OVERT�PPIIy� D/SCHARGE = 2200 CFS OVERT6PP/N� FREQUENCY = 5QOt YRS OVERT�PP/N� ELEVATION = 625.9 F1' DATE OF SURVEY = 2-17 20/6 WS.ELEVATlOIy _ sn� � AT DATE OF SURVEY 650 640 630 620 610 600 _ . - \ � \ � \ \ ' � � � � � i � i � _,_ DETAILA \ ,' BUFFER IMPACTS PERMIT TOE PROTECTION / INor�o s�aiel / ' O�0. sio / �' M1'�.(tF. Pe / �--_ caouNo d f� - _ i �� � � \ \ 1 �' � /� � I � � d= 1 Fe. cForE*rnE / / � \ � / � � \ � � �-- Type ofL'iner= CLASS B RIP RAP /� // i � � FROM STA.72+70 TO STA.13+65 LT. � ��- FROM STA. 74+55 TO STA. 14+80 LT. � �� / �S. � � � FROM STA.13+50 TO STA.13-70 RT. � / 9� / / � FROM STA.14+05 TO STA.14+25 RT. �V` � // / � / _- _ �� �� �� � � � 8 i � �� / l / \ � \ �� \ � ?a>> ��, � i i � � i i ♦ f° � I / � � � A � �� nw�lAs w s EvSA a�111A1,1� ! / � � � � � � � i � i , BEGI � � � �` S9��--�'� � � � � _L ' i � � � � � �--� I � i � �� � � . � � ,' ` � i � i �' i' � � \ � ' � ' � _ 1- �� Sl�a.10-f00.U0 ' �L- � � o. OA � 1 � � � � \� I / / l \� \ �\ � � � � \ W000s �� � � �\ / � �� � � /� � .. -' _' � p�_ � � � i a� �--� m \ ` � � > � c � - _ 1--=-- eS� � �< � � -1��� \ ��i 0.i�TY.fS � 1 � mj/ I �_y — s-7 \ � � � � 4ti - - � � \ � I - � /�/ / ' I /_ h � -' � � l \ � , / � � j � \ // � i � � _ - - - . � � i�/ ' - . � /� c _/ � / / � ,1 % i " � i - i �'OODY � \ �99 � %�� �i %' - , gm' � � ' i � 1 �R � � � / �i7 � �6 � � (\ , � � � `� ,— / /i�� i � i i� � � � \ °� /�� � ! � � � � ( \� � \ y �� // I � � / � 1 � � � � � p9 � � � � / �O�AS 1(c A F115'�G �L1.1�5 � � \ � � � _b�c /��,.Pi ,�000s �� / �� i i �' \ � \ / �/ � / � / / / � � / � � � � g � �� ' � hm � � � � i 1 � � �y � � FL� / / E87 / /� �� 3I] LF qF OU7LE1 2HANIJEL IMPkO� �sr. �0 roN� a � EST. 7�i S7 (iEOTI / � � � m TOE PR � � SEE DE' � � �EST.zz � � iesr?� IN / I I l l � I I I �D�R� � � I / � // �� �� � � l / � l, l /;o // � i /� // /� eai��o ar �evi/xyue // � I \�� \\ � / ��!\ ��G� �� I � / / � �/ �� / �/ � � // // / / � \ � � / � � � y / / � � � � // � % / / / / / \ \ / s � I �p // �� / / � / � � / � / CLA55 II RIP RAP 4N // / �. \ 1 / �� 6�� // �� // // / � // // // /(�A� �/ ��/E5T�.76 TOI�YRIPBRAP R �/ �/ � � � �- i i i / i i i � i esY. io s GEOTEXfILE � � i \� I I <i� ` � i , � / � / / / � / / i �� �� �� �� �� �� i �� i� I � i' i / i / i i � � i i i � � � i � � , m � � i i i � i i � � l i i / i i i / � �� � IOO ' / m p/ / / / ,m / / I / / , � , , , / , E 50 100 SCALEa I"= 100' HORIZ, ��i �. � E 650 � c 6' � � 640 �I ,� I 630 ,� � � I 620 w c�� G� 610 �w z� «� � �, ��,� �, � � ��� 600 10 BEGIN PROJECT BEGIN GRADE STA. 12 + 50.00 EL = 631.56' `` � `� ` `� �//- �j(/�-�� PROIECT REFERENCE SHEET NO. \e Ip � � � 1 � � � � �l 'ROA�NGIN DROIRGAN GE 209 ENGINEERS �� �i � 1� � � / / � i � � �` x � i � � / \ � _ i \ / .�, , �. � / � 1 � / l / - � � � e°' i � I�T�O�vIFLE ]E ]PLA�T� �� oOp��" // Do t7oT V�B FOA /W AbR07$ITIOA � o�m�~ �� /�/- // �`O ) / HATCH MOTT MACDONALD 18 E, LLC LICENSE NO. F-0669 /�� I � �� DOCUMENT NOT CONSIDERED FINAL . l � � UNLESS ALL SIGNATURES COMPLETED �, /� � Q � � � repare i t e ����� q� • � � I Office of: � � i , Hatch Mott po eo. ,00 � � ` � _,�_ \� � i MacDonald ww»s��� t+' �m's�` � ' / � � � � / � �o `/ `�/ � / I 1�� w��� i� � ,. � ��----_ii . ,, _ _ _ _ � , - _ _ _ , i Engineering�� _,--� �� VERTICAL SCALE HORIZONTAL SCALE � 5' . 0 5' 10' 25' . 0 25' 5p' � � ii \ L- /�/ JiO. // TDUd7t/- _ � �/i / � / �///. / J /--- ___ _ � , �/� / � i -06g_ _ �% ��.r i � � �mtl9 ' -- � � __ i /� / / � � � NLVERT BURIED 7' BACKFILL � �� WITH NATIVE MATERIAL PER SPEC. �� // / / CLA55 II RIP RAP i /� 2'THICK W/ / � V /� � � � =EOTE%TILE (NP.) C 5 � � � � � 25 - - � � _ ive . 5�20 �� . / z.,�� i � � � i i �J CT f�P7.R p9' � ' � r' � /� NOTE: FOR CUT CONDITION, USE �� SILL O.IJ�'H� /,� �� CLASS II RIP RP.P FLOOD BENCH � BORDER WITH NATURAL GROUND / �'7� / / / � / � COVERED WITH COIR FIBER MAT / // i / � INSIDE BORDER. IN FILL CONDITION, / / / USE CL4S5 II RIP RAP FlLL THROUGHOUT / / WITH NATIVE BED MATERIAL FlLLING LOO / �/ � / THE VOIDS ON TOP. R� RAP � 'SEE ��NL��RG� � E9r.50 5Y GEOTEXTILE I � � � CLP,SS ,� i; ; �; ; ; � AI��A O�N r GEOTI �; i; � �; � � ; NEXT �CHEE� I I I � � I O1 I � l \ \ i I I � � i � � � � � \ z`�i i i i � � LEGEND "'"ai ALLOWABLE IMPACTS ZONE 1 � 5��� (ROAD CROSSING) CULVERT BURIED 1' �y�_�5' 0'-12' � BACKfILL WITH NATIVE MATERIAL PER SPEC. � A��OWABLE IMPAQS ZONE 2 NOTe: OUTLET CHANNEL (ROAD CROSSING� SILLS TO 8E LOCATED AT rHe iN�er nNo our�er oN�r (LOOKING DOWNSTREAM) ���� V' �u.J VV d.l'��� � L�J PI = 13+40.00 EL = 624.72' VC = 140' K = 14 REMOVE E%ISTING BRI�GE � BUFFER DRAWING SHEET 3 OF 6 END PROJECT END GRADE STA. 15 + 00.00 EL = 628.08' � / ��/ . -{� � i NATURAL GROUND AT UPSTREAM FAGE OF CULVERT � � ELEV.":=617.6 � 2 �: 12'.x7'RGBC onTe:z-i �-zoi s �I � , � , �� . _ _ ,_ 11 12 13 14 15 16 17 S 2' SILLS BACKFlLL WITH NATIVE MATERIAL PER SPEC.(TYP.) � EXCAVATION = 60 2' SILLS BACKFILL WITH NATIVE MATERIAL PER SPEC.(TYP.) �EXCAVATION=90 CY CULVERT HYDRAULIC DATA DESIGN D/SCHARGE = 800 CFS DESIGN FREQUEN�1' = 25 YRS DESIGN MN ELEVATION = 6223 fT BASE D/SCHAR�E _ 1200 CFS BASE FREQUEN�' = l� YRS BASE HW ELEVATlOIV = 623.47 fT OVERT�PPIIy� D/SCHARGE = 2200 CFS OVERT6PP/N� FREQUENCY = 5Q0+ YRS OVERT�PP/N� ELEVATION = 625.9 F1' DATE OF SURVEY = 2-17 20/6 WS.ELEVATlOIy _ sn� � AT DATE OF SURVEY 650 640 630 620 610 600 BUFFER IMPACTS PERMIT OODS EXISTING DITCH OUTLET VELOCITY TO THE STREAM V10 =1.3 fps (NON—EROSIVE) Q10 = 2 .4 cfs -L- � -�� -�--�-�-- -- GRASS SWALE BMP - (12 + 50-13 + 50) AND BECOMES DIFFUSE FLOW AT 13 + 50 V10 =1.9 fps (NON—EROSIVE) Q10 =1.7 cfs GRASS SWALE DATA DA= 0.59 AC SLOPE= 2.64% L REQ. = 59 ft. L PRO. = 100 ft. Q2 = 1.3 cfs V2 = 1.5 fps D2 = 0.47 ft. Q10= 1.7 csf V10 = 1.6 fps D10= 0.52 ft. STA. 12 + 50 TO 13 + 50 RT V z � z a w z �� oz C! w O� �V H� 8� q 2p7� • � \�)� �✓�� a III �J ., • T \ .i �. . � � �, , v, , � , , N r m � m m m PDE X , �� � �/ � -- -- - - � ------ NN m m I O O N � N � m E�ISTING DITCH ENDS HERE aND BECOMES DIFFUSE FLOW AT 14+42 V10 =1.6 fps (NON—EROSIVE) Q10 = 0.6 cfs �_��_ � - - _ t - F� �� — �----- �r���_.-.,��. ���� � ��11��� �-� � .� . � �����i'_�_�..�'.�, .�L�� ��'i� .� � .�. J I���1! ����.�.���� \� � GRASS SWALE BMP W 0 0 D S PDE (14 + 25-15 + 35) AND BECOMES DIFFUSE FLOW AT 14+25 � V10 =1.9 fps (NON—EROSIVE) , Q10 = 2 .5 cfs � ; � ������ ����� ��� ���� � � N � N m �i / GRASS SWALE DATA DA= 1.0 AC SLOPE= 2.64% L REQ. = 100 ft. L PRO. = 110 ft. Q2 = 1.9 cfs V2 = 1.8 fps D2 = 0.57 ft. Q10 = 2.5 cfs V10 = 1.9 fps D10 = 0.63 ft. � LEGEND 30 0 � ALLOWABLE IMPACTS ZONE 1 (ROAD CROSSING) 15 30 �j//// ALLOWABLE IMPACTS ZONE 2 SCALEo I"= 30' HORIZo (ROAD CROSSING) V z � z � w z �� oz C! w O� �V BUFFER IMPACTS PERMIT ,� , , , � � / � � � / � J � I / / / I � // I / � �' / � i �� I � \ � \ � , (�') `• � � � � � -� � ` � QobS �� ' , ., � , � � ,, � , ��\`,EXISiINC��,� DITC�Fi� OUTLET l ��%ELOEI��(���0 �fHE �TREAM �� V']0 � 1.3�,�p;s �N01�1; EROSIVE) ,�� Q10 �,2.4 �6f��� � � �� ,_ � „ , � �. � �- � �. � . � �� �r� �v�� '�� �� � �`'�"/� y > , - � ` -' ` - > >` � '`� , '��, ----_�\ � _�- ---------___ ` `_ �i � - � � � - � � � � �- `� `� � � — � � , � � , , , � � � , � � , � , � � � — T � �\ _ _ � �' \ `-�� _-� / �-__ .sti. � ;:r� ,-�=T . � �- _ _ _ ' - - - - � �_------ - _- G�ASS SV�ALE BM� � ' - -----__ ' �'�,✓ (1 �' + 50-1'3 + 50) AI�J D BEC��!1ES v ,' ����� D FFUSE; FLOW Al'� 13+5� �, �,, ;� ' , V�0 =1.9', fps (NON—�ROSk�) ; `, �' ,�� Q'10 =1.7, cfs � � � , `� , i � i i � � � � � ' � � I ( i �� \ i .� � � 1 � � I � \ I j � � I ^ / �� � I � �� � � V ----.� , I � � � � �� � i , , , i i i I � � ��/ i�/ I m�� \ r i I � I i 1 � � I 1 I � � I \ ��f � � � i � i � i i � � � I i \ � I � � I � I � , I I � i i � � � � 1� i i � i � I i � STA. 12 + 50 TO 13 + 50 RT i i � i i i �� , � � � � , � � i � � . �, ������ s����e� ��� ���� n H� 8� q 2p7� • � \�)� �✓�� a III �J ., • T \ .i �. . , CD�, --,,, , / / O // �/ � ' � O // � f� / / ' N � r i m N �- , m , � E ISTI� DITCH ENDS H-EI�E �� I�Id� BECOMES DIFFU,�E ,-� -�tOW AT 14+42 ��� � � , V10 =1.6 fps (NON� EROSIVE) � � Q10 = 0.6 cfs � _. _ -- - -- - - � - - �-�-��---- -- ----- ------� \T— , ___---� �--__ �-� -- _.,,,. _ `� �— — _ _ �l � _ , _ — i� - �� ��� � `. -, �_`__ ___--- /- < _____ I �� - -__ _----_" _---_ � , , __ _ _�-- _ � � __ // -� _,-� -- -- -- > � � ,-- , , � , - � , , � , , , �x� � ,� ,� � o, - .- ,� ,% ,�,� GR��S�NVALE BMP , I�l 0 0 D S ,� ,� � ��� ,� ,� (14�+ 25-15 + 35� �I�IU BECOM�g� ' � � � DIFFUSE FL�OVr/ AT 14+2��� ' � ; �`, ;_ _�,-' ,�' ,��/10 =1,9" fps (NON—ER�3SIVE) i � � i �� Q� �� 2.5 Cf$ �� i i � ___--__ � l i � / � i /' - - - i i ; � `� �i i GRASS SWALE DATA � � �� i i � � i DA= 1.0 AC � i � i ��i � �i i SLOPE= 2.64% j� i i "� i , i � i i L REQ. = 100 ft. i i � � i m i � i i L PRO. = 110 ft. � i i � � oi i � � � Q2 = 1.9 cfs � � � �i i � i � V2 = 1.8 fps ' � � i � � i � i � D2 = 0.57 ft. - �� � i �� � i � i � Q10= 2.5 cfs i �� i � i � i i V10= 1.9 fps i � � i � � � � i D10 = 0.63 ft. i � i � i � � � i i � �i i � � � i � i � ,� `�,' � ; i ! i STA. 14 + 25 TO 15 + 35 RT LEGEND ALLOWABLE IMPACTS ZONE 1 (ROAD CROSSING) ALLOWABLE IMPACTS ZONE 2 (ROAD CROSSING) 30 0 15 30 SCALEo I"= 30' HORIZo � � � 1 1 � � � � � � � . � � �� �� � � � •��� .�•� • • • � • • • � • • • ' • '• • '• :' � �. • '• 1• • • _ � '� •• _-- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ _____- _ ____-- • � � _� -- aaa CONSTRUCTION SEQUENCE � GRAPHIC SCALE 3.0 0 3.0 6.0 �J��I� CULVERT PHASING SF-670209 PHASE 1 PROJECT REFERENCE NO. � SHEET NO. RNJ SHEET NO. BRIDGE N0. 209 OVER STAGG CREEK ON SR 1366 (ATKINS ROAD) ORANGE COUNTY,NC 1.) INSTALL ALL TEMPORARY SEDIMENT CONTROL DEVICES NECESSARY FOR CULVERT CONSTRUCTION. 2.) INSTALL SPECIAL STILLING BASIN WITHIN PROJECT RIGHT-OF-WAY. PUMP ALL EFFLUENT INTO SPECIAL STILLING BASIN. 3.) INSTALL IMPERVIOUS DIKES AND INSTALL 24" TEMP. PIPE. 4.) DE-WATER EFFLUENT FROM WORK SITE INTO SPECIAL STILLING BASIN. 5.) CONSTRUCT PROPOSED 2@ 12' X 7' RCBC, CHANNEL IMPROVEMENTS AND FLOOD BENCH PER PLANS. PHASE 2 b.) REMOVE TEMPORARY IMPERVIOUS DIKES AND TEMPORARY PIPE TO ALLOW FLOW THROUGH NEWLY CONSTRUCTED CULVERT. 7.) UPON STABILIZATION OF ALL DISTRUBED AREAS, REMOVE ALL TEMPORARY SEDIMENT CONTROL DEVICES. � om H � < � H Z 7o��p r�TI�Cn �z-I=D =�DDm � Z 2 N O � z,���-n • �OH �DDD �� U' o z� m Z � � m� � _ _ � � m � D � z = O p o �7 D � � � � r '-' � D � � �"� Z Z � � � O � �SEEIPBANS A �� �CLEARING LIMITS � \ S� �E '� =�E � R�W ^��� CLEARING LIMITS E� � �E l�� � �E E E � � - � R/W C � � - - - - � - - - - � � SLOPE STAKE LIN� rE.O.P. R/W � � � R/W � l�✓ SLOPE STAKE LINE F Iy B � E.O.P. �-� D - - - ----� � �-� �-� � � � � _F ��`�`` /��------ � �) E ���� E R/W � - � E E �O \ R�W �� E E-'J/ E, ` CLEARING LIMITS i �� �j �. � � �- �•;: _ .���� CLEARING LIMITS , ^ , A �j�, :;:' CLEARING LIMITS ' .• � �• . ��''' �: �. B .. • . D GENERAL NOTES: C � 1. REMOVE TREES OUTSIDE THE CLEARING LIMIT WHEN, IN THE OPINION OF THE ENGINEER, THE UTILITY OF A TREE WILL BE DESTROYED BY THE CONSTRUCTION OR THE CLEARING OPERATION. 2. CLEAR IN ACCORDANCE WITH THIS STANDARD EXCEPT WHERE ADDITIONAL CLEARING IS REQUIRED FOR SAFETY AS SHOWN ON THE PLANS. 3. FOR SECTIONS WITH WIDE MEDIANS WHERE TREES ARE TO REMAIN, CLEAR THE MEDIAN SIDE IN THE SAME MANNER AS ON THE OUTSIDE. CLEAR TO SLOPE STAKE LINE OR CONSTRUCTION LIMITS . � i •� ^ ` � :�' •• '.. : :l:••' �. . . SLOPE STAKE POINT - C� ROAD � SLOPE STAKE POINT J � PART SECTION D-D CONST. LIMIT LATERAL DITCH, CHECK DAM, SILT BASIN, SILT DITCH, - . TEMPORARY DIVERSION - CONST. LIMIT � � '-� � . `• ��.�. •i � SLOPE STAKE POINT � PART SECTION C-C ,;� :+ :' �� �: . . ...• . FENCE � i � ISLOPE STAKE POINT� PART SECTION B-B CONST. LIMIT RISER BASIN � z o� H � H aQ HOCC='�C� LLJ�Hz oo�= wQz�-x QU��H � F— 2 Z W c!)H�OJ O�CAQ Z H � 1 � �� 0� � O L.L � Z Z H ~ �. Qa� o W � J o v ' � o LL O z � _ � � � � _ _ � � � W J �C.'3 Z W 1EET 1 OF 1 S�OPE STAKE POINT —� `} SHEET 1 OF 1 200 ■ 02 SECTION A-/4 CONST. LIMIT ^O� ■ o^ L L