HomeMy WebLinkAbout20160941 Ver 1_More Info Letter_20161019 PAT MCCRORY
l 1 [ �.N Governor
I �(� DONALD R. VAN DER VAART
Nic Secretary
Water Resources
ENVIRONMENTAL QUALITY S. JAY ZIMMERMAN
Director
October 19, 2016 ,
DWR#16-0941
Orange County
Certified Mail
, Return Receipt Requested
7014 1200 0000 8627 3944
Carolina Forestry
Attn: Keith Brouillard
314 W. Millbrook Rd., Ste. 121
Raleigh, NC 27609
Subject: REQUEST FOR ADDITIONAL INFORMATION
Richmond Road Tract
Dear Mr. Brouillard:
On September 30, 2016,the Division of Water Resources (Division) received your application
dated September 27, 2016 requesting a 401 Water Quality Certification from the Division for
your project. The Division has determined that your application is incomplete and cannot be
processed.The application is on-hold until the following information is received:
1. A complete review of the project cannot be conducted until the U.S. Army Corps of
Engineers has verified all stream,wetland, and/or open water locations for the project.
The Corps of Engineers must also verify the Nationwide Permit used to authorize this
project. [15A NCAC 02H .0502(a)(7)]
2. Provide the project location and delineate the project boundaries on the most recent
USGS 1:24,000 topographic map and published county soil survey. [15A NCAC 02H
.0502(b)]
3. The impervious surface of the project must include proposed houses, driveways, and
sidewalks in addition to the road network. The site plan should include all the
components of the project not just a close up of the road impact. If you have any
Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps
1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200
Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159
Richmond Road Tract
DWR#16-0941
ON-HOLD
Page 2 of 2
questions about this requirement, contact Cherri Smith at 919-791-4251 or
cherri.smith@ncdenr.gov. [15A NCAC 02H .0506(b)(5) and (c)(5)]
4. The site plan needs to depict topographic contours for the entire project not just the
road. The stream is currently depicted as a line, but it should be shown as having
dimension with the buffers measured from each streambank. [15A NCAC 02H .0502(b)]
Pursuant to Title 15A NCAC 02H .0502(c),the applicant shall furnish all of the above requested
information for the proper consideration of the application. If all of the requested information
is not received in writing within 30 calendar days of receipt of this letter,the Division will be
unable to approve the application and it will be returned. The return of this project will
necessitate reapplication to the Division for approval, including a complete application package
and the appropriate fee.
Please respond in writing within 30 calendar days of receipt of this letter by sending four copies
of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service
Center, Raleigh, NC 27699-1617.
Please be aware that you have no authorization under the Water Quality Certification Rules for
this activity:
Please contact Cherri Smith at 919-791-4251 or cherri.smith@ncdenr.gov if you have'any
questions or concerns:
Danny Smith
Supervisor,Water Quality Regional Operations Section, '
cc: C?,1 R,RRO>401 file ;
DWR 401 & Buffer Permitting Unit file
U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade
Drive, Ste. 105;Wake Forest, NC 27597
Don Curry;The Curry Engineering Group; 205 S. Fuquay Ave.; Fuquay-Varina, NC 27526