Loading...
HomeMy WebLinkAbout20160963 Ver 1_Approval Letter_20161020Water Resources ENVIRONMENTAL QUALITY October 21, 2016 Robert Matthews 6152 Plantation Pointe Drive Granite Falls, NC 28630 PAT MCCRORY 0--c' DONALD R. VAN DER VAART Secre(my S. JAY ZIMMERMAN D,.. DWR# 16-0963 Caldwell County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Matthews — 6152 Plantation Pointe Drive Dear Mr. Matthews: You have our approval for the impacts listed below for the purpose described in your application dated September 26, 2016, and received by the Division of Water Resources (Division) on October 6, 2016. These impacts are covered by the attached Water Quality General Certification Number 3898 and the additional conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit, and/or Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved Permanent Open Waters Above Pool Below Pool 0.0045 (acres) 0.0045 (acres) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and 5164209OU .H" 7 Euvu Loa,N oUhC IUA2Ree59'ces 2090 U.S. Hwy_ 90 89296450 NOM C�ralire 28]]8 8292964500 Matthews- 6152 Plantation Pointe Dr. DWR# 160963 401 Approval Page 2 of 4 General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Stabilization techniques must meet the General Conditions listed in the Shoreline Stabilization Technique Selection Process found in Duke Energy's Shoreline Management Guidelines for the Catawba-Wateree river system 2006 Shoreline Management Plan. 4. The Permittee shall replant the vegetation within temporarily disturbed areas located within 30 feet of the shoreline in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns can be replanted with grass or trees and woody vegetation. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.) Replanting of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [15A NCAC 02H.0507 (c)] 5. The access corridor(s) must be the minimum width required to get the construction equipment to the shoreline and shall not exceed 15 feet in width. The number of access corridors should be limited to the minimum number required to get the construction equipment to the shoreline (many times only a single corridor is required) and shall not exceed 2 corridor(s). The access corridor(s) should cross the buffer as close to perpendicular as practicable and disturbance to existing vegetation should be minimized. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the DAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the DAH within five (5) business days following the faxed transmission. Mailing address for the OAH: Ijsending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Matthews- 6152 Plantation Pointe Dr. DWR4 16-0963 401 Approval Page 3 of 4 Ijsending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Kevin Mitchell at 828-296-4650 or Kevin.mitchellno ucdenneov if you have any questions or concerns. Sincerely, (//N` ZanP.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3898 Certificate of Completion cc: William Elliott — USACE Asheville Regulatory Field Office (via email) Wade Harmon — Duke Energy (via email) Andrea Leslie — NC WRC (via email) Caldwell County Planning DWRARO 401 files DWR 401 and Buffer Permitting Unit (via email) WWR\WQ\Caldw]lA0ls\Non-D0T atthews- 6152 Plantation Pointe DrWPRVL.Mattlam-6152 Plantation Pointe Dr. 10212016.docx Water Quality Certification No. 3898 &ENE AL CE IFICATIO O7 ROJECT ELIGIELE 'ORU•S. MYCCOORPSSOO EREERS�GION QP! IT ; 520115 S,f�V _ P E oU�` LIjTP0 PUBLIC UTILITIES) ND R �010yyA� NIT 1BSi0b�fl„(Y�OE LAKE AN RESERVOIR MAINT ANC�P IRi4ND 9:, y TI A IAV �iI AND RIPARIAN AREA PROTFlbtg, t. IEUF1'ER R I s1. The State of Noith Carolina certifies that tbespecified category of activity, will not violate applicable portions of Sections 301;'50,2, 303 306 and 307 of the Public Laws 92-500 and 95-297 it conducted In accordance with. the Conditions hereinafter set forth. - Activities meeting any one (1) of this following thresholds or circumstances require written appmvdf tote 401 Water Quality Certification from the Division of Water 'Quality (the "DIVlsion"I: a) Activities thatresult in fill, dredging or egcAationof watpm or wetlands below the normal high water level; or b) Any Impact associated with a Notice of Vlotatign or an enforcement a0lon for violation(s) of DWO Wetland Rules (15A NCAC 02H 000), Isolated: Welland Rules OSA NCAC 02H rules or Included In this written approval from the Division Is_retfufted, Conditions of Certification: 1.. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use ofthiaCodification No waste, spoil,. solids, or fill of any kind shall occur In wetlands, waters, or riparian areas beyond the footprint of theimpacts depicted In the Pre -Construction Notifloatlon, as authorized in the written approval from the Division or beyond Me thresholds established for uas of this Certifloation without written authorizallon including Incidental Impacts All construction activities Including the design,installation, operation, and maintenance of _ sediment anderosioncontrol Bost ManagemanI .PracITOes shall be performed so that no violations of at." water quality standards statutes, or rules obour Approvedplans and Water Quality Certification No. 3898 1 Wates' Quality Certification No. M8 speelfioatonsfor this project are Incorporated by reference andare enforceable parts of this Parrott, _ &. Standard Eroslon and Sediment Control Practices Erosion god5editent control practices most be to fullcompltampe with all specifications governing the proper design, Installation and operstlonand maintenance ofsuch Best Management Ptacticae and if applicable, comply With the specific conditions and requiramerile of the NPOE$ Constwoffon StormWater. P0md%Sgoa0 to the site: a, Desipn,. 0"' operation, and malMenance of thateedimentand erosion control Measures must be suchdhatthey aqual or exceed, the; ragilTraments Specified in the Most recent verston of the Ndith r ending Sedfi'nentadd Erc.sidnControfMalydal, The devices shall be maintained on all construction slide, borrow sltbs .and Waste pile ($poll) projects: Including contractor -owned or leased borrow pitsassoolatod With theprojeof, b. For borrow pit sites, the erosion and sediment control measures must be designed, Installed operated and maintained In accordance with the most recentversion of the North Carolina Surface Mining Manual. - - .c. Reglamatkm measures and implementation roust comply -With the reclamation in accordance With the regQirsundnts of the Sed(MeMaton Poltuton Control Act and the: - 14100 Act of 4971, d. Sufficient materials required for stablUano0andwfe)2alfoferasiemcohtrotmeaedres and stormwater routing and treatment shall be on she stalltitnea. a. if the project occurs In waters or, watersheds classified as primary Nursery Areas (PNAid,; - - SA, WS•l, WS -11, High Quality (HQWh or Outstanding Resource (QAW1 Waters than the sa Gmantado0 and orosloh 7,gnVAl dssfgns must comyVvfth the requirements set Icsth In') SA NCAC04B -0'124, Design Standards in Sensitive lNefelsherla. 1 No Sediment and Emslon Control Measures in Wetlands or Waters -. released 4. Consfructlon Stotmwater Permit NCG010000 An NPOES Construction Storrawa ar-Parmit is required for'donsbuedon projects' that disturb .one (1) on more acres of land, This Permit allows gtormwater to be discharged during land disturbing construction aebvities as stipulated In the conditions of thepcomif Ifyourproled't is covered by this permit, full coropltanod with permit conditions mciarling the erosion & sedimentation control plan, fnspectena and maintenance, Selfmanitorin99 record keeping: and repotting requirements Is required. A copy of the 0erreral permlt(NC©p:10000) inspection log s,haets, and other information meq be found at bloc /Ibdrtal P araLWeblwalN e(sdlbodessv HlL&w- . Water Quality Certification No. 3898 'Z- Water Quality Certif cation No. 8898 The North Carolina DepartmerAcif Transportation (NODCT)shall be requited to be in full _ opmpliahoe with the conditions related to construction sohvittes within the must recent version of their Individual NPDES (NCS00025D) stormWater permss " 8, ConstructionMoratariumsandCpordinalion it activities must occur during periods of high biological activity (i.e. sea turtle nesting, fish spawning, or bird nesting), the" biological mothering may be required at the request of other state or federal agencies and coordinated with these activities.: All Moratoriums on construction activities alta ,fishad by the NO Wildlife Resources - Commiseioq (WRC), US Fish and Wildlife Service (USFWS) NC Division of Marine Fisheries,. (DMF) or Natlonal Marina Fisheries Service (fNMFS) to lessen Impacts on trout, anadromdus fish, laNallposFlarVal fishes and crustaceans, Ar gther aquatic species of concern shall he Implemented Rxcephons tothiscondition require written approval by the resource agency . responsible for the given moratorium.. Work within the lwehty five (25) designated trout counties or Identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS NMFs, and/or oMF personnel. 9. Work In. the Dry All Work In or adjacent to stream waters shall be conducted so that the flowingstreamdoes hot come in contact with the disturbed area. Approved best management practices: from the mosteurrent version of the NO $edfriant and Eroaigo Control` Manual, or the NO DCT Construction and Maintenance Activities Manual, such as sandbags rock berms, cofferdams, and other diversion stroofuresgliall be, used to mininike excavation in flowing water: Exceptions to this condition requite applloaffonsubmlttai to and written approval by the Division. y. Riparian Area. Protection (Buffer) Rules 8, if concrete isused during the conetruotion, (bon all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the stadst, Water that Inadvertently contacts uncured concreteahall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic rife/ fish kills: Ot Rip -rap shall be installed waterward of bulkheads Installed in freshwater lakes to ensure proteclron of aquatic habitat Construction overwetlandsshalnte elevated at least three (3). foot above any wetlands; and Rustling structures shall not rest Periodically on the bottom, - - 1A Piers and boat houses shalt be constructedto provide for storage and removal of sewage . radr er than allowing raw waste or other sewage to be disposed directly into surface waters. II Deed nolifipations or similar mechanisms shall be placed on all retained jurisdictional Wetlands waters, and protective buffers Within the project boundaries in ordef to assure I r Water Quality Certification No. 3898 3' Water Quality Certification No. 3898 'compliance for future wetland, water, and buffer impart These mechanisms shall be out In place at the time of recording ofthe brod6rhiptof9ndiyidu61169Whidhayer 19 AWroortate, A sample dead notification can be downloaded from the 401/Watl0hds nit website at - The:te%tofthe aarlmr deed notification may ba modified as approo ate id Olt to 00060010pmle0t, - -Documentation of deed notifications shall be provided 10 the DIVISlon Upon request 12,. If an environmental document is required under the Net[ phal or State Environments( policy Act (NEPA or SIPA), then this. General Certlfleation is not validuntil a Finding: of No Significant Impact (FONSI) or' Record of Decision (ROD) It issued by the Slate Clearin4hmise. 13. in the twenty20) coastal counties the appropriate DWO Regional Offloe must be copteetod to determine I. Coastal Stormwaler Regulations will be required: 14_. This General Certification does not relleve the applicant of the respohsibil(ty to obtain all other required Federal. State or Local approvals. - 15. The applicant/parmttee and their authorized agents shall conduct all activldee ih a manner consistent with State water quality standards (including any fsputramehrs resulting from compliance with 5303(d) of the. Clean Water Act), and any other: appropriate requlraments of State and Federal Law, If the Division determines that such standards or laws are not being met Including failure t0 sustain a deaignatedor achieved use, or that State or Federal law is being violated, of that further conditions are necessary to assure compliance, then the Division may reevaluate and: modify this General Water quality, Certification. 16, When written authorization lsnegolred for use of this certification upon compietion:of all permitted applicantt$Rillbe rects qluded uired to lthin the return the 8erifcate of compedouentchedmodifications, the nettache to the approval. Ono copy of the certificate shall be sent to the DWO Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NO, 27658.1660. - 17. Additional site-saeeiflocon'dltlona, Including monitoring and/or modeling requirements, may 18. This cerBflcatiortrah9s permission tO tba dire€tor, an authorizedrepresentative of the: `Dlreotdr, dr DEN& 6taff, upon the. presentation of proper credentials to enter the property dudhg normal business hours, in of'a formal determined Water Quality Certification No. 3880, 4 Water Quality Certification No, 3898 PUbko heads maybe held for specific applications orgracp of a plBdtfons prior to a Oertlfioation ocisfoh if deemed in the P1100's best Interest by that irector of the North Carolina Division of Water Qua@y, - Effective date: March 19, 2012; DIVISIO40F WATERQUALITY By Charles Wakild, p.E, Director Water Quality Qertlficatlon No, 3888 8 Water -Resources ENVIRONMENTAL DUALITY WR Project No.: Project Name: PAT MCCRORY G-- DONALD oy— DONALD R. VAN DER VAART s"r -ry S. SAY ZIMMERMAN D.11i , County: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Appli'cant's Geri ficatlon 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: !f this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date sma ofNOM CNV1- I E ----MI Quality I W.Mraesources 1611 Mol wma, C-R, I Rdm h, North C—om 47699-1611 919]079000