HomeMy WebLinkAbout20130477 All Versions_Mitigation Site Visit_20160701 Wrenn, Brian L From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent:Friday, July 01, 2016 9:30 AM To:Elliott, Jason C; Wrenn, Brian L; Parker, Jerry A; Hayes, Meredith D Subject:RE: U-3615B Skeet Club Road Stream Thanks for the pictures and status update. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Elliott, Jason C \[mailto:jelliott@ncdot.gov\] Sent: Friday, July 01, 2016 8:19 AM To: Wrenn, Brian L <brian.wrenn@ncdenr.gov>; Parker, Jerry A <jparker@ncdot.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Hayes, Meredith D <mdhayes3@ncdot.gov> Cc: Elliott, Jason C <jelliott@ncdot.gov> Subject: \[EXTERNAL\] U-3615B Skeet Club Road Stream Good morning all, Per our discussion at the stream relocation for Skeet Club on Wednesday, I'm sending you all some brief minutes of what we discussed. Brian/Jerry if there's anything I've missed let me know. * We walked the entire stream relocation. As of Wednesday the contractor had completed all of the proposed relocation with the exception of the tie-in's at each end of the project. The project was built entirely in the dry and the purpose for our review was to ensure that the agencies were satisfied that DOT could turn water into the new stream and begin back filling the old channel. * Brian Wrenn with NCDWR agreed that DOT had constructed a stable channel (with seeding & mulching completed and coir fiber matting installed on the banks throughout) and that water could be turned into the new channel. He requested that DOT install silt fence around the pipe crossing (both up and downstream) and install silt fence as needed along the upper reach to protect the new channel from the work zone. We also discussed installed SF as needed around the waste pile. Seeding and mulching was completed along both the upper and lower reaches on the terrace as of Wednesday afternoon. 1 * I revisited the site yesterday and the tie-in is complete and stable. I've included photos of water in the new channel per Brian's request. I'm hoping we get rain this weekend which will increase the flow and assist with vegetation establishment. The site will need to have live staking and reforestation scheduled to be completed this winter prior to DOT beginning the monitoring requirements. Monitoring at this site consists of vegetation monitoring and photo documentation of channel stability. Please let me know if you have any additional info that I may have missed. Thanks and I hope you all have a good holiday weekend. Jason C. Elliott PDEA - Natural Environment Section Natural Environment Engineering Group NC Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919-707-6114 Fax: 919-212-5785 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2