HomeMy WebLinkAbout20200065_STIP R-4707 CP2R Draft Meeting Summary_20160606
Wrenn, Brian L
From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Sent:Monday, June 06, 2016 1:31 PM
To:Ramkumar, Rajit; Megahed, Samuel; Payne, Bruce B; Houser, Anthony A;
felix.davila@dot.gov; gary_jordan@fws.gov; Wrenn, Brian L; Weaver, Derrick G;
Makhlouf, Tamara; Clodgo, David J.; Saunders, Douglas B.;
Vanderwiele.cynthia@epa.gov; Craig.mckinney@greensboro-nc.gov; Mason, James S;
Dagnino, Carla S; Murray, Emily E; Staley, Mark K; Dickens, Shantray D; Mills, James M;
Lydia.McIntyre@greensboro-nc.gov; Gledhill-earley, Renee; Abuya, Michael R; Lakata,
Richard J
Cc:Al-Sharawneh, Ahmad A
Subject:RE: STIP R-4707 CP2R Draft Meting Summary
Rajit,
Thank you for the meeting summary. My only comment is that, while the USACE did inquire about the possibility of
eliminating either Alternative 2 or 3, the USACE did not recommend elimination of one over the other. Rather NCDOT
discussed which of these 2 alternatives should be eliminated. Once presented with eliminating Alternative 3 (Traditional
Diamond Interchange) from further study, the USACE agreed to it.
This is a subtle differentiation, but important to the process. Thanks, and please let me know if you have any questions.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Ramkumar, Rajit \[mailto:ramkumarr@cdmsmith.com\]
Sent: Thursday, June 02, 2016 9:55 AM
To: smegahed@ncdot.gov; bbpayne@ncdot.gov; thouser@ncdot.gov; felix.davila@dot.gov; gary_jordan@fws.gov;
brian.wrenn@ncdenr.gov; dweaver@ncdot.gov; Makhlouf, Tamara <makhlouft@cdmsmith.com>; Clodgo, David J.
<clodgodj@cdmsmith.com>; Saunders, Douglas B. <saundersdb@cdmsmith.com>; Bailey, David E SAW
<David.E.Bailey2@usace.army.mil>; Vanderwiele.cynthia@epa.gov; Craig.mckinney@greensboro-nc.gov;
jsmason@ncdot.gov; cdagnino@ncdot.gov; emurray@ncdot.gov; mstaley@ncdot.gov; sddickens@ncdot.gov;
mmills@ncdot.gov; Lydia.McIntyre@greensboro-nc.gov; renee.gledhill-earley@ncdcr.gov; mrabuya@ncdot.gov;
rjlakata@ncdot.gov
1
Cc: aalsharawneh@ncdot.gov
Subject: \[EXTERNAL\] STIP R-4707 CP2R Draft Meting Summary
Merger Team,
Please find attached the draft meeting summary for the CP2 Revisit Merger meeting for R-4707, US 29 and Reedy Fork
Parkway in Greensboro, Guilford County. If you have any questions or comments please contact me or Ahmad. If there
are no additions or deletions by June 15th, 2016 this summary will be considered the final version.
Thanks,
Rajit
Rajit Ramkumar, P.E., LEED AP |Transportation Project Manager| CDM Smith
5400 Glenwood Ave., Suite 400, Raleigh, NC 27612 | Office: 919 325 3606 | Cell: 919 931 6452
|ramkumarr@cdmsmith.com <mailto:ramkumarr@cdmsmith.com> |cdmsmith.com
<Blockedhttp://www.cdmsmith.com/>
2