Loading...
HomeMy WebLinkAbout20200065_STIP R-4707 CP2R Draft Meeting Summary_20160606 Wrenn, Brian L From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent:Monday, June 06, 2016 1:31 PM To:Ramkumar, Rajit; Megahed, Samuel; Payne, Bruce B; Houser, Anthony A; felix.davila@dot.gov; gary_jordan@fws.gov; Wrenn, Brian L; Weaver, Derrick G; Makhlouf, Tamara; Clodgo, David J.; Saunders, Douglas B.; Vanderwiele.cynthia@epa.gov; Craig.mckinney@greensboro-nc.gov; Mason, James S; Dagnino, Carla S; Murray, Emily E; Staley, Mark K; Dickens, Shantray D; Mills, James M; Lydia.McIntyre@greensboro-nc.gov; Gledhill-earley, Renee; Abuya, Michael R; Lakata, Richard J Cc:Al-Sharawneh, Ahmad A Subject:RE: STIP R-4707 CP2R Draft Meting Summary Rajit, Thank you for the meeting summary. My only comment is that, while the USACE did inquire about the possibility of eliminating either Alternative 2 or 3, the USACE did not recommend elimination of one over the other. Rather NCDOT discussed which of these 2 alternatives should be eliminated. Once presented with eliminating Alternative 3 (Traditional Diamond Interchange) from further study, the USACE agreed to it. This is a subtle differentiation, but important to the process. Thanks, and please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Ramkumar, Rajit \[mailto:ramkumarr@cdmsmith.com\] Sent: Thursday, June 02, 2016 9:55 AM To: smegahed@ncdot.gov; bbpayne@ncdot.gov; thouser@ncdot.gov; felix.davila@dot.gov; gary_jordan@fws.gov; brian.wrenn@ncdenr.gov; dweaver@ncdot.gov; Makhlouf, Tamara <makhlouft@cdmsmith.com>; Clodgo, David J. <clodgodj@cdmsmith.com>; Saunders, Douglas B. <saundersdb@cdmsmith.com>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Vanderwiele.cynthia@epa.gov; Craig.mckinney@greensboro-nc.gov; jsmason@ncdot.gov; cdagnino@ncdot.gov; emurray@ncdot.gov; mstaley@ncdot.gov; sddickens@ncdot.gov; mmills@ncdot.gov; Lydia.McIntyre@greensboro-nc.gov; renee.gledhill-earley@ncdcr.gov; mrabuya@ncdot.gov; rjlakata@ncdot.gov 1 Cc: aalsharawneh@ncdot.gov Subject: \[EXTERNAL\] STIP R-4707 CP2R Draft Meting Summary Merger Team, Please find attached the draft meeting summary for the CP2 Revisit Merger meeting for R-4707, US 29 and Reedy Fork Parkway in Greensboro, Guilford County. If you have any questions or comments please contact me or Ahmad. If there are no additions or deletions by June 15th, 2016 this summary will be considered the final version. Thanks, Rajit Rajit Ramkumar, P.E., LEED AP |Transportation Project Manager| CDM Smith 5400 Glenwood Ave., Suite 400, Raleigh, NC 27612 | Office: 919 325 3606 | Cell: 919 931 6452 |ramkumarr@cdmsmith.com <mailto:ramkumarr@cdmsmith.com> |cdmsmith.com <Blockedhttp://www.cdmsmith.com/> 2