Loading...
HomeMy WebLinkAbout20200065_R-4707 CP2 Revisit_20160516 Wrenn, Brian L From:Al-Sharawneh, Ahmad A Sent:Monday, May 16, 2016 1:44 PM To:Wrenn, Brian L; Davila, Felix; David.E.Bailey2@usace.army.mil Cc:Weaver, Derrick G; Al-Sharawneh, Ahmad A Subject:R-4707 CP2 Revisit Good afternoon Guys, I just want you all to have heads up, based on our designers the SPUI will not work with the interim design, currently we are working to revise our presentation and list the benefits for the DDI vs the SPUI, also discuss why the SPUI will not work with the interim design. I will email you our presentation later today. I do not want you to be surprise for asking to drop the SPUI from further study and replace it with the DDI. This is basically different from what I said in our meeting this week. Since the SPUI will not work with the interim design we will be wasting time to study something we know it is not going to work. I am hoping to email the presentation by the end of the day. Thanks Ahmad Al-Sharawneh Project Development Engineer Project Development and Environmental Analysis North Carolina Department of Transportation 919 707 6010 office 919 250 4224 fax aalsharawneh@ncdot.gov 1548 Mail Service Center Raleigh, NC 27699-1548 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1