HomeMy WebLinkAbout20200065_R-4707 CP2 Revisit_20160516
Wrenn, Brian L
From:Al-Sharawneh, Ahmad A
Sent:Monday, May 16, 2016 1:44 PM
To:Wrenn, Brian L; Davila, Felix; David.E.Bailey2@usace.army.mil
Cc:Weaver, Derrick G; Al-Sharawneh, Ahmad A
Subject:R-4707 CP2 Revisit
Good afternoon Guys,
I just want you all to have heads up, based on our designers the SPUI will not work with the interim design, currently we
are working to revise our presentation and list the benefits for the DDI vs the SPUI, also discuss why the SPUI will not
work with the interim design. I will email you our presentation later today. I do not want you to be surprise for asking to
drop the SPUI from further study and replace it with the DDI. This is basically different from what I said in our meeting
this week. Since the SPUI will not work with the interim design we will be wasting time to study something we know it is
not going to work.
I am hoping to email the presentation by the end of the day.
Thanks
Ahmad Al-Sharawneh
Project Development Engineer
Project Development and Environmental Analysis
North Carolina Department of Transportation
919 707 6010 office
919 250 4224 fax
aalsharawneh@ncdot.gov
1548 Mail Service Center
Raleigh, NC 27699-1548
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1