HomeMy WebLinkAbout20080795 Ver 1_Application_20080509eSINE ?,?
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
L`1
v?uT??Rfi ????lyy
y
MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TiPPETT
GOVERNOR SECRETARY
May 6, 2008
Ms. Sonia Gregory
NCDWQ
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650 080795
SubJject: Nationwide Permit # 14 SR-1544 Chatham County
Project # 8C.0190084 (DWQ Permit Fee $240)
Ms. Gregory:
The North Carolina Department of Transportation, Highway Division 8 is requesting Nationwide
Permit Number 14 and the corresponding 401 Water Quality Certification for project # 8C.0190084 on SR 1544
( Lashley Road) in Chatham County. The proposed project will replace an existing deficient crossing pipe as
follows:
Site 1- Replace existing 2 lines of 30"x 42' RCP with a 2 lines 42"x 44' CUT (with 2x 8' FES) total =60'.
Site 2- Replace existing 1 line of 72" x 40' CMP with 128'x 83'x 60' CMP with knee walls.
These pipes are being replaced in anticipation of a scheduled grading and paving project. The amount of pipe length
increase is needed to allow for the widening of the roadbed. The total percentage of impervious surface within the
project area will remain at less than 20%. All erosion control devices used on the project will be appropriate to the
location and in compliance with the current version of the NCDOT Best Management Practices manual (BMP). The
crossings are located on Unnamed Tributaries of The Haw River, a class WS-IV; NSW stream within the Cape Fear
River basin. All construction activities at this location will be done in compliance with conditions listed in the
current BMP manual, for projects built within areas of Water Supply Watersheds. Construction will be done under
dry conditions with the use of dewatering devices when needed. There were no threatened or endangered species
observed within the project area during the required minimum criteria check. The project is outside of the critical
habitat area of the Cape Fear Shiner. The project is on a loop road. Any detours will utilize existing state roads.
If you require any additional information, please contact me.
Sincerely,
c-
Art C. King
Division Enviro fficer
Highway Division 8
cc: Tim Johnson, PE
Barry Harrington
Benny Sloan, PE
P.O. BOX 1067, ABERDEEN NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 944-5623
DSCF1714.JPG
DSCF1715.JPG
DSCF1720.JPG
DSCF1721.JPG
Office Use Only' Form Version October 2001
USACE Action ID No DWQ No. 2 0 0 8 0 7 8 5
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4.. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
Owner/Applicant Information
Name: Timothy Johnson PE Division Engineer
NCDOT Highway Division 8
Mailing Address: PO Box 1067
Aberdeen NC 28315
Telephone Number: 910-944-2344 Fax Number: 910-944-5623
E-mail Address: tjohnson dot state nc us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Benny Sloan, Highway Maintenance Engineer
Company Affiliation: NCDOT/Chatham County Maintenance Office
Mailing Address: 1404 East Raleigh St
Siler City NC 27344
Telephone Number: 919.742.3431 Fax Number: 919.742.3986
E-mail Address: bfsloan(c?dot state ,.us
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1544• (site 1)Station 49+25 (site 2)Station 22+75
2. T.I.P. Project Number or State Project Number (NCDOT Only): 8C.019084
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Chatham Nearest Town: Chapel Hill
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): North on NC 87, right on
SR 1545, left on SR 1525, left on SR 1539, left on SR 1544
5. Site coordinates, if available (UTM or Lat/Long): N 35.8492 W 79.2227
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
residential
7. Property size (acres): N/.
8. Nearest body of water (stream/river/sound/ocean/lake): Haw River
9. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at llttp://h2o.enr.state.nc.us/admin/maps/.)
Page 6 of 12
10. Describe the purpose of the proposed work: Grading a secondary road for paving.
11. List the type of equipment to be used to construct the project: Motorgraders,
Backhoes, Trackhoes Excavators Scrapers Tractors & Dump Trucks
12. Describe the land use in the vicinity of this project: Residential
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
NA
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application:
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 7 of 12
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
None
* List each impact separately and identify temporary impacts. impacts include, but are not limited to: mechanized clearing, g,au,iig, rill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http_//www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Perm pipe 30' UT of the Haw River 5-8' I
I Temp
dewaterin 20' .< «
2 14 20' 8-12' P
2 Temp for
dewatering
25 «
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated lip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
wvcvv.us?s.?oc. Several internet sites also allow direct download and printing of USGS maps (e.g., vvvvvv.topozone.com,
www.maxuest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: Perm =50ft Temp=4511
Page 8 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on ma)
NA
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
t... 1:. ..:?e.J ?... F.li ,ot;nn ArvAaina
* List each impact separately and identify temporary impacts. impacts lncluuc, oul a?;; L,UL M,.,- LV. - , -----5 ?•- b
flooding, drainage, bulkheads, etc.
4. Pond Creation
if construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Pipe lengths are limited to accommodate the road widening only.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
Page 9 of 12
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/striiigide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
NA
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http:/%h2o enr state nc.Lis;wrp/iiidex.litm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Page 10 of 12
IX.
Amount of Coastal wetland mitigation requested (acres):
Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Neither the current impervious cover nor the new proposed impervious cover (gravel road bed or
asphalt pavement) will exceed 20% of the total site area Erosion control devices appropriate to
the site will be utilized on this project which may include silt fences, check dams and storm
water retention basins.
XII. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
di,
Applicant/Agent's Si&ature lia«
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
?I
O R A N G E
C O U N T Y
LLU
4
r
? 1117
w 1731
tOtO
Sca . 1 le 1 :14.400 TN
l " = 1200 ft
w) 2002 DeLorme. 3-0 TopoQuads w. Data copyright of content owner.
?? a rw
www.deiorme.com
s,
PROJECT REFERENCE NO.
SR 1544
WW SHEET NO.
STREAM BED
8.411 CROSS SECTION ELEVATION
1
PI Sto.45+46.41
0 = 59OOJ7
L = 529BZ
T = 2B4Br
R = 562.67'
= f 50
70 :
- ----- I ?47+00 - -
- - ----------Y___ - - -
SR 1594
LASHLEY RD.
_ P/ql ed In Ire d/Rx of,
DIVISION OF HIGHWAYS
DIVISION 8 - DISTRICT I
300 COUNTRY CLUB DR.
ASHEBORO NC 27203
PHONF. NT/MBF_R (.136)629-14
sr1544c_pipe rep2 dgn 04/18/2008 01:27:13 PM
ROADWAY DESIGN
ENGINEER
2 LINES 44'
42" RCP AND
2 FES(Total L=60')
(Replacing Existing )
(One 42"-30' RCP)
Existing
30'-42' RCP
,
N 43 2r 018 E 50+00
48+00 49+00 _ 00
,
POTSta. 49+37 \
,
To. \
N 35'50'57.01' P/ 51, 50
W 79'13'2120' 16° 9f0g5? rl
D .- Zearct?a ~/
T ` /28.66-" /
R ` 319 /
I ya
(0tp?xv,
PLAN
"NOT TO SCALE" 04117108
SHEET NO.
HYDRAULICS
ENGINEER
CLASS B RIP RAP
TYP
Oo o° o o
0 0 000 0 00 0 0 0p0 CLAS S B RIP RAP o0
TYP
0
0 00 KNEEWALL Oo 0 0 0000 00 00 ° 00 00 3'
0 °
0 0 0
0° 0 0 Oa 000
°00000 0000 4'
° 0
° ,
oo ,
I
o 000
000000 p
1 °0 CAPA
-
0000 CAPA 0 0 PIPE
. . . ' ? . . . ?.CONC. ` .. `
.
`
e' I
STREAM BED Toewoll STREAM BED
As Req d. 12'
CROSS SECTION Toew°lI
ELEVATION
h?
PI Sto 23+6293 .x6
S
- P awad in iie Office or,
DIVISION OF HIGHWAYS
DIVISION 8 - DISTRICT I
300 COUNTRY CLUB DR.
ASHEBORO NC 27203
PHONF" NUAIBF.R 1336 6) 29-14
SO 44c_pipe-rept.dgn 04118/2008 08:47:24 AM
0000 : 00 = 1.4459-r(LT)
'
' 5xc
°p(
0 f 0 0 ° 0
D = 13
00
000
)
0 0l ?rj 000° L = 59bC
12 N
0°000 0 C 0000
o 0000 o
T =2985'
,^' R = 44074' ro
.3 0 - --- °? b 10
0 00
° 00
x 00 0 °0 Existing
72"X40' CMP
?_._-
- I
----
-I
------- Sto.24+00
_ - -
? -- Sto.23+00
SR 1544
ZZ+?
'
' SHLE ROAD
LA
S 4
06.5- E
00
/ N 35'50'52.
W 7513'47
POTSTA.22+75
N
? a
n U
10
PI Sto 21+88,61
N A= 38' 02'59.4-(RT)
D = 30' 00' 000
L = 126BY
T = 6585'
R=190-W
PROJECT REFERENCE NO. SHEET NO.
SR 1544 SHEET: IOE 2
RW SHEET NO.
10ADWAY DESIGN
ENGINEER HYDRAULICS
ENGINEER
25
00 1 LINE 128"x83"x60'
I 0008° CAP ARCH &
/
°
° KNEEWALL
(
I oQ
oo
Q?
oooc lacing (1) 72"X40' CMP)
(Re
0° ° p
?0 °
CLASS B RIP RAP
ITYP
ni Ant
"NOT l"O SCALE"
04/17/08
PROJECT REFERENCE NO. SHEET NO.
SR 644 SHEET: 2 OF
RW SHEET NO.
ROADWAY DESIGN
ENGINEER HYDRAULICS
ENGINEER
STONE BERM W/
FABRIC COVER v
sr1
Prewe0 In Ila p/2e of,
DIVISION OF HIGHWAYS
DIVISION S - DISTRICT 300 COUNTRY CLUB DR.
ASHEBORO NC 27203
PHONE NUMBER (V6 629-l4
1 dgn 04/18/2008 08:46:51 AM
FABRIC LINED
CHANNEL
TEMP. DIVERSION
PIPE
0
FABRIC LINED
CHANNEL ?
STONE BERM W/
FABRIC COVER PLAN
in
NOTES:
1. INSTALL TEMP. BERMS, DIVERT STREAM FLOW
THRU DIVERSION PIPE AND FABRIC LINED CHANNELS.
2. PUMP CONTAINED AREA TO SILT BAG.
3. INSTALL PIPE AND BACKFILL.
4. REMOVE TEMPORARY DIVERSION DEVICES.
15'X 15'
SILT BAG
"NOT TO SCALE"
04/17/08