Loading...
HomeMy WebLinkAbout20070812 Ver 1_Public Comments_20080502 (2635)FROM : PHONE NO. : Poe Mr. Join Nmey 401 Development Unit StgxTvisor North Carolina Department of Environment and Natural Resources 2321 Crabtree Boulevard Raleigh, North Carolina 27604 Re: Section 401 Water Quality Certification DWQ Project Number 2007-0812 E ear Mr. Dorncy: My name is MicheUe Miller and I am a citizen of Norwood in Stately County, North Carolina. I write to you in response to Alcoa Power Generating, Inc.'s ("APGI1) request for a Section 401 water quality certification. As a citizen, l am concerned about the impact the proposed activities may have on Badin Lake and related water bodies in the Yadkin River. Radin Lake serves as the primary drinking water source for the City of Albemarle. The people of our area, as well as many across the state, utilize Badin Lake for fishing and swimming. Alcoa conducted aluminum smelting operations from approximately 1919 at the Badin Works which is located next to Radin Lake. It is wall known that the operation of the Radin Works resulted in contamination both on the site of the facility and in the water supply. i am concerned with the environmental issues because of buried materials, water leaching toxins from burial sites, lack of oxygen in the water, detriment to birds and animals from toxic materials, and human sickness caused by exposure to these dangerous materials. I believe that their operation will continue to cause damage to our cco-system, and ask that you deny APGI's request for a Section 401 water quality certification until these issues are corrected. The operation of the hydroelectric dams has had and will continue to have a negative impact on the citizens and wildlife of our area. I am aware that Stanly County is presenting information to you that if fully reviewed, will convince the State of ]North Caroline that APGI has not been a responsible steward of the people's water. We ask that you not issue this certificate until the appropriate tune is taken to fully evaluate the environmental impacts to the Yadkin basin and our region from the Radio Works operations and APGI's hydro dams, including information that Stanly County has uncovered in reoent months. After doing so, I hope that you will deny the 401 water quality certification or, at the very least, put the proper conditions is place to protect the health of our region. Sincerely, Jk4au" 1"L-u rc: Mr_ Jerry D, Myers, County Manager, Stanly County MAY-2-2808 FRI 15:24 TEL:9197336893 NAME:DWQ-WETLANDS P. 8