Loading...
HomeMy WebLinkAbout20070812 Ver 1_Public Comments_20080502 (2632)FROM : PHONE NO. : P05 Mr. John Dorney 401 Development Unit !supervisor North Carolina Department of Environment and Natural Resources 2321 Crabtree Boulevard Raleigh, North (~arolina 27604 Re: Section 401 Water Quuli/y Certification DWQ Project Number 2007-0812 Dear Mr. Dorney: My name is Frances Turner and I am a citizen of Albemarle in Slpnly County, North Carolina. I write to you in response to Alcoa Power Generating, lnc.'s ("APGI") request for a Section 401 water quality certification. As a citizen, I am concerned about the impact the proposed activities may have on Badin Lake and related water bodies in the Yadkin River. Badin lake serves as the primary drinking water source for the City of Albemarle. The people of our area, as well as many across the state, utilize Badin Lake for fishing and swimming. Alcoa conducted aluminum smelting operations from approximately 191$ at the Badin Works which is located next to Badin Ltakc. It is well known that the operation of the Badin Works resulted in contamination both on the site of the facility and in the water supply. I am concerned with the environmental issues because of buried materials, water leaching toxins from burial sites, lack of oxygen in the water, detriment to birds and animals from toxic materials, and human sickness caused by exposure to these dangerous materials. I believe that their operation will continue to cause damage to our eco-system, and ask that you deny APGT's request for a Section 401 water quality certification until these issues are corrected. The operation of the hydroelectric dams has had and will continue to have a negative impact on the citizens and wildlife of our area. I am aware that Stanly County is presenting information to you that if fully reviewed, will convince the State of North Carolina that. APCI has not been a responsible steward of the people's water. We ask that you not issue this certificate until the appropriate time is taken to fully evaluate the environmental impacts to the Yadkin basin and our region from the Badin Works operations and APQI's hydro dams, including information that Stanly County has uncovered in recent months. After doing so, I hope that you will deny the 401 water quality certification or, at the very least, put the proper conditions in place to protect the health of our region. sh=rely, (JW ate. &-d cc: Mr. lercy D. Myers, County Manager, Stanly County MAY-2-2008 FRI 15:22 TEL:9197336893 NAME:DWO-WETLANDS P. 5