Loading...
HomeMy WebLinkAbout20070812 Ver 1_Public Comments_20080502 (2615)234 Highland Drive Wadesboro, NC 28170 May 1, 2008 Mr. John Dorney 401 Development Unit Supervisor NC Department of Environment and Natural Resources 2321 Crabtree Boulevard Raleigh, NC 27604 Re: Section 401 Water Quality Certification DWQ Project Number 2007-0812 Dear Mr. Dorney: My name is Emmett S. Patterson and I am a citizen of Wadesboro in Anson County, North Carolina. I write to you in response to Alcoa Power Generating, Inc.'s ["APGI"] request for a Section 401 water quality certification. As a citizen, I am concerned about the impact the proposed activities may have on Badin Lake, the Yadkin River and the Pee Dee River. Alcoa conducted aluminum smelting operations for over 70 years at the Badin Works, which is located next to Badin Lake. It is well known, and in fact acknowledged by Alcoa in Federal Court, that contamination resulted both on the site and in the water supply as a result of these operations. I am concerned because the Pee Dee River is the primary source of drinking water for Anson County and we are down stream of this contamination. Before a certification is issued, there are many environmental issues that need to be addressed due to the buried materials, leaching toxins from the burial sites and continuing exposure to the environment. I believe that their operation will continue to cause damage and contamination to the river system. I respectfully request that you not issue a Section 401 water quality certificate until appropriate time is taken to fully evaluate the environmental impacts to the Yadkin and Pee Dee River basins. Thank you for your time and consideration. Sincerely, Emmett S. Patterson