HomeMy WebLinkAbout20040825 Ver 2_Stormwater Info_20080416MI.-'0Z'qA
P't'f??
TIC JOHN R McADAMS COMPANY, INC.
LETTER OF TRANSMITTAL
To: Annette Lucas
NC Division of Water Quality
2321 Crabtree Blvd., Suite 250
Raleigh, North Carolina 27604
919-715-3473
Re: Merck VMF 102
I am sending you the following item(s):
COPIES DATE NO. DESCRIPTION
1 Approved Final Design Calculations
1 Approved Plans
These are transmitted as checked below:
? As requested
® For approval
? For review and comment
Remarks:
Date: April 15, 2008
** FEDERAL EXPRESS **
Job No.: MER-07000
? For your use ® P Q512,
? APR 3 6 ?(?Cif2
yy??NDS AND STQRPn?"?6i??? SR,ANC??
Copy to:
Signed: 9./C?
Brandon R. Finch, PE
Sr. Project Manager
FOR INTERNAL USE ONLY
® Copy Letter of Transmittal Only to File
? Copy Entire Document to File
CIVIL ENGINEERING LAND PLANNING • SURVEYING
PO Box 14005 • Research Triangle Park, INC 27709 • (919) 361-5000 • fax(919)361-2269
www.johnrmcadams.com
77
kR@rfflq1,W' U
L.
APR 1 6 2008
DEitiR WA(EC? C "Al'
WETLANDS AND STORMWATER 6F2ANCH
COUNTY OF DURHAM
ENGINEERING DEPARTMENT
March 25, 2008
Raymond Rein
Merck & Co., Inc.
5325 Old Oxford Highway
Durham, NC 27712
Re: Stormwater Measures Control Plan Approval
Merck Temporary Construction Staging
DRB Number D0700545
Dear Mr. Rein:
MAR 2 7 2008
On February 19, 2008, we received a submittal package for the Merck Temporary
Construction Staging Plan. Enclosed is one copy of the plans and calculations, stamped
approved by this office.
The approved stormwater system consists of the conversion of an existing approximate 250' x
70' x 6' dry detention basin to a constructed wetland stormwater facility. The existing precast
outlet structure, barrel, and dissipator pad shall be reused. This system is designed to limit the
post-construction flowrate from the one-year 24-hour storm to 1.12 cubic feet per second.
Our office will issue a Stormwater Permit after the following are completed:
1. The stormwater facility is constructed, and final construction inspected by a registered
professional engineer, a registered land surveyor, or a registered landscape architect. A
signed and sealed copy of the inspection report must be submitted to this office.
2. Any sediment deposited in the basin during construction is removed from the basin.
Please feel free to contact me if you have any questions pertaining to this approval at (919)
560-0739.
Sincerely,
Chris Roberts, PE
Stormwater and Erosion Control Division Manager
cc: Joseph Albiston - Erosion Control Technician
Brandon Finch, PE - The John R McAdams Company, Inc.
120 E. Parrish Street, Law Bldg., 1st Floor, Durham, N.C. 27701 (919) 560-0735 Fax (919) 560-0740
Equal Employment/Affirmative Action Employer
'dip ;%;
THE JOHN R. WADAMS
APR 1 6 2008
DE??< . ey?rEi? titUAi?TY
WETi?NDS At?D 5TC>Ftt?WATER BRAN
MAR 17 2008
DURHAM COUNTY
ENGINEERING DEPARTMENT
S & E DIVISION
MERCK TEMPORARY
CONSTRUCTION STAGING
DURHAM, NORTH CAROLINA
Research Triangle Park, NC
Post Office Box 14005
Research Triangle Park,
North Carolina 27709
2905 Meridian Parkway
Durham, North Carolina 27713
800-733-5646
919-361-5000
919-361-2269 Fax
Charlotte, NC
5311 Seventy-Seven Center Drive,
"e 66
800;
rth Carolina 28217
704521lQ00
704-527-2003 Fax
FINAL DESIGN CALCULATIONS FOR THE PROPOSED CONVERSION
OF THE EXISTING DRY POND INTO A STORMWATER WETLAND
FACILITY
ppRUW i
zE
MER-07000 ;;'ENT
G?
Brandon R. Finch, PE
Sr. Stonnwater Project Manager
onnp e! tei?Slve 'La(t.fi Deve{vi.imie3 t DeSigr) Services
www.johnrmcadams.com We help our clients succeed.
DURHAM
1 B 6 9
WY OF MEDICM
City of Durham
Pu orks Dep ent
Stormwater S s Divisions
101 City Hall
rburham, No Tina, 27701
560-4326 FAX (919) 316
Constructed Wetland and Pocket Wetland Design Summary
Stormwater Management Construction Plan Review:
A complete stormwater management construction plan submittal includes a design summary for each
stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details.
1. PROJECT INFORMATION
Project Name: o Cows uc ,o Phase
PIN: oms - a¢- se- -7342 Case #:
Design Contact Person: -SebAyorl 1z. F:IrAc_kV - 'Pe Phone #: (Qq) 3c,? - 5 ooa
Legal Name of Owner: magm it c ,4vAw'1 JG.
Owner Contact: pg n n L g, IA Phone #: dtq %- 4 i i
Owner Address: 4sys aw twexov yu&gwAY -- pow A ., w. zi-m
Deed Book Page # or Plat Book Page# for BMP Property
For projects with multiple basins, specify which pond this worksheet applies to: INx,s-cwc V" pv?jp ro ?,
Does the proposed pond also incorporate stormwater detention? Yes No c'Mn
etention provided for: -,v,-1-year X 2-year x 10-year other
am Height: 0,z (feet) Dam Classification: D
Elevations
Wetland bottom elevation
Permanent pool elevation
Temporary pool elevation
1-year storm orifice/weir elevation
1-year storm water surface elevation
2-year storm orifice/weir elevation
2-year storm water surface elevation
10-year storm orifice/weir elevation
10-year storm water surface elev.
Emergency spillway elevation
Top of embankment/dam
Maximum water surface elevation
Depth from design storm to Lowest orifice elevation
Areas
Permanent pool area provided
Minimum required perm. pool area
Design storm surface area
&rainage area (10-acres min to Constructed Wetland)
241.00 ft. (floor of the wetland)
294- . ao ft. (invert elevation of the orifice)
Z9?l.q} ft. (itia,?oTt,.--a a?) ?,'° Wad
-' ft. (invert elevation) G?uAU*y s1Y9A
295.94 ft.
- ft. (invert elevation)
2%.Vs ft.
ft. (invert elevation)
248 nd ft.
29 .aS ft. (-top or RiS
Eq-
E1_EVXn-M
3w ft. (elevation) 299.02-> 16 svrr.+4JAf
}
249.24 ft. o-yaA
(max. storm pond can safelf passim ao
ft SmeM
w?T
CASE
SC+fiJO?b
q . 809 ft' (water surface area at orifice invert
elevation)
19 qql° ft' (calculated surface area required)
30,UT ft2 (Sped frequency event: I0 year)
I(0.(10 ac. (total drainage to the wetland)
Discharges (Specify only applicable frequency events)
At BMP
?l -year 2-year 10-year too year wnesm
Inflow t.4 cfs 33.8 cfs t,Z.o cfs cfs chsE
5?iGNlh'2?t7
Routed outflow n • I cfs 1).2- cfs o cfs ?Lb.a cfs
At Analysis Point(s) that BMP Contri butes to (SU686-S, 013)
1-year 2-year 10-year -year
Pre-development 14 cfs 4` cfs 14.5 cfs cfs
Post-development w/o detention 722 cfs cfs 79.2 cfs cfs
With detention ?.1 cfs 2.5 cfs 03.3 cfs cfs
Volumes
Permanent pool volume 11 #1? ft3 (volume of main pond and forebay)
Water quality pool storage volume t8 Sit ft3 (volume above permanent pool)--? t?' yon
Design storm storage volume 7 ft3 (volume above permanent pool)---* to- %flt
Total Storage volume provided at design storm 4! S?? ft3 t 1,3t.1 + 301207 = 41, 196$ Gi S"M
Total Storage volume provided at top of dam A.25 _ ft3
Forebay volume (Constructed Wetlands only) _A sift ft3 VWVt 'f -t fAtL t)-ftbL
Environmental Zones
Zone Water Depth at Normal Pool' Water Depth at
Temporary Pool (Max
Depth of 12-inches
above Normal P Portion of Tem
Pool a Area
Deep Pool
Low Marsh
High Marsh
Woody U
' Depths are to be calculated using the hydraulic depth calculation for each zone. Hydraulic Depth is the volume of water at an
elevation divided by the water surface area at the same elevation.
Other Parameters
SA/DAZ tA /A (from DWQ table)
Diameter of orifice 2 .,0 in. (must provide draw down over 2 to 5 day period)
Draw-down time '72 hrs
Design TSS removal 6.5 % (minimum 85% removal required)
z When using the SA/DA tables from the NCDENR BMP Manual, linear interpolation may be used for values between table entries.)
C?
Riser/Principal and Emergency Spillway Information
1-year storm orifice/weir diameter - in., length - ft.
2-year storm orifice/weir diameter in. length ft.
•10-year storm orifice/weir diameter - in. length = ft.
year storm orifice/weir diameter - in. length ft.
Principal spillway Fr. vI&s_jETEjL caizcw.afL 96SER-
Emergency spillway width--q_ R. side slopes slope_ %
5EE PcS- ?t LT pATA ?____
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements. Initial in the space provided to indicate the following
design requirements have been met and supporting documentation is attached.
Applicant's initials
- t a. The forebay volume is approximately equal to 20% of the pond volume.
ck?_ b. The temporary pool controls runoff for water quality design storm.
c. The temporary pool draws down in 2- to 5-days.
d. The drainage area to a Constructed Wetland is at least 10-acres. Smaller drainage areas to
Pocket Wetlands will be reviewed on a case-by-case basis.
e. Riprap outlet protection, if provided, reduces flow to non-erosive velocities (provide
calculations).
f. The wetland length to width ratio is greater than or equal to 3:1.
g. The wetland side slopes above the permanent pool area are no steeper than 3:1.
t4 lk h. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the
perimeter of the pond (show on plan and profile and provide a vegetation plan).
i. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is
permitted on the embankment.
j. A surface baffle, trash rack or similar device is provided for both the overflow and orifice.
Flat top trash racks are not acceptable. Access hatch has been provided.
t4 l k. A recorded drainage easement is provided for each pond including access to the nearest
right-of-way and is graded per Section 8.3, Stormwater Control Facilities (BMPs).
1. If the basin is used for sediment and erosion control during construction, a note requiring
clean out and vegetative cover being established prior to use as a wet detention basin shall be
provided on the construction plan.
in. A mechanism is specified which will drain the pond for maintenance and emergencies.
Valves used shall be plug valves.
n. Anti-floatation calculations are provided for riser structure.
o. A plan view of the wetland with grading shown is provided.
t4 t+, p. A profile through the forebay, wetland and spillway is provided. Water surface elevations
are shown on the profile.
Np, q. Riser structure details are provided.
r. Dam designed to account for a 5.00% settlement factor.
s. Compaction specifications for the embankment are shown on the plan.
t. The minimum top of dam width has been provided for the wetland embankment top width
per Section 8.3, Stormwater Control Facilities (BMPsj
Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit
0 fee per facility and payment of surety are required prior to construction drawing approval
This Page is Intentionally Left Blank
•
0
I?
•
1 MISCELLANEOUS SITE
1 INFORMATION
2 PRECIPITATION INFORMATION
3 WATERSHED SOIL INFORMATION
4 PRE-DEVELOPMENT
HYDROLOGIC CALCULATIONS
5 POST-DEVELOPMENT
HYDROLOGIC CALCULATIONS
6 STORMWATER WETLAND DESIGN
CALCULATIONS
7 100-YEAR (WORST CASE)
ROUTING CALCULATIONS
g APPENDIX
MIS C. SITE INFORMATION
•
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
•
• ? 1`i
Z
r
f_
-
s` I
E
S
I.
i:4
140 _ ._
• u
t
pp r (
L? II I SCALE 1.24000
U 1 MILES
1 t8 f
0 1000 YARDS
1= -
0 1 KILOMETER
91 VV
?i
Oe: NORTHEAST DURHAM I_oratinn- 036° 06` 34_9R" N ')7'P,' SO' 35_J.R^ vlll iV4.[1 ?7
i
Daie: 1%23%20025 F
Scale: I inch equals 2000 r`ee I
Copyright (G) 1998, Maptech Inc ????
MCI
LL
d?
L)
w
LLJ
cT
c?
?dY
`i
li3
=-t
PRECIPITATION INFORMATION
DATA TAKEN FROM PREVIOUSLY APPROVED DESIGN CALCULATIONS
(SEAL DATE: JUNE 18, 2004)
•
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
W o
C`' o
N
0
F °
?L
? a
W L
a L
? a
•
F
F O
U ?
U
? o
z
U F A
Q A
e
D
? ?
i
W Q O
N'NIN'NIN
?O ? M G
.- N
lI NI
L
y
.-. O ?--? O O 4 V1 00 O
oov,oo?Oin od'r- ooo
G ,p. C .-• N m 4 4 r; .O o0
? y
h 00 ?O O [? o O. O --?
O? N N
N M M4 Vl ,C l-:
L
y° 00 n V M N N N
?y u "0 00 N ?o ?O in
? C O .-. ? fV fV M M er v? ?O
N --L
Y
'y v o o M 00 eT n c) ON ?o M E,y
W C ,C. O ?-+ .+ ?--? N N M M V vl
A
H
z
' d kn N 00 et N O 00 00 N a
Z ci
Wa C O C + lV CV N M d V
a w
z
0 0
0 ? d? DD O\ ?!1 O W N v'i M O
v n O M [? Q .r ? ., ?p WW
F L ?^
N O O .r .-i --? :
.? N N t+1 M
" A
?
a
? ? ?
?y
?
?
y
' 7
? 7
E 7
? O
?
0 +
0
0 7
0 p
0
W ? E E E E E '° '_ = L ?
A
A
N
M
`O c
V
?„? v
N
? ? H M ?
L
d ?" N O d' 00 O O O ?O t? M
? ? l? V' N N Vl O Vl Q1 ? m
OC ,. C. T OO [? Vl M N --O O O
ti
L.
L _
? ter' OS t? ?O DD .N-. 00 m DO h OM
tn
L _
?--? O O M 00 ?O N r` `I' N
N u 00 n ?O ?t N ?--? --? 0 0 0
L _
?' N M ?1' .-. r+ N h O? N
? N r+ N [? et M O ?O M N
0 u? ? Vl M fV -+ ?+ 0 0 0
C L 00 r- N O 00 m Q\
d ' h h h N N --? N 00 vl M --?
? vl et M cV ? O O O O
?IN\C??I?IOIO?O??I?I?INI?
q ? yy. y yy
O ?+ ?+ w ?+ a?+ L LL V F.
7 l*0070 0 0g7
CC
0 0
? 'E E E E Ess.ass
A ,Ci.VI- oo NM'Z
N
w
ao
C>
N
1 ?
4v-
co
L
}? •• ??+ N h I'D O n
0000000'---
. .r
L
? 0 0 0 0 0 0 0 --? M
O
L
a?i N 7 t? M vl N M O 00 Vl
--N M 00 M [?
? 0 0 0 0 O O O? N M
N
L
N
7
\0
ON
r-
M
00
V'
01
%0
>y -i -i •• N 'V l- C? ?n In eF
0 0 0 0 0 0 0 0 N 'IT
ra ti
U
Q
w
0 L
00
N O
M I-
et M
00 N
-- r-
l- as
O?
?D
:
V7
U
Q
w
? L
4
t-
--?
N
h
N
el
vl
O
?
:
V
rG
N
0t
00
tIR
\D
? O O O C O --? N M ?O
Z N
G
Q
Q G
?
C4 in tn
M
N
O
7
a .
r M
A r.
? U
N
w
O
N
•
WA TERSHED SOIL INFORMA TION
DATA TAKEN FROM PREVIOUSLY APPROVED DESIGN CALCULATIONS
(SEAL DATE: JUNE 18, 2004)
•
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
laaj 000 5 01789T:T BIODS
Z Ti 0
al!W T n
MER-04000 WATERSHED SOIL R.E. JIMENEZ JR., El
MERCK VACCINE MANUFACTURING FACILITY INFORMATION 5/20/2004
Watershed Soils Information
Symbol Name Hydrologic Soil Group
Al Altavista C
Cc Cartecay & Chewacle soils C
Gr Granville B
Mf Mayodan B
Wn Wehadkee D
References:
1. SOIL SURVEY: DURHAM COUNTY. NORTH CAROLINA. UNITED STATES
DEPARTMENT OF AGRICULTURE: SOIL CONSERVATION SERVICE (IN
COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT
SECTION). SHEET NUMBER 1 I
2. SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL
CONSERVATION SERVICE. 1986.
=> Conclusion
Due to the large proportion of 'T ".group soils, the entire watershed was modeled with the following curve numbers:
Cover Condition SCS CN - HSG B
Impervious 98
. Open 61 (Assume Good Condition)
Wooded 55 (Assume Good Condition)
C7
MERCK VACCINE FACILITY
•
PRE-DEVELOPMENT HYDROLOGIC
CALCULATIONS
DATA TAKEN FROM PREVIOUSLY APPROVED DESIGN CALCULATIONS
(SEAL DATE: JUNE 18, 2004)
•
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
0009-T96 (OTO)
9001-aULZ dIZ 900iT XOa 'O'd
ox 'xava si!)xymi Hoxvasax
sxOaaeiiiis/saalau d/saaM!)Na
'DNI `?kNVdi'voo
SNiV(IVC)Nt *H NHOf HHI
r
11)
f
:aara
vclM Q?IG-dRLTXIA ITINMWO'TI??A:IQ?-aM tV00Z-LZ-90
V NIIIO? V o t1.l.Cl?l?l 6J/?L V HI:M(i '00-V = l :alms
i
%C IT 9 W
92= Z9'1i
aalani S .LORI Vaav
------------------
09-L
a.IJE ZoH vauv
Ir`? ? 83rJt3
= (iaicnLS,Lori
Z5'0
Gal
9# J.NZI l DZS
1 t# .iXRK02S
a
0
1# .IMi1 oas J I ?/r
Z# MaKoaS J ?-
s#
n
Z# JNZD1iDZS
r
I# J.NaKD2S
1 ?y= t
J it
1
san OI
amcms ION,
d
LMS-000*083W ,
000-Vo-83w '0, r?araua
a
00t, = gout I
i
0019 00ir ooz o 00ir
SOS DIHdV2iO
M ,t
j
?? tJ
1
z,
8
1
I# l
q;r,:
MERCK VMF HYDROLOGIC CALCULATIONS B.R. FINCH, PE
MER-04000 Pre-Development-Subbasin #3 5/26/2004
•
Total Sub-basin Area = 13.66 acres
On-site Area = 13.66 acres
Off-site Area = 0 acres
Contributing Area SCS CN Area (acres] Comments
On-site open 61 0.00 Assume good condition
On-site impervious 98 0.00 -
On-site wooded 55 13.66 Assume good condition
_ On-sit_pond 100 -
? 0.00 _
Off-site open 61 0.00 Assume -good condition
Off-site impervious 98 0.00
Off-site wooded 55 0.00 Assume ood condition
Off-site Pond 100 0.00 _
Total area = 13.66 acres
0.0213 sq.mi.
Composite SCS CN = 55
• % Impervious .= 0.00%
B. Time of Concentration Information
Time of concentration is calculated using SCS TR-55.
Segment 1: Overland Flow
Length = 50 ft
Height = 2.3 ft
Slope = 0.0460 ft/ft
Manning's n = 0.40 Woods - light underbrush
P (2-year/24-hour) = 3.6 inches (Durham, NC)
Segment Time = 8.33 minutes
Segment 3: Channel Flow
Length = 670 ft
Height = 63.05 It
Slope = 0.0941 ft/ft
Manning's n = 0.045 Natural Channel
Flow Area = 4.00 sf (Assume 2'x 2' Channel)
W. Perimeter = 6.00 ft (Assume 2'x 2' Channel)
Channel Velocity = 7.75 ft/sec
Segment Time = 1.44 minutes
$C"SC?
Cover Condition SCS CN Comments
Impervious 98
Open 61 Assume good condition
Wooded 55 Assume good condition
_> Sub-basin #3
A. Watershed Breakdown
Segment 2: Concentrated Flow
Length = 102 ft
Height = 12.2 It
Slope = 0.1196 ft/ft
Paved ? = No
Velocity= 5.58 ft/sec
Segment Time = 0.30 minutes
Time of Concentration = 10.08 minutes
SCS Lag Time = 6.05 minutes (SCS Lag = 0.6* Tc)
= 0.1008 hours
Time Increment = 1.75 minutes (= 0.29*SCS La
•
1 OF 1
HEGHMS Project: MER-04000 Basin Model: SIA -
/X/ Subbasin-1
Subbasin-2
•
f Subbasin-3
•
HMS
Project : HER-04000
• Start of Run : 21May04 0000
End of Run : 22May04 0000
Execution Time : 26May04.0947
Summary of Results
Run Name : Pre - 1
Basin Model SIA - Predevt
Met. Model RDU - 1 Year
Control Specs SIA - 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak
(ac Area
(cfs) ft) (sq mi)
Subbasin-1 5.9540 21 May 04 1219 1.4786 0.128
Subbasin-2 5.7033 21 May 04 1218 1.5827 0.155
Subbasin-3 1.3809 21 May 04 1205 0.21998 0.021
Subbasin-4 1.3273 21 May 04 1208 0.26773 0.026
Subbasin-5 2.9000 21 May 04 1212 0.70023 0.068
0
HMS * Summary of Results
Project HER-04000 Run Name : Pre - 2
Start of Run 21May04 0000 Basin Model SIA - Predevt
End of Run 22May04 0000 Met. Model RDU - 2 Year
Execution Time 26May04 0948 Control Specs SIA - 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 18.717 21 May 04 1227 2.8153 0.128
Subbasin-2 20.297 21 May 04 1225 3.1036 0.155
Subbasin-3 4.1463 21 May 04 1212 0.42984 0.021
Subbasin-4 4.3374 21 May 04 1216 0.52372 0.026
Subbasin-5 10.100 21 May 04 1220 1.3713 0.068
•
0
HMS
Project : HER-04000
• Start of Run : 21May04 0000
End of Run : 22May04 0000
Execution Time : 26May04 0948
Summary of Results
Run Name : Pre - 10
Basin Model SIA - Predevt
Met. Model RDU - 10 Year
Control Specs SIA - 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 73.208 21 May 04 1223 8.4295 0.128
Subbasin-2 86.012 21 May 04 1221 9.6195 0.155
Subbasin-3 17.513 21 May 04 1209 1.3305 0.021
Subbasin-4 18.459 21 May 04 1213 1.6218 0.026
Subbasin-5 42.911 21 May 04 1217 4.2481 0.068
is
E
•
POST-DEVELOPMENT HYDROLOGIC
CALCULATIONS
0
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
0009-19£ (616) T 8002-9z-LO :3190as-6OLLz atz 900ro1 x0o 'U•d af?-IW UZHS`HaL?7A&J-2kdO'f A2C1-;LS0d JN ';INVd 21JitVIN 'r1OTKIS:19 t. ?.
'00Z = ,j :31VDS saoTTx i 7an?nds/sa?n?tlNSyta/sr???nrelnt? ! ? : I - f :A.?f D NJ x!5 10T1 ?u1 Y l, -j h .I. It , -) ?14( , I? 1 .8d91d Jf. al. l,di 1?9 .Z ll v.,.?Wl.y' 91?d? .rY1 VLC..-a XG00L0213W fZ-LO-BCIOZ:AWWNB
III . OOOLO-b3W 'ON .LJaI'007 = ugut Z p? l? !, .f rf < . , , ;p r kk j, "'
T
--
iia I Ir Jr ' ? X, ,;, Y/^ aS "? I +r ,"I ., a" r '•`'9 ?Y N ?. , ,I ' `'-. ,,.
oob OOZ 001 0 007 fi '" ` a 4e e Sa d wY ?I F " M I 1 1 u {rl e
?J. 1 `? IJ 1 1. d ll w? h.'& •?v? aY 5,• ;j ...j p? ?, .ty ti'I 4 I y kyR nCy rS 4 , 1 w ,y +5 Rt
Y' r ` t 5 t I, `?n„, x,, !d' r. * rc q
"7r- t r'? q ,,,a 7 , .Ai,: ?
i,, y }
J 11 ,
w
hk { Y 1 / ?'
` rM?ll)'. '? r r ' ,np .... '+a I $I1 {i,p 5 4
k lur r w yy'' a t i:, r d ?" ft 41r,
'1 h
r A p
. 11 , ! 1 ;J Iw
, h tt,;- "? a
x w! t . 1 ?+ „ i ! . i ;e?: ,01
3a'a',P, w s y '. c w'S a ,
,I a F La N - `ya'?Ir , tl1 i ?'7 p
? ? { Sa o r t; ?a d ?V
'4 wh f ,
I 's Sd „n.1pY a 5* " 1 J/ d 4 'r, {4 'Jbd' ! ay1. .1 I u?a e t'
?,-' V .Faa' , y'I I h
v
1';*7 qw. J a
.
tfa* 't e7 w'S? 04,14 k r ,'kv rp"w
11,-111 ?. 4, ;N,4 s r:.
4., 11 I „., 1 r ;. I y I.
, 1 h .;
--_- Yµ / 1Yt. •..! { / ++ ,,,,.'^ a y 4
1rY
4
?o { 74 Jtr4 / b sky?"4 1% Yny I 1. M Sd1?D () () n -- Sn1?ndjdW ask
"? ,y,5? ,' w ^r {r".,. ? rd7Jk,,. M k•
I I*
A ? --?_ ?Q -`., ?. r r, I:::? 9y? 'X d r:.Y ? ? 1?A. ,a t `" il?? ,. . .c7..7 D r1 4 1 .CV F'I , U 1 r4 r y
"; ?? , ? ? ',' S BS b = d3Zjv ?d101 M I
V32JV SSddlB 9,A r @r,a v 11
.1 1, I
ONI ',INVdV51OO SWVC]VDW ?J NI-10f 3Hl. J.`9 w ) "sw ? a ? . ' M; A' `a I .1, ,ill-IOV3 ONOcl ),aa 3H1 JO ),3AHflS 1?Ino-SV , - - +w' ' nj gala 1 ' 4 - ;p 4 r `- J- Nv' Ma-3 SI b3?]V S I H I 30 301SIN1 XHHVd`)Od01 '*
?\,-!11
_ _ 91ya , s , .y i
i" '
° ? 52JDD 99 *17 - SnOIAa3dN ?' °t' ,"
Ir r sD_IDD 0991 = V3dV lt/ Oa ?,? Y ,? ?': rF? • ??
°° OfIV313M 2i31VMW?JOIS 03SOdGbd OI_ y :'"? , 'r `?iv14"'
T f; r .
I , I , _ - - -- f A ,, , ,,. - Y r i r .? ?
C" ,, ", ". , 1, I I " , ? ?- - I I '. I , .., im ? ,,, , ,?: "?
W, " ?, y ut x ? V ', r r ?t'q , , - , ? "W i
. r Rh 7:, q&,. G r
µ rr3°F I R • IIJI ':b
r /,. t , .,, , 1? a".. r r ?'?'. 1 .1 a iv7-
Ir. .1 ?- 4Jx r 1 r11 i ll t " ?l. q p t' " lad' i?yk "p s -
W 1..I III 1 I 1.1 h Jy 1J ,?
r / " '\ ;7 ^r 1 ?•I I IJI1? ,^ µI PI '4?a J,?,.9 jt ( w; „y{4 y "br..
7, •t- " w a ,? tlt 51?'lll I I I'1, I ^I_.( I rlf'-117 Y !k a,"+' rm w, V -
J it1 ?,. ro' _ e ''r ".;? wH.f lYl r':? .. ri.t1! V 't 1'. ' . , -
N
? i
I .1 t41j`' b 5.,^ •"N tt , I -,.P W 11 "'" , q' ''I? M, Id'}I ,Ii \ 1. ?5. 1 y`I. 'Vy ?M ,
,llit 1 v?k,u '?, jt h? r ."" ?, `} nl J!i pi a "r .
L1' i, b r ,} 1
. I
5 r 1 ; I 7: C.;; 5' w
.?.. Ar. <I J1 ` . ` J ,
t 1 ?t F t, u
"?FVh h ?}
d_wk ti, I ?'' I s r; ..J/ :r,.v .;: '? 1' ,rt<?' 4.1- la.:? ('' t I I k s.: ? d? ,•I j rlr+:', 1 N
d P
s,
P -.. - I ,j . ?', '.;'bps r,C u., "?, y,.' ., , y}p, 'rl",I' 1 7r :I?yc ` I j , r` ,'d d' „y a rc ` 'L 't;,
1, 1 ,l„9 F X ',-k- z ??t. a: ?', 4'7 I r 1 ',?'? 1 I ..1 7?'r , 1
,,
s
-. ,. <.._ _ I .?> y , T k "Y I l J Jr r1 l'(x ,? p ?,z?
. ,, A
,? !1 y J a?,/ a 1#
fi?y
/
-- .. _ a s .'+ r- , iat' c v?.;6 .6 ?,1 t 1?1 !? ,, ?? x'11 ,? rd Pf dyS:. a' 15'..
?.:__
-t Ix ?„v:?til w;'-i 'ail' I ':? v < r'"t
f,
,.
' 01[ r ? I ry r? r
`} rP " 'x ?M" , ? 11 7 4? Y I I . J 11 1 ,
?? ?di j `° 4 k3'x rI .1" 4: .i`??* ?i, . a
eJ Ny. .:/ Ad, roj". I -) Va" d h 4 H
I 'ft - I YC ?, 1 '' ! J a l'v ,, , ! gyp v6 ^a 2 F i;.y.
L? ?:, r'rf ':C '? - Y,q)A {tiro .}ry ' 7 w4 ••J 5?
r( tti , 'I t 1 v r
2 .. ?? ` ? ,
?' bh t ar jq 6 l a w a +!a „
lu??,'r #= ''k 'n }., z
., P", 0 ,, 5f r' w r ",
': ?.. - ? P J ems ` war yl 1s9, 7 t I d N r k 5};?
11 II ? d Y'?,e F ., {r( T ?Y. t}t , , 1 1 dE ? '.'p ! r -
.? IN i J, `r I ,?
I ?, 11 I ?
...1 ?4.{. .:nJK.W?:: jdb i - 1 1I1 h 'SR ? n. ' P . ?','
It . i , , , I. j ? , i - ? I 11 " ,?, ,, . ; I I ? k I L - jll rr Ijl b? fi M ?, A ,
: .
'L. 1I I I I I J_.rs, S. ,
,.
w
I ? ? I' , ,? ? ,. I- I., I 1,?,,:, ?,- -'?..,?.,,., ??,,
?3AVbO 03S0cI0dd 4 „ at1 ?
q
1),
,1 1
_ I , I 1111 t jft , ily- 1 v - 1 F s A -11 , I, lI l J I V' f` I,",YY w '??` te{
11 ? 111' 17y: ?,! p? ,
(, _ j l I, I 11 1 1 i 1 V) ! J`P[ R ^a 4„,-, a
al 111111 i ?u 7 1
PP.1 ? .1 , ? , , :- I 1, . 11, , p • -1 xkK??r ..
r? *I
' ', q 44 11%11 ,
I 1. ' ? 1 I1 ?' 1, r ? q''g
A1411 ; ;4, 5
' s'"`
1 IJ IIII I It I. .A lI yn ,, b w , a ' ,
7ii. . ".. ?'. I Y II`?e A 1 li, 1 , ?x q
,111 n.' I
i, n . .? ._., .. I? r .1 1 J
• w}. . ._ r_ r., .- :..: 111, 1 I 111,, I Ig "' l' ti.r...T. .. "
11
? 4j a-J 1 ?,,.b i a,Ik.. k i' ,? 'I+ i;lf:' ill I hI II pY IF1?.;;: 5,A,.,? «r' ;
?.?
I I ?`i I
y ! ..
A.,,tk a N, V?II1II 11I I 111 I ` dI? - -----.-- -- -.._.. ?`_ i
'II'J? NGI1Gna1SNG3 o3sodoad 3H1 30 laVd
.. , I i w ` ' fI SV ONV313M 2i31VMN2JO1S V O1N1 031?I3AN00 ' "4
S 38 Ol )d1n10VJ SNOB ,1b0 ONI1SIk3
x
y
r?r
pl ` k q, t, ¢ 10 NA",k; t ` I
v I,
tl ! i
? 4m ? " ?, ,, ,?'y`, . . , t , . , ?lj ON - ? ?? ,*,:?',
I w
M
7
r
,?. - I I ?4? _?,f?"` . I I - -? 4 - . - -,? ?;' -,a I* -?11 I , ? , - I .
._ -_ _ __
s1:9
-. )yp
ymr a. ,17 nvw J .
r
_:
.. - .. :.
r• a „I 3(" a q
' l „' ti
?A
; ( ! __ i :
tJ h
1 I -, fII .?; ?'?,.? 11
"r r f I I I•I w r
F rNxl ." , ?'r r^a ! •A Wy - t I I , 6 aw 'Z',y "" Jr r, ?," ^' 4
( j 'P I r' - I ?. ICI l ,
'+ ?I r A. I ` ^' ,? s ?, , i ?.../, '1 1" jlf' nlr., % 1 b?j#+r` ?o- x ;?1 +r
I f'-i?ill` 91' ? ? , ?? / , e l r , ?Z ?y: , ' *,
1 r ' M,'rY
JJ %,.
A I Y C
, '. Yv? 1
1, r.. , ?,d ., ? 'I?
:',' ? ' #+" gy m c:r I . " ? l a -
M:I 1 % f 1 a i Y ^k
f I I I " '. I , Wt, I d r Ii r H1 'i 11,P? }8? S', " :,' ? q
k M
r 'i t? If 4 1g •+ -F ark F 1,1 - 0 . --- - 11 .._ ..?-_ _ q
Yy,.AUx mnkYd[ti?.w,m., x, ., z .u '. ,. ... •?.wLL?, --M- . ,.... _nnM.?
MERCK TEMPORARY HYDROLOGIC CALCULATIONS
CONSTRUCTION STAGING Post Development
MER-07000
•I. SCS CURVE NUMBERS
Cover Condition SCS CN Comments
Impervious 98 -
Open 61 Assume good condition
Wooded 55 Assume good condition
II. POST DEVELOPMENT
=> Subbasin #3 - To SWMF #1
A. Watershed Breakdown
==> Hydrologic Calculations
Contributing Area SCS CN Area [acres] Comments
Onsite impervious 98 4.86 -
Onsite open 61 7.29 Assume good condition
Onsite wooded 55 3.63 Assume good condition
_ Onsitepoond 100 0.82 Measured at Top of Dam
0ffsite im ervious 98 0.00 -
Offsite open 61 0.00 Assume good condition
Offsite wooded 55 0.00 Assumood condition
Offsite and 100 0.00 -
• Total area = 16.60 acres
0.0259 sq.mi.
Composite SCS CN = 72
% Impervious = 29.3%
B. Time of Concentration Information
The post development time of concentration is assumed to be 5 minutes (conservative assumption).
•
Time of Concentration = 5.00 minutes
SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc)
0.0500 hours
Time Increment = 0.87 minutes (= 0.29*SCS Lag)
B.R. FINCH, PE
1/25/2008
I OF 2
MERCK TEMPORARY HYDROLOGIC CALCULATIONS
CONSTRUCTION STAGING Post Development
MER-07000
022> Subbasin #3 - Bypass
A. Watershed Breakdown
-> Hydrologic Calculations
Contributing Area SCS CN Area [acres] Comments
Onsite impervious 98 0.00
_Onsite open 61 1.54 Assume good condition
4
Onsite wooded 55 3.04 Assume ood condition
Onsite and 100 0.00 Measured at To of Dam
Offsite impervious 98 0.00 -
Offsite o en 61 0.00 Assume good condition_
Offsite wooded 55 0.00 Assume ood condition
Offsite and 100 0.00 -
Total area = 4.58 acres
0.0072 sq.mi.
Composite SCS CN = 57
% Impervious = 0.0%
B. Time of Concentration Information
The post development time of concentration is assumed to be 5 minutes (conservative assumption).
•
B.R. FINCH, PE
1/25/2008
Time of Concentration = 5.00 minutes
SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc)
= 0.0500 hours
Time Increment = 0.87 minutes (= 0.29*SCS Lag)
•
2OF2
HEC-1` MS Project: MER-07000 Basin Model: Post Devt
•
0
HMS * Summary of Results
Project HER-07000 Run Name : Post W/O - 1 Yr
Start of Run 23Jan08 0000 Basin Model Post Devt w/o SWMF
End of Run 24Jan08 0000 Met. Model RDU - 1 Year
Execution Time 18Feb08 1047 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (s4 mi)
To SWMF #1 21.392 23 Jan 08 1157 1.1144 0.026
Bypass Area 1.0351 23 Jan 08 1201 0.094251 0.007
Junction-1 22.177 23 Jan 08 1158 1.2086 0.033
•
0
HMS * Summary of Results
Project HER-07000 Run Name : Post W/O - 2 Yr
• Start of Run 23Jan08 0000 Basin Model Post Devt w/o SWMF
End of Run 24Jan08 0000 Met. Model RDU - 2 Year
Execution Time 18Feb08 1047 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 33.791 23 Jan 08 1205 1.6374 0.026
Bypass Area 2.3655 23 Jan 08 1207 0.17397 0.007
Junction-1 35.955 23 Jan 08 1205 1.8114 0.033
•
0
HMS * Summary of Results
Project : MER-07000 Run Name : Post W/O - 10 Yr
. Start of Run : 23Jan08 0000 Basin Model : Post Devt w/o SWMF
End of Run : 24Jan08 0000 Met. Model : RDU - 10 Year
Execution Time : 18Feb06 1048 Control Specs : 1 minute dT
Hydrologic Discharge Time of volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 -61.980 23 Jan 08 1205 3.4420 0.026
Bypass Area 8.1720 23 Jan 08 1205 0.50341 0.007
Junction-1 70.152 23 Jan 08 1205 3.9454 0.033
•
C7
HEC-HMS Project: MER-07000 Basin Model:
is
•
S,51?ti m
0
HMS * Summary of Results
Project : NER-07000 Run Name : Post - 1 inch
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model : 1" Storm
Execution Time 25Jan08 1004 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1
SWMF #1
Bypass Area
Junction-1
•
0.022031 23 Jan 08 1755 0.016484 0.026
0.0078030 23 Jan 08 2400 0.0036092 0.026
0.0 22 Jan 08 2400 0.0 0.007
0.0078030 23 Jan 08 2400 0.0036092 0.033
0
ISMS * Summary of Results for SWMF #1
Project : HER-07000 Run Name : Post - 1 inch
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model 1" Storm
Execution Time 25Jan08 1008 Control Specs 1 minute dT
Computed Results
Peak Inflow 0.022031 (cfs) Date/Time of Peak Inflow 23 Jan 08 1755
Peak Outflow 0.0078030 (cfs) Date/Time of Peak Outflow 23 Jan 08 2400
Total Inflow 0.01 (in) Peak Storage 0.012875(ac-ft)
Total Outflow 0.00 (in) Peak Elevation 294.04(ft)
•
is
HMS * Summary of Results
Project MER-07000 Run Name : Post - 1
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model RDU - 1 Year
Execution Time 25Jan08 1005 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 21.392 23 Jan 08 1157 1.1144 0.026
SWMF #1 0.14678 23 Jan 08 2400 0.13298 0.026
Bypass Area 1.0351 23 Jan 08 1201 0.094251 0.007
Junction-1 1.1235 23 Jan 08 1201 0.22723 0.033
is
HMS * Summary of Results for SWMF #1
Project : 14ER-07000 Run Name : Post - 1
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model RDU - 1 Year
Execution Time 25Jan08 1005 Control Specs 1 minute dT
Computed Results
Peak Inflow 21.392 (cfs) Date/Time of Peak Inflow 23 Jan 08 1157
Peak Outflow 0.14678 (cfs) Date/Time of Peak Outflow 23 Jan 08 2400
Total Inflow 0.81 (in) Peak Storage 0.98141(ac-ft)
Total Outflow 0.10 (in) Peak Elevation 295.94(ft)
•
C7
HMS * Summary of Results
Project MER-07000 Run Name : Post - 2
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model RDU - 2 Year
Execution Time 25Jan08 1005 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 33.791 23 Jan 08 1205 1.6374 0.026
SWMF #1 0.17000 23 Jan 08 1931 0.15959 0.026
Bypass Area 2.3655 23 Jan 08 1207 0.17397 0.007
Junction-1 2.4633 23 Jan 08 1207 0.33356 0.033
0
HMS * Summary of Results for SWMF #1
Project : MER-07000 Run Name : Post - 2
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model RDU - 2 Year
Execution Time 25Jan08 1009 Control Specs 1 minute dT
Computed Results
Peak Inflow 33.791 (cfs) Date/Time of Peak Inflow 23 Jan 08 1205
Peak Outflow 0.17000 (cfs) Date/Time of Peak Outflow 23 Jan 08 1931
Total Inflow 1.19 (in) Peak Storage 1.4778(ac-ft)
Total Outflow 0.12 (in) Peak Elevation 296.73(ft)
•
C7
HMS * Summary of Results
Project MER-07000 Run Name : Post - 10
• Start of Run 23Jan08 0000 Basin Model Post-development
End of Run 24Jan08 0000 Met. Model RDU - 10 Year
Execution Time 25Jan08 1141 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 61.977 23 Jan 08 1205 3.4419 0.026
SWMF #1 2.9638 23 Jan 08 1449 1.2319 0.026
Bypass Area 8.1715 23 Jan 08 1205 0.50340 0.007
Junction-1 8.3146 23 Jan 08 1205 1.7353 0.033
is
0
HMS * Summary of Results for SWMF #1
Project : MER-07000
• Start of Run 23Jan08 0000
End of Run 24Jan08 0000
Execution Time 25Jan08 1141
Run Name : Post - 10
Basin Model Post-development
Met. Model RDU - 10 Year
Control Specs 1 minute dT
Computed Results
Peak Inflow 61.977 (cfs)
Peak outflow 2.9638 (cfs)
Total Inflow 2.49 (in)
Total Outflow 0.89 (in)
Date/Time of Peak Inflow 23 Jan 08 1205
Date/Time of Peak Outflow 23 Jan 08 1449
Peak Storage 2.3243(ac-ft)
Peak Elevation 298.00(ft)
C7
0
•
STORMWA TER WETLAND DESIGN
CALCULATIONS
0
0
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
_- / /? ? // Il 11 111 I\ I ` 1 i 1 1 1 1 1 ` F 1 I I I ? ?
/I /// \\` \\?? \ \??? 1\ 11 Il 11 II Ill 111 111 111 I 11 111 111 ,Il II III ?? i II II III i /I
I / /??_? ?\\ ??\ \ 11 II I Il 1 1 1 1 1 I I I I I 11 ? I Il I I /
I ! / \- //? ? \ 1 1 1 1 1 1 11 II 1 I I I II 1 1 II I? 1 I 11 i /!
I I ? ? 1 11 II 11 I 11 I I 11 11 II I II 11 11 I II I I I 1
I I \ 11 11 11 II I 11 II 11 II I II 11 II II I Il 11 1? I I I I I I
I 1 1 1 1 1 I I 11 11 1 1 1 1 11 I I II I 119 / / I / ? I
I II 11 \ \, `I `, `\ \ `\ 1\ I, `\ I 1\ '\ II II ? W ? rn /I / i ; ?
II I \ \ \\ 1 ,1 1 \ `1 11 \ \ \ \ ? N O N \ \? I / I / / I
1 \ \?
\ \ \ `1 , 1\ 1 N J, CO
1 1 ; C) t l `
\ \\ 11 11 \I Q 6 ` \\ \\ \\ `\ \ / / I
I I ?? 1 A V 1 ul O O N \ 1 A ` V A V\ A\ \V / // // / I
`I \\ \ \ \ \ \ \ \ \' I I
? 1? I?I 111 11 'I ? __- ? ? \ \\ \\ \\I \\\ A \\\ \\\ \\\ \\\ ?\ \\\ \\\ \\\ \\\ \ \?? ? I 1\\ I\ \\ \ \?
I A \ \ \
ill WI III III III ? `? \? \,\\ `\\\ \\\ \\\ A \\\ \\\ \\ \\\ ?\ \\\ \\\ \\\ \\\ ? ? ?? \\\ \\\ \\\
11 1 I 1 ? ?? ? A \ V A V A ` V A V A ? ? A V A
I 1 N \ \ \ `\ \\`,
I W 11 ?l \ 1\ \\ \\ \\ V A A\ \\ \\ \ \V ,v , V
\\ \\ \I 11 I II I 1 - \ I \\ ? ?\ ?? \ ?? ?? ?? ?? \ \I I I II I I\?
11 I 1 1 ?? I I I ?? V ? ? ?? ? V ? I I I I 1 1 I l
_ I I 1 1 I I I ??? \\?? \?? ?? \? ? I II I V I I I II
?,` ???-'1 I I 1 I I 1 \\ I I I I I I I I I II
1 / / ? I I i _ ?? ?? A ?I ?1 I I II II I I I I I I i
I/ /// I I?? ?. ,.. ? ? I I I I ? I II II I I I 11 I I
I I I I I I I I
??, // I/ I I I i ,___ ? ?? II Il I I I I / I I I I I I I I I
??(? `` I I I I I I ? I II I I II // // / I II I II II I?
/ >\ I I ? ? I I I I I I I I / / I I I I
\ I /
C?u
???6L'N ,
/ I I II ?', ? ?C
i
G-R PIIP-SCM'i F'- _ - '
40 0 2G' 40 , 80' -17 ci-, zxr "'L
?
%EP POOLS (21-x,
STH-1ALL0 TI LAND (32%)
) c NO. MER-07000
2009-02-12 NER07000-SW3 q -
SCA E'er 1 "=40' DURHAM, NORTH CAROLINA
DATE.02-12-2008
-l T ff-Ill E
J?gll '"" JOHN R. McADANIS
a ,?7n7,Ais - raTe. f, T ElgGINEERS/PLANNERS/SURVEYORS
RESEARCH TRIANGLE 4 k R 1. NC
t .0. L;0)( '-"f)05 ZS! ?-7709-SO05
(919) 361-5000
MERCK TEMPORARY SWMF #1 B.R. FINCH, PE
CONSTRUCTION STAGING 1/25/2008
MER-07000
•
Stage-Storage Function
Average Incremental Accumulated Estimated
Contour Contour Contour Contour Stage
Contour Stage Area Area Volume Volume w/ S-S Fxn
(feet) (feet) (SF) (SF) (CF) (CF) (feet)
3. ? 0.00 1980Q
2-p 5.LN) 2.00 24864 22337 44673 44673 2.01
2 Ak) 4.00 302!3' 27536 55071 99744 3.95
100Jyj 6.00 3551= 32860 65720 165464 6.05
Storage vs. Stage
C1
180000-
i
160000
1.1883
0
140000 Y = zl
R = 0.9996
120000
100000 -;
U
2 80000
o
60000 I
I
40000
20000
i
i
0 -- --- ---'--- ----
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00
Stage aacad0
1 , = 10496
j, fa = 1.188_
0
MERCK TEMPORARY SWMF #1
CONSTRUCTION STAGING
MER-07000
• Stage - Storage Function
Ks =
b=
Zo =
Elevation Storage
[feet] [cf] [acre-feet] 100-YR
294.00 0 0.000
294.20 2880 0.066
294.40 6563 0.151
294.60 10625 0.244
294.80 14955 0.343
295.00 19496 0.448
295.20 24212 0.556
295.40 29080 0.668
295.60 34080 0.782
295.80 39200 0.900
296.00 44428 1.020
29620 49756 1.142
296.40 55176 1.267
296.60 60682 1.393
296.80 66268 1.521
297.00 71930 1.651
29720 77663 1.783
297.40 83465 1.916
297.60 89331 2.051
• 297.80 95258 2.187
297.85 96749 2.221 0.000
298.00 101245 2.324 0.103
298.20 107288 2.463 0.242
298.40 113386 2.603 0.382
298.60 1!9537 2.744 0.523
298.80 125737 2.887 0.665
299.00 131937 3.030 0.809
29920 138284 3.175 0.954
299.40 1-14627 3.320 1.099
299.60 151014 3.46 7 1.246
299.80 157444 3.614 1.393
300.00 163916 3.763 1.5'!2
B.R. FINCH, PE
1/25/2008
11
MERCK SWIVIF #1 B.R. FINCH, PE
MER-07000 2/18/2008
Stage-Storage Function - Above Normal Pool
• i
Average Incremental Accumulated Est
mated
Contour Contour Contour Contour Stage
Contour Stage Area Area Volume Volume w/ S-S Fxn
(feet) (feet) (SF) (SF) (CF) (CF) (feet)
294.0 0.0 19,809
_
296.0 m
2.0 24,864 22,337 44,673 44,673 2.01
298.0 4.0 30.207 27,536 55,071 99,744 3.95
300.0 6.0 35,513 32,860 65,720 165,464 6.05
•
Storage vs. Stage
180,000-
160,000--
y = 19496x'-1883
140,000
R2 = 0.9996
LL 120,000
100,000
a
0 80,000
N 60,000--
40,000--
20,000--
0-
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0
Stage (feet)
Ks = 19496
b = 1.1883
•
1 OF 6
MERCK Below NWSE - North Forebay B.R. FINCH, PE
MER-07000 2/18/2008
Stage-Storage Function - North Forebay
• Average Incremental Accumulated Estimated
Contour Contour Contour Contour Stage
Contour Stage Area Area Volume Volume w/ S-S Fxn
(feet) (feet) (SF) (SF) (CF) (CF) (feet)
291.0 0.0 647
292.0 1.0 982 815 815 815 1.00
293.0 2.0 1,374 1,178 1,178 1,993 1.98
293.5 2.5 1,591 1,483 741 2,734 2.52
•
Storage vs. Stage
3,000
2,500 y = 811.9x1.3141
R2 = 0.9996
LL 2,000
V
1,500
0
N 1,000
500
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Stage (feet)
Ks = 811.9
b = 1.3141
2OF6
MERCK Below NWSE - South Forebay B.R. FINCH, PE
MER-07000 2/18/2008
Stage-Storage Function - South Forebay
• Average Incremental Accumulated Estimated
Contour Contour Contour Contour Stage
Contour Stage Area Area Volume Volume w/ S-S Fxn
(feet) (feet) (SF) (SF) (CF) (CF) (feet)
241.0 0.0 461
292.0 1.0 m 732 m?597 597 597 1.00
293.0 2.0 1,059 896 896 1,492 1.98
293.5 2.5 1,244 1,152 576 2,068 2.52
0
Storage vs. Stage
2,500
2,000--
y = 594.4)0""'
U 1,500 RZ = 0.9996
d
$ 1,000--
500--
0 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Stage (feet)
KS = 594.4
b = 1.3486
•
3OF6
MERCK Below NWSE - Micropool B.R. FINCH, PE
N ER-07000 2/18/2008
Stage-Storage Function Micropool A Outlet
• Average Incremental Accumulated Estimated
Contour Contour Contour Contour Stage
Contour Stage Area Area Volume Volume w/ S-S Fxn
(feet) (feet) (SF) (SF) (CF) (CF) (feet)
291.0 0.0 424 M-
292.0 1.0 761 593 593 593 1.00
293.0 2.0 1,123 942 942 1,535 1.98
293.5 2.5 1,325 1,224 612 2,147 2.52
•
Storage vs. Stage
2,500
2,000 y = 590.54x13972
R2 = 0.9997
C1 1,500
M
I
w 1,000
N
500
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Stage (feet)
Ks = 590.54
b = 1.3972
0
4OF6
MERCK Below NWSE - Main Pool B.R. FINCH, PE
MER-07000 2/18/2008
Stage-Storage Function - Main Pool
•
Project Name: Merck VMF
Designer: B. R Finch, PE
Job Number: MER-07000
Date: 2/18/2008
Average Incremental Accumulated
Contour Contour Contour Contour
is
•
Contour Stage Area Area Volume Volume
(feet) (feet) (SF) (SF) (CF) (CF)
293.50 0.0 4,160
294.00 0.5 13,490 8,825 4,413 4,413
5OF6
MERCK STORMWATER WETLAND B.R. FINCH, PE
MER-07000 Volume /Surface Area Computations 2/18/2008
Volume of North Forebay =
Volume of South Forebay =
Volume of Micropool @ Outlet =
Volume of Main Pool =
Total =
2,734 cf
2,068 cf
2,147 cf
4,413 cf (EL 293.5 to EL. 294)
11,361 cf
0.26 acre-ft
Volume Above N"E = 165,464 cf
3.80 acre-ft
Total Volume of Facility = 176,825 cf
= 4.06 acre-ft
rw
Surface Area @ NWSE = 19,809 sf
Area of Deep Pools = 4,160 sf
= 21%
Volume of Deep Pools = 6,948 cf
Hydraulic Depth = 1.67 ft
Area of Shallow Land = 9,330 sf
• 47%
Area of High Marsh = 6,319 sf
32%
r?
6OF6
MERCK TEMPORARY WATER QUALITY VOLUME
CONSTRUCTION STAGING CALCULATIONS
MER-07000
SWMF #1
> Determination of Water Quality Volume (WQ v)
WQ v = (P)(R v)(A)112
Input data:
Total area, A = i 6, f= acres
Impervious area = a.. +n acres
Percent impervious cover, I = %
Rainfall, P = f ii) a inches
Calculated values:
Rv =
WQv = acre-ft
cf
where,
WQv = water quality volume (in acre-ft)
Rv = 0.05+0.009(I) where I is percent impervious cover
A = area in acres
P = rainfall (in inches)
B. PINCH, PE
1/25/2008
=> Drawdown Calecatations
Per the NCDENR handbook "Stornnvater Rest Monogen?ent Practices" (October 2007), drowdown of the
storinwater runoff shall occur within 2 to 5 drays
•
Gptf ?. ada Eta:
V%'Qv = cf.
st'A e/•Sic.ro e DEaiapo
Ks
b
Zo -
Vol. in 1.0" Rainfall = cu. fi
!?Ca?c r?E'are Es?rY Va3?ug"yo
Depth an Easi_S - 0.97 is
_ 11.09, inches
EL = It
0
MERCK TEMPORARY SWMF #1 B.R. FINCH, PE
STAGING AREA 1/25/2008
MER-07000
• Inverted Siphon Design Sheet
D orifice =
# orifices =
Ks =
b=
Cd siphon =
Normal Pool Elevation =
Volume @ Normal Pool =
Orifice Invert =
WSEL @ 1" Runoff Volume =
•
2 inch
1
19496
1.133
0.60
294.00 feet
0 cf
294.00 feet
29=1.9- feet
WSEL
(feet) Vol. Stored
(cf) Siphon Flow
(cfs) Avg. Flow
(cfs) Incr. Vol.
(cf) Incr. Time
(sec)
29.,4.97 18891 0.099
294.89 16985 0.094 0.097 1906 19728
294.81 15113 0.089 0.092 1872 20412
294.72 13277 0.084 0.087 1836 21208
294.64 11480 0.078 0.081 1797 22153
294.56 9727 0.072 0.075 1753 23303
24.4' 8023 0.066 0.069 1704 24751
'94,3? 6374 0.058 0.062 1648 26665
?x=1.31 4791 0.050 0.054 1503 29394
2_94.;2-' 3288 0.039 0.044 1503 33826
X94, °_ ? 1889 0.023 0.031 13991
44608
Drawdown Time = ?~ 3.08 days i
By comparison, if calculated by the average head over the orifice (assuming
average head is half the total depth), the result would be:
Average driving head on orifice = feet
Orifice composite loss coefficient =
Cross-sectional area oft" orifice = _ 7 sf
Q = 0.0701 cfs
Drawdown Ti_?ire = Volume / Flowrate / 8600 (sec/day)
Drawdown Time = 112 days ?
lConclusion e Use 1 - 2" Diameter PVC Inverted Siphon to drawdown the accumulated
11 1
volume from the 1.0" storm runoff, with a required time of about 3.1 days.
0
•
Type.... Outlet Input Data Page 1.01
Name.... SWMF #1
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 294.00 ft
Increment = .20 ft
Max. Elev.= 300.00 ft
OUTLET CONNECTIVITY
---> Forward Flow Only (UpStream to DnStream)
<--- Reverse Flow Only (DnStream to UpStream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall El, ft E2, ft
Weir-XY Points ES ---> TW 299.020 300.000
Stand Pipe RI ---> BA 297.850 300.000
Orifice-Circular SI ---> BA 294.000 300.000
Culvert-Circular BA ---> TW 290.910 300.000
TW SETUP, DS Channel
r?
•
SIN: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 11:30 AM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1
Page 1.02
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
OUTLET STRUCTURE INPUT DATA
Structure ID = ES
Structure Type = Weir-XY Points
------------------------------------
# of Openings = 1
WEIR X-Y GROUND POINTS
X, ft Elev, ft
.00 302.00
3.29 301.00
6.59 300.00
7.46 299.74
14.50 299.50
28.72 299.02
33.32 299.50
38.15 300.00
42.27 300.43
Lowest Elev. = 299.02 ft
Weir Coeff. = 2.600000
Weir TW effects (Use adjustment equation)
.7
•
S/N: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 11:30 AM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1
Page 1.03
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
•
OUTLET STRUCTURE INPUT DATA
Structure ID = RI
Structure Type
----------------- = Stand Pipe
-------------
------
# of openings = 1
Invert Elev. = 297.85 ft
Diameter = 5.0000 ft
Orifice Area = 19.6350 sq.ft
Orifice Coeff. _ .600
Weir Length = 15.71 ft
Weir Coeff. = 3.000
K, Submerged = .000
K, Reverse = 1.000
Kb,Barrel = .000000 (per ft of full flow)
Barrel Length = .00 ft
Mannings n = .0000
Structure ID = SI
Structure Type = Orifice-Circular
------------------------------------
# of Openings = 1
Invert Elev. = 294.00 ft
Diameter = .1667 ft
Orifice Coeff. _ .600
SIN: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 11:30 AM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1
Page 1.04
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
•
OUTLET STRUCTURE INPUT DATA
Structure ID = BA
Structure Type
------------------ = Culvert-Circular
------------------
No. Barrels = 1
Barrel Diameter = 3.0000 ft
Upstream Invert = 290.91 ft
Dnstream Invert = 289.83 ft
Horiz. Length = 71.50 ft
Barrel Length = 71.51 ft
Barrel Slope = .01511 ft/ft
OUTLET CONTROL DATA...
Mannings n = 0130
Ke = .5000
Kb = .007228
Kr = .5000
HW Convergence = .001
(forward entrance loss)
(per ft of full flow)
(reverse entrance loss)
+/- ft
INLET CONTROL DATA...
Equation form = 1
Inlet Control K = .0098
Inlet Control M = 2.0000
Inlet Control c = .03980
Inlet Control Y = .6700
T1 ratio (HW/D) = 1.153
T2 ratio (HW/D) = 1.299
Slope Factor = -.500
L`
•
Use unsubmerged inlet control Form 1 equ. below T1 elev.
Use submerged inlet control Form 1 equ. above T2 elev.
In transition zone between unsubmerged and submerged inlet control,
interpolate between flows at T1 & T2...
At T1 Elev = 294.37 ft ---> Flow = 42.85 cfs
At T2 Elev = 294.81 ft ---> Flow = 48.97 cfs
S/N: 621701207003 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 11:30 AM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1
Page 1.05
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
OUTLET STRUCTURE INPUT DATA
Structure ID = TW
Structure Type = TW SETUP, DS Channel
------------------------------------
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES...
Maximum Iterations= 30
Min. TW tolerance = .01 ft
Max. TW tolerance = .01 ft
Min. HW tolerance = .01 ft
Max. HW tolerance = .01 ft
Min. Q tolerance = .10 cfs
Max. Q tolerance = .10 cfs
•
S/N: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 11:30 AM Date: 1/25/2008
Type.... Composite Rating Curve
Name.... SWMF #1
Page 1.17
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
•
•
Ll
WS Elev, Total Q
Elev. Q
ft cfs
--------
294.00 -------
.00
294.20 .04
294.40 .06
294.60 .08
294.80 .09
295.00 .10
295.20 .11
295.40 .12
295.60 .13
295.80 .14
296.00 .15
296.20 .15
296.40 .16
296.60 .17
296.80 .17
297.00 .18
297.20 .19
297.40 .19
297.60 .20
297.80 .20
297.85 .20
298.00 2.95
298.20 9.97
298.40 19.44
298.60 30.83
298.80 43.85
299.00 58.31
299.02 59.83
299.20 74.56
299.40 93.56
299.60 101.55
299.80 114.34
300.00 131.54
S/N: 6217012070C3
PondPack Ver. 8.0058
***** COMPOSITE OUTFLOW SUMMARY ****
-------- Converge
TW Elev Error
ft +/-ft
-------- -----
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Free Outfall
Notes
-------------------------
Contributing Structures
(no Q: ES,RI,SI,BA)
SI,BA (no Q: ES, RI)
SI,BA (no Q: ES, RI)
SI,BA (no Q: ES, RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA .(no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
SI,BA (no Q: ES,RI)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
RI,SI,BA (no Q: ES)
ES,RI,SI,BA
ES,RI,BA (no Q: SI)
ES,RI,BA (no Q: SI)
ES,RI,BA (no Q: SI)
ES,RI,BA (no Q: SI)
The John R> McAdams Company
Time: 11:30 AM Date: 1/25/2008
•
100-YEAR STORM (WORST CASE) ROUTING
CALCULATIONS
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000
MERCK TEMPORARY SWMF #1
CONSTRUCTION STAGING
MER-07000
__> Stage - Storage Function
• Ks =
b=
Zo =
Elevation Storage
[feet] [cf] [acre-feet] 100-YR
294.00 0 0.000
294.20 2880 0.066
294.40 6563 0.151
294.60 10625 0.244
294.80 14955 0.343
295.00 19496 0.448
295.20 24212 0.556
295.40 29080 0.668
295.60 34080 0.782
295.80 39200 0.900
296.00 44428 1.020
296.20 49756 1.142
296.40 55176 1.267
296.60 60682 1.393
296.80 65268 1.521
297.00 71930 1.651
297.20 77663 1.783
297.40 83c165 1.916
• 297.60 89331 2.051
297.80 95258 2.187
297.85 96719 2.221 0.000
298.00 101245 2.32-/+ 0.103
298.20 107283 2.46-,3 0.242
298.40 113386 2.603 0.382
298.60 1 1953 7 2.744 0.523
298.80 12573 7 2.887 0.665
299.00 13198 7 x.0_,0 0.?S09
299.20 138284 3.175 0.95!
299.40 144627 3.320 1.099
299.60 1'5101_; ,.J67 1.2J!6
299.80 1 5744J 3.61's 1. 93
300.00 163916 3. 7 631 1.54
E.R. FINCH, PE
1/25/2008
0
Type.... Outlet Input Data Page 1.01
Name.... SWMF #1 - 100
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 297.85 ft
Increment = .20 ft
Max. Elev.= 300.00 ft
Spot Elevations, ft
297.85
OUTLET CONNECTIVITY
---> Forward Flow Only (UpStream to DnStream)
<--- Reverse Flow Only (DnStream to UpStream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall E1, ft E2, ft
Weir-XY Points ES ---> TW 299.020 300.000
Stand Pipe RI ---> BA 297.850 300.000
Orifice-Circular SI ---> BA 294.000 300.000
Culvert-Circular BA ---> TW 290.910 300.000
TW SETUP, DS Channel
•
E
S/N: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 12:02 PM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1 - 100
Page 1.02
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
•
OUTLET STRUCTURE INPUT DATA
Structure ID = ES
Structure Type = Weir-XY Points
------------------------------------
# of Openings = 1
WEIR X-Y GROUND POINTS
X, ft Elev, ft
.00 302.00
3.29 301.00
6.59 300.00
7.46 299.74
14.50 299.50
28.72 299.02
33.32 299.50
38.15 300.00
42.27 300.43
Lowest Elev. = 299.02 ft
Weir Coeff. = 2.600000
Weir TW effects (Use adjustment equation)
C,
•
SIN: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 12:02 PM Date: 1/25/2008
Type.... Outlet Input Data Page 1.03
Name.... SWMF #1 - 100
File.... X:\Projects\MER\MER-07000\Storm\Con struction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
• OUTLET STRUCTURE INPUT DATA
Structure ID = RI
Structure Type = Stand Pipe
-----------
------
-------------------
# of openings = 1
Invert Elev. = 297.85 ft
Diameter = 5.0000 ft
Orifice Area = 19.6350 sq.ft
Orifice Coeff. _ .600
Weir Length = 15.71 ft
Weir Coeff. = 3.000
K, Submerged = .000
K, Reverse = 1.000
Kb,Barrel = .000000 (per ft of full flow)
Barrel Length = .00 ft
Mannings n = .0000
Structure ID = SI
Structure Type = Orifice-Circular
------------------------------------
# of Openings = 1
Invert Elev. = 294.00 ft
Diameter = .1667 ft
Orifice Coeff. _ .600
Ll
•
S/N: 6217012070C3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 12:02 PM Date: 1/25/2008
•
Type.... Outlet Input Data
Name.... SWMF #1 - 100
Page 1.04
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
OUTLET STRUCTURE INPUT DATA
Structure ID = BA
Structure Type
------------------ = Culvert-Circular
------------------
No. Barrels = 1
Barrel Diameter = 3.0000 ft
Upstream Invert = 290.91 ft
Dnstream Invert = 289.83 ft
Horiz. Length = 71.50 ft
Barrel Length = 71.51 ft
Barrel Slope = .01511 ft/ft
OUTLET CONTROL DATA...
Mannings n = 0130
Ke = .5000
Kb = .007228
Kr = .5000
HW,Convergence = .001
(forward entrance loss)
(per ft of full flow)
(reverse entrance loss)
+/- ft
INLET CONTROL DATA...
Equation form = 1
Inlet Control K = .0098
Inlet Control M = 2.0000
Inlet Control c = .03980
Inlet Control Y = .6700
T1 ratio (HW/D) = 1.153
T2 ratio (HW/D) = 1.299
Slope Factor = -.500
•
•
Use unsubmerged inlet control Form 1 equ. below T1 elev.
Use submerged inlet control Form 1 equ. above T2 elev.
In transition zone between unsubmerged and submerged inlet control,
interpolate between flows at T1 & T2...
At T1 Elev = 294.37 ft ---> Flow = 42.85 cfs
At T2 Elev = 294.81 ft ---> Flow = 48.97 cfs
SIN: 621701207OC3 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 12:02 PM Date: 1/25/2008
Type.... Outlet Input Data
Name.... SWMF #1 - 100
Page 1.05
File..... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
OUTLET STRUCTURE INPUT DATA
Structure ID = TW
Structure Type = TW SETUP, DS Channel
------------------------------------
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES...
Maximum Iterations= 30
Min. TW tolerance = .01 ft
Max. TW tolerance = .01 ft
Min. HW tolerance = .01 ft
Max. HW tolerance = .01 ft
Min. Q tolerance = .10 cfs
Max. Q tolerance = .10 cfs
•
S/N: 621701207003 The John R> McAdams Company
PondPack Ver. 8.0058 Time: 12:02 PM Date: 1/25/2008
•
•
•
Type.... Composite Rating Curve
Name.... SWMF #1 - 100
Page 1.10
File.... X:\Projects\MER\MER-07000\Storm\Construction Drawings\FINAL DESIGN.PPW
Title... Project Date: 1/15/2007
Project Engineer: Brandon R. Finch
Project Title: Merck VMF
Project Comments:
WS Elev, Total Q
Elev. Q
ft
- cfs
-------
294.00 -------
.00
297.85 .20
298.00 2.95
298.20 9.97
298.40 19.44
298.60 30.83
298.80 43.85
299.00 58.31
299.02 59.83
299.20 74.56
299.40 93.56
299.60 101.55
299.80 114.34
300.00 131.54
S/N: 621701207003
PondPack Ver. 8.0058
***** COMPOSITE OUTFLOW SUMMARY ****
Notes
------ -- Converge ---------- ---- -- ---------
TW Elev Error
ft +/-ft
- Contributi ng Structures
-----
Free -- ----- -
Outfall ----------
(no Q: ES ---------------
,RI,SI,BA)
Free Outfall SI,BA (no Q: ES,RI)
Free Outfall RI,SI,BA (no Q: ES)
Free outfall RI,SI,BA (no Q: ES)
Free Outfall RI,SI,BA (no Q: ES)
Free Outfall RI,SI,BA (no Q: ES)
Free Outfall RI,SI,BA (no Q: ES)
Free Outfall RI,SI,BA (no Q: ES)
Free outfall RI,SI,BA (no Q: ES)
Free Outfall ES,RI,SI,B A
Free Outfall ES,RI,BA (no Q: SI)
Free Outfall ES,RI,BA (no Q: SI)
Free Outfall ES,RI,BA (no Q: SI)
Free Outfall ES,RI,BA (no Q: SI)
The John R> McAdams Company
Time: 12:02 PM Date: 1/25/2008
HEC-AIMS Project: MER-07000 Basin Model: Post - 100
is
•
SWMF #1
E
HMS * Summary of Results
Project MER-07000 Run Name : Post - 100
• Start of Run 23Jan08 0000 Basin Model Post - 100
End of Run 24Jan08 0000 Met. Model RDU - 100
Execution Time 25Jan08 1201 Control Specs 1 minute dT
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
To SWMF #1 106.50 23 Jan 08 1204 6.4783 0.026
SWMF #1 78.791 23 Jan 08 1209 6.4400 0.026
Bypass Area 18.661 23 Jan 08 1205 1.1514 0.007
Junction-1 93.905 23 Jan 08 1208 7.5914 0.033
0
HMS * Summary of Results for SWMF #1
•
Project : HER-07000
Start of Run 23Jan08 0000
End of Run 24Jan08 0000
Execution Time 25Jan08 1201
Run Name : Post - 100
•
Computed Results
Basin Model Post - 100
Met. Model RDU - 100
Control Specs 1 minute dT
Peak Inflow 106.50 (efs) Date/Time of Peak Inflow 23 Jan 08 1204
Peak Outflow 78.791 (cfs) Date/Time of Peak Outflow 23 Jan 08 1209
Total Inflow 4.69 (in) Peak Storage 0.98629(ac-ft)
Total Outflow 4.66 (in) Peak Elevation 299.24(ft)
0
r 1
L_J
APPENDIX
DESIGN PLANS FROM THE JOHN R. MCADAMS COMPANY, INC.
SEALED ON SEPTEMBER 16, 2004
•
•
MERCK TEMPORARY CONSTRUCTION STAGING
MER-07000