HomeMy WebLinkAbout20080592 Ver 1_Approval Letter_20080414O~~F W ATF9pG Michael F. Easley, Governor
~ William G. Ross Jr., Secretary
~~-- North Carolina Department of Environment and Natural Resources
> .:.i
(p ^~ Coleen H. Sullins, Director
Division of Water Quality
April 14, 2008
DWQ Project # 08-0592
Durham County
Mr. Donald Greeley, Deputy Director of Department of Water Management
City of Durham Department of Water Management
101 City Hall Plaza, Durham, NC 27701
Subject Property: City of Durham - SR46 Durham Sewer Rehabilitation
Goose Creek [030401, 27-5-1, WSfV, NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Mr. Greeley:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise temporarily impact 2701inear feet of intermittent stream and 0.00 square feet of Zone
] Neuse River basin protected riparian buffer, and 0.00 square feet of Zone 2 Neuse River basin protected
riparian buffer, as described in your application dated February 18, 2008, and received by the Division of
Water Quality (DWQ) on March 31, 2008, to rehabilitate existing sewer line at the site. After reviewing
your application, we have decided that the impacts are covered by General Water Quality Certification
Number(s) 3699 (GC3699). The Certification(s) allows you to use Nationwide Permit(s) NW 12 when
issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise
comply with any other required federal, state or local permits before you go ahead with your project
including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
T e of Im act Amount A roved Units Plan Location or Reference
Stream -intermittent 270 (linear feet) - tem ora im acts PCN a e 8 of 13
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: htto://h2o.enr.state.nc.us/ncwetlands
N °C Carolina
~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
City of Durham
Page 2 of 4
April 14, 2008
Buffers Zone 1 0.00 (s uare ft.) PCN a e 11 of 13
Buffers Zone 2 0.00 (s uare ft.) PCN a e 11 of 13
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Diffuse Flow
All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected
stream buffers and will not re-concentrate before discharging into the stream as identified within
15A NCAC 2B .0233 (5)
If diffuse flow as per 15A NCAC 02B .0233(5) is not achieved, then the DWQ shall be notified
and corrective actions to restore diffuse flow shall be taken if necessary to impede the formation
of erosion gullies. At no time shall stormwater from the proposed development be piped directly
through the buffer without prior DWQ written authorization.
The structural stormwater (diffuse flow) practices as well as drainage patterns must be maintained
in perpetuity. No changes to the structural stormwater practices shall be made without written
authorization from the Division of Water Quality. Stormwater easements shall be recorded for a
distance of at least 10 feet on each side of all stormwater conveyances on all lots containing these
structures including future access for maintenance. The stormwater easements shall allow for the
ability to maintain the structures, perform corrective actions as described above and shall provide
protection of the structures from potential alternations by future property owners.
City of Durham
Page 3 of 4
April 14, 2008
6. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities;
7. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have
any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786.
Si ely
Coleen H. Sullins
CHSlijm
Enclosures: GC 3699
Certificate of Completion
cc: USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Donald Greeley, City of Durham Department of Water Management, 101 City Hall Plaza, Durham,
NC 27701
Filename: 080592CODurhamSR46EDurhamSewerRehab(Durham)401 _NBR