Loading...
HomeMy WebLinkAbout20080659 Ver 1_401 Application_20080408'; ~~~4C~Q OCR 4G°~Q~]~[~1~4~Q~ O S 0 6 5 9 __- TO NCDENR/Division of Water Quality 401/Wetlands Unit ~~, {~~ V ~ D 1650 Mail Service Center ~~ Raleigh, North Carolina 27699-1650 APR 9 2408 Phone: 919.733.1786 DENR -WAVER QUAUIY~CH usf DATE JOB NO. 08-Apr-08 2719 ATTENTION Regulatory Staff - --_ - - - - - _ _ - Re: Pre-construction Notification Application Indian Creek Greenway --- Pedestrian Stream Crossings Wake County, North Carolina ~a `~ - SIiE 2 3 2 0 W. Morehead Street Charlotte, NC 28208 P 704.521.9880 F 704.521.8955 www.sitesolutionsoa.com VVE ARE SENDING YOU ~ Attached ^ Under separate cover via FedEx the fouow~ng items ^ Shop drawings ^ Prints ^ Plans ^ Samples ^ Specifcations ^ Copy of letter ^ Change order ~ PCN Application COPIES DATE , NO. DESCRIPTION - i - - -- - 7 04 Apr-08 1 ~ PCN Application Form - ongmal copy ~*Note: Includes USGS Map, Stte Coordinates, Stream X-ing Location Pictures, Overall Site Pian (Sht. No.'s L-4.4 a _ - _ _ _ _ _ --- ---- _ -- 'thru L-4.6) and Agent Authorization Letter). 1 07-Apr-08t 2 $240 Application Fee (Chk. No. 19473) -original -- ~ --- -- -- THESE ARE TRANSMITTED as checked below ^ For approval ^ Approved as submitted ^ Resubmit ___ _ copies for approval Q For your use ^ Approved as noted ^ Submit copies for distribution Q As requested ^ Returned for corrections ^ Return corrected prints ^ For review and comment a- _ _- - - - -- --- --_- - --- - --- REMARKS Please do not hesitate to call if you should need any additional information. ---- --__ Respectfully submitted. - - COPY TO E. Lynch (TOM) SIGNED: Dave Rector LATER Q~~~od~~ APR 9 2008 ~. Office Use Only: ~~pS pNp STO~~' a soon March os ~08 0 659 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing ~ ~ I Check all of the approval(s) requested for this project: X^ Section 404 Permit ® Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ^X 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ N/A -NOT APPLICABLE. 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ N/A. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ N/A. II. Applicant Information 1. Owner/Applicant Information Name: TOWN OF MORRISVILLEā€¢ C/O JOHN WHITSON -CITY MGR Mailing Address: 100 TOWN HALL DRIVE MORRISVILLE, NC 27560 Telephone Number: 919.463.6150 Fax Number: 919.481.2907 E-mail Address:.. jwhitson(a,ci.morrisville.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: DAVID P. RECTOR, PE Company Affiliation: SITE SOLUTIONS Mailing Address: 2320 W. MOREHEAD ST. CHARLOTTE, NC 28208 Telephone Number: 704.521.9880 Fax Number: 704.521.8995 E-mail Address: david(a,sitesolutionspa.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect. to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: INDIAN CREEK GREENWAY 2. T.LP. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 0745-68-7043 & 0745-68-6714 4. Location County: WAKE Nearest Town: TOWN OF MORRISVILLE Subdivision name (include phase/lot number): NOT APPLICABLE. Directions to site (include road numbers/names, landmarks, etc.): THE PROPOSED CULVERT CROSSING IMPROVEMENT(S) ARE LOCATED OFF OF TOWN HALL DRIVE ON INDIAN CREEK NORTH OF MORRISVILLE- CARPENTER ROAD IN THE TOWN OF MORRISVILLE (WAKE COUNTY). 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): (SEE ATTACHED°N (SEE ATTACHED) °W 6. Property size (acres): 5.69 (PROPERTY AREAS AT BOTH CROSSINGSI 7. Name of nearest receiving body of water: INDIAN CREEK 8. River Basin: NEUSE (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: RESIDENTIAL, RECREATIONAL (PARK/GREENWAY~ AND INSTITUTIONAL. RESIDENTIAL LAND USES SURROUND THE PROPOSED PEDESTRIAN BRIDGE CROSSING(S). 10. Describe the overall project in detail, including the type of equipment to be used: Page 6 of 13 THE PROJECT WILL INVOLVE REMOVAL OF EXISTING CULVERT(S) AT TWO (2) SEPARATE LOCATIONS ON INDIAN CREEK. THE EXISTING CPP CULVERTS WILL BE REPLACED WITH "NEW" RCP CULVERTS. THE CULVERT CROSSING(S~ APPROXIMATELY 1,000 LF APART AND LOCATED 1.3 MILES UPSTREAM OF MORRISVILLE-CARPENTER ROAD (SR 3014). CONSTRUCTION WILL INVOLVE THE USE OF A FRONT END LOADER, OVERHEAD CRANE AND BACKHOE. 11. Explain the purpose of the proposed work: PROPOSED CULVERT CROSSING IMPROVEMENT(S) ON INDIAN CREEK AS PART OF THE. INDIAN CREEK GREENWAY PROJECT FOR THE TOWN OF MORRISVILLE. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NO JURISDICTIONAL DETERMINATIONS OR PERMITS EXIST FOR THE PROPOSED CULVERT CROSSING(S) IMPROVEMENTS. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. NO FUTURE IMPACTS ARE ANTICIPATED FOR THIS PROJECT. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: THE PROJECT INVOLVES THE UPGRADING OF TWO (2) EXISTING CULVERT CROSSINGS AS PART OF THE TOWN'S INDIAN CREEK GREENWAY SYSTEM. THE EXISTING CORRUGATED POLYETHYLENE PIPES (CPP) WILL BE REPLACED WITH REINFORCED Page 7 of 13 CONCRETE PIPES (RCP). NO NEGATIVE IMPACTS TO THE STREAM ARE ANTICIPATED AS A RESULT OF THE PROPOSED CULVERT INSTALLATIONS. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: N/A. 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length (linear feet) Area of Impact (acres) 1 INDIAN CREEK CULVERT PERENNIAL 25 45 .0258 2 INDIAN CREEK CULVERT PERENNIAL 35 95 .0763 Total Stream Impact (by length and acreage) 140 .1022 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on ma) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres Page 8 of 13 Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.1022 Wetland Impact (acres): 0.00 Open Water Impact (acres): 0.00 Total Impact to Waters of the U.S. (acres) 0.00 Total Stream Impact (linear feet): 140 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ~ No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. NOT APPLICABLE FOR THIS PROJECT. 8. Pond Creation -NOT APPLICABLE If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts: PROPOSED CULVERT CROSSING IMPROVEMENT(S) ARE NECESSARY TO PROVIDE IMPROVED MAINTENANCE (EX. SANITARY SEWER) AND PEDESTRIAN ACCESS ALONG INDIAN CREEK. DURING CONSTRUCTION SILT FENCING AND MATTING WILL BE USED TO ISOLATE THE IMPACTED AREA AND PROVIDE TURBIDITY AND SEDIMENTATION PROTECTION TO DOWNSTEAM AREAS. Page 9 of 13 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A -NOT APPLICABLE. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A. Amount of buffer mitigation requested (square feet): N/A. Amount of Riparian wetland mitigation requested (acres): N/A. Page 10 of 13 Amount ofNon-riparian wetland mitigation requested (acres): N/A. Amount of Coastal wetland mitigation requested (acres): N/A. IX. X. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ® AN ENVIRONMENTAL ASSESSMENT (EA) IS NOT REQUIRED FOR THIS PROJECT. 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ N/A Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the, applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify *Greenway Stream X-ink No.'s 1 & 2)? Yes ® No ^ 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (s uare feet) Miti ation 1 1,655 3 (2 for Catawba) N/A 2 7,405 1.5 N/A Total ~ 9,060 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. *Note: In accordance with 15A NCAC 2B .0233, pg. 7 (6) Table of Uses, greenways are an allowable use within the buffer. The proposed greenway is routed within an existing sewer easement which is in the buffer in order to minimize land disturbance. Page 11 of 13 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. NOT APPLICABLE. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. PARK AND RECREATION GREENWAY PROJECT FOR THE TOWN OF MORRISVILLE. STORMWATER MANAGEMENT PLANS ARE BEING REVIEWED BY THE TOWN ENGINEER. MINIMAL INCREASE IN IMPERVIOUS AREA FOR PROPOSED GREENWAY WITHIN EXISTING PARK PROPERTIES. I~III. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. EXISTING PUBLIC WATER AND SEWER (TOWN OF CARY) IS PROVIDED TO THE SITE AND SURROUNDING AREAS. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No XQ Is this anafter-the-fact permit application? Yes ^ No Q XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No ^X If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: FUTURE DEVELOPMENT IN UPPER AREAS OF THE EXISTING WATERSHED WILL BE REQUIRED TO PROVIDE WATER QUALITY AND DETENTION REQUIREMENTS IN ACCORDANCE WITH THE TOWN'S ZONING AND SUBDIVISION ORDINANCES. Page 12 of 13 XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~. ~~ ~~ Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 Indian Creek Greenway Renovation of Existing Culvert Crossings on Indian Creek Morrisville, North Carolina AGENT AUTHORIZATION I, John Whitson, representing the Town of Morrisville, hereby acknowledge that we authorize David P. Rector, PE of Site Solutions, to act as an agent on our behalf and take all actions necessary to the processing, issuance, and acceptance of this Nationwide Permit and any and all standard and special conditions attached for the above referenced project. The information submitted in our Pre-Construction Notification (PCN) for the aforementioned project is true and accurate to the best of our knowledge. ,, ;~ ~ . J John Whitson Town Manager Town of Morrisville ~ ~~ ~ ~ c. Date Note: Completion of this form will allow the agent to sign all future application correspondence. T~PD! map printed on 04/04/08 from "North Carolina.tpo" and "Untitled.tpg" L _~ (\ C O u n 2 C C C 0 U D' Z O O O O 0 to m Z 0 0 0 v M MN ~TN ° ~ ~ Hne 7~' ®OC9 FEET 0 500 X000 P.sEiEflS Panted from TOPO! ®2001 National Geogeaphic Holdings (www.topo.com) INDIAN CREEK GREENWAY MORRISVILLE, NORTH CAROLINA PROPOSED CULVERT IMPROVEMENT LOCATION(S): CULVERT X-ING N0. 1 (NORTHERNMOST LOCATION) LATITUDE - 35.8331° N LONGIUDE - 78.8414° W CULVERT X-ING N0. 2 (SOUTHERNMOST LOCATION) LATITUDE - 35.8311° N LONGIUDE - 78.8408° W 0 z z X 1- w J z X W W O Z W Q W N a 0 z z X w J u z ~, X w lL O Z W Q W H N Z O D 0 0 z m D 3 m z 0 O T m X H '~ H z Cl n C m --1 X Z Gl Z O N c m D 3 rn Z 0 O T m X ~_ Z n C r C m X H Z Z O N