Loading...
HomeMy WebLinkAbout20060500 Ver 1_Certification of Completion_20080201556 Highlands Road Franklin, North Carolina 28734 Telephone 828-369-5003 .--- pf,~,ti/ . ~ 9 boo g' ~d ~/ ~.(~~fLf~N~~ C,fiVl/ ~i4T~~ ~/ G(15~LJ / ~,4~,~oUlU~? ~~U/S~O~(J ~~ ~o~J ,~ ~~~ ~ 6 ~~- /~ 5 ~ ~T o.c~ o~ C~D,~~~€~~~ ~c : ~~T~~iC' ~~ ~o~~cT ~ ~ -- oSoo ~~ L~i~S~ ~ Nl~ ~~tJ O~ ~ o'`r1~L~ T~ ark /` ~~~~~ ~~ ~i Sul ~~'! ~if/L~/ ~~~~ ~ ~ ~, 7 ~$ ° ~ ~~ ~ ~~ ~G~IA~Q`' ~,ND Jan 28 2008 18:23 Buchanan and Sons Inc (8281 631-4801 P.1 Cextli~cation of Comp~e~on ~~~ ~ ~ ~KG~ -~ DWQ Project No.: ~ ~" .- ~5 °~, County: MA-~N Applicant: ~^n ~ t^z~ ~ +v Project Name: ~ r"t ~~~'~^1 G~C'~SC~-`-~. Date of Issuance of Isolated Wetland Permit. __~ ~ r.T 1 i Wi 2~~G .,_ ^` Certificate of Completion Upon completion of aJl work approved within tht 401 Water Quality Certification end Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40l.NVctlands Unit, North Carolina Division of Water Quality, 1ti50 Mail Service Center, Raleigh, NC 27699-1650. This form tray be returned to DWQ by the applicant, the app)icant's authorized agent or the project engineer. it is not necessary to send certificates from all of these. Applica~nt~'s CeQrtifcation 1 cT I Yh Y~L~ hereby state that, to rho best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliannce end intent of the AO our Quality Certircation and Buffer Rules, the approved plans and specifications, and of cr su rting materiels, 7 Signature: ~ Date; ~ _ ~~, ~2r~>~ Agent 's Cert f cation N/•r 1 _ hereby slate that, to the best of my abilities, due cart and diligence was used in-the observation of the const7ruction such that the construction was observed to be built within substantial compliance and intent of the 40l Water Quality Certification and Buffer Rules; the approved plans and specifications, and other supporting materials. Signature; Gate. ff this pJroject was/de_signed by a Certified Professional l <-~~r~' ~ G~-~y ~~ ~, as a duly registered Professional ~~~' (i.e., Engineer, Landsc pca~Arebitect, Surveyor, etc.) in the State of Nvrtit Carolina, having been authorized to observe (periodically, weekly, full tune) the construction of the project, fox the Permittoe hereby state that, to the best of my abilities, due care and diligence was used in the obswation of the construction such that the construction was observed to be boil[ tvithir~ tied,„compliance end intrnt of the 401 Water Quality Certification and Buffer Rules, the approved plat3'" ~~ s, and others pporting materiels. Signature; : `'~- ,'~, y< Date: :r..: AL r ~. • : ~ ~ ~~. . • '~1• ~~i~ F EB 1 2008 DENR - ~JAYERMWATE.R g~NGH ~T~Npg AND STOR