Loading...
HomeMy WebLinkAbout20071470 Ver 1_Email_20071102O&M requirements Subject: O&M requirements From: "Shannon Sweitzer" <shannon.sweitzer@ncturnpike.org> Date: Fri, 2 Nov 2007 15:31:08 -0400 To: "rob.ridings@ncmail.net" <rob.ridings@ncmail.net> , "john.hennessy@ncmail.net" <j ohn.hennessy@ncmail.net> CC: "jennifer.harris@ncturnpike.org" <jennifer.harris@ncturnpike.org> , "mike.randall@ncmail.net" <mike.randall@ncmail.net>, "gwprice@dot.state.nc.us" <gwprice@dot.state.nc.us> John and Rob, If you are not aware, NCTA is submitting the NPDES Application and revisions to the draft NPDES permit to Mike Randall on Monday, November 5, 2007. We anticipate obtaining our permit around the first of 2008. In that regard, we would hope to adopt NCDOT's BMP inspection and maintenance procedures for the Triangle Expressway as detailed in our permit application. I'm not sure how this affects the wording with the 401 permit considering we currently do not have the NPDES permit in hand. I offer the following attachment which details NCTA's plan to address inspection and maintenance on the Triangle Expressway and would further request that such be included, if possible, in the 401 permit. This would keep NCTA's programs and processes consistent with the NPDES permit application. Please advise if this information is acceptable or if you believe other requirements are necessary to meet your inspection and maintenance requirements. Thanks for all your assistance and please let me know if I can provide any additional information or assistance regarding this matter. ****************************** Shannon Sweitzer, PE Director of Construction North Carolina Turnpike Authority 5400 Glenwood Avenue, Suite 400 Raleigh, North Carolina 27612 (919) 510-4372 Office (919) 571-3015 Fax (919) 524-1854 Mobile 'Triangle Expressway BMP 1 /141-0 Inspection and Maintenance Process.doc Content-Type: application/msword Content-Encoding: base64 L? l / 6 !,2,7 2, //Li . --7 1 of 1 11/5/2007 1:23 PM Strategy: In order to streamline planning and implementation between NCTA and contractors, applicable programs of the NPDES program shall be applied as soon as they are pertinent to the Triangle Expressway Project. The current NCDOT I&M Manual will serve as NCTA's source for guidance and requirements. Plan: NCTA will implement the following practices which are anticipated as part of the future NPDES permit. Information initiated for the current project will be incorporated into the expanded versions of these programs and tools expected to be developed under the NPDES permit. a. BMP Toolbox - NCTA will utilize NCDOT's Toolbox as well as the best professional judgment of the design engineer to design necessary BMPs. i. BMP selection will consider watershed classification and its impact on identifying the pollutant of concern, and site-specific needs such as soil type, Average Daily Traffic (ADT), slope, available area, effect on control structures and options, drainage area, quantity and size of BMP design, etc. b. BMP Inspection and Maintenance Database - A Microsoft Excel or Access database of post construction BMPs and their associated outfalls will be compiled and maintained. The information associated with each BMP will include: i. BMP type and description, ii. Latitude/Longitude coordinates and any other pertinent location information, iii. Photographs to assist in the identification, inspection, and maintenance of each BMP, iv. Construction date and details, and v. Assigned inspection frequency based upon NCDOT's I&M Manual. c. Inspection and Maintenance Program - BMP inspection and maintenance will be included as a requirement in the maintenance contract maintained between NCTA and a hired contractor. The hired contractor will be required to follow the inspection and maintenance procedures and schedules as listed in the NCDOT I&M Manual. All inspection and maintenance activities will be documented, submitted to NCTA, maintained in NCTA records, and will be available upon request. BMP I&M requirements will include: i. Inspection to be performed within the time frame required by I&M Manual, ii. Checklists from NCDOT I&M Manual (or latest update) be used and submitted to NCTA to assess level of service (LOS), iii. Photos of inspection findings, and iv. Maintenance action(s) as authorized. All inspection reports will be reviewed by NCTA staff for appropriate detail and to authorize any maintenance that may be necessary. Once authorization has been given, BMP maintenance will be contracted. Upon completion, maintenance activity will be evaluated and verified by NCTA. Once NCTA is issued a NPDES permit, the efforts previously discussed specific to the Triangle Expressway will be incorporated into the NPDES program. The NPDES programs will supersede the activities specific to this project and enforcement, if any, will be made under the NPDES permit. Every effort will be made to plan and implement all Triangle Expressway activities so that they will be compliant with NPDES requirements.