Loading...
HomeMy WebLinkAbout20071470 Ver 1_EEP Acceptance Letters_20070723PROGRAM July 18, 2007 Steve Dewitt, P.E. NC Turnpike Authority 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 Project: Western Wake Expressway County: Wake The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Perrmt1401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. Cape Fear 03030002 Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer II (Sq. Ft.) Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impacts 0 0 4,910 6.56 6.94 0 0 0 Credits 0 0 9,820 13.12 13.88 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, WilliD. Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Eric Alsmeyer, USACE-Raleigh Linda Fitzpatrick, NCDOT Beth Harmon, NCEEP File kmtoY' E .. Pro" our .ftA fift North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 91 9-71 5-0476 / www.nceep.net r '11V_ A?Ji svstem Mmement PROGRAM July 18, 2007 Steve Dewitt, P.E. NC Turnpike Authority 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 Project: Western Wake Expressway County: Wake The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. Uwe have not received a copy of the issued 404 Permit/401 Certifiication/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount. of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.neeep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. Cape Fear 03030004 Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer Il (Sq. Ft.) Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impacts 0 0 5,149 4.25 2.39 0 0 0 Credits 0 0 10,298 8.50 4.78 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, b. Willi Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Eric Alsmeyer, USACE-Raleigh Linda Fitzpatrick, NCDOT Beth Harmon, NCEEP File X"bring... Ep ... Prot Our Stag 2644 6L North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net