HomeMy WebLinkAbout20011477 Ver 1_Certification of Completion_20080401
DWQ Project No.: ~ ~ - ~''f 7 7 County:
Applicant: n'1 ~ ~)^o (,v e ni r i i L Gl
Project Name: g/'~o k 1~ Ve' rr Sty b ,
~~~~
7 r~~ ~
Date of Issuance of 401 Water Quality Certification: ~q n o"2 S - ~ O o ~-
Certificate of Completion
g5,
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North
Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
~ppl. nt, ~~~~~10~'1 ~~9/t~/O!,(yt_
I~ hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and a sup rting materials.
Signature• .t Date• ~Q~ 3 / - D~
Agent's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I~ as a duly registered Professional (i.e., Engineer,
Landscape- Architect, Surveyor, ect.) in the State of Nortli Carolina, having been authorized to observe
(periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No. Date
F~~ ~. 4 2006
pENK -WATER QUALITY
~tVETl.ANC~S AND STORMWATER BRANCH
DWQ Project No.: ~~ ! - ~ `f I / County:
Applicant: 1'1R 14 ~ i-,4 l~ e t7i c ~ i ~ Gl c
Project Name: g/'oo Ic l~ yc' c-~- Scab ,
Date of Issuance of 401 Water Quality Certification:
~. k ~.
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North
Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
A I' nt' ~J~~~-fCaf'1, ~~~c ~OLCf-C~
PP
I~ hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and a sn rung materials.
Si atnre• ~ ~_ Date• ~ Q. ~1 3 / ` O ~
~ •-~
Agent's Certification
I, ~~ . ~ /-7 ~ ~~~ -^ -^ ~ S ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, an supporting materials.
Signature:T ~-_~--~-L- Date:~~'/ fi`g''
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, ect.) in the State of Nortli Carolina, having been authorized to observe
(periodically, weekly, fall time) the construction of the project, for the Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No. Date
~~~~
o ~~
DEB 2 ~ ~p06
~~ S ~p STOf~NWA~BRPdtGN
~IE~p