Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ver _Certification of Completion_20050518
v~2-25-'D5 ©9;34 FROM-NCDENR ASHEVILLE FO 8282997043 t.Gl Ltti1~;QLiI),11 ~.)l ~.~~~~~~~'~~~ , `. C.I nD tnca_~ F~LLCti~4xt~ : I'},zelwew'~-NR~u-~~G~tS ~__•_.• _~.., D~VQ nr~}ect t~'o.: County: ~'`~,'~C.~~'. ~ ~ s "t ~ ~ ~~ applicant: `~ /~' 1~ ~ . f ~~ ~' i i Project Name: ~.~~4N~ ~^~.e~~ ~I.OSSia .s`o1~r-1, ~j.M Date of Issuance of Isolated ~rVetland Permit: Certificate of Cc~m letion Upon completion of ail work approved within the 401 Water Ciuality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Watlands Unit, North Carolina Division oP Water Quality, 16501YIai1 Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applieattt, the applicant's authori2ed agent; or the project engineer. l;t is not necessary to send certificates from all of these. Applicant's Certi, fication I' ~~' ~ `f ~S _, hereby state that, to the best of m abilities due used in the observation of the corxstruetion such that the corGS[ruetion was observed to~be built w th ail u b to al compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. , Signatute: ~ ~~'l. ~x-(.~c, ~ j Z 0j ---`~ Date: - ~ e ~~ ~~ Agent's Certifzcation I~ ,hereby state that, to the best of my abilities, due care and diligence vvas used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 '4'Vater Qualaty Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified 1°rofessional z, Date: T-991 PD9/D9 U-907 as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Pernuttee hereby state that, to the best of my abilities, due Care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quallty Cerhfieation sad Suffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date D ~~j ~Q V ~~ I1~~,Y ? A ~~C:S -`~'EILUYQ~ A1dp S i CFt~, ~r 1TC l~ ~ :,., ~ a~t`~::~~^h!