HomeMy WebLinkAboutWQ0003418_Monitoring - 08-2016_20160929L p
NON -DISCHARGE APPLICATION REPORT Page of
SPRAY IRRIGATION SITE(S)
THERE ARE TWO APPLICATION FIELDS PER PAGE. USE ADDITIONAL PAGES AS NEEDED.
PERMIT NUMBER: WQ0003418
MONTH: August YEAR: . 2016
FACILITY NAME: Durham Mine COUNTY: Durham
Formulas:
Daily Loading (inches) = Nolume Applied (gallons) x 0.1336 (cubic feet/gallon) x 12 (inchesRoot)] /[Area Sprayed (acres) x 43,560 (square feet/acre)] OR
= Volume Applied (gallons) / [Area Sprayed (acres) x 27,152 (gallons/acre-inch)]
Maximum Hourly Loading (Inches) = Daily Loading (inches) / [Time Irrigated (minutes) / 60 (minutesrhour)] Monthly Loading (inches) =Sum of Daily Loadings (inches)
12 Month Floating Total (inches) =Sum of this month's Monthly Loading (inches) and previous 11 month's Monthly Loadings (inches)
th 7 d sFxeek)
- Weather Codes: C -clear, PC -partly cloudy, CI -cloudy, R -rain, Sn-snow, a ee
Spray Irrigation Operator in Responsible Charge (ORC): Brian Gardner Phone: 919-387-9257
ORC Certification Number: 993136 Check Box if ORC Has Changed: ❑
Mail ORIGINAL and TWO COPIES to:
ATTN: Non -Discharge Compliance Unit
DENR
Division of Water Quality
1617 Mail Service Center
RALEIGH, NC 27699-1617
(SIGNATURE OF OPERATOR IN RESPONSIBLE CHARGE)
BY THIS SIGNATURE, I CERTIFY THAT THIS REPORT IS ACCURATE AND COMPLETE
TO THE BEST OF MY KNOWLEDGE.
DENR FORM NDAR-1 (5/2003)
Average Weekly l- ding (Inches)
= [Moodily Loading (inches/month) / Number of days in the month (,a_on )] x (ay
Did Irrigation Occur On This Field:
Did Irrigation Occur At This acility:
Did Irrigation Occur On This Feld:
Yes:
No: El
Yes:
D No:
El
Yes: No: ❑
1-B
FIELD NUMBER: 1-A
FIELD NUMBER:
AREA SPRAYED acres : 0.156
AREA SPRAYED (acres):
0.624
COVER CROP: Trees
COVER CROP:
Fescue
PERMITTED HOURLY RATE (inches):
PERMITTED HOURLY RATE (inches):
WEATHER CONDITIONS
PERMITTED YEARLY RATE (inches):
PERMITTED YEARLY RATE inches
D
storage
Maximum
Maximum
A
Weather
Temper-
Lagoon
Volume Time Daily Hourly
Volume Time
Daily Hourly
T
Code'
ature at Precipita-
Free-
board
A I[ed Irrigated Loading Loadin
Applied Irrigated
Loadin Loading
E
appllcadon tton
(°F) Inches
feet
9 allons minutes inches inches
gallons minutes
inches inches
1
R
89 0.04
10'
2
R
91 0.28
10'
3
CL
88
10'
4
R
87 1.02
10'
5
R
88 0.18
10'
6
PC
93
10'
7
R
86 0.39
10'
s
R
89 0.54
10'
9
PC
91
10'
10
PC
92
10'
11
PC
92
10'
1
4094 120 0.97 0.48
9821 120
0.58 0.29
12
PC
94
10'
13
PC
94
10'
14
PC
96
10'
15
PC
96
10'
16
PC
95
10'
17
PC
97
10'
18
PC
93
10'
19
R
91 0.38
20
PC
91
E10'
10'
21
PC
94
10'
4094 120 0.97 0.48
9821 120
0.58 0.29
22
PC
87
10'
23
PC
89
10'
24
PC
87
10'
25
PC
92
10'
120 0.97 0.48
9821 120
0.58 0.29
26
PC
99
10'
4094
27
R
98 0.18
10'
28
PC
90
10'
29
PC
90
10'
30
PC
92
10'
311
PC95 10'
Total Gallons/Monthly Loading (inches)
12282 2.90
29463
1.74
12 Month Floating Tota[ (inches)
77777777 32.85
20'88
Average Weekly Loading (inches)
0.6543057
SI I t
0.3923996
- Weather Codes: C -clear, PC -partly cloudy, CI -cloudy, R -rain, Sn-snow, a ee
Spray Irrigation Operator in Responsible Charge (ORC): Brian Gardner Phone: 919-387-9257
ORC Certification Number: 993136 Check Box if ORC Has Changed: ❑
Mail ORIGINAL and TWO COPIES to:
ATTN: Non -Discharge Compliance Unit
DENR
Division of Water Quality
1617 Mail Service Center
RALEIGH, NC 27699-1617
(SIGNATURE OF OPERATOR IN RESPONSIBLE CHARGE)
BY THIS SIGNATURE, I CERTIFY THAT THIS REPORT IS ACCURATE AND COMPLETE
TO THE BEST OF MY KNOWLEDGE.
DENR FORM NDAR-1 (5/2003)
NON -DISCHARGE APPLICATION REPORT
SPRAY IRRIGATION SITES)
Facility Status:
Please indicate ( by inserting Y(es) or N(o) in the appropriate box) whether the facility has been compliant
with the following permit requirements: (Note: if a requirement does not apply to your facility put (NA) in the
compliant box. )
1. The application rate(s) did not exceed the limit(s) specified in the permit.
2. Adequate measures were taken to prevent wastewater runoff from the site(s).
3. A suitable vegetative cover was maintained on the site(s) in accordance with the permit
4. All buffer zones as specified in the permit were maintained during each application.
Page
5. The freeboard in the treatment and/or storage lagoon(s) was not less than the limit(s)
specified in the permit
If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance with its
permit. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach
additional sheets if necessary.
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines
and imprisonment for knowing viol tions."
A�10I��
ignat r f Ke.rmittee)* Date
Rickv Merritt
(Permittee -Please print or type)
6523 NC HWY #55
Durham, NC 27713-9436
(Permittee Address)
Ricky Merritt
(Name of Signing Official -Please print or type)
Director of Engineering
(Position or Title)
919-544-1796 2/28/2019
(Phone Number) (Permit Exp. Date)
. If signed by other than the permittee, delegation of signatory authority must be on file with the state per 15A NCAC 2B.0506 (b)(2)(D).
of
4- -
DENR FORM NDAR-1 (5/2003)