Baker, Virginia
From:Herndon, T. Mason
Sent:Tuesday, September 06, 2016 5:23 PM
To:Baker, Virginia
Cc:Steenhuis, Joanne
Subject:RE: temp impact / other question
Hey Ginny,
17BP.3.R.1 (Onslow 26) is complete. 17.BP.6.R.40 is a Division 6 project so you would have to ask Jim Rerko. Joanne
should have a spreadsheet on my old computer and she could check to see if I did a final inspection. If memory serves
me well, I think it has been completed. As for R-2633B, Site 7 the temporary fill is still in place and will be for the next
several months. We’re building a bridge over CSX railroad and the temporary fill is for construction access.
Please let me know if I can be of further assistance.
MH
From: Baker, Virginia
Sent: Tuesday, September 06, 2016 1:22 PM
To: Herndon, T. Mason
Cc: Steenhuis, Joanne
Subject: FW: temp impact / other question
Mason,
Hope things are going well for you at DOT. I was planning a site visit with Joanne later in the month and was wandering if
you knew the status on the two projects highlighted in yellow below which we may or may not take a look at depending
on their status.
Thanks much,
Ginny
From: Elliott, Jason C
Sent: Thursday, September 01, 2016 10:35 AM
To: Baker, Virginia <virginia.baker@ncdenr.gov>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: RE: temp impact / other question
Hey Ginny,
Sorry for the delay, still trying to get caught up on things from the conference. Here’s a few more answers to questions
you had.
17BP.3.R.1 & 17BP.R.6.40: These are both small division projects that we had minimal input/work on. I’ve
attached the permits that I have for both projects to this email for your file.
R-2633B US 17 Bypass Site #7: The project is still under construction so I’m not sure the timing of when the
monitoring will begin. This was for temporary impacts only on this project and DCM required that we
monitoring for 3 years or until jurisdictional wetland status has returned. I’ll check with the construction office
to see how progress in this area is coming along.
B-4090: Construction complete and monitoring report (Year 1) will be completed this year.
B-4273: Construction complete and monitoring report (Year 1) will be completed this year.
B-4639: Will be planted this winter.
1
R-3324: Construction complete and monitoring report (Year 1) will be completed this year.
I-3819A: For this project, I believe early on we proposed the possibility of preserving the wetland area in the SW
side of the interchange as indicated in the attached drawing you provided. I’m not 100% sure why but the
preservation fell out and was not included in the mitigation plan that was in the permit for the I-3819A
project. That’s why you saw the ???’s on my spreadsheet because I wasn’t told by Leilani’s crowd what to
include there. I’ve now updated our spread sheet to show that we only did the stream enhancement in the NE
quadrant. Sorry about the confusion on this one. Also I’ve included a link below to the permit for this project.
https://xfer.services.ncdot.gov/pdea/PermIssued/Archived%20Permits%202012%20and%20Earlier/I-
3819A%20Individual%20Iredell%20County%20May%203%202012.pdf
B-3373: This is an older project, I’ll have to dig into it and see what I can find. I’ll be back in touch on it.
I hope this info is mostly helpful, let me know what other questions you have. Thanks!
Jason C. Elliott
PDEA - Natural Environment Section
Natural Environment Engineering Group
NC Department of Transportation
1598 Mail Service Center
Raleigh, NC 27699-1598
Phone: 919-707-6114
Fax: 919-212-5785
From: Baker, Virginia
Sent: Friday, August 19, 2016 1:17 PM
To: Elliott, Jason C <jelliott@ncdot.gov>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: temp impact / other question
Hi Jason,
I went through the table you sent me a while back and had some questions on a few of the sites (see attached) that I
had trouble finding info on.
There were a couple (17BP.3.R.1 and 17BP.R.6.40), that I could not locate a DWR project # on. Do you know if these are
projects we permitted? Joanne was not familiar with these.
I believe DWR required mitigation for R-2633AA/AB (US 17 Bypass Site 7), B-4090, B-4273, B-4639, but not for R-3324.
For the sites that are under construction, do you know the status?
For I-3819A, the I-40/I-77 Interchange, there will be 2354 LF stream Enh and 26.69 ac preservation as stated in mit plan
but the table says “????”. I looked at the GIS coverage and saw what I thought was the stream mitigation (NE side of
interchange) and what looked like wetland preservation (SE side of interchange, ~15ac, is this right? I see our permit
approval conditions approved all the onsite stream enh and an excess needed through DMS. For the wetland mitigation
we required 1.36 ac and approved all of it through DMS, no mention of onsite mitigation. I was wandering if you knew
what happened there? (see attached map).
2
Lastly, is there a GIS boundary or Figure 1 map from the mit plan available for B-3373? The mit plan I had access to was
scanned as black and white so the aerial was hard to see. I made a rough boundary of the site (attached).
Again there is no rush on these questions. Although, I am planning to go in the field with Joanne on Sept 28/29 and
would like to know about the sites in her divisions (3 and 6) before then. I also will be seeing Gum Swamp with Brian at
th
the end of the month and the I-40/I77 interchange with Dave Wanucha on Sept 20. I can see those last two sites
without a definitive answer. I can follow up with the DEOs directly on construction status if that will be easier for you.
Have a great weekend, I’m sure I will run into you at the stream conference next week.
Ginny Baker
Ginny Baker
Transportation Permitting Unit
NCDEQ-Division of Water Resources
1650 Mail Service Center
Raleigh, NC 27699-1650
Phone-(919) 707-8788, Fax-(919) 733-1290