HomeMy WebLinkAbout20140090 All Versions_U-2579B Forsyth January 21 2014_20140121n"`����
w m y,
�..
� �� t - '_ �
c�+w ww��
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY
GOVERNOR
January 21, 2014
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATTN: Mr. John Thomas
NCDOT Coordinator
ANTHONY J. TATA
SECRETARY
SUBJECT: Application for Section 404 Individual Permit and Section 401 Individual
Water Quality Certification for the proposed Winston-Salem Northern Beltway
Eastern Section from US 158 to I-40 Bus/US 421, Forsyth County, Division 9.
WBS Element No. 34839.1.2, TII' No. U-2579B.
Debit $570.00 from WBS Element No. 34839.1.2
Dear Sir:
The North Carolina Department of Transportation (NCDOT) proposes to construct a portion of
the Winston-Salem Northern Beltway Eastern Section from US 158 to I-40 Bus/US 421, Forsyth
County, for a total of 3.4 miles (Section B). The other remaining sections including AA, AB; C,
D, E, and F will be permitted separately. In addition to this cover letter, the application package
consists of an ENG Form 4345, NCEEP acceptance letter, Interagency Hydraulic Design Review
meeting minutes (Concurrence Points 4B and 4C), onsite mitigation plans, Stormwater
Management Plan, permit drawings, and half-size roadway plan sheets. This project calls for a
Let date of October 21, 2014 and a review date of September 2, 2014. However, the Let date
may advance as additional funds become available.
_ _ _ _ _ _ _ _ _ _ PURPOSE AND NEED
The purposes of the proposed project are to improve intrastate and interstate mobility, improve
roadway system linkage and continuity, reduce traffic congestion and carry future traffic at a
desirable level of service, enhance safety, and provide a corridor for I-74 (a congressionally
designated High Priority Corridor on the National Highway System). The transportation needs of
the proposed project are intended to address the following: poor intrastate and interstate linkage
to the north and south, poor roadway connectivity within and through eastern. Forsyth County,
capacity deficiencies, above-average accident rates on area roadways, and corridor for I-74.
MAILING ADDRESS:
NC DEPARTMENT OF TR,4NSPORTATION
PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS UNIT
1598 MAIL SERVICE CENTER
Rn�ei�H NC 27699-1548
TELEPHON E: 919-707-6000
FAX: 919-212-5785
WEBSITE:NCDOT.GOV
LOCATION:
CENTURY CENTER, BUILDING B
"I020 BIRCH RIDGE DRIVE
RALEIGH NC 27610
NEPA DOCUMENT STATUS
A Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) for U-2579
(includes Sections B-F) and U-2579A (includes Sections AA and AB) were completed in January
2007 and February 2008, respectively, and have been provided to the appropriate agencies. A
Right of Way (ROW) Consultation for U-2579B to update the FEIS was completed on May 17,
2012. Additional copies of the FEIS, ROD, and ROW Consultations will be provided upon
request.
INDEPENDENT UTILITY
The subject project is in compliance with 23 CFR Part 771.111(fl, which lists the Federal
Highway Administration (FHWA) characteristics of independent utility of a project:
(1) The project connects logical termini and is of sufficient length to address
environmental matters on a broad scope;
(2) The project is usable and a reasonable expenditure, even if no additional transportation
improvements are made in the area;
(3) The project does not restrict consideration of alternatives for other reasonably
foreseeable transportation improvements.
RESOURCE STATUS
Wetland delineations within the U-2579B project study area followed the field delineation
method outlined in the 1987 Corps of Engineers Wetland Delineation Manual (USACE, 1987)
and the Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual:
Eastern Mountains and Piedmont Region (USACE, 2010). Stream identifcation and
classification followed the Methodology for the Identification of Intermittent and Perennial
Streams and Their Origins (NC Division of Water Quality [NCDWQ], 2010 and 2005).
A jurisdictional determination (JD) for both U-2579 and U-2579A sections, dated March 31,
2006, was received .from USACE. The JD expired on March 31, 2011. Subsequent JDs were
issued for Section U-2579B on December 3, 2008 and February 28, 2013. A request packet for
the final JD for U-2579B was submitted to the USACE on February 4, 2013. The corresponding
JD, dated February 28, 2013, was received from the USACE for the re-verification of.U-2579B
section. Following the issuance of this JD, jurisdictional features for U-2579B were feld re-
verified by NC Division of Water Resources (NCDWR) representative Amy Euliss on March 25,
_ _ _ _ _ 2013_ _ _ _ _ : _ __ _ _ - __ _ _ _ _
This project lies within the Piedmont Physiographic Province in the Yadkin River Basin
(Hydrologic Unit Code 03040101). Jurisdictional features within the U-2579B project study area
that will be impacted include 7 unnamed tributaries (UT) to Lowery Mill Creek (NCDWR
Classification WS-III; NCDWR Index No. 12-94-12-3-[0.5]), Martin Mill Creek and 4 UTs to
Martin Mill Creek (NCDWQ Classification WS-III; NCDWQ Index No. 12-94-12-3-1), Kerners
Mill Creek and 1 UT to Kerners Mill Creek (NCDWR Classification WS-III; Index No. 12-94-
12-2-[03]), Smith Creek and 11 UTs to Smith Creek (NCDWQ Classi�cation WS-III; NCDWQ
Index No. 12-94-12-2-1), and Fishers Branch and 2 UTs to Fishers Branch (NCDWR
Classification WS-III; NCDWR Index No. 12-94-12-2-2-[1]), 5 ponds, and 17 riparian wetlands.
There are no designated Outstanding Resource Waters (ORW), High Quality Waters (HQW),
Water Supply I(WS-I), or Water Supply II (WS-II) waters within 1.0 mile of the project area.
U-2579B Individual Permit Application
2
No waters within the project area and within a mile of the project area are listed on the 2012
303(d) Final List of Impaired Waters ofNorth Carolina.
IMPACTS TO WATERS OF THE UNITED STATES
Surface Waters
Total surface water impacts for U-2579B are 9,800 linear feet of permanent stream impacts,
1,553 linear feet of temporary stream impacts, and 4.36 acres of pond impacts. The jurisdictional
stream impacts are summarized below in Table 1. There will be no impacts from utilities for
Section U-2579B.
Table 1. U-2579B Stream Im acts
Impacts Impacts
Stream , � '�UP � � �' Permanent requiring � USACE= �irequiring �, Temp
Permit Impact
Name/JD Flow Impacts' USACE, Mitigation NCDWR Impacts
Site No. Type 1
Packet ID Status (ft) mitigation Ratio .. mitigation ;(ft)
ft �: � � ft . � �
UT to
1 M 11 Cr ek/ I Fill 142 142 1:1 03 0
ES-S45
UT to I Fill 109 109 1:1 03 0
2 Lowery P Fill 208 208 2:1 208 0
Mill Creek/
ES-S36 P BS 10 Oz 10 37
UT to
3 Lowery p Fill 438 438 2:1 438 33
Mill Creek/
ES-S35
UT to
Lowery Temp
3A Mill Creek/ P Detour 0 0 0 545
ES-S35
UT to
Lowery Temp
3B Mill Creek/ P Detour 0 0 0 194
ES-S47 ' '
UT to p Fill 493 493 2:1 493 18
4 Lowery
Mill CreeW P BS 9 OZ 9 31
ES-S37
UT to ,
5 Lowery p Fill 740 740 2:1 740 22
Mill Creek/
ES-S38
UT to
SA M 11 Cr ek/ I Fill 306 306 1:1 03 0
ES-S39
U-2579B Individual Permit Application
3
Table 1. U-2579B Stream Im acts continued
Tmpacts Impacts :
Stream I/P ` Permanent requiring USACE requiring Temp
�; Perri►it � � �� � Impact � ��
� �Name/JD Flow Impacts � USACE _ � Mitigation � �NCDWR Impacts ��
Site No: � Type' , , i , �
Packet ID Status (ft) mitigation Ratio m.itigation (ft)
ft ft
UT to
6 Martin Mill p Fill 312 312 2:1 312 42
Creek/
ES-S40
UT to Fill 442 442 2:1 442 53
Martin Mill
g ES-S42 P BS 58 OZ 58 44
UT to
10 Martin Mill p Fill 783 783 2:1 783 22
Creek/
ES-S43
UT to --
l0A Martin Mill p Fill 684 684 2:1 684 0
Creek/
ES-S44
Kerners
11 Mill Creek/ P Fill 808 808 2:1 808 57
ESE-S 1
Kerners
1 lA Mill Creek/ P Fill 223 223 2:1 223 41
ESE-S 1
UT to
12 MI11 C eek/ I Fill 88 88 l:l 03 205
ESE-S30
UT to
14 Creek/ I Fill 688 688 1:1 03 0
ESE-S3 �
UT to
15 Smith p Fill 332 332 2:1 332 0
Creek/
ESE-S31
UT to
15A C eek/ I Fill 108. 108 1:1 03 0
ESE-S32
UT to
16 C eek/ I Fill 104 104 1:1 03 0
ESE-S36
U-2579B Individual Permit Application
Table 1. U-2579B Stream Im acts continued
Iimpacts Impacts ,
Stream UP Permanent requiring, USACE; requ�ririg Temp
Eermit � �� Tm�pact � �� � � �
Name/ETD � Flow ��� � Iinpacts� i�SACE� Mitigation �NCDWR Impacts ��
Site No. Type . � . �. i
Packet TD Status � ��,� (ft) � initigation Ratio, it►itigation �(ft)' :�
ft ' ft °
UT to
17 Fishers p Fill 928 928 2:1 928 0
Branch/
ESE-SS
Fishers Fill 377 377 2:1 377 67
18 Branch/ P
ESE-S4 BS 80 OZ 80 59
UT to
20 Fishers p Fill 163. 163 2:1 163 0
Branch/
ESE-S7
Smith Fill 100 100 2:1 100 32
23 Creek/ P
ESE-S29 BS 54 Oz 54 21
UT to
23A Creek/ I Fill 57 57 1:1 03 0
ESE-S43
UT to
23B Creek/ P Fill 135 135 2:1 04 0
ESE-S38
UT to
24 Smith p Fill 202 202 2:1 202 0
Creek/
ESE-S40
25 Smith I Fill 73 73 1:1 03 0
SE-S41 BS 21 Oz 03 16
UT to
2�A Smith p Fill 205 205 2:1 205 0
Creek/
ESE-S24 _
UT to
Z�B C eek/ P Fill 130 130 2:1 04 14
ESE-S33
UT to
��C C eek/ P� Fill 116 116 2:�1 � �04 0
ESE-S34
Smith
28 Creek/ P BS 25 OZ 04 0
ESE-S29
U-2579B Individual Permit Application
Table l. U-2579B Stream Imnacts continued
Smith
30 Creek/ P BS 28 O2 04 0
ESE-S29
Martin Mill
31 Creek/ P BS 21 Oz 04 0
ES-S41
TOTALS (ft) 9,800 9,494 7,649 1,553
Notes: P= Perennial; I= Intermittent; BS = Bank Stabilization. �Determined by USACE during final JD packet review. ZMitigation
for bank stabilization not required by USACE. 'Intermittent streams grandfathered from NCDWR mitigation. "Mitigation not
required by NCDWR (less than 1501inear feet of steam).
Wetlands
There will be a total of 1.96 acres of permanent riparian wetland impacts associated with this
section. These impacts will result from 1.87 acres of permanent fll, <0.01 acres of excavation,
and 0.08 acres of inechanized clearing. Permanent and temporary wetland impacts are
summarized below in Table 2 for U-2579B. There will be no impacts from utilities for Section
U-2579B.
Table 2. U-2579B Wetland Im acts inal
Permit JD Package Permanent Excavation ' Mechanized ' Total Impacts
' Site.No. ' ID i i Fill ac ac : Clearin ac ac
1 ES-W 16 0.03 <0.01 0.02 0.06
6 ES-W 18 0.03 <0.01 0.04
7 ES-W13 0.52 0.01 0.53
9 ES-W 14 0.03 0.01 0.04
10 ES-W 19 0.01 0.01
13 ESE-W1 033 0.33
14 ESE-W2 0.04 0.04
15 ESE-W3 0.18 0.18
17 ESE-W16 0.09 <0.01 0.10
19 ESE-W4 0.47 0.01 0.48
21 ES-W 17 0.02 0.02
22 ESE-W22 0.01 - OA1
24A ESE-W20 0.03 0.03
24A ESE-W21 0.03 0.03
27B ESE-W 17 0.05 0.05
29 No ID <0.01 <0.01
TOTALS (ac) 1.87 <0.01 0.08 1.96
Notes: Totals are rounded based upon sum of actual impacts. AII permanent impacts requlre 2:1 USAC� mitigation.
MITIGATION OPTIONS
The USACE has adopted, through the Council on Environmental Quality (CEQ), a wetland
mitigation policy that embraces the concept of "rio net loss of wetlands" and sequencing. The
purpose of this policy is to restore and maintain the chemical, biological, and physical integrity of
U-2579B Individual Permit Application
6
the waters of the United States. CEQ has defined mitigation of wetland and surface water
impacts to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts
over time, and compensating for impacts (40 CFR 1508.20):
The NCDOT is committed to incorporating all reasonable and practicable design features to avoid
and minimize jurisdictional impacts, and to provide full compensatory mitigation of all
remaining, unavoidable jurisdictional impacts. Avoidarice measures were taken during the
planning phase and minimization measures were incorporated as part of the project design.
Minimization includes the examination of appropriate and practicable steps to reduce the adverse
impacts.
Avoidance and Minimization
Avoidance and minimization has been employed in the project area to the maximum extent
practicable. The following measures were implemented for the project:
U-2579B Minimization Measures
� NCDOT's Best Management Practices (BMPs) for the Protection of Surface Waters will be
enforced;
� Grass swales will be used throughout the project to treat stormwater;
• All storm drainage will be diffused and designed for non-erosive velocities before entering
wetland areas to the maximum extent practicable;
• Rip rap stabilization on banks of jurisdictional streams will be implemented to prevent
erosion;
• Pre-formed scour holes will be constructed at 10 locations, riprap apron/pads at 12 locations,
and riprap energy dissipator basins at 3 locations;
• Reduction of permanent stream impacts by bridging Martin Mill Creek and Smith Creek (2
locations).
Despite these best efforts of NCDOT, final pexmitted wetland impacts (1.96 acres) for U-2579B
did increase from the impacts calculated from the FEIS (0.89 acres). The increase is due to 10
new wetlands totaling 0.36 acres found during the 2012 re-delineation survey that were not
calculated in the FEIS. The remaining increase of impacts (0.71 acres) is due to minor design
changes and wetland boundary expansion of the FEIS-listed wetlands from the 2012 re-lineation
survey since the FEIS.
Permitted stream impacts (9,800 linear feet) for U-2579B increased from the impacts calculated
from the FEIS (6,183 linear feet). This increase is due to 11 new streams totaling 1;508 linear
feet found during the 2012 re-delineation survey that were not calculated in the FEIS. Also minor
design changes along with increase in jurisdictional length of FEIS-listed streams from the 2012
re-delineation survey contributed to the remaining increase of impacts (2,1091inear feet).
Comuensatorv Miti�ation
Compensatory mitigation requirements for U-2579B are �summarized below in Table 3. The
U-2579B section will permanently impact 9,800 feet of warm water streams. Of these 9,800 feet,
there are 306 feet of bank stabilization that do not require mitigation by the USACE, resulting in
9,494 feet of stream impacts requiring USACE mitigation. �
The USACE is requiring 2:1 mitigation for 7,819 feet and requiring 1:1 mitigation for 1,675 feet
of stream impacts. NCDWR is requiring 1:1 mitigation for 7,649 feet. Therefore; the total
USACE mitigation requirement exceeds the NCDWR requirement. NCDOT is providing onsite
mitigation of 450 feet of warm water stream by restoring one stream at a proposed drained pond
site (Permit Site No. 20). See the attached On-Site Mitigation Plan Document for further
U-2579B Individual Permit Application
7
information. The remaining mitigation requirements of permanent warm water stream impacts
will be provided by the NCEEP for U-2579B (Table 3). The NCEEP will also provide mitigation
for the 1.96 acres at 2:1 mitigation ratio of permanent riparian wetland impacts resulting from
roadway fill, excavation, and mechanized clearing:
FEDERALLY PROTECTED SPECIES
Plants and animals with a Federal classification of Endangered (E) or Threatened (T) are
protected under provisions of Section 7 and Section 9 of the Endangered Species Act (ESA) of
1973, as amended. As of December 26, 2012, the U.S. Fish and Wildlife Service (USFWS) lists
three federally protected species for Forsyth County: small-anthered bittercress (Cardamine
micranthera), bog turtle (Glyptemys muhlenbergii), and red-cockaded woodpecker (Picoides
borealis). No habitat exists for these species within the project study area. A search of the North
Carolina Natural Heritage Database on November 22, 2013 revealed no known occurrences of
any federally protected species within 1.0 mile of the limits of this section. Therefore, this
project will have no effect on these listed species.
CULTURAL RESOURCES
Four historic structures that are listed on or are eligible for the National Register of Historic
Places (NRHP) include the Clayton Family Farm, Seaver's Gulf Station, Hammock Family Farm,
and the John and Charles Fries Day Farm. In a March 1, 2004 concurrence form (Appendix D of
FEIS), the North Carolina Department of Cultural Resources, State Historic Preservation Office
(HPO) concurred that the proposed project has no adverse effect on the Clayton Family Farm
with the condition that any trees removed during construction will be replaced with similar
species. The HPO agreed that there would be no adverse affect to the Hammock Family Farm
provided that no construction occurs within the historic boundary and there would be no effect to
Seaver's Gulf Station. In an April 21, 2004 concurrence form, the HPO concurred that the
proposed project has no effect on the John and Charles Fries Day Farm (Appendix D of FEIS).
Based upon the NCDOT Archaeological Survey Report dated December 14, 1999, NCDOT
recominended one site, Site 31FY1053** (the Westmoreland-Snow 19'n�2�cn century farmstead),
as being eligible for the NR�IP for its potential to yield information on a mid nineteeth to early
twentieth century owner-operated farmstead. HPO concurred with this recommendation on April
13, 2000 (Appendix D of FEIS). Site 31FY1053** is included in the amended Memorandum of
Agreement (MOA) between the Federal Highway Administration (FHWA), HPO, and NCDOT,
U-2579B Individual Permit Application
last signed on March 15, 2006, which calls for data recovery for this site. The MOA is located in
Appendix D of the FEIS.
� �I �1 � /:TK�]_u 1 � 11__/:\�[yJ�
There are streams within the project limits that are within Federal Emergency Management
Agency (FEMA)-designated flood zones. Coordination between the NCDOT Hydraulics Unit
and FEMA will occur prior to Let to ensure that NCDOT is in full compliance with applicable
floodplain ordinances.
INDIRECT AND CUMULATIVE EFFECTS
An Indirect and Cumulative Effects (ICE) report was completed for the proposed Winston-Salem
northern beltway (U-2579, U-2579A, and R-2247). The report details the potential
socioeconomic, and ecological effects that may result from the proposed Winston-Salem northern
beltway and other past, present, and reasonably foreseeable future development activities in the
region. It was completed in June 2005 and distributed shortly thereafter. Additional copies of the
ICE report are available upon request.
Based upon the ICE report, a majority of the study area is urban and suburban in character, and
most of the area already has access to an established road network. The project's individual
effects on land use and natural resources are minor. The potential indirect effects identified in the
ICE report are consistent with all local jurisdictions' land use and transportation plans. Current
land use and transportation policies contained in the local plans support the proposed project.
WILD AND SCENIC RIVERS
This project will not impact any designated Wild and Scenic Rivers or any rivers included in the
list of study rivers (Public Law 90-542, as amended) or North Carolina Natural and Scenic
Rivers.
ESSENTIAL FISH HABITAT
The project will not impact any essential fish habitat afforded protection under the
Magnuson-Stevens Act of 1996 (16 U.S.0 1801 et seq.).
REGULATORY APPROVALS
Application is hereby made for a Department of the Army Section 404 Individual Permit as
required for the above-described activities for the proposed T.I.P. Project U-2579B. We are also
hereby requesting a Section 401 Water Quality Certification from NCDWR. In compliance with
Section 143-2153D (e) of the NCAC, we will provide $570.00 to act as payment for processing
the Section 401 permit. We are providing two copies of this application to NCDWR for their
review and approval.
U-2579B Individual Permit Application
9
A copy of this permit application and its distribution list will be posted on the NCDOT website at
https://connect.ncdot.�ov/resources/Environmental/Pages/default.aspx. Thank you for your time
and assistance with this project. Please contact Greg Price at either �wprice(a),ncdot.gov ar(919)
707-6148 if you have any questions or need additional information.
Sincerel ,
� ��_
Richard . Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
Cc: NCDOT Permit Application Standard Distribution List
U-2579B Individual Permit Application
10
U.S. ARMY CORPS OF ENGINEERS oMg aPPRova� No. o��0-0003
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT ExPiREs: 2s FEBRuaRY 20�3
33 CFR 325. The proponent agency is CECW-CO-R.
Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding
this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense,
Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and
Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be
subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT
RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of
the proposed activity.
PRIVACY ACT STATEMENT
Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries
Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on
this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other
federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission
of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set
of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see
sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application
that is not completed in full will be returned.
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE
(ITEMS BELOW TO BE FILLED BYAPPLICAN�
5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required)
First - Richard Middle -W. Last - Hancock First - Middle - Last -
Company - NCDOT-Preconstruction Company -
E-mail Address - E-mail Address -
6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS:
Address- 1598 Mail Service Center Address-
City - Raleigh State - NC Zip - 27699 Country -USA City - State - Zip - Country -
7. APPLICANT'S PHONE NOs. w/AREA CODE 10. AGENTS PHONE NOs. w/AREA CODE
a. Residence b. Business c. Fax a. Residence b. Business c. Fax
919-707-6001
STATEMENT OF AUTHORIZATION
11. I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request,
supplemental information in support of this permit application.
SIGNATURE OF APPLICANT DATE
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME OR TITLE (see instructions)
U-2579B
13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREETADDRESS (if applicable)
Lowery Mill, Martin Mill, Kerners Mill, & Smith Cr, Fishers Branch Address
15. LOCATION OF PROJECT
Latitude: �N 36.131959 Longitude: �W 80.131995 City - • State- Zip-
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
State Tax Parcel ID Municipality
Section - Township - Range -
ENG FORM 4345, OCT 2U12 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3
I17. DIRECTIONS TO THE SITE
Please see attached vicinity map and cover letter.
18. Nature of Activity (Description of project, include all features)
U-2579B proposes to construct a section of the Winston-Salem Northern Beltway Eastern Section from US 311 east of US 52 in Forsyth
County, NC for a total of 3.4 miles.
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
The purposes of the proposed project are to improve intrastate and interstate mobility, improve roadway system linkage and continuity,
reduce traffic congestion and carry future traffic at a desirable level of service, enhance safety, and provide a corridor for I-74 (a
congressionally designated High Priority Corridor on the National Highway System).
USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED
20. Reason(s) for Discharge
Impacts will result from widening the roadway and shoulders, construction of roadway on new location, and bridge construction.
21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Type Type Type
Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards
See attached cover letter.
22. Surtace Area in Acres of Wetlands or Other Waters Filled (see instructions)
Acres See attached cover letter. -
or
I Linear Feet See attached cover letter.
23. Description of Avoidance, Minimization, and Compensation (see instructions)
See attached cover letter.
ENG FORM 4345, OCT 2012 Page 2 of 3
24. Is Any Portion of the Work Already Complete? ❑Yes QNo IF YES, DESCRIBE THE COMPLETED WORK
25. Addresses of Adjoining Property Owners, Lessees, EtC., WhOSO PfOpeffy AdJ01ilS lll2 Wat0Cb0(lY (if more than can be entered here, please atlach a supplemental list).
a. Address- See attached permit drawings.
City -
b. Address-
City -
c. Address-
City -
d. Address-
City -
e. Address-
City -
State - Zip -
State - Zip -
State - Zip -
State - Zip -
State - Zip -
I26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application.
AGENCY TYPE APPROVAL"` IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED
NUMBER
�" Would include but is not restricted to zoning, building, and flood plain permits
27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is
complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the
appl'
I�.._._. ,�---- � � z� 2��y�
SIGNA RE OF APPLICANT ATE SIGNATURE OF AGENT DATE
The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly
authorized agent if the statement in block 11 has been filled out and signed.
18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States
knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or
fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or
fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both.
ENG FORM 4345, OCT 2012 Page 3 of 3
�
Ecos stem
y
PROGftAM
January 17, 2014
Mr. Richard W. Hancock, P.E.
Manager, Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Mr. Hancock:
Subject: EEP Mitigation Acceptance Letter:
U-2579B, Winston-Salem Northern Beltway (Eastern Section) from US 311 to east of US 52,
Forsyth County
The purpose of this letter is to notify you that the Ecosystein Enhancement Program (EEP) will provide the
compensatory stream and riparian wetland mitigation for the subject project. Based on the information supplied by
you on January 14, 2014, the impacts are located in CU 03040101 of the Yadkin River basin in the Central
Piedmont (CP) Eco-Region, and are as follows:
Yadkin Sri-eam Wetlands Buffer (Sq. Ft.)
03040101 Non- Coastal
cp Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2
Impacts 0 0 9,044.0 1.96 0 0 0 0
(feet/acres) �
^'�ome or tne stream ana wetland �mpacts may be proposed to be mingated at a 1:1 mitigation ratio. See pennit application for
details on the mitigation ratio proposal.
EEP commits to implementing sufficient compensatory warnz and/or cool stream mitigation and riparian
wetland mitigation credits to offset the impacts associated with this project as deterniined by the regulatory agencies
in accordance with the N.C. Department of Enviromnent and Natural Resources' Ecosystem Enhancement Program
In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this
mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from
EEP.
8420.
If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-
Sincerely,
�. �
Ja s B. Stanfill
EEP Asset Management Supervisor
cc: Mr. John Thomas, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, Division of Water Quality, Wetlands/401 Unit
File: U-2579B
�ZP.St"OV'GbG9... � ... PY'OtP.GtGI� OGf,V' StG�L
��L,
NCDENR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-707-8976 / http://portal.ncdenr.orq/web/eep
Draft Minutes from the Interagency 4B Hydraulic Design Review Meeting
U-2579B Winston-Salem Northern Beltway (Eastern Section) from I-40 Bus/US 421
to US 158 in Forsyth County
A Hydraulic Design Review Meeting was held on Wednesday January 23, 2008 in
the Hydraulics Design Conference Room at the NCDOT Century Center Complex
from 9:00 am —11:00 am
Team Members:
John Thomas: USACE
Marella Buncick: USFWS
Marla Chambers: NCWRC
Amy Euliss: NCDWQ
Brian Wrenn: NCDWQ
Chris Militscher: EPA
Kathy Matthews: EPA
Donnie Brew: FHWA
David Harris: NCDOT, REU
Tony Houser: NCDOT, Roadway
Lonnie Brooks: NCDOT, Structures
Derrick Weaver: NCDOT, PDEA
Rachelle Beauregard: NCDOT, NEU
Keith Raulston: NCDOT, Division 9
Participants:
Andrew Nottingham, NCDOT Hydraulics
Will Hines, Sungate Design Group
David Wainwright: NCDWQ
Troy Wilson, USFWS
Kent Boyer, NCDOT Division 9
Gene Noderino, NCDOT NEU
Missy Dickens, NCDOT PDEA
Vasim Barodawala, NCDOT Roadway
John Braxton, NCDOT Roadway
Lee Moore, NCDOT Roadway
Roy Girolami, NCDOT Structures
John Arms, NCDOT Hydraulics
Greg Price, NCDOT NEU
Minutes:
(present)
(present)
(present)
(not-present)
(not-present)
(not-present)
(present)
(present)
(not-present)
(present)
(present)
(not-present)
(not-present)
(present)
General Introduction was initiated by Andrew Nottingham. Introductions were made by
all in attendance.
General Comments:
The Hydraulics Engineer stated that where it was practicable, guardrail and shoulder
berm gutter were eliminated and 4:1 fill slopes were used.
The Hydraulics Engineer stated that proposed cross-pipes located on Jurisdictional
Streams (JS) would be increased by one pipe size and buried 20% (except in locations
where Agencies requested that a Drop Box be used).
The Hydraulics Engineer stated that in locations where the storm drainage outlet pipe was
a 15 or 18 inch pipe, a Preformed Scour Hole would be used where practicable.
Sheet 4:
No Impact from U-2579B. Begin Construction starts on Sheet 5.
Sheet 5:
JS (unnamed tributary to Lowery Mill Creek) located on Sheet 5 and 20: The Hydraulics
Engineer stated that the proposed double barrel box culvert will have a sill in one barrel.
The Agencies requested that baffles also be placed in the box culvert.
Wetland located near Begin Construction: The Hydraulics Engineer stated that an Energy
Dissipater would be used at this location.
JS located near Station 495+00: The Hydraulics Engineer stated that the three storm
drainage systems taken to this outlet would connect to each other using a Junction Box
and that there would only be one outlet pipe.
Sheet 6:
JS located near Station 502+00: Use a Drop Box at the outlet of the cross-pipe in order to
dissipate as much energy as possible prior to stormwater re-entering the natural stream
channel. Due to the steepness of the proposed cross-pipe, this is preferable to using an in
stream riprap dissipater. In cases where a Drop Box is used, no need to bury inlet of pipe.
JS located near Station 506+00: Use a Drop Box at the outlet of the cross-pipe.
JS located near Station 509+00: No comment.
Sheet 7:
JS located near Station 523+00: No comment.
Sheet 8:
Wetland located near Station 527+00: The Hydraulics Engineer stated that the inlet invert
of the proposed cross-pipe would be placed at the same elevation as the water surface
elevation in the wetland.
Pond: There was some discussion about whether or not the pond would be kept and if this
area could be used for mitigation. At this time, NCDOT does not know because
negotiations with the current property owners have not taken place.
Sheet 9:
No impact.
Sheet 10:
Martin Mill Creek and Tributary to Martin Mill Creek: After a lengthy discussion where
the pros and cons for several alternatives were discussed, based on a general consensus, it
was decided that a minimum length bridge (about 225 feet) will span Martin Mill Creek
and that a box culvert would convey the Tributary to Martin Mill Creek. The Hydraulics
Engineer stated that a sill would be placed in one of the barrels of the box culvert. The
Agencies requested that baffles be placed in the box culvert.
Sheet 11
JS located parallel to the roadway (Sheet 10 and 11): The Hydraulics Engineer stated that
the stream would be piped along the toe of fill due to the large amount of excavation that
would be required for an open channel. It was also stated that there would be a short
channel change at the inlet in order to protect the proposed roadway embankment. Use a
Drop Box at the outlet of the proposed pipe.
JS located near Station 572+00 (Sheet 11 and 12): The JS is completely impacted by the
proposed roadway. The Hydraulics Engineer stated that a lateral ditch would be used to
take the stormwater along the toe of iill to a point where the length of the proposed cross-
pipe can be significantly reduced. The Agencies suggested that the proposed cross-pipe
tie directly into the proposed pipe that is carrying the JS located parallel to the roadway.
Sheet 12:
JS located near Station 575+00: No comment.
Sheet 13:
No impact.
Sheet 14:
No impact.
Sheet 15:
JS located near Station 616+00 (Kerners Mill Creek): The Hydraulics Engineer stated
that a triple barrel box culvert is proposed at this crossing. The Agencies requested that
baffles be placed in the box culvert and that a sill be placed in one of the barrels. There
was some discussion about using a bottomless culvert or a wider box culvert that could
match the width of the natural channel. NCDOT Hydraulics stated that in order to use a
bottomless culvert, there would have to be bedrock located fairly close to the surface.
Bedrock had been observed in the upper portion of the stream, but was not clearly evident
in the lower portion. NCDOT will investigate if a bottomless culvert can be used.
NCDOT Structures stated that using a wider box culvert would not be practicable due to
the thickness of the top slap required.
The Hydraulics Engineer stated that a majority of the storm drainage from the roadway
would be taken to an area located near Station 619+00 Left where the proposed cross-
pipe would act as an outlet control device and provide as much detention as practicable.
JS located near Station 629+00 (Smith Creek): The Hydraulics Engineer stated that
bridges would be used to span the stream.
Sheet 16:
JS and Pond located parallel to the roadway near Station 635+00: The JS and Pond are
completely impacted by the proposed roadway. It was brought to our attention that there
are wetlands associated with this JS that are not currently shown on the plans.
The Hydraulics Engineer stated that the areas inside of the Loops and between the Ramps
would be designed and used as a Detention Basin as much as practicable.
At this point, the allotted time for the 4B Meeting ran out and it was stated that the 4B
Meeting would have to be continued in 2 months.
Meeting adjourned.
Draft Minutes from the Interagency 4B Hydraulic Design Review Meeting
U-2579B Winston-Salem Northern Beltway (Eastern Section) from I-40 Bus/US 421
to US 158 in Forsyth County
A Hydraulic Design Review Meeting was held on Wednesday, March 12, 2008, in
the Hydraulics Design Conference Room at the NCDOT Century Center Complex
from 9:30 am —11:00 am. This meeting was a continuation of the meeting held on
January 23, 2008.
Team Members:
John Thomas: USACE
Marella Buncick: USFWS
Marla Chambers: NCWRC
Amy Euliss: NCDWQ
David Wainwright: NCDWQ
Chris Militscher: EPA
Kathy Matthews: EPA
Donnie Brew: FHWA
David Harris: NCDOT, REU
Tony Houser: NCDOT, Roadway
Lonnie Brooks: NCDOT, Structures
Derrick Weaver: NCDOT, PDEA
Rachelle Beauregard: NCDOT, NEU
Keith Raulston: NCDOT, Division 9
Participants:
Andrew Nottingham, NCDOT Hydraulics
Will Hines, Sungate Design Group
Greg Price: NEU
Felix Davila, FHWA
Kent Boyer, NCDOT Division 9
Gene Noderino, NCDOT NEU
Missy Dickens, NCDOT PDEA
Vasim Barodawala, NCDOT Roadway
John Braxton, NCDOT Roadway
Roy Girolami, NCDOT Structures
Paul Ervin, NCDOT Structures
Minutes:
(present)
(present)
(not-present)
(not-present)
(present)
(present)
(present)
(not-present)
(not-present)
(present)
(not present)
(not-present)
(present)
(present)
Chris Militscher (EPA) noted that Marla Chambers (NCWRC) could not make the
meeting but had provided comments to him to present at the meeting.
Sheet 16:
The Hydraulics Engineer stated that the areas inside of the Loops and between the Ramps
would be designed and used as a Detention Basin as much as practicable and that the
ultimate outlet will be taken directly to Smith Creek by way of a 4 foot base channel with
riprap.
Sheet 17:
An additional wetland will be delineated near Station 662+50.
JS located at Station 667+00 (Fishers Branch): The Hydraulics Engineer stated that the
box culvert would be a triple barrel due to FEMA requirements and that two of the
barrels would have a sill.
Sheet 18:
JS located at Station 667+00 (Fishers Branch): The Hydraulics Engineer stated that the
storm drainage system will be taken directly to Fishers Branch by way of a 4 foot base
channel with riprap, with the exception of the stormwater from the shoulder berm gutter,
which will be taken to a Preformed Scour Hole.
Sheet 19:
JS located at Station 688+50: The upstream pond will be completely drained and the
downstream pond will be temporarily drained to an elevation below construction. The
Agencies asked if there could be a Stream Restoration in the drained upstream pond.
NCDOT will investigate.
Stormwater from the shoulder berm gutter will be taken to a Preformed Scour Hole.
Sheet 20:
JS (unnamed tributary to Lowery Mill Creek) located on Sheet 5 and 20: The Hydraulics
Engineer stated that the proposed double barrel box culvert will have a sill in one barrel.
The Agencies requested that baffles also be placed in the box culvert.
Sheet 21:
The Project ends before US 158 crosses Lowery Mill Creek. The Hydraulics Engineer
described the proposed stortn drainage systems and stated that existing drainage patterns
and outfalls were basically being kept the same with the exception of the existing storm
drainage outlet located immediately downstream of the US 158 crossing, which will be
relocated immediately upstream of the US 158 crossing.
Sheet 22:
No impact.
Sheet 23:
No impact.
Sheet 24:
No impact.
Sheet 25:
No impact.
Sheet 26:
Smith Creek: The Hydraulics Engineer stated that a combination of retaining walls and
1.5:1 fill slopes with riprap were being proposed in order to avoid permanent impact and
relocation of Smith Creek that would also impact the adjacent ponds. The Agencies
expressed some concern that the water quality of Smith Creek would be temporarily
impacted during construction of the retaining walls. NCDOT stated that the retaining
walls, type unknown at this time, would have less of an impact, both during construction
and permanently, than the alternative of using 1.5:1 slopes along the entire length.
The Agencies expressed some concern that the existing box culvert under Business I-40
is undersized due to evidence of a large scour hole located at the outlet. NCDOT stated
that based on the hydraulic calculations, the box culvert was not undersized.
Sheet 27:
Smith Creek: The Hydraulics Engineer stated that 1.5:1 fill slopes with riprap were being
proposed in order to avoid permanent impact and relocation of Smith Creek that would
also impact the adjacent ponds.
An additional Jurisdictional Stream will be delineated upstream of Station 65+00 -Y4-.
Sheet 28:
JS located at Station 107+50 -Y4- (downstream): The Hydraulics Engineer stated that
three cross-pipes (two under Business I-40 and one under Ramp B) will be connected
using a Junction Box just downstream of Ramp B and that there would be only one outlet
pipe. The Junction Box will serve as a Drop Box.
An additional Jurisdictional Stream will be delineated upstream of Station 104+50 -Y4-
(outlet of pond).
An additional Jurisdictional Stream will be delineated downstream of the existing 18"
cross-pipe located at Station 109+50 -Y4-.
Sheet 29:
No impact.
Sheet 30:
It was stated that the stream located south of Business I-40 and running parallel to the
roadway embankment was Jurisdictional. The Hydraulics Engineer stated that the fill
slope in this area has been steepened to 1.5:1 with riprap in order to avoid any impact.
The Hydraulics Engineer stated that existing drainage patterns are being maintained.
The Project ends before Business I-40 crosses Salem Creek.
Sheet 31:
The Hydraulics Engineer stated that an Energy Dissipater will be used at the end of the
proposed storm drainage system, which is located about 200 feet from Salem Creek.
The Project ends before SR 2667 crosses Salem Creek.
Meeting adjourned.
Minutes from the Interagency 4C Permit Drawing Review Meeting
U-2579B in Forsyth County (lst Half�
July 17, 2013
1:00 PM — 2:30 PM
Team Members:
John Thomas, USACE
Marella Buncick, USFWS
Marla Chambers, NCWRC
Amy Euliss, NCDWQ
Chris Militscher, EPA
Felix Davila, FHWA
Minutes:
(present)
(present)
(present)
(present)
(phone)
(present)
Participants:
Stephen Morgan, Hydraulics
Will Hines, Sungate Design Group
Brad Smith, Sungate Design Group
Doumit Ishak, Construction Management
Lee Moore, Roadway Design
Tony Houser, Roadway Design
Mark Staley, REU
Charles Hunt, Structures
Steve McKee, Utilities
Jamshid Hafshejani, Utilities
Rachelle Beauregard, NES
Greg Price, NES
Elizabeth Lusk, NES
Byron Moore, NES
Keith Raulston, Division 9
General Introduction was initiated. Introductions were made by all in attendance.
Sheet 05-1:
Delineate impacts to JS upstream of 42-inch cross-pipe.
Sheet 05-2:
(General Comment): Breakout stream bank stabilization. Show length of stabilization in
Summary.
Breakout perennial and intermittent. Break line is at 2GI between -L- and Ramp.
Sheet OS-3:
(General Comment): Show floodplain benches for box culvert. Include Detail on Plans.
Sheet 6:
Station 508+00 -L-: Label Tributary as Site SA.
Station 504+00 rt. Do not show as Bank Stabilization since excavating.
Sheet 7:
No Comments.
Sheet 8:
No Comments.
Sheet 10:
Station 557+00 -L- Right: Investigate whether stream bank stabilization is needed at the
intersection of the tail ditch and stream or if a wider grass lined tail ditch is needed?
Site 9: Any Utility Impacts? NCDOT Utilities to provide information.
Site 10: The question was if a Plunge Pool was needed at the 60-inch outlet. This was
discussed at the 4B Meeting and it was decided that the drainage structure upstream of
the outlet would be a drop box. The drop box has been designed with a 2.3-foot drop and
the 60-inch outlet pipe has a 0.5% slope.
Sheet 11:
Label tributary coming from the east as Site 10A.
Label begin J.S.
Sinall wetland impact not shown near 571+50
Sheet 15-1:
Site 11 (JS located along ROW Station 618+00 -L- Right): Relocate JS and tie to Kerners
Mill Creek. Show impact to JS. T`^�� *�;� rc „ooa � ,-�+o c;�o „„,�,o,-� This needs a
separate site number.
Tie 48-inch cross-pipe to box culvert instead of wingwall. According to Structures this
would be acceptable. The sill and floodplain bench would need to be switched to the
other side of the box culvert.
At this point, the allotted time for the 4C Meeting ran out and it was stated that the 4C
Meeting would have to be continued next month (August).
Meeting adjourned.
Minutes from the Interagency 4C Permit Drawing Review Meeting
U-2579B in Forsyth County (2"d Half)
August 22, 2013
1:00 PM — 2:30 PM
Team Members:
John Thomas, USACE
Marella Buncick, USFWS
Marla Chambers, NCWRC
Amy Euliss, NCDWQ
Chris Militscher, EPA
Felix Davila, FHWA
Minutes:
(present)
(present)
(present)
(present)
(phone)
(present)
Participants:
Stephen Morgan, Hydraulics
Will Hines, Sungate Design Group
Josh Clemmons, Sungate Design Group
Doumit Ishak, Construction Management
Lee Moore, Roadway Design
Tony Houser, Roadway Design
Mark Staley, REU
Charles Hunt, Structures
Steve McKee, Utilities
Jamshid Hafshejani, Utilities
Rachelle Beauregard, NES
Greg Price, NES
Elizabeth Lusk, NES
Byron Moore, NES
Brett Feulner, NES
Ahmad Al-Sharawneh
Keith Raulston, Division 9
Diane Hampton, Division 9
Greg Errett, City of Winston-Salem
General Introduction was initiated. Introductions were made by all in attendance.
Sheet 15-1:
Site 12: Contain channel change within PDE.
Sheet 15-2:
Site 14: Show impacts to JS between riprap embankment and Smith Creek.
Sheet 16:
No Comments.
Sheet 17:
Site 18: Show Floodplain Bench.
Site 19: Utilities has a concern with placing the new sanitary sewer line in the wetland.
Therefore, Utilities asked if the proposed 3@ 60" cross-pipes could be moved closer to
the box culvert. The Hydraulics Engineer will investigate.
Sheet 18:
Station 668+50 -L- Rt: The agencies asked if the PSH was needed. They suggested that
a�i� rip rap base ditch be used instead of the PSH.
Sheet 19:
Site 20: There were some questions about why a bridge was not required or if the project
could end just before the crossing and place the crossing on the next section of the project
which has not been scheduled for construction. Roadway Design said that they would
look into possibly adjusting the end of project and noted the R/W limits will change to
not show a take on the Booth property.
Sheet 20:
Site 21: Fill in wetland will be a total take.
Sheet 25:
No Comments.
Sheet 26:
Site 23: Need to tie the JS tributary to the lateral ditch. Impacts to the JS tributary need
to be shown and labeled as Site 23A.
USFWS asked if a sill and floodplain bench can be proposed for the box culvert. The
Hydraulic Engineer's response was that this location is in a FEMA Detailed Study and
the existing box culvert did not have a sill. Therefore, the hydraulic requirements for
obtaining a CLOMR from FEMA may not allow for proposing a sill.
Station 54+50 -Y4- Rt: Label as Site 25. On Smith Creek, call for streambank
stabilization. For the JS tributary, place riprap on banks only. The Permit Drawing for
this area needs to be blown up in order for the impacts to be seen clearly.
Label Smith Creel<.
Sheet 27:
Site 24 Outlet: Use streambank stabilization and label as Site 24B.
Sheet 27-1:
Site 24: Change to Site 24 and 24A. Show impacts to JS.
Site 27-2:
Site 25: Riprap banks only.
Sheet 28:
Missing legend for Wetland Impact.
Site 28-1:
Site 26: JS impact should be Site 27A.
Site 27: Site should be labeled Site 27A, 27B and 27C.
Missing legend for Wetland Impact.
Site 30:
Site 28: Pull back pipe outlet and riprap. Eliminate Site 28.
Summary Sheets:
Subtotal each sheet.
Meeting adjourned.
Mitigation Plan
Winston Salem Northern Beltway
Forsyth County, North Carolina
T.I.P. Number U-2579B
WBS No. 34839.1.1
August 22, 2013
1.0 BASELINE INFORMATION
Transportation Improvement Project (TIP) U-2579B involves the construction of a new section of
highway known as the Winston Salem Northern Beltway in Forsyth County. The proposed
construction of U-2579B involves unavoidable impacts to jurisdictional resources within USGS
hydrologic unit 03040101 of the Upper Pee Dee River Basin. NCDOT proposes to offset a portion of
these impacts with on-site mitigation.
TIP U-2579B is located in the Central Piedmont Ecoregion. The topography in the project study area is
generally characterized as rolling hills with moderately steep slopes along the drainage ways.
Elevations in the study area range from 850 to 900 feet above mean sea level (USGS 1971). The project
study area and surrounding area consists of low density rural, residential, commercial, agricultural, and
forested areas.
The mitigation site selection and mitigation work plan sections of this plan will refer to the
identification labels given the affected jurisdictional resources in the associated permit drawings.
2.0 OBJECTIVES
The goal of the proposed onsite mitigation is to offset and mitigate for a portion of the impacts from the
construction of U-2579B by restaring the natural flow regime to the stream channel through the
removal of the dam and establishment of riparian buffer areas. This mitigation will result in a total of
4501inear feet of stream restoration.
3.0 SITE SELECTION
The proposed mitigation site is located within the proposed right-of-way for U-2579B. The site was
evaluated both internally as well as discussed and reviewed with regulatory personnel during
concurrence meetings and a field visit on August 1, 2013 with Amy Euliss of DWQ and Marella
Buncick of the USFWS. The existing site conditions are described in this section.
U-2579B Mitigation Site 1-UT to Fisher Branch (ONE ID #034-004)
This site is located on plan sheet 19 from approximately Station 687+80 to 691+56 and coincides with
Permit Drawing Site 20. An USACE Stream Quality Assessment Worksheet was not completed for
this site because the site is currently a pond. UT to Fishers Branch has a NCDWQ Best usage
classification of WS-III. The proposed work to UT to Fishers Branch includes the removal of the
concrete dam on the UT to Fishers Branch. UT to Fisher Branch is a jurisdictional perennial stream
where it enters NCDOT Right of Way. After the stream enters NCDOT Right of Way it becomes a
pond that has been created by the construction of a concrete dam that is over 50 years old. The dam will
be covered by roadway fill and therefore will be removed. The majority of the pond has an intact
wooded buffer with some incidental clearing near the dam for access to the pond and dam.
1
4.0 MITIGATION WORK PLAN
The mitigation site will be constructed along with the construction of its associated section of the
roadway project. Following the successful completion of the pond draining and stabilization, the site
will be replanted with appropriate native tree species. The stream restoration areas will be stabilized
by planting a mix of live stakes on three foot centers and matting with coir fiber on the banks as
necessary. Reforestation plans are attached and can be found in Appendix A.
Native seed and mulch will be applied on all disturbed areas within the mitigation sites for stabilization
purposes according to guidance and standard procedures of NCDOT's Roadside Environmental Unit.
An as-built report will be submitted within 60 days of completion of the project.
The Natural Environment Section shall be contacted to provide construction assistance to ensure that
each mitigation area is constructed appropriately.
U-2579B- Mitigation Site 1
The pond associated with this mitigation area, will be drained as part of the construction of U-2579B.
The stream mitigation will be conducted within the drained pond. The Contractor will develop a Pond
Drainage Plan for this pond and submit the plan to the Engineer at the preconstruction conference for
approval. The Pond Drainage Plan shall include but not be limited to procedures and rate of water
drawdown, sediment control measures, water quality monitoring, iish and wildlife relocation plan,
shall address procedures avoiding the inundation of a receiving body of water with deoxygenated or
nutrient rich water resulting in impacts to aquatic life or algae bloom and procedures for maintaining
downstream channel stability
After the pond is drained, a natural flow regime will be restored. An evaluation of the stream channel
will be conducted following dam removal. If any stabilization is needed on the channel it will be
conducted at that time. Reforestation of the stream buffer will be conducted following any required
channel work. Based on preliminary measurements, NCDOT will restore 450 ft. of the stream system
within this drained pond area.
5.0 PERFORMANCE STANDARDS
An As-built will be submitted within 60 days of completion of the project. The As-built will document
changes in the dimension, pattern, profile, vegetation plantings, and structures of the constructed
channels.
Success for vegetation monitoring within the riparian buffer areas are based on the survival of at least
260 stems of five year old trees at year five. Assessment of channel stability will be based on the
survival of riparian vegetation and lack of significant bank erosion, channel widening or down-cutting.
6.0 MONITORING REQUIREMENTS
All of the mitigation sites will be monitored according to the Apri12003 Stream Mitigation Guidelines.
The following components of Level 1 monitoring will be performed each year of the 5-year monitoring
period: reference photos, plant survival (i.e., identify specific problem areas (missing, stressed,
damaged or dead plantings), estimated causes and proposed/required remedial action); visual
inspection of channel stability. Physical measurements of channel stability/morphology will not be
performed. A monitoring report will be submitted within 60 days after completing the monitoring.
2
7.0 DETERMINATION OF CREDITS
NCDOT proposes to supplement mitigation provided by EEP with 450 feet of onsite stream mitigation.
NCDOT proposes a 1:1 mitigation ratio for a total of 450 feet of stream credits.
An as-built report will be submitted within 60 days of completion of the each mitigation site to verify
actual mitigation areas constructed and planted. The success of the mitigation areas and
determination of iinal credits will be based upon successful completion and closeout of the monitoring
period.
7.1 CREDIT RELEASE SCHEDULE
NCDOT proposes immediate, full release of the proposed mitigation to offset the unavoidable impacts
associated with U-2579B.
8.0 GEOGRAPHIC SERVICE AREA
The proposed Geographic Service Area (GSA) for the mitigation sites is composed of the 8-digit
Hydrologic Cataloging Unit (HLTC) 03040101.
9.0 SITE PROTECTION INSTRUMENT
The mitigation area is within the NCDOT Right-of-Way for the project. It will be managed to prohibit
all use inconsistent with the use as a mitigation property, including any activity that would materially
alter the biological integrity or functional and educational value of the site, consistent with the
mitigation plan.
The site will be placed on the Natural Environment Section's (NES) Mitigation GeoDatabase. This
database is provided to all NCDOT personnel as a record of mitigation sites and their attributes,
including prohibited activities. NCDOT is held by virtue of the permit associated with these mitigation
sites and the associated roadway impacts to protect the sites in perpetuity.
10.0 MAINTENANCE PLAN
The mitigation sites will be held by NCDOT and placed on the NES Mitigation GeoDatabase. Once
monitoring is completed and the sites are closed out, they will be placed in the NCDOT Stewardship
Program far long term maintenance and protection.
If an appropriate third party recipient is identified in the future, then the transfer of the property will
include a conservation easement or other measure to protect the natural features and mitigation value
of the site in perpetuity.
11.0 LONG TERM ADAPTIVE MANAGEMENT PLAN
The sites will be managed by NCDOT according to the mitigation plan. Encroachments into the areas
will be investigated and appropriate measures taken to minimize any negative effects. In the event that
unforeseen issues arise that affect the management of the site, any remediation will be addressed by
NCDOT in coordination with the Interagency Review Team.
12.0 FINANCIAL ASSURANCES
NCDOT is held by permit conditions associated with U-2579B to construct, monitor, and steward the
mitigation sites. NCDOT has established funds for each project and within each Division to monitor
mitigation sites and protect them in perpetuity.
HI� �lway, Nar h CFiralinia Oep�anmer 1 01 Tnan�iponedicin `'�`�
,,.;, h IgN way Slormwater Ariaguarri "„.�7�. �
9TORMWAI9R M�IA AGBIMBINT ALA� _
(1�ersfo� 1.2; Raleasec July 20'12) FOFI l INEAIR R4ADWAIY PROJECIT;
Pro ecUTIP No.: U-25798 Count ies : Fors h Pa e 1 of 5
Geinenal Prdjecl iniformatian
Pro ect No.: l-257151B Ara'eal T e: Raadw Alelaiation 0a1e: 9�' 1912CI13
NCDOT Contact: :Ite hen R. Mon an, P9 Contractor / Desi ner: W. F en Wells, J�., RE
Address: ry��p011 F ydnaulics l, nit Address: Sungate Design Gnaup
159q M�iil Serviae Centeii 9'15 Janes Fn�inF lin Floaid
Alalei h, � CI 271EI99 R�deii h, NC �I719CIEI
Phone: 919-71(17-EI739 Phone: 9'19-859-2243 x202
Email: sma �m�e ncdcd. ov Email: hwellsC�Dsun atedEisi n.ccim
Cit /Town: V1 instan-;lalem Coun ies : Rars h
� River Basin s: Y adkin Reie Deei CAMA Count ? No
Prima Receivin Water: flea Enviiainmeintal Summa 9heat NCDWQ Stream Index No.:
NCDW� Surface Water Classification far Primary Receiving Water Prima :
Su lemental:
Other Stream Classificatlon:
303 d Im airments:
Buffer Rules in Effect
Aro Desc rl t� n
Pro'ect Len th lin. Miles or feet : 4.(16 miles Surroundin Land Use: Funal, Rairmlaind, :luburbain � eighbd nhoods
Fra .ied Pro E�ilstini SHe
Pro'ect Built-U on Area ac. ac. ac.
Typical Cross Section Description: In each direciton thene will be �I 12=1oot lanes plus 'I �I 2-float future lane plus �i '12-foat
paved shauldeu Hiith a 22-fa t guassec medi�m.
Average Daily Traffic (veh/hdday): 0esi n,IRutune: AI❑T fan 203a is 1988C1 Existin : FIOT 11cin 2(I'I q is 5356CI
Geineua I iinajecl � aunalive: V1 instcin-9alem �arlhemi Beltweiy (9aste�ri ;lectian)(Rutune I-74) Inam 19198 ta I-4(I 9us l 9� 21: an�issed Swales wene used thnaughciut the Riioject to tueat thei staumwaten.
llhes e Grassed 9wedes have s ide slcipes th�d a�e 3:1 an Il�dteu, Hiitt many side slc ipeis being EI:1, haue ei veloaity duning tt e�I-Y eau Stonm crf less than 2 feet pen seeeind and
have a minimum ditch length equivadent tci 10011eet pen aicre ctll imperwious aneei. In �idditioin to the aneissed Swales, Frelcirmed 9couii I-ales and 9neugy 0issipatcirs ane usec
at sevenal loaations.
REifeireniaes
Hi h'wia �' Ncirlh CauoilnFi Depa�rtmenl af Tnanisporallon �� �'�
� .,.„,.,.. Hic�hwary Slormiwafeir Rrogluami .� ;
9TOFIMNIAITER MAINAGEM6NT ALA�
(Versfon 1.2; Rekasa< Jul�� 2017} FCIR! INEAR ROADWAIY PROJ9CTS
Pro'ecUTIP No.: U-2579B Count ies : Fors h Pa 2 of 5
Rrai I B nwircinimemifal Sumrria �
S�I n ace Wa1er im cts
Sheet Station Feature Water / Wetland / Receiving Surtace NRTR Map NCDW� Stream NCDWU Surtace 303(d) Type of Existing Proposed
No. From / To Im acted Buffer T Water Name ID Index Water Classification Im airments Im act SCM SCM
5 28+00-Y1- y� edand LowEiry Mill Creel WS-III Ftll
5 16+00-Y 1 FflD- �Itream LoH�ery Mdl Creel 1N S-III Clulvert
5 21+5A-V 1- 9tream Loweiry Mill Creel W 81-III Clulvert
25+77-V 1-
6 501+51 -L- Stream LowEiry Mill Clree{ W S-III Clulve rt
503+21-L-
6 503+85-L- 9tream LoHiery Mill (Iree4 II W S-III Cluhie rt
509+64L-
523+00-L-
7 8tream tv a rtm Mill areek W 9-III 4uN ie rt
8 527+00-L- Clpen W ater Iv arlm Mill Creek N 8-III Fill
� � 559+79-L- Stream Iv artin Mill Creek 1A S-III Cluhie rt
�� 56Ui79-L- Wetlancl NartinMillCreek V18-III FIII
�p 560+50-L- gtrean N artin Mill Creek N S-III auNiert
579 i 79-1-
15 61��� ��� 8tream Kerners Mill areek V1 &III qul�iert
�9 19i79-Y4HPB0- Strearn Kerners MIIICreek WS-III Fi11
21+44 -Y4FiflBIL1-
19 20+00-Y�IFiPEIlI7 Wetknd KernersM111Creel W:I-III FiVI
21+40-Y4RPB0-
19 629+95-� :Itnearn 9mrtt areek W.I-III Fill
635+90-L-
� 9 636+32-L- Open W ateii 8mitt areek W S-III Fill
641+55-L-
15 6�� � .Itream 8nitt qreek W9-III Clulvert
645+00-L-
15 643+56-L- Open Waler Smith Creek WS-III Clulvert
644+61-L-
' List all stream and surtace water impact bcations regardless of jurisdiction or size.
Equalizer Pipes to be noted as a minimization of impacts.
All proposed SCMs listed must also be listed under Swales, Preformed Sour Holes and other Energy Dissipators, or Other Stormwater Control Measures.
D�scr lion ot Mlnirr6za11on of Imi els aui Mi111 fion
Fieterences
High�Nay Nurl h Cauailnai Dep��rl meM anl Tiiansportallon l` `� �
.„,,, .r Hic�hway SlormwafEni Pnograrri � w.r,7��.'
.ITORMWpITEIIFI MA� AG9ME� T PLAN �"`` �^��'�
(\�ars{on 1,2; Release� July 2017} FOR LINEAIR ROAIDWRIY PROJECTIS
Pro ecUTIP No.: U-2579� Count ies : Fors h Pa 3 of 5
Arcijecf Eniuinanrr�irnal9umirtiaryl
5lurface Wateu imi c1.i
Sheet Station Feature Water / Wetland / Receiving Surtace NRTR Map NCDWO Stream NCDW� Surtace 303(d) Type of Existing Proposed
No. From / To Im acted Buffer T Water Name ID Index Water Classification Im airments Im act SCM SCM
�� 663+65-L- �Itream Fishen 9rancl W:I-III Nill
667+00-L-
�� 667+15-L- �Itream Fisl era 9ranch WS-III Clulvert
�� 668+50-L- y�etland Fishens Brancf WS-III HIII
19 687+80-L- Clpen Water Fishers 9rancf W9-III Hill
691 +59-L-
20 22+50-V1- y�etland LoH�eryMdlCreel W9-III Hdl
25 40+SU-V4 y� eUand .Imith Clree{ W S-III Fdl
26 45+65-Y4 �Itream .Imith ClreaF 1N S-III Clulvert
27 80+50-Y4HPBID- �etland flmith Clrael W 9-III Fiil
81+51-Y 4HPBD- !
27 37+31-Y4FiPEl- gtream .Imith ClreeE W S-III Clulvert
28 29+16-Y4BPC- aPen W ater .Imlth ClraeM N 9-III Ftll
31+12-Y4RPC-
28 107+34Y4 gtream Smith CIreaF W SI-III Quhiert
30 ��� 90-Y4- W etland Kernens N dl areek H S-III FIII
30 �'19+92-Y4- Wetland Kerners Nillareek V18-III dleanngl
' List all stream and surface water impact bcations regardless of jurisdiction or size.
Equalizer Pipes to be noted as a minimization of impacts.
All proposed SCMs listed must also be listed under Swales, Preformed Sour Holes and other Energy Dissipators, or Other Stormwater Control Measures.
Desari tfon al MlNmizallon of Im acts cir Miti tiar
RelEireinces
H1gi1�Ma ` NaKh Clanaiinia D�partmenl of Tnanspor alfan -�
,.,...: .,.,
H ig�hway Slarmwaleir Finognami ��
SITOAI4 VIpR9A M�I�AGEMENT RLAN �`��°""�'�
(Versbn'1.2; Releasad July 2012j FOR UNE� R Ral IDWqY PfIWE QTS
Pro'ecUTIP No.: U-25798 Count ies : Fors h Pa 4 of 5
Arefcirmed Sccwu Ho es and Enemc Dlsaip�alcirs
Pipe/Structure
Sheet Energy Dissipator Drainage Area Dimensions D10 V10
No. Station T Ri ra T ac Conve ance Structure in cfs f s
9 476+50-L- Ahprap Energy Dissipator Q�aas I 31.80 Pipe 42 63.0 3.8
Ba s in
9 28+10-Y1- FiipnapFlpronlPad Cllass'B' 0.22 Pipe 15 1.2 2.4
9 42+50-Y1• PNBF Cllass'B' 1.26 Ripe 15 3.4
10 556+50-L- Riprap Energ�� Oiss'ipator Class I 34J0 Ripe 42 47.d 3.4 �
Basin
10 558+30-L- PNBF Cllass'B' 2.59 Pipe 18 3.8
15 16+50-Y4RPBI[]- flFSF Cllass'B' 0.48 Pipe 15 2.5 2.3
15 19+; 0-Y4FIIPBI[]- HFSF Cllass'B' 0.60 Aipe 19 3.1 2.:
15 2�I+OU-Y4FIIPB[]- HFSF Cllass'B' 0.36 Aipe 19 1.9 7.0
15 28+UA-V4HRBL1- PFSF Cllass'B' 0.21 Pipe 19 1.1 1.9
19 A87+9U-L- PFSF Cllass'B' 1.35 Pipe 19 �.�I
20 19i2;-Y1- HFSF Cllass'B' 0.95 Plipe 1:1 5A �.0
21 50+99-V 1 Riprap Alpron I Pad Cllass'B' 3.10 Pipe 18 10.6 9.�1
21 92+69-Y1- RiprapplpronlPacl Cllas�'B' 1.3A Pipe 19 4.5 2.8
25 39+00-Y4- RiprapAlpronlPacl Cllasa'B� a.ea Pipe 15 2.3 2.2
25 43+00-Y4- flFSF Cllasa 'B' 4.91 Pipe 19 4.1 2.8
26 46+00-Y4- RFSF Cllass 'B' 0.88 Pipe 15 4.1 2.8
26 50+35-Y4- Riprap Alpronf Pad Cllass'B' 4.9�I Hipe 18 2.'I 2.1
27 57+57-Y4- Hipra p Plpron 1 Pad dlass 'B' 4.�I1 Hipe 18 1.A 1.9
27 60+90-Y4- Pliprap Plpron! flad Cllaas'B' 0.30 Plpe 18 1.2 1J
27 63+35-Y�I- FliprapPlpronlPad alaas'B' 1.00 Hipe 18 9.8 2.6
� Y�s � No Have minimum design criteria, as presented in the NCDQ�T Best Management Practices Toolbox (2008), NCDOT Standard Details, or FHWA
HEC-14 (July 2006), been met and verified, as applicable? If No, provide further explanantion of why design criteria was not met.
Adcliticir al Comrr�iMsi
' Refer to tF e NCIDOII 9est Management Pra aUces loolbo�i, Vension 1(h arcf 70U A), NCDOI Standand Ddlta ils, the Federal H igh way Aldmmistration (FF WFI} Hy� rauiic E ngmeering Circuian Na. 14 (HEC-1 a),
If ird Edrtion, Hyc nauhc Des ign of Energy Oisaipators tor Clulverta and Clhannela (Jul�� 2006), as app6aat le, for design guidance and antena.
�l i� hHAa , NaiKh C�ncilina Depar rr�iM of 1 ranspqrtatian �'' ����y
. .,..,, F ig�hway :Itairmiwaten Araf�raim �.�
S70AMW ATER MANAGE N 9NT RLAN
(�larsbn 1.2; Refease� July 20'17} FCIN ! fNEAF ROAIOWI 111 RRCIJECT9
Pro'ecUTIP No.: U-25798 Count ies : Fors h Pa 5 of 5
Pndcirmed Scaiun Hcdeis and B neirgy Olssiq�alars
Pipe/Structure
Sheet Energy Dissipator Drainage Area Dimensions 010 V70
No. Station T Ri ra T ac Conve ance Structure in cfs f s
27 40+00-114FiPEl- RiprapPlpronlPad Cllass'B' 0.41 Pipe 15 2.1 2.1
27 71i33-Y4- RlpnapplpronlPad Cllass"8' 0.62 Pipe 18 2.4 2z
27 79i14-Y4- RiprapAlpronlPad Cllass'B' S.84 Plipe 24 18.5
30 141i19-Y4- RiprapAlpronfPacl Cllass'B' 2.80 0itch 9.7 3.A
31 80+00-Y5p1- Riprap Energ�� Dissipator (Ilass I 8.39 Pfipe 24 22.7 8.7
Basm
❑ Y�s ❑ No Have minimum design criteria, as �resented in the NCDmT Best Management Practices Toolbox (2008), NCD�T Standard Details, or FHWA
HEC-14 (July 2006), been met and verified, as applicable? If No, p�rovide further explanantion of why design criteria was not met.
�Idc iticu ial ommEmt�
' Hefer ta tl e �CIDO�I 9est Management Praatices lbolbon, Version 1(March 2008), � CDO7 Standard Detalls, the Federal Hig�f Hiay Pldmirnatration (Fh W fl) F ydrauha 9ngineenng Clircular N o. 1�I (F EQ-14),
fl inl 9dition, �ydraulia qesig�n a( Energy OisaiF ators for Clulverts and Qhannels (Jul�� 2006}, as appliaat ie, tor cle sign gwdance ana antena.
�
See Sheet �-A F�or I ndex of Sheets
� �- ,_ � .� �--, � - � - - 1 ° - � �' - - � �
VICII�ITY MAP / �� �
\� �
BEG. PR OJ. U-2� 79B
-L- S TA 4 78 + 00. 00
� �a
,�
SITE 3
E1VD BRIDGE ;
-YI- STA. 35 + 26.34
BEGI11l BRIDGE
-YI- STA. 32 + 93. 77
SITE 1 ��,
,, �,
11 a�
3 L
�S / �
� �
� O `~
%�
����
���� �
��v�
�� v
�
/
�� �� � � ��� � � ���
�� ��� � � ���� ��
LOCATI011t: WI1�lST01� SALEM 11tORTHERI� BELTWAY (EASTERI� SECTI01�)
(FUTURE I-74) FROM US 158 TO I-40 B US/US 421
TYPE OF WORI�: WIDEI�II�G, GRADII�G, PA VI1�G, DRAII�AGE, SIG1�I1�G, SIGI�ALS,
�\�'' �
,���
� ,��
C UL VERTS A1�D STR UCTURES.
►
0
W� YZ
���Q
���pwp
E11tD BRIDGE N -� � � �
-L- STA. 585 + 60.73 W�I O��
BEGI11t BRIDGE � U� °Z O
SITE 9 -L- STA.582+85.67 Y �;;
� i;
E111D BRIDGE �' �
PERMIT DRAWI NG
SH EET 1 OF 64 �
�
-L- STA. 557 + 98.01 ,�� i,i} EY4RPAR � AE19 + 00.
BEGIN BRIDGE i!� i ��
-L- STA. S55 + 73.00 Q!I � I; BEGI11l BRIDGE
>" �� � �r�\ E111D BRIDGE �' 4 R P A- S T A. 1 5 + 1 9. 2 4
SITE 8 M�� i,i i�
R �R K IN
SITE 31 %�l
� ���
�Fv��� 9 ��
, � ��
�Z� 8 _ , ' <
�__ � �'M►u
+ ` � ���p�,� R CREEK
STON �SALEM
-L- ��11, �
-Y4CD- STA.34+68.98 SITE 28
��- BEGIIV BRIDGE
NQR�,y -Y4CD- STA. 31 + 63. 73
FRH e SITE 30
\' I F� SITE 14
, 3 �'�Y SITE 25
� _ ,:
��___',�Q ��
_;
� ;� s�,o `�� J��,�� j /, i
; : ,_ � �
_ -, �� i
' �� BEGIIV BRIDGE Q�� �-�� l' �'� �
-Y2- STA.18 + 99.25 r ����'� Q.4 S ITE 11
E111D BRIDGE �; J O
/ ` , 4I.18 �� �� � SITE 12
` ` SITE 10 !�F
'� � cTY�FRs�
TF
� � l��l�
SITE 5 SITE 6 BEGI11l BRIDGE �'� � SITE 13
Y4RPBD STA. 25 + 40.00
E1VD BRIDGE � S I T E 15
S I T E 4 �� -Y4RPBD- STA. 27 + 80.00 ��
��'�o BEGI11l BRIDGE S ITE 2 6
SITE 2 ��,��°sL
1�
' l�
�
WETLAND AND SURFACE WATER IMPACTS PERMIT
A PORTI011t OF THIS PROJECT IS WITHI11l THE MU11tICIPAL BOU11lDARIES
OF WALKERTOW11t A11tD KER11tERSVILLE
�CLEARI11lG 011t THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
U STA. 627 + l3. 78
E1VD BRIDGE
-L- STA.630+I8.74 SITE 27
BEGI11l BRIDGE /
-Z� STA. 64l + 70.8�
E111D BRIDGE
-L- STA. 643 + 82.64
si
��✓�^�'�
�
,
,
�
�_,� �
�� �,� � b�1,
� �,
� �` ��
� �� �
ti � �
� � ��
�
O� E1VD BRIDGE
-YSA- STA. 69 + 53.11
�
BEGIIV BRIDGE
-YSA- STA. 66 + 78.
�
SITE 29
0
i �r' //"'O `,
'� i` Q�
�,�`�� ' �
�
SITE 18
BEGIIII
BRIDGE
-Y4RPBD-
STA. 5I + 70.14
SITE 20
-Y4CD- STA. 45 + 76.53
E11tD BRIDGE
-Y4CD- STA. 47 + 88.32
SITE 24
E111D BRIDGE
$ �'j' E � (� -Y4RPBD-
j STA. 54 + 72.30
BEGIIV BRIDGE
-YS- STA. 22 + 95.35
E1VD BRIDGE
-Y5- STA. 24 + 06. 99
SITE 17
BEGIIV BRIDGE
-YS- STA. 26 + 62.28
E111D BRIDGE
-Y5- STA. 30 + 97.13
��� SITE 19 E1�D PROI. U-2�798
-L- STA 692 + 32. 98
� ��
,� � �
I IDEIVTITY � � �
-YS- POT Sta. 45 + 00.00 LB =��� O� O
-YSA- POT Sta. 45+00.00 LA � � � (� �N�������� �����
END BRIDGE � � DO NOT USE FOR R/ W ACQUISITION
�I'BD- STA. 4� + 17.13
-Y4RPBD-
r ����.I��N��� ��.�N�
E r DO NOT USE FOR CONSTRUCTION
+ 04.00 �
Prepared In the Offlce of: HYDRAULICS DIVISI01� OF HIGHWAYS
GRAPHIC SCALES DESIG11l DATA PROJECT LE11tGTH E1�GI11tEER STATE OF 1VORTH CAROLII�A
DI T�ISI01� OF HIGHWA YS
50 25 0 50 l00 ADT 2010 = 53,560 LENGTH OF ROADWAY PROJECT U-2579B = 3.86 Miles. l000 Birch Ridge Dr., Raleigh xc, 27610 ��� �a�r�p� ��
ADT 2030 = 79,880 LENGTH OF STRUCTURE PROJECT U-25796 = 0.19 Miles. 2006 STANDARD SPECIFICATIONS ��� ��Q�
PLANS DHV = 10 % TOTAL LENGTH OF PROJECT U-2579B = 4.06 Miles. � �
SIGNATURE: g
50 25 0 50 100 D= 60 % RIGHT OF WAY DATE: TONY HOUSER PE � �
PROJECT ENGINEER ROADWAY �� ��
T= 18 %* J U N E 19, 2 012 E1VGI1� R �� �� Q� ������
PROFILE (HORIZONTAL) V = 70 MPH
l0 5 0 l0 20 * TTST 12 % DUAL 6% LETTI11lG DATE: LEE ANN MOORE
PROJECT DESIGN ENGINEER
FUNC CLASS= INTERSTATE OCTOBER 21, 2014 pE
PROFILE (VERTICAL) SIGNATURE: STATE HIGHWAY DESIGN ENGINEER
N
Z
�
N
1
w
�
�
�
E--
W
W
_
N
O
O
-i-
N
r—
N
�
N
I
J
�
W
Z
J
2
U
Q
�
DETAIL #4
LATERAL 'V' DITCH
( Not to Scale)
I �
� Min. D= 2 Ft,
b= 5 Ft.
FROM STA 511 + 75 TO 512 + 50 -L- LT
FROM STA 512 + 50 TO 513 + 45 -L- LT
� �
,- ,
� -so�� , =
.
.
. ,,-
, ,,
� ,
��� �
-' , _ �, �\
. �
� -' �3 , ,
.
• �� ,s
�� ���--
ROBERT J. DILLON
ILENA B. DILLON
GOSPEL LIGHT
BAPTIST CHURCH
MATCHLINE - Y2 - STA. 15 + 61 SHEET 22
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
��j� / JAMES DAVID DILLON
� � �
/ �� ��
� ROBERT JEFFREY BARBER
/
�
�
�
C
, �
MqTcy��A, � �
'v� �
y2 , Srq
?4�8�sti \
��r 23
�rn _ _ 1�° ��-- ; , �
---- �
---- ,
GR �
--- ,
�
DENOTE,��� TEMPORARY
IMPACTS�h�J SURFACE W
DENOTES
SURF�CE
MP�CTS IN
�,TER
DENOTES FILL I
WETLAN D
LJI V 7 � VI`IJ
EST 185 SY FF
SEE DETAIL#b
FROM STA. 522+42 TO 522+45 -L- LT
\
�
�
�
, , �
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
7
HYDRAULICS
ENGINEER
��������T��$i�' �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
PE RMIT D RAWI N G
SH EET 9 OF 64
FROM STA 522+00 TO 523+20 -L- RT
FROM STA 522 + 60 TO 523 + 50 -L- LT
�
F�-
W
W
_
N
N
�O
+
�
N
N
�
N
I
J
�
W
Z
J
_
V
H
�
N
Z
�
N
1
w
�
�
/
� � � �� � �
- � � �
� � ' �V � � I � �
. , 1
_ � � ��� J �?' ', �
__�
j
/ _ �
�
I 4
IDETA �
� �"` ,
�
� � �� �LATE%RAL 'V' DIT�CH
� ��\ (�Not �o Scale) �
� � / � �v�NS > . � / �
u� � � .
_ ` ��
� Naturol
� ���Ground 2,y � p 2\ I"/Ft, I
�� Min� D= 2 Ft.
�,� � b= 5 Ft.
��� FRO��v1 STA 511 +�TO 512 + 50 -L- 1T
FRO�v1 STA 512 + 50 ZO 513 + 45 -L- LT
�
E--
W
W
_
N
O
O
-i-
N
r—
N
�
N
I
J
�
W
Z
J
2
U
Q
�
� �
,- ,
-' ;
.--�s����—
.
.
, ,,
� ,
�'� �
-- ,_ �, �\
. �-.�
�-� �3 . .
.
. �. �
�� '��--
� l
� �
/ GOSPEL LIG�I�` T
; BAPTIST CHU�2CH
Fill ,
Slope
��
l
`v'
� SPECIAL DITCH GRADE �
SE�P,R,OFILE FOR GRADE,
1 �.�.-,'��
;� ,�
, �, � , ,
MATCHLINE — Y2 — STA. 15 + 61 SHEET 22
ii � i � , � �
m � � �� �� � � � �� � � � �� � �
I . , ' �� rCn I , \ � �,I `'' ', :
I � �� , � v I � - --------1 ° � ,, � � �� �
�II � -� - i
� ,,� ��----- --GR_------- ---' �
__ _ /
� � ; �,ri �, _ D,
���.� _
� i �
, � .
� � � �
i ���
�� / � ,
� �� -
�, � �
/ � � � � ��
��� �\�� 1 , I
s�� ���� � ,, 1 � �
s��� � �e I I
1 � I �
� 1 �� , � � � �� � � �� �
� � ��
�� �`' � � ENOTE,��`� TEMPORARY �� � i
� ������ I , PACTS���� � � SU��RF��CE�� WATER
r �� �
� DE�,NOTES MP�CT� IN ' �N
�
\ SUf�F�CE TER � � �
� ���� � � � � .� �'� � � ��
DEN� TES FILL I � � \ � � \ � -
F p � � � ��
� V�ETLAN D � � ` � ��
l , � , \ \
� � � � , A � �
� �� � I � �� � � � \ � .
�� � � ► f�ENO�S MECHq� IZED �� � � 9e�\
� � � � � r�i �eQi�ir_ 1 . � � � �
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
7
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
PE RMIT D RAWI N G
SHEET 10 OF 64
/
,�
/�
i
I
� / / � � - � - � ��� � ;� � � � � i ; � �� � � � �� � ��., �� ` \
� � � ('�
�
r
/ � // , I /�� � ( [ � I � / % / l�E PROTECTIQN W/ � e�6 \ � \ �� � w;
;
/ j
/ / % f � I / � � CLASS „B„ RIPRAP � \ � \�
/ / / , / //� C / ' / � / '� � ESTT185 SYO FF ' \ \ \ \ \ \
/ / / � I � � / � / / � i � �� � � � �
� �� � � r� SE�' DETAIL#6 � � �
� � � � � m � � � � � � � v�j � � � / � � � � � � � � � � � � �ss_ ��
� / �n m � �C� M � � � � � 11 � �/ � -� � � � , � � � � \
� � � � � % ' a-� r �I �I / / 0 � l � � � � / - -' ' 1
� � ;
�� ;
� �
�
� � / � � / ' ; � o � /� �JAMES DAVID DIL�LON / ' � � m � �- - — � ��
0
� � � � � � � � / � � � �
, m '� � � r // � # �
/ � ROBERT J. �ILLON o= � � � J/ STANDARD BASE DITC+I TOETAIL #-�
/ DETAIL 9 , � � DE _
� � � ��� � � PROTEC,TION
' � J 0 / / I �.\
� ILENA B. DILLON � � / J � / � � � C � / �
� � � � � � � � � �,� � / / � ( Not to Scole) ��' �,,� ot to Sc�le) / �
� � � (
�� � �
G� � � � �-
� j � � ROBE T JEFFREY BARBER � � � � � � / , � � \ � Noturo� � , � �ao��d� �aturo� _ �� Z���F.� Fi��
� / � � m � � � � Ground � ,�.,
/ � � � / � p P'( Slope
� ,i � � m �� � � , r � � ;. � � � � /� � � � ' Ground ; � F�, � ��
/ / _ _
� � � � ' � C / �� � � /� �' / � ° / ' � � � � � � . � ; = �-
� � � � � � � Min. D= 2 Ft. � � � Fi�ter
' / � � � � n�a. B= 3 Ft. � , d=; 2�Ft. Fobric% �,
� � � � � � � � � \ e �`—
, � �
� , � , � ;
,/ � l � / � / % � � �� I ` � � � � � '�R�@M--S�A, �22 + 42 JA�522 + 45 -L-�CT � � - -- J
� - -- � � � l � I ,; � � � � � \- _ � �` T � - - - ?� B� Rip-Rap
/
/ / � / / / ype Q`f Liner- Clas /
� � � �, C � � � � � i � � � � � �� % - FRO, STA 5,22+�0 T<� 523+2 �L- RT �
� / � / / � I � J � ° / -- �
�
� /�� � � � � � � � � � � � " � F�CSM STA �22 +60 TO �3�-� -L- LT
�C / � � � � � � � � � � � �
�
, /yl�N � � m � � � � �– � — —� % ,%�' ' ,
/ F � � � � - -- �
_. I
� � � � I � / �
; � y2 ,r , � - � -
�sr � �� � � � � \ � i / � _ � - - --� / �
A.�4 � � � � I � % � � � � � 0
�g � / � � � —
% `�� � � �I � � �, � � � � / / / l � � � / � � � - -- � � � ;
�FT 2 I � � ! � � � ,n' � � _ l �
3 e __ ,-
, ; � / � �
- —
; � — � /
— - ---
� —�;�,. — �- �
� � , �� �
�
F�-
W
W
_
N
N
�O
+
�
N
N
�
N
I
J
�
W
Z
J
_
V
H
�
N
Z
�
N
1
W
�
�
��
� �
1 _-----------------
____=-----------------__ --____
DETAIL #4
LATERAL 'V' DITCH
( Not to Scale)
Natural � � I Fill
Ground 2y D 2� I'/Ft. Slope
Min. D= 2 Ft.
b= 5 Ft.
FROM STA 18+25 TO 19+25 -Y4RPD- LT
�
r
W
W
N
�
�
�O
�
�O
Q
H
N
I
J
I
W
z
J
_
U
2
DETAI� #6
TOE PROTECTION
( Not to Scale)
d= 2 Ft. Fobric
Type of Liner= Class 'B' Rip-Rap
FROM STA 659 + 00 TO 661 + 00 -L- RT
DETAIL #12
LATERAL BASE DITCH
c Not to Scole> ,
Ground �r/ p ZJ I'/Ft. - -r-
d
Min. D= 2 Ft.
Filter J g Max. d= 2 Ft.
Fabric B= 2 Ft,
�When B is < 6.0' b= 5 Ft.
Type of Liner= Closs 'B' Rip-Rap
FROM STA 657 �, 60 T� 663 + 80 -L- LT
� �
���_ . �� : ,.��, r��`��—�-�i�`-v
� - - - I-U
E - 38 PG 142 / EI�-�� 1
� _-___---- _-___---- ��E
- - - - _ _ - - - - 30'ACCESS EASEM�
—E --- ---- —
— --'— -__- -___--- Q --E
- _________ ______ --_ � - �r�-' „�"'�ti,�`�r'-
____ --__ � �����
- _ E �
__--- - -�
- — � . _ ,�`1-�X � �
DENOTES FI��
WET��ND
� DENOTES
,
SURF�CE
IMP�CTS.
FROM STA 663 + 80 TO 666 + 70 -L- LT
�
M
GROUP (�GK. �L,C
�� ��
��
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
17
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
PE IT D RAWI N G
SHE T 26 OF 64
N
Z
�
N
1
W
�
�
�
�
� � I � I I I
�
- �I ; "'� �
--
-
� � \
-- \ '
\ � � � _ -- � \ � � � �� � � � � �' ----
, � � ��—___—_a�9---- ---�,eg � \ ������ I l —
\ \ � � �� � \ GROUP � GK ��C .
1 � � �
�� \� \ �� __ �
I � \ � � - �� � � � - � � �� �
_ � � � \ �
_� \
/ w �
� � � � � \ � � �
i � � \ \\` � � � � �� � � _ � � � \ � � \ \ � Q � , \ � �'
� � � � � � � � � � � �_ � � .,. � — — — � ��� A � � � � v��'� � ' i �; �
� � � � � � r � � �
� � � � � � - -- , � ,
\ � - _ �_ -- � o
I � \ \ \ � \ � \ ' —_____- ----- I � �
�_ o ;
_ ,
\ , , � � � � � . � � I I ��
�
�
� �� ,
,
,
; ; o � �� � _ — ,, , � � , ` ,_ - D E f� � I � � � , ��, .
,
,
-,� � . ------------ , .;> , �
�— ___ � � F F OTES F7�� �IN , � � `� �
�
zi ,
,
— ----�
_ �, — — , � -�
. -_ DETAIL I2 � -— _ WET��ND I I a,1 I�', 0�-,1 ' � \
- -------------
�_---
� ---' . . � a
.---- � ET RICI T E C T�10 N, _ ---- % I I �', �� �r ,, I `
�
# � � I ( Na� to Scole> �� � _ ,- - - �� � �
� LA�ERAL BASE DITCI� � ��
�ETQ,�L 4 ��� �� ( Not to sca�e) • b � — ��� % / � � � � � �� � � � �' � � \
j�� Fill � � I � �
� � LATERAL 'V' tTCH � '� % , — - � , �� I � '�
(�-�to�sc�) � ,� ��O��R Fiu Natura� � I � I ��� � s�ope � _ � � � � � �, ' � \
;� � � �� �
% . Ground `
, . �•�
� / Nat,�ral � Z �� Slope �� d / ��� p �,. Ft. �� � � � 1 � � ��
/ � Ground F�,p' -_ _
J �NOTES 'IMP,�CTS �
Min. D= 2 Ft. �
� � �Fill d / Filter.- -- �
' ��
_-�
I - B Max. d= 2�Ft. �. t ` \\
� '
�latural - Slope � ' F-iter ' F�br'c - BOBBY GORQON
Ground 2y .,p Z� I'/Ft. obric When B' is < 6.0 b 5 Ft: , 1 I
_ r�. .
d- 2 Ft. /� ' , S U I� F� C E' I j BETSY ORD0�1 ',� �
.
Min. D= 2 Ft. ' �
, � ,
, � � � � � �
�� � �
/ -" , � � � � � � �
�� b= 5 Ft. ;� � � �
Type-of Liner- Class 'B' Rip, Rap �ype of Liner= Closs 'B' Rip-Rap � � � � � � � � � � � � � i � � �-
-- ���� � ' � � �� - DEI�OT � � _ �3�I�ED i �� ��� � �� �� �� ''�� �
�� �� � Ff�OM STA 6�9 + 00 TO � 661 + 00 -L- RT � FROM STA 657 60 T�� 663 + 80 -L- LT �� �'
FROM STA 18.+25 TO 19 + 25 Y4RPD=" LT � �� �� �� � �
�
'� � � � � _- - � �� � � � � .
f ��;��-������`-�� � � � � C LEARI N C� I� LATERAL 3' �ASE ;DITCH i� ���
_. ,r`-, _�-, ,J,., � _ f, : ;:��. ,�� �C. . � i . ,.,. ..,.. :. . .. � � ' � \ �\
�
r
W
W
N
�
�
�O
�
�O
Q
H
N
I
J
I
W
z
J
_
U
2
� \ � � . c -. E — .
- �' .
,, �
' _ - ,,- ,�'
� \\ �E��__ _--_-- _-,- EIP,,-
=�� \ � ti, ________ _ _____-
�
� -- ------- —153a P� �
�, � 30'ACCESS EASEMENT DB E
E �----_-_-----�_--_ —
_ _ _ — � /
-- �
�` -- \�—E / / `
� ___--_- -____ -_ � — � �"���'�
� — ------ _-- — � � � ,
__ __ � �
_ _ _ _ �,�`�,
___________ ____
s
_— � ��—E � / /
--__ — — �
-- -,
� �� , r �
� � � , �`�-�X �
_ � � \
� STA 663 + 80 TO 666 + 70 -L- LT�-
\
. /l�l ... ..
V �� ---� ��� �
- � �
�� �� ���
`; � _ _�y.��
_- � �
� � � ��
- --_ ,\ �_ I I i �
_�
�
�� I
- _% I �
� ��
�
%'
,. _ I /
\� I
�� S� _
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
17
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
PE RMIT D RAWI N G
SHEET 27 OF 64
N
Z
�
1
W
�
�
PROJECT REFERENCE NO. SHEET NO.
U -2579B
RrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�������� � �����
dJ� N�'li` U�]E 1F�F8 % W A���Td���°d�N
�������� �� �����
Il�� Iai�°Il° �J51E �'� 4��N�'JC][8�TC1"d�N
PE RMIT D RAWI N G
SHEET 28 OF 64
� � � � �
ii ii i i i
� I I I I I
- II II I I I
I
II II II I I
I I I I I
II II I I I
I I I I I
I I I I I I
I I I I I
I I I I I I I
I I I I I
_l I_ I I_ I 1
- - - -- - - -- - -- - - - - - - - - - - - - - - - - - - - - I I I.
-
I I I.
-e� - � - - - - - - - - - -
i ii
�
i
_ _ _ _ �- _- _ � � �
E
i ii
_ _ - _
_ _.
_ _
l� _ �
- - - - _ _ _ _ _ _ _.
:�_ -i i-i �
_ _ 1 _� B I
- $�# . � -� � ,
_ _ I- I `
- - _ - . - - - 4 .-g- - _ _ _ _ _ _ � ,
- 0, R � - �
- - - �. - -- _ __ _ _ _ _ _ _$.
• I I. I
� - - - - I
_ _ _ -- - __ _ - - - -
�' _ I �_ � 1
_ - - -
-
- - � �
� �
_ . ; , �- - -
�
_ -
� � i _ - - �_ �.
�� -
_ _ _ _ � - - �-
� _ _ _ --- , - _ _ - _ _ i
. . ,,
_ _ _
-- - �
� , . , , , � --- -- i-
T € - - - --- - .
, , , ,, , ,
,
- - _ ..
- -- � _ _ - _ - _ _ _
. -
1_ - _ � _ _ _ P_ � _ _ _ _ I
N
Z
�
N
1
W
�
�
�
/
�
/
�
�� 0�
G�
�S
�
,��� vP �N� �
GRO
���SP NN �
GR��
�/ y PQ���
G�P ��p�
� S.NP�.S�1.
PN�����p�
DENOTES FI�� IN
WET��ND
DENOTES MECHANIZED
CLEARING
�..
NCDOT
�REBECCALHWE WEAVIL�
GLENN D. HART
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
�8
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
PE RMIT D RAWI N G
,SHEET 29 OF 64
�
�
I N �, -- --- -._.. ._ _. •When B is < 6.0' F3= 4 F t. � ����� �. �- � � �.
r EST.125 TONS
a W/313 SY FF Type of Liner= Class '�' Rip-Rap
z FROM STA. 668 + 51 TO STA. 668 + 53 -L-
� FROM STA. 667 + 88 TO 669 + 14 -L- RT
b
N
�
'�
n
_
r
Z
rn
I
r
I
(/'�
D
o�
o�
�
+
0
.�
�
2
rn
rn
�
�
�o
N
Z
�
N
1
W
�
� G�OVQ �N"" �o � P PQ o�� `' �
�G �
�S.�p �1G. �PN S\,���A
G�pvQ `N �N �.
, P ��`�`��� � _�
_` ` / 1
N — —
� �_, �
� �� � . �
� � � � � _ � \ � � ,q�,m� � � � � ( �
� � � � � � � � � � , �
�
� � � ��� � ������� \ � � � _ ,
\ � \� \ \� � � \
� 1 � \ \ \ �� �� � � \ �
��, � � � � � �
� � ` \ � �--� � � � \
, �� � � —�� � �, � � �
\ / � ` \ � \ � � \ �\ -
� � �� � � � � � \ NCDOT �
� � �� � � � � � \ WILLIAM LEWIS WEAVIL ��
,,
\. � `
�, � � � _ � � � � `�, REBECCA HINE WEAVIL
DENDTES FI�� IN ��� \ � � ,� � � �
�� �
� ��e � GLENN �. HART � � \ \ \
WET��ND _ � \ ��\ \ � \
�
� � \ �� � � \ ��� \ �
� � , � � �
DENOTES MECHANIZED � �� \`� � � � � \
- CLEARI_. � `�, � � � � � , �. I
. -- - � ,\ � � � � � � o �
��" ` � 9 � � \ �� ° a � �
� e _ � __ --- ���e, , � \ �� � � i
, � � �, ' \ ` � - - ,-- � , � � � \
�\ \ � , � � � �--�— � \ \ \ � � \ �
� � ���a ,
, �
� \ \ \ \ \ \ � �—� � � \ \ \ � �
� v � \ � v � v � � I I � � � � _ A V � � � \ � � � I � �
��
\
�
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
�8
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8gI�`I°d�N
� � N
_ � �
�
'�
n
_
r
Z
rn
I
r
I
(/'�
D
o�
o�
�
+
0
.�
�
2
rn
rn
�
�
�o
N
Z
�
N
1
W
�
�
PROJECT REFERENCE NO. SHEET NO.
U -2579B
RrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�������� � �����
dJ� N�'li` U�]E 1F�F8 % W A���Td���°d�N
�������� �� �����
Il�� Iai�°Il° �J51E �'� 4��N�'JC][8�TC1"d�N
PE RMIT D RAWI N G
SH EET 35 OF 64
N
�
N
1
w
�
�
'
r�
�I
ti.
s
�
�
r� ���
O ;
NS
N�
�
N�n
�c��
O �
N
W
�.�..�
c=i�
�
M
�
Q
N
�
�
�
�
W
Z
U
H
�
. _- - ,
� � y- �_�
. .. _
, �
�
- �
\ / 1 - ---
\ � - - -
� .,, --.....� � \ � \ •. � � ;\ � � � .., � / �....,' ���...� , ��,�. � . . ---- --- --- - - � � � , , , -- --- ------- - _ _. " --- _ � � �� . �
, � . , ., � . i . , . . . _ _ _ -' � � � - ' -
i
� � . � -
,
� �� 1 � � � \ - � i� � � �� - - - - - � _
l I
, \ ,,
,
'
PON� \ 1 � � S � � 5`� ,-"" , `-� `�, \ � � �, dETAIL #I6� � �6'�TAIL #I7 ��- -� _ �3 � \\
� . ., ,,
� -� — � �
, � � � � � DETAIL � �
��, A w.E. 855.6 ` � , � � � � � ' � � � � I � � I �TANDARD BASE DITCH �- � = -- - - � -- -
, � � ; GR � � � ,� � � � � � E�ARTH BERM , � � L�;��RAL�AS�-91TCH
� � ( ot to Scale) ( Not to ScalP� \.
������� � � S / � i � � �� � / � .aem� — � � — ._ � _ �� �Ot t0 SC41@) � � �
� � � ,�� �� � �
, � ; � �� �� ,
I � '
� I
� � � � � � - � � � , �' /� � � � atural � �- � /'-�ural _ � � �� Fi
� � , 5,
J � � � � `-- ��\ \�ti� � � L �� / , i � � 862.0' Grpq nd 2,y � G�n�- �� p \ � �
\ _
� � �\ ' I i NV/ T � / 1/ D-� atur � \ Slo e
� � \ � � g P� ; ,
� i
�
�s � � --� � � � 1 ' � � � / � � � d � Ground :/ �`�• �1 � � �
di�' � � ' _- � � \ ��� 1 � i �� � � � � � � � � � � � � ��
T� - V � �
�� � �� � � � i � I� � � � e
� � �
� �
, P � I ' � � � 3� i `�% � i�ter Fab�ic g in. � Ft -- -� B-� Min. D= Ft. '9 �
� � � � � � � � �� �� 'y � � � � '
1 I � � a
� � �
� � - � � ��I � � 1 � ; ; �1G. N.G. '�� � �a� d= . Ft. � � �--'" ��� 2 Ft� \ � �
� � � � � �� �� ��� � � CONC / � �� \� � hen B is < 6.� / ts= 3.�t. � -- - � �� b= �t. V A,
���% � `��!�� � E T �'� P R��R ���� � � � � r � — \
,�, � , � N � MOA _
�������� . '�- / �, � ! � i �, , , � � ' ' \
� � ' ����, � � � � �� FROM S 3+ 85 TO 4+ 50 -Y4- L
�� � � � ' �` � � � � � p � � � � STA.4�+93 -Y4- LT � TY ass 'I' ip-Ra ^\ \� � �
\V � � � � �� � � � pe f�Liner � T
J / I 1
� ' � 1 � � MT�� P� � ' � R ' � , �i8 T 47 + 3 -Y� LT � 'sb� � � A �
v
� �� I�'J SU RF�C
; � � � _. � �
, � � � , � � S 4 - - -_ _
, M T
� � % � , � ' L I i I I '��� � � CANOPw � �\ �- � p % � � V �\ � � � -
n
o ,
�
�
, I � `� �
�� - -
,- _ , , _ -
, , ' � ti� �I II� �� ' l --- , i� ' � _ -- / � � / __ �v� ,
, , `� � _ � � ' I � �C.�
� � POND �'��, � � ` � I � � �I i ' �, � � � V � ` � I I � � � � � � �
--
� � � �� -
, �
. , � , 8557 �'�y�1'I � � � � � - � � �
� � �� ! - _ E. ', � � I � �� � �' �� - � �
�
. � �
�. — w� , , � � �, � D�'E N 0 I M�P �� T �� f��J � � — � �— � ,
S � � ' �,
, ,�
� , l �
� _ �,
r , , ,� , � � � � ,
�
� �
� � � ' � \ � � �
, � �
� �� ; � � �
.� �
, ; '� , ,
/ � � � � � ,�� � � � �� � �- - � i I i � � I I � V � / , , �J i � —�� A , �V � ��
� �,
� � � � � � � � i �
, , � ��
� �
�� � � � v � , � � �y . � ,, — - � R�F � �C � Wl� F�, , , ; � � � � .� � � � �e
� _ �
' � ����, A \ t _� > � � � � � � '� � � ` � POOL � j ' ! ' `, �' ' I � ���' � � ` � � � � i � •' �� � r �� , � � � �
\ / I � \ \ �
, , ,, � � _ ; . � � - ,�� �
�, ,
�' �� , ` ; � ��� _ %� , _ � � , � �� � �� �,� ; � ;; ��� � i !� � � \ � � ��-�- � — _ _ ; , — ; , - i / ,�- , e � � \ � , _
,- �
, _
� , � �i
_ _ ,
, . � , � � � , ; ,
, , _� S� " � ` � � � � �� � � , '/ � � � �
, � , W D �j/ ' ' �� , � � yq � _ _ , � � �� ,
, � �
� � �
� -
V �
� �-- _-� /
, A �. � \ � 1 --- - �-t�- � _ � � � � � �1 i l � � , �� � � �� - � \
� ��\ �
� � �� � _
�\ � � _ -- , �� I � � HAROLD D VID KIN�, JR: � � �� \ ;,,,,---__ _ --- � ��m ,-� � _ � � \ � � � � �
� . . .
, , 1 I , � , , / I � . � � �
`�� � � � � � � � / � � � � � � �� -;N,,� _ � � � � � �^� �� � � � � � � � � � � � % � � � � / � � � � � -- � � � � �' � � � � � � --
i � � �
� �- � -- � ,. � �,�� -��
�� �� ^�� ; %� ' , � i �� � � � EN HOULDER BERM�"GUTT�R � � __.- �- �� � '�� I � � " ''� � � ��' .rae� � � � � / � _; . '�, � � i -� �� ; ! ; � \ � �
� � � � � , � %� ��� � � �� � � � ��\ TA� �-66--Ya-�--r �� � � �� � �� � I � 1 � ,'�� �"� ` � / � / � � � / � � � � I I % � � � � � \ � \ � ----
� �' �' ! / ��i`� �� . � � ' � � � �
� \ \ � � � j ��� i � , � - ' � _
\ �
, �.
— � � ��
� ,
,
� � Ctt ' � � �� �� � � � � � � � � � � � � �✓ - � PRDfiE�T'�ON , I / � �� � � \ � _
� , , � � � � � � I ------- -- - " � CLA�SS B" RIP � � �
1
�_ , �
� � � , %� � , � , ;� � � ; � � � ���� � ��r' / � � �� � V� � �
, � wr ' �, � �
,
,
� ,
; �
�
�� , � - , � � � EST 4 ONS � � ��� �
, , � �, , �
• � ERR� M. PEGRAM
� � � � � � � - 1 � � � � � �� � � I i I � I I � �. i i � � � �em� ES 23 SY FF if� � � � � � � � 9 � N�4NCY �'.�E�RAM_ -
, �
� � �
���, - � � �, � ; � �Si ,, � � � � ;"' I �' '� � � �� /_ � �� � / � � SEE DE�L#6 � � � ��� A �� �
;' ' j I / 1 � - - - / / � A
I
,
� � �
� � ,' � � . � � i � , � �� _ - _ � / � - _ � �� � -
:
� i , � � � � /a �� i � i �� � � � � � � � � _
,
�� m � � � � � � '
�,.
� � / �� �
' ' � I�� / - � � ,
� , � ., ; � � � � ' � / i � � � "�' � %� ��/ A
�� �,
_ , , , � � \
i � / � ,� �
,,
`� � , � ;� , � � � / � � , � � , � � i � ' � _ � HAR�OLD D. CF�AN'F L _ = � � � � � �� --
. � �
��. - � � - � � - -
� ' � S I T�E 2 3 A � � � _ � � � �� � _ ' ' ��--� -- — � � p TiYIE c�d�Fl - -- s`�/ �' �,Sr��C� \ -- �
, , � � , , � / _ �% �
� � :; ,� .� � I A �
�� /
� � � ��, � � � ' � r� ,, - � �� � �.- e�m ��
�_ , � ,
�- � _ _
,
V ' n � TAIL DITGI�I� O �,� I '� � � x i _ � � _ - � � EE ET�IL 3 � � \ � ����
\ / \
� � � / � � -- _ c / /� � � � — - -- —
� � � _ �EE�6�TAIL#� / ' g6" �NL&3SBWx � � �
�
� � � ggm�
HEAD DITC � �� �. I � � � , ' � � � - � � �' � � \
I� \
� � EST. D Y35CY � � � � ( �� X ONC BL f � � � � � � � � �
E D ETAI L 7 � � \ � \ � � � _ -EtAS�' RI � � �� i EART�-I B� R� � I � � � X ' � i , � � i � � � / � � � � � � �6>
� � , �
� �DDE Y \ � �� � EST.��NS� ✓ � ��, SEE �ETiA #�b � � � ' � � /� � � / �. � _/� � � �i���� �� �� . A� � ���_---
� � � �'�� . � � � �
_ I
� �
� �� �
� C S � �� _ � �
�� c�a �i� � � � ` , , � / , I 1 � � � X M r� � � . / / / / � � / RiP �� ��j .5m � � � � ���� � �
� � LINDA �AYES�, HOPK�NS � - 535 SY FF �/� , ( x � � � � ; / � � ES T � a �� � � I P ` ��
\� � � �
,
;
; �\ �,P . l �\ � � ; � , ' ,, �, j . - ,,, - � / - 5�,� / // -__ � � ���'��o`�is � --- -
� � Q , F��
,
�-�, ��
� ���, �� . , �
--
�. �
� ,
_ ` '
�� , � _
� TD�� � , �� T�E �'�-�—� � TD�� � � �€. ,� T � , � , , - -- - , , � , � , _ - ---- -- __ , �r�i� s�� �
,-
�
� � �
, , , �
,
,
_
,
= / /
�
, , , , � � � �
� , � - �`� i , - / � � `�
�
� �\\ � _. _�.
=°�1- -- -
�.�r'��� �SEE SHEET, 2-�
- - -� -
J
% cn
� ---
;
� ', . , � / : �`-��, �
��
e
C
:.� ����� _- , ��\ - � �i - - --
� --- -
�__ � l �� �_ _ - - �-`��krr�i-r �\
-""
i � , � - - - � ���,,�,T� �
- � � - .- � -
-� ' _ - - - _ �`� ' � �� � � `'�� � � � � � � � � � -
- �� ,�,� � �
,� � , �
i� � - '� - � 1 � - - - t--- - - - � T0� 1- - � - T �'�-0� 1-��- - - - - - - - - - �- - - - - - -0' 1�� -� \- A '"V \ - -0� 1
� � _
.,� . � � � � � � �- �_, �- �-- � �- , ��
�� � � , �
� � , � � , �i � , �% � � � � � ,�� - 3�;, �� � -.
�
� � � i � � � � � �, � � � � , � � � � ' �\\
/ �o�� H� � � i � . ��
� � � � — � � � � � � / , / , " �
/ � " m�
� ��
_ , �� j� ,
— �-1- , , � ;= j "`= a --- ���
� ,-
� � �.
� �
�� �� � � � � - --- - � ��� � � �---
\ � j � �4, ,� � �
� i ' - - -
�
�
_ ,
,
\ � \ -- --' - ------ � -� - --_ -' �-%, � __ W P- - \
�' / � � � — � � � , / � � � , � � �4
_ _ __
� � � � � — -- - � � �
/ � � � � r _ n�� .R7m� � _ _
-- � � - - - - - - � � _ / - - �� � —
; �, ,_ � � �` � - - — - — - , / � Y � � ,
\ R -
����". `� . �- - � - -- -- - - - _ _ - __ -- - -J - - � / �� - , - S CO R� \ 3� �
_ � � � i III
-- - _ _
- - -- - --- -
,
I F m ' ��A
-r T T' � ----- ------ - = // __ --- --� - Z `n u� \\ � �_ �
� �GRAU 350 , -- - - - - — --- - - -- - — -- - _ - _ _ - - -- _ -- — - �-- - . .��— - -- ------ - - -- - - � � � - '� \ --- _ _ _ _-
; — � �
�E W�F�AT CzBAIE - - -- - - __ - _ _ - - - -- - - _ - _ - -- -
. . _-_ _ — -
_ - - o� H - - - -= - - -o� 1-- - -_- - - - - - - - -o� 1- - - _- - - - - - - �� _ --- �, - _-- _ --
-,_- - - - - - - - --- - - - - - - - - - ----- - - - -
--- � ---
0� 1 ., F-
- �— —T i Z T �L TL- 7 - �- _ � -� - / d — L _ � — � —�� T � L � _ �_ �Z ��1� — —T— —L —
z
�
` �, �
\ ,, - - � 30" STEEL PIPE
��Tf�lt�,�ND- ��T€f�4D-
� � �� ' BORE AND JACK
V � i-� eus e� � us 4� se� zs� esr ', N 85 33 45.8 W,� � � Q
v
�-1 MOVE � C�nv nTCR Tn 7G1 � C'.,n., [lT('R T�, 7(:I
� .�_ � - _"� � — �1— �-�" -�' �`J_ / - - -�T , _ �'� ' "� 1 --''_" _ __ _ — y.S — 1—�— _� ---� --�' r � — �- — _ �' � = -F �-- 1 � _ � � a�\= �-�- y - �--_T_���r-'�. .y- �/-d1eb'y.i 1'-. =r- — �_ �� , _'� — �-._,�� � _ _�__: �y , � _.-e,� P e 1 � —
_- __ _- ' - _ - -- ... .,.,..�_, �� —��,-.,n �
- - . . . _ --- - - -
. __ - ._--- __��_ __'-t � .-__ - C �.
_
-_ - _
---- T----- --- � � �---- __ L � — - -
L � T � - ---� -�-----=� L � — '� ---� � — T— L — — T - — _ _ �- — T — � � -- —
--------� - ---- - T L-- � - �' ." _ .
- — — - — — T — — - - s'. —
� . .... _ , , . _
`� I� FILL W/FLOWABLE ���� 1-40 eUs we� US 42/ NB� 26' E�ST N; 85° 33' L�5.8" �/�/ i R, �
m RETAIN AND EXTEND
\ � MATERIAL v �
�
� � � � - � � �_ _,, � RETAIN AND� EXTEND � �
� �— � � -
- �_ � . , ; - _ ����� � -
;
�� � � / � � � __---
/ - - - - - - - - - -
_ -
- -- - - - - - -- - ---- _- - - - --- - -- --- - - -_ - - � �_- ,�_
- - � _ _ - - ----- -Ivt�C _- �2�I / MTL -o� p�V� - - - - - _ - •,, 1 � � � 1, COLL R l- ,Q; _�.- �- _�-, -
_ T - ---- "' ,-:-� _
- -- V�FfFLAT �RATE = COLLAf�--- _ _ _,,,�'gC `- 2G1 W/FLAT GRATE � m
-- --- -- - __ - -�G�f �Yt'F - - -
--- --
- - - - - - � - -- - - - - - - --- - --- - -
- - - - � - -
,
---- -
- -_ - -- -- --- -- - ---- — � - -_ _ _ -- - - - - _ , _ _ — -- � _ - _ -
,. ,
� �- � � _ �-� _ _ � ,
; _,_
- - - �� _-_ - - - - - � — — — � �� - - -� _- - -- --- -,� - - - -
__
_.. , —
--- - � �� �. . � � -- - -- ' -_ �_ _ - � - - � - -
-- --X � �� � — ---- - - --
� -- - - --� -- - - - - - _ � -- , - -- -� - - _ _-_ - -
' �
� � ,, � . � -
� � � � � �� ���
- -- - - ` - �� � _ - � T ��
T� --- __�� _ � -- x _ _ - X = , ., t. , -� , �- _ - �-- x� �� ; - -_ __ - ---- - =- _ � --J �, -� �
_ _:s54-,— � _ ' , -. _ _ `-- --.--- - ' � --� --- _ � - - � �� --_ - _ __ '-�' '`�...
�_ - , --� < � - - - - --
�� � � , , , , �,, � _ ,,. 1 � _ _ V� ITFfi REEK - ��i
i
� — , , - — � � , - - � -_ � ��" — — / -- � � -
�,, � � - . =- -- -__ - - -- -- - ,- - — - - � -_ -- - -- �
. , ;> � - - = --, � - � � " -" � ' - - - - --- - - �, �_ _- _ � - ----- -
-- � , . _ � ( � � , 'I' 24" RCP �
_, - , - - - - - -
� ._,� �
�- \ - \\ '- i z_ �, --� � �� --- _ - - - -- _ -- � _ - - -- - � � '
/ 18 fiC / SM �
,_ � �- � - - /
_ , - - ._-- --- � ; ;' i ! ' \ - � � � -- - --- ,_ `_ , � '-- ,� �� -- �� '_ -- ---- � b�/ - - - - - - h,,- - °��
-- ` �
� �=' � �,_ - - � � � � i � � �� , - -- - ;= __ - i _ -- - - _ � - - - -- -_� �/ - -- --- --- - - - �-- - - _ -_ I �s �- - �___ �� -- ---
-- -
----- � � - -
_ _ _ __
� _
_
� - - _ � ,__ �- - - - --- - - ---- --- - - - - -- _ _
- ---- A 1 � � i - - - - - -
--- __� - E sr � % - - - - -
-- - . - � -- � , -- -- - - - � _ .
� � W L i i � -- �� - -- �- _ _
- - - _ - - �- ��s .,, '_ - � - -� - -- - - - - - - -- --, , (���VF7`E_RS f - - - � ��-
_ „ � `� � - -
- - � - �
�� - -_ � _"- � �-= , � ;� ; �- -- _ �� -. _ ------ ---- - - ,- - - - _ - - -_ _ -- -�—
---
�_���� ---- -- - - _ - — _ ! -- - --- -- -- - - -- -- - - - -- - � ��
- - — — — — ----- � - - -- ,- - _- --- - - � - --
��
, — �
TON
�� � � _ - - -- - - - -
------ -" - � s MiT _ - - - _- - {� � - _ --
��,s_ � � � �
- - -- � , � SMITH CREEK - - -
- - -�- ; --_ � - � -
--- -- � - _ ` - ^ �s -r�rr } _ -- � � -- - -
_ � ' � �
- - �� � � --- • � � �- -- - -------- ---- ----
- -- > - - --- \ �. � - --- -� - � - ---ab�� - -- _ ---------------- �t' ---------- ------- -------- � --, ---_ _
� � � /
i
�
, . _ -- � - -
- � __- - � / � a�- - _ -- ---- '--
- J�kHT -- - ----- --- j � �-- - -- - --- -- -- ----------------------------------------- --___ ---_
�
'- � � �` � - - - - -- ---- --- - -- -- -- ------- -
� _
--- � - � - - -
` � ._ � - - _ -- --- --- Y�f — - - --- -��
\\ � - -- - -- ---- - � � - -- - --- `�--
€ T Z7 CV
� . � � \ --- -��� � _ - - - - - ----- ------ - IIW � _ � � _ �
-
M - - ---- - -- _
` ;�N - � - \ - - --- -
- - � - -� � i \ / ��"
- - - - - ��
i___��
TOE PROTECTION W/ � �� � -� \ "- - - - _ _- _ _ _
\ � 1
CLASS 'I' , � � _ , • � � � � .--� ,Sa� � � _ i1V�5 � / � � _ _ -
�� �� S I T E 2 3 6 �R �`�ss B� �,'
CLASS I RIPRAP RiP Ra,P V � �� � �j�, � � -� ��� j, �; '�� �--- RIP RAP � � � '' PIER `'���
EST 779 SY FF '\ i�� �---____ �� �'� �� ��� ��,' �,' � WD PIER EST 7 SY� FF I�� i �' I I END SHOULD BERM GUTTER
EST 380 TONS � � � � ' � ' � �
SEE DETAIL#27 �� �, �� i v�� � STA. 55+50 -Y4- RT
�:3 � �� � l �� i /� , REVISE FILL SLOPES TO 1.5:1 � � � ��� ��
7J
DETAIL #7
STANDARD 'V' DITCH
( Not to Scale)
Naturol � Natural
Ground 2� ,L\ Ground
D
Min. D= 2 Ft.
FROM STA. 45 + 14 TO STA. 45 + 18 -Y4- LT
AW .
ETAIL #27
TOE PROTECTION
F 2� ( Not to Scale)
Rr C�T FR 2����F� F�u
Fill P"� Slope
�
S�ope d F
Filter
d= I Ft. Fobric
Type of Liner= Class 'I' Rip-Rop
FROM STA. 40+30 TO RCBC -Y4- RT
DETAIL #6
TOE PROTECTION
( Not to Scale)
�
O
Natural 2��"��� Slope
Ground d ��,P
Filter
d= 2 Ft. Fabric
Type of Liner= Class 'B' Rip-Rap
F ROM STA. 53 + 05 TO 53 + 85 -Y4- LT
�,� ��� \ j;- �_�- /� 1�r i/� I'I ST/AO50K 00 TOG50+50 -Y4- RT I� li I�� �� �
� i
'�� � � �� � � REVISE FILL SLOPES TO 1.5:1
�-- � � - � F \ _� � � i � � W/ROCK PLATING
-� �� � --.9 � � �
��' �' � � j � . _ _ � � � � - --,, � `��, t �� `,`'� ��, � I � I
�� � Js �-� - ` STA 55 + 50 TO 66 + 00 -Y4- RT
/ � �/ �-
�
�� -' � � � ��`� ����`�� PONo SITE 28 �, �
� . , , - �_ � � ��', , , ;
� � _� __ -� _ --- � �� � __�� �.�` , � W.E.847.2 / i_� ��
� � , �/ \
� � �' � �� � \ �� \ � FISH HATCHE 1'
,
� � � ,� ; J / �_� -- � � �,
� �������.
,
, �, , � � , � , � /
,
/ �' / � � � � � �� -
� � , � � , , i �, � � � -� � � ��� � \ �� ���� � �� � ���M s ��� � ��� .�
� — -- -- ,� `�' ��
Q ' ,/ � / � �m��- � � � � _ „8, � � ' _ _� �
e
N
w
W
t=
�
�O
�O
�
H
N
�
�
i�
W
J
U
H
�
PROJECT REFERENCE NO.
U-2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
26
HYDRAULICS
ENGINEER
����������� �����
�D� IV�'JC �J�IE 1F� ��N�7Cff8g7�`I°d�N
PE RMIT D RAWI N G
SH EET 39 OF 64
a� � � � , / - � S � �� � - - �--- - _ _
� �<��� � � ��,� _ � - -- _, _
� .
/ � , �`'�-`�,,
/ _ � SS
' ' � / � \ � �� s' � �� / /� ��
20 � � � �
_ � �.
, - ,
;
,
, , - � — — �_
� i i /��� . / / � � � �RM � � � � � � � _
� � % � _ \ SF� �`�\ RONALD LEE ANGEL SR. , � � -- - - / --- �- �_ \
� � � , �� . _
� � �
� � , � � � � � i -�' � � � � �,� � �� � �l � '�� \
- -
�
,�. �
_ ,
� �� � � �� � , � / , � � �� � � � � � � �� `c��� �� ��� �i - _ � � �' --- - ���� � � � � � �
�
� � m ���- � , � �, � i � , �� ,
� � �
, , �
.
� , � � --- � '� �� �
' � i / � � � � � V � � � ��
, �� , � \
/ � , � � � � � \ A � � �� E� � - � - � � , ��
� � , � A � � �
- � � � � e� �
� � �/ � � � � ; � ---- � H9� B�� / � � � \ �� . � �PS� / / � � � � � � ,��� � � � � �K
m � � � \
' i �' i m � � � � � �� � � � � �`'� � A c ' - , _ � � ��� ' / / � �_ � � V� �
� � � � � ��- � \� � , � - ��� ' _ � � � o ��
� i � �� � � ' � � � � � `, . � � � a�� � � � ��� �� �
r-� _
�, �
� � - - ��
\
i � �I��,I, i �z � � � � � � �� � ��� � � A� �P��� , /� � j � - � �� � ������ �
� _
_ , , � � � --
� \ , �_ ,
-� i - � Ss
I � ��
-- __� -
� � � , ��� � � �- � m � � , _._ � � � A � VA �� � ''� 2� - �� / ��� A � �s,q�
� �
-
_ ;
� � � r � � / / � �, \ � � _ ` ` \ � _/ 0ge \
_ � ; _
�� � �
� , , � N � � � \ . � , , �� � �� _ � �/�/� � �v , �
� � / , -� ,� . � ; � ' � , � � � � -� � _ �,; _,�,�,� = ��� � � � � � _
�
�
.
: , , �, �-� � , �, , - , i �
�
;
_ � �
, , , , /J
, , � _ � l � SFo � . � \ � _ � � � � .� ss ��� �� /� s
- , / � \ �� � �
;, w
, �� �
, � � -
J �_
,
, r� , ���� � � , � , -- , � �� �_� � � , � � _ ,- / / i / � �� ��
� � �
,
�. � , �
� � � � / � � � � �� � � �o � � � - _, � . -�� _ ,_,, � \ � � � �� � � � � �-�
i
e
� I �iv � �� � � / .� �6 �� i--� A � � � �•��� �. � �� - / � � � �� �
� � I 1 �1 � � , � � z. � NC I � � � � - \ � � � �� � � �
, �
� � \ , � � ! /"� � i � `, � �. -- - -_ Y A � � �� �� � � —` �
� V � �
• i � ', �, � � � \ i � � �
� � / /
I / � � ` � ��NN NGEL� BERRI� � � � � �
,
� , � � � � , � �
�
, m��.
� , - � � � � � --
�
' ` i � � � \ � � JAMES�L�EON BE�RY � � / � �
, � �� �
_
\ � � � � I � i -_ � � -. ._----��e---� � � � , � / � -
� �
� =
� �
� ii � i ,� � . A � � � � �, � � � � � ��
I \
�� � � � � GR� �� � � � � . � � � � � � �� - /� �
� � � ��� �
� I� � ii �i . . _ — � � - � � � � ' ` V � �\, A,�� � - / ° � �
\ �
V V A � �i . � � � � / � � A � � � . � ' �� „ / ' � � �
/
e ,� , , , , , / � � \
, , �� � , , , � �� � ` �— ' ,� \
�� � '' � � � / � � � �, ��� , \ � � � � � / \
� � � ' � V `t._� �
I `I� • � � �_ = -� � ��:. � ���i
� /
� � / / � ' � ------ , � � �__ � � � -,, � / \
,�� � � � �
� / ��,
,. i � �� � _ ��
� � � � I I � �� _ � � �
\ � � �� � , � , � � � �' � i �� � '�, � V "' � , �
. �
� , ,
� � � � �� � ' ; ' �� � �� � � � � % � _ -- — � � `� �- / / � — — E SHOU �ER
� , �
� � ��,
,
� � � � � �\ i � � � �—
�
� �� �� ���il� i � � i � � � � � � � \ � �
; PAV L
� � � �
�� � �� � � ! � � ��� � � � � � � � � � ��
� �� �
� �
� _
�� ��� �� ' � � �'' j -- � � �i i� �i k � � � � � ���` �,� -- �� � � /m�g� � � �.
�
�,
, � � � � ,
� �' � �� � �� i � � �e- � - - _ � � � ��� � ,, � � � � . ,
� �� ! � / �� i � � \ � `_ / � � � � - � � � / � � ��) N� - ` - -
I '� i
� I Q Q
, �. �`\\i 1 \I � ' I '� � I � � � \ � � � � � � � _- ----- ��'ea \ � \ �9 . . � � � / � � � '� (1�,� �� ,.�!
� �' � � FO ' Y4 �OFILE SEE SHEET 50 5/
, 1 �1 I i , ' � � �I f � - — _ _ - --- ---- -- � \ � � � � - - ,
, , _
� ,
� ��` ' � � _ ' � �
� '' � � '
� ,
�
� ; , --
�
� � � �
- -
, � • �
� � � �� .
� �� , � � � � � \ L �� �
.
� , � � � V �' � � _ _ ,.z _ , � _,
� �� _ , � ��
, � � .
� , , � , �
� I �� lil� I�I ', � if �
� \, I - �...
N
�
N
1
W
�
�
i i � � i
� � �
i� � � � - � � i i
i � i � i i
I I I T I I I I
I � b� � I I I I
I I I I I I I I I
I I I I I I I I I
� � � � � �
I
I
I I I I I I
I I I I I I
I I I I
I I I I I I I
I I
. I I
I . .I
I I
I I I
I I I I I I I I I
I I I I I
� I I I
� j i �
�
I I � I I I I
I I I I E
- - I
I I I
— — � � �
I I I
_ I 1� 1— -- — —
I I I i I
- - -- � � I , I � -- i - - --
., , I , I I I
.,,..,. .,,.,,..,,. ��., ., -, I I I I I I I ,�..,.,..,
, � i i � � �.
�
;_� � I I�I I I�-�� � �' �I� I
I I � I I I I I
I I I I I I I I I I
I I I I I I I I
i ' I I I I! IIII I.
i i I I I I I I
i I I I I I I
i � � i i i i � � � i i �
PROJECT REFERENCE NO. SHEET NO.
U -2579B
RrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�������� � �����
dJ� N�'li` U�]E 1F�F8 % W A���Td���°d�N
�������� �� �����
Il�� Iai�°Il° �J51E �'� 4��N�'JC][8�TC1"d�N
PE RMIT D RAWI N G
SHEET 41 OF 64
N
Z
�
N
1
W
�
�
�� 1
— ------� o
_____ _ _ _ _ �
-0� 1 - -
Z--- T ---Z—
I
I
_ _ �
T ---1__�
Z —
� I I �� l. V L LHI(
� � REMOVE FES
�� �
— — — — —�� 1— — — — —
-�� --L�— � --Z--- --Z--- T —
� �� �
�� �� RETAI N AN D E TE N D
� � � �� �
----F�
5----�--
- - ' � - )�
_� � ( '_ " ) ( ' " )� _ - '/
�
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
�
�
PROJECT REFERENCE NO.
U -2579B
RrW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
27-2
HYDRAULICS
ENGINEER
�������� � �����
dJ� N�'li` U�]E 1F�F8 % W A���Td���°d�N
�������� �� �����
Il�� Iai�°Il° �J51E �'� 4��N�'JC][8�TC1"d�N
PE RMIT D RAWI N G
SH EET 45 OF 64
SEE PROFILE FOR GRADE
�
�
y
25 12.5 0 25 50
PLANS
---------------------------------------------------------------------��
e�__ee o�ee__�e o e�__ee o ee__�e o e�__e� �e__e� �e__e� �e__e� �e__e� _�_
0 5 10 PROJ. REFERENCE NO. SHEET NO.
; U-2579B X-180
�
- - _� _
280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 - 120 110 100 90 - 80 70 = 60 '�, I 50 40 - 30 20 10 0 10 20
i
-__- -__-___-_
.
_ _ - _ 'I -
II I I i -__ -__ _,__- ___-_______ _______----- � __--__.- ._ . - - - - - - - - - - - - - - _ - - - - - - - -- - '- - I I -,
_ _ _. _. _ - - - - _ __ _ - - - - - _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ - - - - - - - _ _ _ _ _ _ _ __ _ _ _ _ _ _ -;
______ _____ _ _�_-___ _ _ _---- - __�-- - - - -�------- PERMITDRAWING _
� _- �
- - _ _ _ _ _ __ - - - - - - - - - --- - -- - - - -- - - -- -- _ - - - --- -- - - - -- - - - - -- - --- - - -!,
- - - - - - -- - - - - - - - - -- - �
� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ __ _ __ - ---_ ___ ____ _ _ ____ ___ . __ ___ _ __ _ ___ . __ _ __ __ _ ____ __ ___ ____ __ . ____ ___ _--- _ __ _ __ __ _ ____ __ __ __ ____ ___ ___ ____ _ __ ____ __ ____ _ __ _ _ __ _ ____ ___ _ _ ,
�io . S H E ET 51 O F 64 . 9i�
_ _ _ _ _ _ _ __ _ _ _ _ _ _ _ ___ _ __ _ _ _ __ _ _ __ __ _ _ _ _ ___ __ _ _ _ __
� 1 H-i �- _ _ _ _ _ _ _. _ _ _ _ _ _ _ __ _ _ _ - - - - - - - - - - - -- - - - - - - - - - -- -- - - - - - - - - - -- - - - - - - 6
- - - - - - -- -- - - - - - - - - - - - - �.�21 6:1 :1
��� I- - _ _ _ _. _ - - _ _ _ _- - _ _ - - - - _ _ - _ _ - _ __ __ _ _ - -_- - - -- -- - - - - -- ��'��
! � _ _ _._ _._ _._ _._ __ . . - ---_. ___ __- ---- __ __ _ _. __ --- -.__ ___ .---- --_..__ _ _._. _.._ _ _..__ _ _.
_ _ _ _ _ _ _ _ _ _ - -- - - -. _ - _ _ _ _ _ _ -. _ _ - _ _ - -- _ _ _ _ _. _ _ . . D.P. 901.588 . ,
_ _ - -- _ _. _ _ - - -� ,� '-
-- - _ _ _ -- - - �
_ _ __ _ _ _
�--- - - - --- --- -- - - - ----
- - - - - -- -- -
�. -- - -- - -- -- - - - - - - - - - - - -
— — — — �
— _
-----__ ___�_
--- - - - - - - - - -..- - - - -- -.. _ __ _ _ - - - - - - -
- - - - -_ _ _.. ___._ _ _ _._ _ _ _ . _ _
— _ _
- - - - - - - - - - - -
— — — - -- - - - -- - - - -- - _. -- - - - - - - - - - - - - - - -
_ _
_________________—
_ Q
�9� .i I _ _ _- __ _. _ _ _ _..___ _ . U ��
� � � — — — — — _, . _. . _ ----------- -�-- � � . ._ .. _ _--, _--- ---- .
__ I
_ _ _ _ _ _. _ _ _ _. _ _ ._ _ _ - - - .-� - - _. _. _. _ _. _. _ . _
I I I I I � _ _ _ _ _ ---------___. ------------_ ----- - - - - - � I I I I
_ _ _ _ _.. - - _ _ __ _ - - - _ - - - - _
- -, � - ,
- - _ _ _._ - - - - - - - -- - - - - - - - - - - - - - ���
- - - - _. . - _ __ - -- - - - - .._ - -- - J S S 886 315 � �
Z. ,
QQ- - _ - - - - - - - - _ - - - - - _ _ _ _ _ _ - �'1 . . . _ _ _ ._ _ _ _ - - - � � �. Q
UU� I _. _ _ _ _ ._ _ _ _ _ ._. _._ _- -- -.----_..- - -- - - _.- __ _ _ _ _. _. _ -� . . I I � .. �� . . _ � . �_.._ �. .. �� .._. � . i i i i i i i i i i i i i i i i i �- - - - - _ U���l
RRn�� I.: g$O�g-------
i���F__ _ _ _ _ _ _ _ _ -- _ _ -: -- - _ -_ -- _ - _ - -_ --_ -_ - -- -- -_ - _ - -_ -_ - - -- _- _ - _-- -- -- - - _-- _- - - - - -- -- _ - _-- _- _ -_ -- i __1���I
I 52 8 + 00.0000 -�
_ __ __ __ ___ ___ _ _ _ _ _
��� Y_ _. _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _._ _ __ _ _ _ _._ ___ __ _ __ _._ __- - - _ __ _- _ _ __ __ -_ _ -_ - _ __- __ __ _ _ -__ __ _ - _ - _ __- --_ _ -__ __ _ _- _ _ _ _ ���;;
�
, � . i i
0.021 6:1 6:1 I
900 : � � 900
'- - - - - - - - - - - - - - _ _. _. _ _
- _._ _ __._
D.P. 902.113
_ _ _ _ ._ -._ . - _
,L.1 -_.I_I
_ _ ,_
, � �, 890
890 �
-- - --- ------- ---------------------- ----------------- --__ ____ _ � � � � � � , _
3.0 — — — — — � �
------ —� _ � -
_ ?•� � � '
� �'� S.S. 886.117 _ � � � � � '
�L� l�/ _illl � _ — — _ _ _ , . -_ _. _. - - �� (��
____—
-i ; 880.10
. _ ��—
--- . _ . __ _ -- � _:---__ . . _
- -- - - - -_ _ �� -- �7T$5-----------
- _. _ _ ._ _
�__-_ _ _
: 527 � 50.0000
��o : . ��o
,-
__ '�,
9/0 : � � � � � � � � � 9/D
,
: � �� �- � �� � �- � . _
�-------------, 0.021
I S ITE 7 I I 6:1 6:1
9OO . . � _____� - � � � yUU
_ - - . ���� D.P. 902.638
- IMPACTS I N S U RFAC E___________________
a — ' �— ' ;�— _ — �� __ !
�.� �-�-;L � WATE R PO N D .
�90 � � � -� � _� �890
�-- - - - _
__ � ----= �� F I LL I N ETLAN D ��----� � .�'
______
-- � MECHANIZED
- � _ . _ - --- . _ _ - __ . __ _ �_ � i ,� _ i i � r
CLEARING �
8 `U�0 . -___ _ — � � � — �� — _ _ ' __ _ _ , ; � i �i l�i i ►�i i i � i � � i � . . . � � , . __�'�'�'
� ���� _s____ ---�� '-��� I I , v
-- ---_. ___ --_—.-- ��---------- ------- --J---�� I
------------ ---------- --- ----- —
- -:-:_ ._._-___-_---. -- -- _ ___- __ — — —$7T.�5
_ _ _ _ 5.5.878.233
�; o � 52 7 -I- 00.0000 _ ��o
'� __ _ _ _ _ __ _ _ __ _ _ _
��. ��-�� - ; _� _`___`_�_`___ ____`�__`___`��_` ��-��
9/0 ., , , � _ -� �� 9/0
_
- 0.021 6:j 6:1
900 _' � �� D.P. 903.163 ���
� . . . . _ _ , . _, , . , ,
i�_��I� ---_ ___ _ ��-�I
- --__ __-________. -
i
ti�,
890 � � � � 890
,
�
1�-1_ri- _ -�-y-I- _ _ _ _ _ _ _ . . -1-i�-i ri
, � .
8�0_ _ __ _------ ------------ ---------- - ----------- --- ------���a---- - -�80
�� � � � � _ - _ _ _ _ -�_ �- - -- - � - - - -�-- � "_ _ - - r -� - - r � - -
S.S. 880.310
i _
_
i
52 +50.0000
8�0 � � ��. 870
�
�:ri-�=-- --- ___ __ ______,_ ___ __ __ ___ __ ___ __ _____--------- --- --------------- ------------------- --- -----_--------- --- --------- --- -- -- --_ __- --- --- ___ _- --- - --- --- -- -_ ___ �-- --- --- __ _ __ _ _- �_i�i__ _i u�_-�1 -�1-=
�' � � �-- �_ __ ��_ � _� __� �__ �� -� _- �� �� -�- __ �- � -� -� -� - -_� ���- 1 � � � -I ��
_ �
� 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20
� c
�
� �I I� I—I —
� 10 � 0 �I I 10 20 I 30 40 50 I, 60 70 �- 80 -� 90 100
9/0 . :_ � � _. � _e
.— —
6: � � 6.� 0.021 I I I � __._ _ _
___._ __ _ ---
900
D. P. 902.638
i,-r�-� �- - --------------------------------------------------------- I M PACTS I N S U RFAC E---- -
�,�- - ------------
= WATER POND
?.,
890 .I' _ _ _ e .__._. � — _ _ �� � _�_� �
_ _ _ _ — -- _ _. _ _
_ __ _ ___: __ - _— _ __ _ — —---- --- �
— —————__ _ — — — ———___— —————--- — _ _____ _ —- — — --
, _ _ _ _ _ _ — _ ———_. - �i�—i�
880
------�5— ----- --------- — ------- ------------ --
- - - _ _ - - _ - - - - - _ _
8�052 7 + 00. 0000 _ _ _ _ _ _ ._ __ __ __ _ ____ _ _ __ _ _ __ __ _
9/0 '�
6:)
900
8'
6:1
� �
n a on� i�z
0.021
�
880-----�,-�a---- — ---
-i-i-� �-�_i �_ � � i-u.=�l�=�=�-1��
8�0526+50.0000
9/0
6:1 6:1
�
9�� — — --- .--
��
.
110 120 130 140 - 150 160 170 180 190 200 = 210 220 230 240 250 260 270 280 290 9��
. I� — —
�ii�
- - - _ _ - - - - - -- - _ _ _ _ - - - - - - - - - - -- - - --
- - - _ __ _ _ _ _ _ - - - - - _ _ _ _ _ _ _ _
-
-
- - - --
__ ____. __ ____ _ __._ _ __ _. ____ ___. _ _ __ i
_.._. __.._ -_..__ _..---- -_. -_
� �
--.._--_. _- . . _--_.._. -- _ _..__ _.._--_ .. _-_. _.
900
_, -- _ - - - -- _ �SITE 7� _ _ _ _ _ _---- - - ��
----------------------------�- � � !
:. __ _ _ _ _. _. �_...a_._ . ___._...___ --. _ _ — — — — — _ _ _ _ 890
— -- -- — — — — -- --
� ,
_ __ _ _ _
_ . 880
� �
---- ---- ----- -------------------------------------------
__ _ _ _ _ �lilli
- S.S. 877.852 � - . - - � � � � � - - - - - - - -
- - - - - - - - - - - - - - - - - - - --�
!- -- --
-- - -- - - - -
_ _ -_ - - _
_ � � � � � � � � � _ _ — -- _ -- —._ _._ _ -:. - _ - _ _ _ _ -_— -. _ - __- - _— — _---_ _ _ _-- _ -- _— _ : � — _ - - : 870
_ _ _ _ _ _ _ _ _ _ _ - - __ __ _ _ ___ __ _ __ _ __ _ _ __ _ _ _ _ _ __1����
�
_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ __ _ __
— — -- -- — — -- -- -- — -- — — --- -- -— — — --- -- — — — — -- -- -- — --- —._ _ _._ _ _ _� _ _ _ _ _ _ — 9/0
� —
� ,
�
900
I
. '� 890
_ '
� �
-- — — ' '_. _'__.__'__ '_ __ . __' __' . __'_ _ ' _ . _ ' . ___'__.__'_ _: '__ , __'_ . __'_ . ' '_ _ , __' _'_ _' _ _ 880
— ------__ ,
� _ _ . _ _ _ . _. .-_ . _ S.S. 879.631 _ I I
870
—T —T— —,--�— — �,
0.021 i
�
880 �. —.
8�0 5 2 6 -I -
,�____ __��_��
�_�_�_�_�_
9/0
_ 6:)
9C —
�. �
8�v .
00.0000
6:1
9/0
���
900
890
-- — — — — — — — — _ �
�
r
___
—__ � � � � � � � � �
— -------__ . . . . . . . . ,
_. ------ _ 880
--- '�
___
---
. _ __—__ _ _ _______ __ _ _— -- -- _
__
----- — -- ----------------------------------------�
--- ----------_____— —_________ ___--
� � � � � � � � i �
S.S. 877.852 _ -
0.021
-----------��
I I I I I I I���I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . — —
8�0525 + 50.0000
„ ___ _- ----- __ ___ __ ____- - ---
> � � � �—
� 10 0 10 20 30 40 50 60
_�_
70
:� •�
--�-
100
870
— �-i: �_�
9/0
� �
f
�
900
l-i��_�i
�
890
�
� , _�. I-1—I—�i
I i
�
_ . . _ . _ . . _ 880
S.S. 877.852 �
_. �
870
_- --- --- ------- ; N i , i u
120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290
i
�
;
10
6:)
�
6 :1
���
4:1 -- - _ - - -
_ -- - - - - - -- - -
- -- - - - - - -- -- -
D.P. 868.351 - - -- - -- - - -- - - - - - - - - - - - - - - - - �
I
- - - - - - - - - - -_ _ - - - - - - --- - _ _. _ _..- - - -- -- -.. _ .-. _._ _ _ _.- - - - --� - - - ---- - - -- - - - - - - - - - - - - - -- - - - - - - -
_ - - - - - -- - - - . _ . - - - -- - - - -- - -._. - . _ _ - -
860 : , _ _ _ _ - __- _ _ _ _ --- _ _._ , --_.-. . -- __ __ __. -- __. - _ --_ -__ : - - - - _- _ - - - - . 860
S.P.60 i �
- - _ _ _ _ _. _ _ _ _ _ _ _ - - - - -- -- - - - - - - -- - - - - -- - -- - - - - -- - - - - -- - - -- - - - - -- - -- - - - - - - - - - - - - - - - - - -
I i I i I � � _ _ _ _ _ _ _ - -- - - - - ._ _ _ _ _ • - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - � i i I i i
_ _ _ _ _ _. - - L 621 + 00 0000
_ _ _ _ - - - - - - - _ _ _ -Y4RPBD 20 + 45.0000
'- - _ _ __ _ _ _ __ _ _. _ __ _ � ELEV. 854.175 - -- - - - - - - - -- - - -- - - - -
_. _ _ _ _,
i
'- - _
_. _ _ _ _
. --- - - -- - -
_ _ _ - - - - - _ _ _ _ _
850 :- _ _ _ _ _ _ _ _ _ _ ._ _._ _._ _.____ - - --- - -- -- - _ _ - _ -_�� � - - � � � � � � � � � � � � � � - - - - _ _ -_- -. _ - __- - __ - _ _ - _- - _._ -_ : � - _ - - : 850
� ��� �, ��� �� � � �� ��� ��� �,
� _ ; - � �-
_ _ _ __ _ _ _ _ - - -- -- - - - - -._ - - -
- -- - -- - - - - -
-- — — — — — — — 84�36\ ___ � - - �-1��fi1
- - - '�- - - - - - - - - - - - -- F I LL I N W ETLAN D -------- -- ---------------------�,
� ____ _ _ _
840 �-- ---___� - _ - _ - -- � , I I - 840
� _ _ _ � ,� .
_ . _ _ _ . _ , ` i� i �� , , - Y4R�BD -
�� ,, I � � � � � � � � � i � � � � � � � � � � � � � � � � � � � I I I
—�,` �- i -', � STA 20�-94.7573
�
�� � i i i i i i i �� i i i i i i i i i i i i i i i i i i i i i �i �i
830 : �--___` _ � � � 830
-, ,- , � � � � � � � � � � �
, - -� , , - - - - - - ,,
_ -,
, � ------------ ------
10
20
��.
30 40 I'� II 50
. �
0.021
60
70 - 80
90 100 110 120 130 - 140 150 160 170 180 190 - 200 210 220 230 240 250 260 270 280
. . , , . _ ,
_ .
- - - - - - - -- - - --' P E RM I T D RAW I N G ' � � '
- _ __ - _ - - - _-- - - -- _- --_ _ _ _ _ - _ _ -- - - - -
_---- - ____ _ _ _ _------'
-- - - - -- - - -- -- - - - - --- -- -
- - - SH EET 53 OF 64 880
- - - --
__ _ ___ . __ _ __ __ _ ____ __ ___ ____ __ . ____ ___ _--- _ __ _ __ __ _ ____ __ __ __ ____ ___ ___ ____ _ __ ____ __ ____ _ __ _ _ __ _ ____ ___ _ _ __ �,_
__ _ ___ . __ _ __ __ _ ____ __ ___ ____ __ . ____ ___ _--- _ __ _ __ __ _ ____ __ __ __ ____ ___ ___ ____ _ __ ____ __ ____ _ --_ _ __ _ ____ ___ _ _ __�
__ _ _- - - --_ _- - - ---- -_ __ _ _ _ _ _____ _ _ _- --- - _ _ _ _ - - - ----- - - -��
�
_ __ _ _ ___ _ ____ _ __ _ _ _ _ __ _ _ __ --- _ _ _ _ _- ----- - - -_. _ __ _
_ _._ _ - -- __ _ _ _ _. _ _ - - - - - - - _ _ 870
III I
___ .----- --_ . . __ _ _._. _.._ _ _..__ _ __ __. _
_ _ . _ _.._ _ _ _
_
8�0 : '
0.021
860
- ---------- --------- ------------------ - ---__ _ _--------
___ ______- ---.----.----___---------.----___-----------:-----------________:________---------_._______--________-.__ -___--- ---------._______-__.____-. __-.________ 8�0
�i i _ _-
. 870
__i_ i
4.� - - - - -- - - _ _. _._ _
• , II
- i i i i i i i i i i i i i i i i �i RF�n
S.P. 59
-L- 620 + 50.0000
�-Y4RPBD- 20 + 00.0000
ELEV.854.934
850 : ---
840 -:
_______
�- —s36�9— — _ _ _ _ _-___. __ --__-_:-- — --
---'—�� I, i I I I I I I I I I
�
850
���
840
830 -----___ � 830
_ -----__
- --
----------
---
� _
- ---- _ _------------
; 620�50.0000 ___ __ ____
___ ____________ ____
8�0 : - - _ . . . ._ 8�0
8
�'••
: •
6:1
0.021
l�l^I��� I I �I I _
� ,
_ �
, 870
4:1 . , _ - - -- - -
- - - _ _ _ _ _. _. - - - --
---I-. - , -----.--�_-_ I � �-CI-I. C1
III��IIII�IIII�i�� . I
� S.P.58 86�
-L- 620 + 00.0000
-Y4RPBD- 19 + 54.0000
ELEV. 856.187 �
t
i
- 850
- Y4RPBD - j_i��_�i
L �
- STA 19 + 88.3503
840 ' : 840
;
________ i
835T3—�__ . . , __ , I
-I-I-I-I-ri
—
—_
_ _ , .
—_
830 �iiNiii � -- _ _ _ _ _ _ _ _ _ . I - 830
__ �
� -
__
620+00.0000 - __ _____________ ____________________
820 : : �_ 820
,_�_�_
20
L
0
,_�_�_
20
�_�_�
30
�
-��
50
�
-��
70
�
:�
�
__ ________ ____ ___ _____ _____________ __ ________ ____ _____
, -�,i,�!
90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280
f
I
I �
I �
I `�
��
��I _. _.
150 140 130 120 110 100 90 I'� I 80 70 — 60 — 50 40 30 20
� � _ � e_ �
�� � I
_ _ � �� . J�_ �
-- ------_ —__ —__—_,__ --_.--_ '�_ _______--:-- � __—,—__.� � . � � .
880
�
870
8
8
8
.
•
.
•
10 — 0
10
�� �
20 I'� 30 40 — 50 60
; � �
i 0.048 0.048 � �TI
0 5 10 PROJ. REFERENCE NO. SHEE
U-2579B X-�
i _I
70 I'�� I 80 90 — 100 110 120 130 140 150
II ,— � I
_ _ _ _ _ _ — — — — _
--- --- P E RM I T D RAW I N G --
____ ____ ___ _____ ___ __ j S H E ET 54 O F 64
_ _ _ _ _ _____ ;
_ __- -__ _ -__ - =i �---
880
;��
870
i ii
�Q
iQ
►O
8
8
.
.
•
150 140 130 120 110 100 90 80 70 60 50 40 30 20
>O
0
�Q
i0
►D
�Q
'0
O
10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
,
�
, �_
280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 - 120 110 100 90 - 80
- -
� , �
_, _
-
-__-=___________-- -----_- ________-__--______----- __--__.- :_ . � . � . _ . �
. � � . � � � .
930
920
��
9/0
900
890 �
-- Q
� W
880 � z
J
I� _
�-I_I-I`I_�� �
�-1 �
870 : -�
860 .
-- — — — ��-���--i-�- - - - - - -
__
_ - ---______
_ _ _ _ _ __ ,
. I ��-���__-
360 350 340 330 320 310 _ 300 290 280
� �
M
�
0
, ___-.___-- . __ °'
0.091
Y4LPA
12 + 36.
�,---_ ! �
----__ �
�,
ii�� ������ � \
890
;;;Ii�
880
,�_�.
870
���
860
0.030 i 0.021
0.090 i
0 5 10 PROJ. REFERENCE NO.
U-2579B
�r
70 - 60 '�� I 50 40 - 30 20 10 0 10
_ 'I -
_ , _ , ,_
— — —-- — — P E RMIT D RAW I N G
— — — -- — --- — —
— —-- SH EET 55 OF 64
__ ____�__ ____ _ __ _ _ __ _ ____ ___�_ _
20
_ 930
�
�--------------,
i S ITE 15 i � � '��
� �-- --- --� 920
� -__-___-__:_-__---:- i
. _. -I: . _ _ :
o.o2i o.02� � 9/0
6�� 6:1 6:1 6:1
D.P. 906.374
_ _ - _ _ _ _ _ _.-__. _- . -
_. -. ,_ -__ _ _ I . i
D. P. 906.565
Y4C D - 900
, � �
�+�4.8902�8 II II I I III iiiYiii liill II III II I I II II III I iliiiiYiiiilil
I)
�0 I
30 I
'0 I
�D I
��U : _ � \ t1,�U
�
��-------------------- --------------------------------------------------- -
��a ---------
I�-I-i-i � ---
-- - - -- - - - --- -- - -- - -- _ _ __ - - - - -- - - -- - - - �.��_`.� _ _ � - - - - - - - - -
840 ' - . Ii�i�i�ir. 840
; ' 638 + 00.0000 �
I �
830 : -- rfi__ 830
�
J-I-�-I -- --- ___ __ ______,_ ___ __ __ ___ __ ___ __ _____--------- --- --------------- ------------------- --- -----_--------- --- --------- --- -- -- --_ __- --- --- ___ _- --- - --- --- -- -_ ___ ,-- --- --- __ _ __ _ __ __ _ _ _-_i_!_ I
� � � __ _ __ _ _ _ __ - - -- -- - -- - --' - -- / -- -- -� I+I
� _
� 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20
� �
�
920 20
;-! � !-i-�-:
9/0 'I
��
I :
1 :
�:
I :
1 : _•
��o
�
,�
940
930
��
920
9/0
1 �'1�1J
� ::I
� : I
� :.•
' 1�1 1111
.
6:1 6:1
�
D.P. 905.280
4:� _ �
�
�
�
--------------------i
_�
110 120
SITE 15'
�
� i
60 170 180 190 = 200 210 220 230 240 250 260 270 28� g20
SP 155 =
_ , ,
-Y4LPB- 13+29.00 - --- -_I PE�IT D�WING { I I I i
--- - ____ _ _ _ _----�
-L- 638 + 00.00 - - - - -- - --- - - - � _
- --- SH EET 56 OF 64 .-: 9�0
ELEV. 902.013 __. ____ _ __ ____. __ ____ _ __._ _ __ _. ____ ___. _
_
P_�_ ___�-__ _ __ ____ __ _---- _ ---_ ___ _ ____ ___ _ I
-- - --- - - - -��-
u.o�a _ _ _ _ _ _ - - - - � � �
0.076 _
- - - --
_.. �._m _. _ _ _ 900
_ ___ _
. _ - _
- Y4LPB - � _ __
- - -- --
A 13 +14.1394 _ _ i
_ - - _--- - _ ---_--- -_ - - -_
5• 967: �
__ i _. __._ _ __ __ __. _._ __ _.__ _ 890
_ __ �� _
� �
� _ �
__ _ __ ____ E _ _ _ _ _ __ _ _ __ _ _ _ _ __ _ _ ____ _ _ _ _ _ _ _ _ _ _
__ ___ _ ___ ___ __________ __� __ _____ �
_ __ __ ______ ___ _ ______ _ _ _ _ �
_ _ _ _ _ ___ _ _ _ _____ _
_
_ _ _ _. _ _ __ _ __ _ _ _.__ _ __ _ _ _ _ _._ _ __ __ _ � _ _ =880
r
, _
-- - - -. -- - - --- -- - - - - -- -- - - --- -- - -- - - - - - - - - - Z
-- _-__- E ________----_ -----______-__ _ --_ __ D
�
_ _ _ _ _ _ _ ___ _ _ _, _ _ __ _
-- - - -. -- - - --- -- - - - - - -- -- - --- -._ _ _._ _ _ _ _ _ 870
. ,
, , _ , _—
- :_ ,� . �_�__
� �I �_ _ , — : �
_ ,�
� ,
� � -, � ____.—
_ � � � � ___�— 860
_ _---
�� __________-- ---- , �I
____ � --
_----- - -
__ __ _ , _______ .__
._____-__--________� � ��
850
�` ii _
_ I _
,
��o
_ ��
. 890 , . '� 940
��u J � _�_ _ , __ � 930
_ � � � �, __; _ __; __ _ _ _ _
U , __-- - _
� � __- �;
� -I - � � � � � S.S. 877.459
� � �
. � �
. 870 _ _ _ — -- — 920
- 2 0 290 300 310 320 330 340 , �-� ,
- --
_ _
9/0
0.02� �
- -- -
- - - - - - - _
I f
_—_ _ _
._ . -. '� 900
-- - --- -- 4. � .
I ! ,_-__ _-_ 4:1
$. P. 82 �i -__--�
. D.P. 895.634 L- 637 + 50.0000 I I
- 4LPB- 13+29.0000
ELEV. 896.628 890
-- - - -- ------J - - - - - -- - - - - - -- l ,CIJ: Ci
i .
88�
,
, i
_ __---870
____._�._.___w __ __.�.__ _ _ _ _ _ _
- �--------_ ----- _ _. -
_ _ ___--- -- � i��_�i
_
-
_ - - ------- ----
�
___---- -- 860
_ ;
_-
--
I�-I I-I � — — _ _ _ — — — — — — — — — — — — — — — — — _____ -------- --- --- - , �-1-I-I-�i
I /�—_�� - --- - - i
. . .
850 _ / � 850
----------� ----------------------����� ��-�� . . � .
63 7 + ��.0000
,
840 .�ki: 840
L
0
�
___ __ _ ___ ___ ___ ___ __ _____ ___ ____ ___ _____ __________ _
__ __ _________
� -��
_ __ __ ___ __ _____ _-__ ,_____________ __________ -_ ________ ___ ______ ___ __ __ ___ ___ ___ ___ ___ __ ___ _ _ __ __ _ _ __ ___ __ _ __ �__�_�.
,__ - _ _
20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280
f
I
T--------- --------------- --------------- --------------- e�__ee o�ee__�e o e�__ee o ee__�e o e�__e� ��e__e� ��e__e� ��e__e� ��e__e� _�_
I � 0 5 10 PROJ. REFERENCE NO. SHEET NO.
� � � � � � � � � � � � U-2579B X-41 7
��
� �- � - =r �-
�� - � - i -
f
I
I �
I �
I `
��
�
;
880 2 $�
�'�i���l
870 :
860 .'.
�
850 :
Iiiii�.
840
8�0
�
s8o
250 240 230 220 210 200 190 180 170 160 150 140 130 _ 120 110
� __._-______ - - Y4CD -
- NWCD2 - __- ._ .
_ _ _ _. _ _ � � _ . STA 73 +43 36854
- _____ STA 16+02.77 - - - --- -- - - �
_ _ _ _ __ _ _ _ - -- - _ __ _ ___ ___ __ ___ _
_ . �_______ __
_ _ �
_ _ _ _ __ _ _ _ _ -- _ _ __ _ ___ ___ __ ___ _ __ _ ___ . __ __ __
_ __ _
_ __ � - - - - - -
______ -� ---__ _ _ ____-_ _ --_--- - _--___- --
__
- - - - - - - - - 0.040 0.040
��
,
\ �_�� - - - -i
�� ��� �� 4��
��� ��� _ ------
� � �� - � � � �- �-I�-�--I-I- . -
- - _ _ S.S. 857.983 4� � _ � � _ - - -
- - - - -- - - - - - - - -_ _ � � - -- -- -
_ � _
_.. - _
��
� .
�
- --- - ---- -- � �
-- - - �
__ _ - _ _ _ �
, ---
870 : :
860 : - -
,
11 .
� �--- - -- -- ---- - -- - -- --
850 ;` ��1 -
I
��� _— I- i I I __ I I I
� � I _ . � �I I�
� _ _ _ : I _ _.-- _.-
� �
840 : _ ------- ---------�-- - ---------- ----
.
830
890
�
880
I : •
� : •
I 8�"D--- --- ----
830
---------------- - ----
6:1 6:1
D.P. 859.983
0.050
0 20
10 _ 0 10 2 � 880
-- --- ----- --- � I I I I i
__ R M I T D R A W I N G
SH EET 58 OF 64 8�0
� �-��-, ,
-i-i,I�ii�����ili��i���iil�i��Iii�ili-ii-
_ � _ , , 186�
- - � �� __ ����� ���. _ 1 I �� -. ����� I����� � _� I
-- - - -- - - _
_ __ __ -- -- - 850
. _ . _ ----_. ---- _. ._ . _ . .---: . ---. . _ _ . . . _ __._� . . _ . . . . ___ . . .- _ ' -I-i`��-r���l
__ _____
-- -
_____-- -__ ---- -
. -.-------- -- -�8- - -----
_ .
-- - - ,
_ _ _
_-- -- __ -� _� I � � � � � � � � � � � � � � � � � � � ��_-�-. _�- __� -��- __ -�- _��- _ , 840
_ - -_ -_ - - -- _- _ _ - _-- -- -- - - _-- _- - _ _ _ -- -- _ - _-- _- _ -_ - _=i - �-j-1����
669 � 00.0000
_ _ _ _ _ _ _ _ _ ___ _ _ _ _
_ _ __ __ _ _ __ __ __ _ _ ___ __ __ _ _ ___ __ _ _ _ _ _ __ __ _ ___ __ _ __ _ _ _� - 8�0
��_
_ �
� � � _ 880
- Y4CD -
_ _ _ _ __ _ _ __ _ _
' STA 72 + 92.116637 �- ---- i i i i
____ . _, _ _
�S_I_TE _ 19J
: '� 870
0.040 0.04 _ � _ _ �
0
6.51:� 6.51:1 0.050
7; � 6:1 Q
D. P. 861.278
� � � I � I I__�— �-------- � __ �_�_' j� � � � I������—�-1-1 �. I-j-1-� �=�—I—� �-1�
i 1 I I� I I_i I I I- � I I i I I 1 I I-1 I I i_ I I- I i I-! I I i I � I_I �_I I
-�_-I--- ---
D.P. 859.084 . - i i
---- - -- -- ---- -- -- F I L I N W ETLAN D ----- -- -- ------------ ----------�=�
850
_
I
_ . _ _ ___ . _ I� _ _ i
-------------- - -- ------------- ---- ------ ----- --- - --��-r,----------�40
.
�r �
��Q � �n nnnn 830
7.62:1 ,..._.-
0.050
890
�rr
880
�'
,_
870
D.P. 862.786 O
�
� D. P. 860.431
f
I
850
l-i��_�i
�
-- ------- �40
---------- - -----
--------------- 84�T$—
— -- ------__ -------- -- --- ------- --- -- ---- ------_ __ -- -------- — —� �I I—�I—�—I �I—I �-�1—I I—�-1—I—I ��-1-1-�1—�—I �I�—�-�. _ �-1—I—I—�I
i
668 -I- 00.0000 830
I
-I_ _I-�IJ. _-I-IJ. I--IJ. I-I J. I-I-I_ _LI-I IJ .I--IJ. I-I J. I-�I_ _I-�IJ. _-�IJ. I--I . - J. I-I-I_ _I-I-I-�_ -1-I-�_ I- I-�_ I-I -�-�-I-I_ . !-I-I-�_ -I-I-!_ !- I-�-�-I--!_ I-I-I_ . !-I-I-�_ -I-I-I-�- I-�-�-I -�_ �-I-I_ . !-1-I-�_ -1-I-�_ !- I-�-�-I -1-�-I-I-. !-I-I-�_ -I-I-I-�- I-!_ � I-I-!- _I-I-�. �--I. !-1J -!-IJ-I-. IJ-I-�_ -1-I. �. I �_�J -�. IJ-I I-!- -1-I-�_�- I-�. IJ -!-1J- I-I. !-. I-I-�. I- �,-1J -!-1J-I-. IJ-I-�_ -1-I. � . I. LI--I-�_ I -I-I_ _�
� � � � � �� � � � � �� I H � � � � � � � � � � � � � � � � � � � �� � � � � � +� � �� � � � � � �� � � � � � ��� �
�
280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20
1
�
I_�_I_
20
f
I
�
;
10
20
��.
30 40 I'� II 50
0.050
60
70 - 80
•� ��
110 120 130 - 140 150 160 170 180 190 - 200 210 220 230 240 250 260 270 280
_ _ _ _ _ _ _ _ _ --- _ I
_ - - - -- -- - _ _ _ _ 1
- - -- -- -
- - - - - _ _ _ _ _ - - - - - _ _ _ _ _
_ _ ___ ____ __ . ____ ___ _----_ __ _ __ __ _ ____. __. __ __ ____ ____ _ ---_ _ __ - ---- --- -
�IIIIi
870
rS I T E 191 _ _ _ - - -_ _ _ _ - - - _�_ __ _ _ � �-��-� �
� � - -- -- - --- - _ _ _ _ _ _ _ _
_ ____ ____ _ _ ___ _ _ _ _- ------ --_. ___ _
_ - -- __ _ _ _ _. _ _ _ - - - - - _ _ _ _ 860
__ . __ ...___. _. __m_
___ --- - --_ . __ _ _ _ _. _ _ - -- - - --- _ _ _
' I��--I- _ _ _ _ _ _ _ _
D.P. 859.084 i i I i I I i I i i I i I i I i i I i I I I i i i i I I i i i I i i i �
` I
- - - - - - i - - -.- - - - -_ _ _.. _ -. _.- - - - - - - - - - - - ,
- - --- - - - -- -- - -.-. -- - - -
- - - - - - - ._ _ _ _ _ _. . _ _
850 . , E=�-------����__����---------- F I L L I N W ET LAN D- 2.� --� �,
_ � � __ _ _ __ __ __ _ _ _ _ _ ___ _ _ 850
� � �
�
l i l i ! - _ _ - _ - _' i I I l i l i l i l i i I I I I i ; I i, _ _ _-_ _ - -_ _ - -_ --- -_ _ _ _ _ _ - _ _ - _ - - -- - - - - i i l l i
�� _ _ _ I III M - - - - - --- - - - - ---- -
M
; ��-� I _�-H�- N�I-��I_� -H-�-H-I _H��-��I-� I I I I I I I I- _� �_ � ' I�I-� I -I-H--I��I _�H-I-- I �-�� I I I I -I�H- I - _ _ - - - - _ _ _ _ .
� - - -- - --- -- - --� -- -- - -- _
848----- --��-r,---------------- ----------------------------------- ----- --____ --------- -- -------- ---------- -------- : - 840
����r-I - � � V � � O • O O O O - - - - - _ _ - - - - - - - - - _ _ _. _ - - - _ S.S. 840.159 - - - - - - - _ _ - - - - _.�-1����
_ -_ - - - _ _. _ _ _._ _ _ _ _ _ _ - _ _ _ _ . - _ _ _ _ �,.
- - -._ _ . - - - - - - - -
- - - -
_
sao �- ������� �� - -- - - - - - - - -- - -- - - - -- --- -- - -- -- --- - - - -- -- - - -- -- -- - -- - - --- -- -- - - --- -- - - - - - -- -- - --- -- - -- - - - - - - - - - - - sao
,
�
.
� .�
�., �,�� i o n�n
?��
�
_ �
860
,���
. '� 850
._ � _
84Q------ 84a�r�-------- ----------------------- ----- --------------- ----------- ------------- ------ --------- ------ 840
ii _ . -_ _ . _ . __ __ . _ _ . _ _ _ . _ _ . __ ___ , _ _ ___. _ . - - _ i i
� j 6 6 8 � O O. O 0 O O S.S. 838.965
830 : '� . � � - , 830
:•
�
7. � 6:1 0.�50
860 -
�
.
�
870
���
860
850
-- - - - - - - - - _
, r
,
84_CZ._ ------��,-------------------------- ---- ------------- — ----- — -- ---------- ''—__ ------- -----�\ 840
�
� — , �
:__-___-__ -------_--_ -------------.--------__------.----- ---___--__ -___:___---------.-_____ _ __-------------------_________ � ______--________-.-__----_- . ._____
- i i i i i i i i i i i i i i i $.S. 839.614 i i i i i i i �_-- / i i i i i I
_ -- - .
I �_ - �
667 + 50.0000
_ �� _
830 : 830
_____,
870 :
=
8E -
�
.
�
�_�
�
�
�
0.050
/i � � i
✓
- - - - - - - - - �
667 +�.0000
830 :
„ Ci_I. �-- GJ-I-�-�J-
> � � �
� 20 �� 0
_,_
30
�
40 50
- -- - - - i - - - -- - - - - - -- �-,-;-i-�-�
870
�
f
i
860
l-i��_�i
?.� ,
,
� � 850
,. ,�
�
�
_ ,`_ --___��
_ _ . . , ____ _ -�-i-i-i-ri
�— ----- ---�—.— - --
— — --
--------- --------- --- ' 840
I
II___I_�__�_ I�I � I I I I I I � I I Y I I I � I I. S.S. 840.357 _ _ �
IIIIII
70 80
-�
90
�
--�--
100
I �
830
�
___ _- --- --- ----- -------- ' �I!I�!
120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280
f
I
280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 - 120 110 100
_, _
, , � . � . � . _ . . � � . � , .
--=___________-- -----_- � ________—__--______----- ---___
� -i
90 - 80 70 - 60 '��I 50
40 - 30 20 10 0 10 20
v- I! I e �Ie
_---- --
--- --- P E RM I T D RAW I N G
_ ___ _ - - _ , �
_ ___ _ _ H E ET F 4 - - - !�
___ _ _ _j S 60 O 6 _ _
_____ � --�
900 '— — _ _ _ _ _ I I I-I _I- I �— I—i —� — —H —H—I -H --I � I I I I f f—H—�.-- I I I —H —._H—I- H--I I_H-- I— I—� I_I— I- I I I_ H— I I�— I I I�— �— �I I—H— H— I- fi�— � I—�H-- I I I I I I— ——— — — —_ _ - 900
— —— - i
, _ — — — — _ _ _ - — — — — — __ _ — — — — — — --- — _ _ ___ _ — — — — — — — _ _ _ _ ___ — — — — — — — — —.— — — -- -- —. _ ___ _ _ _ _.— — — — _ _ _ — — — — —_ _ _. _ ___ _ _ _ _ _ - — — — — — -- — — — _ _ _
_ _ _ _ _ - - -. _ _ - - - - - _ - - - - _ _ _ - Y4EB - _ _
_ _ _ _. __ _ _ _ _ _ _ _ - - - - - -- - - - - - - -- - - - - - - - - - - - _ - -- - - - -- - - - - - - - - - -- - - - - - -- - -._ -- - - - - - - -
__ _ _ _ _ --- _ _._ __ __ __ __ _ _ __ __ __._ _ _._ __ __ __. __._ _ __ __ __. _._ __ _.__ � .
890 . , . . - . . . _ _ .---- _ . � STA 40 + 50.0000 S 890
_ _ _ _ _ _. _ _ _ _ _ _ _ - - - - -- -- - - - - - - -_ _ --- - ---- -- - - - - - - -- - - -- -- ---- - - - - -- - - - - -- - - -- - - - - -- - -- - - � - - - - - - - -
ii _ _ _ _ _ _ _ - - - _ _ _ _ _ _: - _ - - - _ _ _ - - - - _ - - - - - - - - - - - - - _
�- - __ _ _. -- _ _ __ -- ----- - - --- - - -- --- - - - - - - - - ---- - ---- -
I I i _ _ _ r--- - -- � _ _ _ _. _ _ - - _ _ _ _ __ - - - _ -i i
_ _ __ __ SITE 22 - - - -- - --- - - - - -- - --- -- -- - -- - -- _.
-- - _.
-- _ -- - - -
-
�
- --- - - - - -
--- -
- - -
_ _
_ __ . - --
__
_- - . __ __ _
- - --
-- - -- - - - -
- - ----
�_ _ _ _
_ _ --------_- _ _ _ _ _ _ _ _ _ _ _ __ - - _ _ _ _ _ _ _ _ _ - - - ,- �
_ _ _ _ _ _ -- ---_- __- - � -
- -
880 _ _ _ _ _ _ _ _ _ _ _ ._ __ __ e __ __ _ _ _ _ _ — — -- —_ __ _ — --_ -- —_ __ _ _ _ _ _ _ __ _ __ _ ; _ __ _ 880
_� � , � � � .
fi��r- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - -- - - - - -- -- - -- -- -- - - - - - -- - - -- -- - -- -- - - --- -- -- - - - . . . � �o� 5 01 0
- -- -- - -- - - - - - - - - - - - - - - - - - 0 021 _0 021_ _o 021 — �2 __ --
I �
-i
� 8 4.63
_ _ _ _ _ _ _ _ _ _ _ _ __ . _ _ - - - - - -- --- - - - - - - - - - -- - - --
- - - - - -
- -
870 :_ - _ _ _ _ _ _ - - - - - - - - - - - - -- - -- - - - -- --- -- - -- -- --- - - - -- -- - - -- -- _- - _- _ - --- �� -- = --- =- - - _ _ _ . D.P. 874.580 - - - 870
3� ! +
� — -- —
�_ _ � � : :
. _�_ i � i
_i i� � ;
FI � � .
LL I N WETLAN D- -� �� I ��__ -�+-� �� I
i -� i i i ��. � i � i i i i i i i �
860 : � i �� i ��� ` 860
— — — — � � � � � � � �� � —�
— — — — — — — , , , --
�_ _ _ _ — — —
__ . _ _--- , ___ _ -_ _ __._
' i � ____-- _ ._ , ��I
_-- ,_
______--- -------------'--
----------
- - - - - - - - - - - - - - - - - - - - - - - - - - -
850 ------- ----.-----.-------- -----.----.-------- --- S o S o 8 5 q e 8 q q --,____ _. __ ----- 850
--� '� 40 � 50.0000
._ ,I _
900 : 900
� ----_--
� _
i � - Y4EB - _�
890 : STA 40 + 00.0000 S 890
�
880
�� , i � � o�
870 ,- �
_ —.__----_ ____ __—,-------_ ____
---- �
� __-------- -----
a �=�-u � — --- � -- ' —
—_ �-------- SoSo 866o97q __ .
� — _ --- ---- � _ _
860 __.___------- _
___________------ _� -- — — — — —
850 :— . _ __
•I•
�• • �
::/
--------------_ ____
--- ----------- -- 5�1
---- --------__---- — ---------__--______ o
�
��_��i_� , , _. _ � i
--- ------------ ---- ---� �
�
_------ -�
870 : ____ ----- SaSo 87qo635
_�—
________ _
I�—i—i—i_ I — — — — — ----- -- --------
86y0 —
_� �—���__—�—��_�--��_�—� �_�—�—�_ _�--� ��_�--��_�—� �_�—u_ _�—���__—���_�--� �_�--�_ _�—�—�—,_ —, , ,—,_ ,—� —:—�—�_ _:—�—�—_ —�—�—_ :— �--:—�--_ ,—�—�_ _:—�—�—_ —�—�—�—:— �--:—� _ .—�—�_ .--�—, --�—_ :— �--:—� —:—�—�— _:—�—�—_ —�—�—�—:— ,—_ . ,—,—_ , , ,,. --. .--� --�—�—. —�—�—,,_ _�_
-�- i � � � �� � � � i ��-i-H � i � �- � i � i � i � �- � i � �- � i � �� i i �- i �
280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100
,�_,.
90
�
:�
��_
70
�
��_
50
�
n n�i
n n�i
0_�21
n n�i
�_�_�
30
�
0. 021 qa 216o I 5 0� 0 880
.0 _`
D.P. 875.927 ��- 870
: �� ..
0.021
�_�-
20
4_ ��� , c,�i
e
0
10
s
860
� . f
850
900
S'
890
f
0 880
_�--
_i
870
_I—i—i—i—ri
� 860
. . . . I. i. .. . . . . .
i
WETLAND PERMIT IMPACT SUMMARY
WETLANDI PACTS S RFACE ATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 28+00 -Y1- ROAD FILL 0.03 < 0.01 0.02 0.02 142
2 16+00 -Y1 RPD- ROAD FILL - INTERMITTENT 0.01 109
ROAD FILL - PERENNIAL 0.02 208
STREAMBANK STABILIZATION < 0.01 < 0.01 10 37
3 21+56-25+22 -Y1- 2@ 7'x6' RCBC 0.06 < 0.01 438 33
3A 17+36-21+53 -Y1- DETOUR - ROAD FILL 0.08 545
3B 20+55-21+32 -Y1- DETOUR - ROAD FILL 0.03 194
4 501+51-503+21 -L- ROAD FILL 0.03 < 0.01 493 18
STREAMBANK STABILIZATION < 0.01 < 0.01 9 31
5 503+85-507+80 -L- ROAD FILL 0.05 < 0.01 740 22
5A 507+39-509+64 -L- ROAD FILL 0.01 306
6 523+00 -L- ROAD FILL 0.03 < 0.01 0.02 < 0.01 312 42
7 527+00 -L- ROAD FILL 0.52 0.01
ROAD FILL-POND 0.59
8 559+75 -L- 2@ 10'x6' RCBC 0.06 < 0.01 442 53
STREAMBANK STABILIZATION < 0.01 < 0.01 58 44
9 560+75 -L- ROAD FILL 0.03 0.01
10 560+50-568+74 -L- ROAD FILL 0.01 0.07 < 0.01 783 22
10A 566+g4-572+75 -L- ROAD FILL 0.05 684
11 615+00 -L- 3@ 10'x9' RCBC 0.43 0.02 808 57
11A 19+76-21+44 -Y4RPBD- CHANNEL CHANGE 0.08 0.01 223 41
12 15+g4-18+g6 -Y4RPBD- CHANNEL CHANGE 0.01 0.02 88 205
SUBTOTALS*: 0.62 < 0.01 0.05 1.53 0.19 5853 1344
'Rounded totals are sum of actual impacts
NOTES:
ReWsed 3/12/13
WETLAND PERMIT IMPACT SUMMARY
WETLANDI PACTS S RFACE ATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
13 20+00-21+40 -Y4RPBD- ROAD FILL 0.33
14 629+g5-635+g0 -L- ROAD FILL 0.04 0.05 688
15 636+32-641+55 -L- ROAD FILL 0.18 0.04 332
ROAD FILL-POND 2.38
15A 644+00-645+00 -L- ROAD FILL < 0.01 108
16 643+56-644+61 -L- ROAD FILL < 0.01 104
ROAD FILL-POND 0.16
17 663+65-667+00 -L- ROAD FILL 0.09 < 0.01 0.06 928
18 667+15 -L- 3@ 12'x10' RCBC 0.06 0.02 377 67
STREAMBANK STABILIZATION 0.02 0.01 80 59
19 668+50 -L- ROAD FILL 0.47 0.01
20 687+g0-691+59 -L- ROAD FILL 0.03 163
RQAD FILL-POND 0.85 450
21 22+50 -Y1- ROAD FILL 0.02
22 40+50 -Y4- OUTLET PAD 0.01
23 45+65 -Y4- CULVERT EXTENSION 0.06 0.01 100 32
STREAMBANK STABILIZATION 0.02 0.01 54 21
23A 44+95-45+18 -Y4- ROAD FILL < 0.01 57
23B 45+07-46+34 -Y4- ROAD FILL 0.01 135
24 80+73-81+57-Y4RPBD- ROAD FILL 0.02 202
24A 80+50-81+51-Y4RPBD- ROAD FILL 0.06
25 37+31 -Y4RPA- 30" RCP < 0.01 73
STREAMBANK STABILIZATION < 0.01 < 0.01 21 16
SUBTOTALS*: 1.20 0.02 3.77 0.05 3422 195 450
"Rounded totals are sum of actual impacts
NOTES:
ReWsed 3/12/13
WETLAND PERMIT IMPACT SUMMARY
WETLANDI PACTS S RFACE ATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
26 29+16-31+12 -Y4RPC- ROAD FILL-POND 0.38
27A 104+62 - 107+53 -Y4- ROAD FILL 0.02 205
276 107+60 -Y4- 42" WELDED STEEL 0.05 0.01 < 0.01 130 14
27C 107+58 - 108+44 -Y4- 30" RCP < 0.01 116
28 54+65 -Y4- STREAMBANK STABILIZATION < 0.01 25
29 145+62 -Y4- ROAD FILL < 0.01
30 64+34 -Y4- STREAMBANK STABILIZATION < 0.01 28
31 557+28 -L- STREAMBANK STABILIZATION < 0.01 21
SUBTOTALS*: 0.05 < 0.01 0.42 < 0.01 525 14
SUBTOTALS FROM PAGE 1*: 0.62 < 0.01 0.05 1.53 0.19 5853 1344
SUBTOTALS FROM PAGE 2*: 1.20 0.02 3.77 0.05 3422 195 450
TOTALS*: 1.87 < 0.01 0.08 5.72 0.24 9800 1553 450
'Rounded totals are sum of actual impacts
NOTES:
ReWsed 3/12/13
�
P
m
m
�
�
�
_
�
�
T
�
D
�
N
7�
��
a o�
�a�
�
O 3�
N p�
w ��
o��
�
M�fy
�
�
�
00
�
0
N
V
..
�
V
�
�
O
V
� /
Prepored In ihe Offlce of: HI'DRAULICS DIVISION OF HIGHWAYS
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ExcrxEEn STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
50 25 0 50 100 ADT 2010 = 53,560 LENGTH OF ROADWAY PROJECT U-25796 = 3.86 Miles. �000 a�r��, Ridge nr., Raleigh Nc, z�eio Mo�
ADT 2030 = 79,880 LENGTH OF STRUCTURE PROJECT U-2579B = 0.19 Miles. zooe srnNnna� spEcrFtcaz�oxs
RD
PLANS DHV = 10 % TOTAL LENGTH OF PROJECT U-2579B = 4.06 Miles. + '•
50 25 0 50 l00 D= 60 % RIGHT OF WAY DATE: TONY HOUSER, PE src,vazua�: � :
T = � H % # PROJECT ENGINEER ROADWAY � A
PROFILE (HORIZONTAL) y= 70 MPH JUNE 19, 2012 ENGINEER r
R TII� f
LETTING DATE: LEE ANN MOORE
�O S O �O 20 *'��'ST �Z % DUAL 6% PROJECT DESIGN ENGINEER
PROFILE (VERTICAL)
FUNC CLASS=INTERSTATE OCTOBER 21, 2014 PE
SIGNATURE: STATE HIGHWAY DESlGN ENGfNEER
1 �ote: Not to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND PROPERTY.•
State Line ------
County Line ---
Township Line ---
City Line --
Reservation Line - -
Property Line
Existing Iron Pin
Property Corner
Property Monument
Parcel/Sequence Number
Existing Fence Line -X
0
E�P
�
a
ECM
123
x x—
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
Existing Wetland Boundary - - - -W�B— — — —
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
Known Soil Contamination: Area or Site �'
Potential Soil Contamination: Area or Site �
BUILDINGS AND OTHER CULTURE.•
WLB
EAB
EPB
.,.
�
Gas Pump Vent or U/G Tank Cap O
Sign �
Well °
Small Mine �'
Foundation �
Area Outline
Cemetery fi
Building
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir
Jurisdictional Stream
BufFer Zone 1
BufFer Zone 2
F I ow Arrow
Disappearing Stream
Spring
Wetland
Proposed Lateral, Tail, Head Ditch
False Sump
�----�
�----�
JS
BZ 1
BZ 2
. ..
:"I'.,��'I'I�:' (�)I��' �(�)'�'III ��'.,��I'�(�)I:;I:�.��.
I�I)� I � ' I : � I (�)J \ (�) I �� ° I I I � �� I I ��' . �� � " �
� � � � � i �
RAILROADS:
Standard Gauge
CSX TRANSPORTATION
RR Signal Milepost MILEPOOST 35
$WltCil 0
SWITCH
RR Abandoned + + + +
RR Dismantled —
RIGHT OF WAY.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line —
♦
0
Proposed Right of Way Line R
Proposed Right of Way Line with R
Iron Pin and Cap Marker
Proposed Right of Way Line with � R_
Concrete or Granite R�W Marker
Proposed Control of Access Line with
Concrete CJA Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage / Utility Easement—
Proposed Permanent Utility Easement —
Proposed Temporary Utility Easement —
Proposed Aerial Utility Easement —
Proposed Permanent Access Easement —
Proposed Permanent Easement with
Iron Pin and Cap Marker
ROADS AND RELATED FEATURES:
Existing Edge of Pavement —
Existing Curb —
iC�
�A,
E
E
TDE
PDE
DUE
PUE
TUE
AUE
PAE
0
Proposed Slope Stakes Cut --- C---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp cR
Existing Metal Guardrail T T T
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail n n n n
Equality Symbol �
Pavement Removal
I�EGETATION.•
Single Tree
Single Shrub
�
�
Hedge
Woods Line � � � � � � � �
Orchard
Vi neya rd
EXISTING STRUCTURES.•
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES:
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
Recorded U/G Power Line
Designated U/G Power Line (S.U.E.*)
TELEPHONE:
� � � �
Vineyord
CONC
� CONC WW �
�
CONC HW
�--------�
� CB
�•
P
- - - -P- - - -
Existing Telephone Pole -♦
Proposed Telephone Pole -O-
Telephone Manhole O
Telephone Booth �
Telephone Pedestal �
Telephone Cell Tower �
U/G Telephone Cable Hand Hole HH
Recorded U/G Telephone Cable T
Designated U/G Telephone Cable (S.U.E.*) — - - - -T- - - -
Recorded U/G Telephone Conduit T�
Designated U/G Telephone Conduit (S.U.E.*j- - - - -T�- - - -
Recorded U/G Fiber Optics Cable T FO
Designated U/G Fiber Optics Cable (S.U.E.''�- - - - -T Fo- - - .
WATER:
Water Manhole O
Water Meter o
Water Valve �
Water Hydrant �
Recorded U/G Water Line W
Designated U/G Water Line (S.U.E.* - - - -W- - - -
Above Ground Water Line A�c water
TV:
TV Satellite Dish C
TV Pedestal ❑�
TV Towe r �
U/G TV Cable Hand Hole HH
Recorded U/G TV Cable T�
Designated U/G TV Cable (S.U.E.*) - - - -T�- - - -
Recorded U/G Fiber Optic Cable T� F°
Designated U/G Fiber Optic Cable (S.U.E.*� ----TV FO- --
GAS :
Gas Valve
Gas Meter
Recorded U/G Gas Line
Designated U/G Gas Line (S.U.E.*)
Above Ground Gas Line
— — — —G— — — -
A/G Gas
SANITARY SEWER:
Sanitary Sewer Manhole OO
Sanitary Sewer Cleanout 0
U/G Sanitary Sewer Line SS
Above Ground Sanitary Sewer A/G Sanitory Sewer
Recorded SS Forced Main Line F55
Designated SS Forced Main Line (S.U.E.*) — - - - -F55- - - -
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc.
A�G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole (S.U.E.*)
Abandoned According to Utility Records
End of Information
•
a
0
Os
- 7UTL -
0
�ST
0
�
0
AATU R
E.O.I.
GPS NETWORK
`�STOK S COUNTY
F RSYT COUNTY
: J��
.�
�
Q.O� 5 2
�
LEV�ISVILLE
421 �
�
B�S
,
I-4
�--- DA
GPS NETWORK
311
GREEN
RSYTH C T`
�--
SO COUNTY
ELLER 3
BEGII�I C01�STR UCTI0111
-Yl POTSta. 10 + 00.00
NCDOT GPS STATION U2579B-2
LOCALIZED PROJECT COORDINATES
N = 8741120277
E = 1658607a106
ELEVo = 910a76
a
�V
�n o�
� N
I O� I,
[� � .
NOTES:
158
HAWTHORNE
RESET
MARKET
� STREET
311
NOT TO SCALE
NCDOT GPS STATION U2579B—I
LOCALIZED PROJECT COORDINATES
N = 875565o1q2
E = 16598760641
ELEVa = 919053
� US 158
1
�
�
W �' +
U
OW�
� O �''
���
� � v� US 158
�`' O
� �
W� �
E11tD C01�STR UCTI01�
—Y2— POT STA. 29 + 75.00
� W � E1VD C01�STR UCTI011T
—YI POT Sta. 54 + 00.00
S UR VEY C01�TROL SHEET U-2�798
BEGI11l C01�STR UCTI01�
-Y2 POTSta. 10 + 00.00
WALKERTOWN/GUTHERIE RD.
SR 2385
���
�� �
���p.0 _
��� \�� SRR
��F �P
�
ST Ao l0 +OOo00
BEGIN CONST RUCT lON
—Y2A— STAo /6�OOo00 TION U2579B-3
END CONST RUCT lON
—Y2A — ST Ao 22 +OOeQO
END CONST RUCT lON
—y_3 — ST Ae 26 +25000
P��
��� ��
�� 2�
�� S�
��
—SRR — ST Aa 57 �26a59
E11tD C01�STR UCTI0IV
-YSA- STA. 81 + 25.00
E11tD CO1�lSTR UCTI0111
-Y4WB POT Sta. 143 + 00.00�
-Y4EB POT Sta. 143 + 00.00,
� �
NCDOT GPS STATION U2579B-10
LOCALIZED PROJECT COORDINATES
B US. 40
B US. 40 EBL
N= 862393a881 NCDOT GPS STATION U2579B-9
E= 1659q54o537 LOCALIZED PROJECT COORDINATES
ELEVo = 836a07 N = 862298a542
E = 16606950161
ELEVo = 821023
1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN
(HIGH ACCURACY REFERENCE NETWORK) NAD 83/95 ADJUSTMENT. THIS CALIBRATION
WILL ALLOW THE END USER TO WORKWITHIN THE SAME COORDINATE SYSTEM WHEN
USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER
SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES
MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES.
2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTP://WWW.NCDOT. ORG/DOH/PRECONSTR UCT/HIGHWAY/LOCATION/PROJECT/
THE FILES TO BE FOUND ARE AS FOLLOWS:
U2579B LS_GPSCALIB_071217.HTML
U2579B LS_WGS84_071217. TXT
U2579B LS LOCAL 071217.TXT
U2579B LS CONTROL 071217.TXT
THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE
THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT.IF FURTHER INFORMATION
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
�INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL
BY THE NCDOT LOCATION AND SURVEYS UNIT.
PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.
NETWORK ESTABLISHED FROM EXISTING HARN MONUMENTATION
SEE GPS CALIBRATION SHEET FOR HORIZONTAL AND VERTICAL COORDINATE VALUES.
NCDOT GPS STATION U2579B-4
LOCALIZED PROJECT COORDINATES
N = 86755qo058
E = 1665981a533
ELEVo = 9q6a50
NCDOT GPS STATION U2579B-8
LOCALIZED PROJECT COORDINATES
N = 861955a185
E = 1665179o34q
ELEVo = 88qa85
TO WI11�ST01�
���
�.r',�.�
G��J'
BEGI11l C01�lSTR UCTI01�
-YSA- POT STA. 54 + 00.00
NCDOT GPS STA
LOCALIZED PROJECT COORDINATES
N = 8681840593
E = 16669230175
� ELEVo = 947a62
BEGIN CONST RUCT lON
—Y3 — ST Ao l8 �25000
C
�r � �
�� E111D COI�STR UCTI01�
� -Y5- POT STA. 33 + 30.00
END TIP PROJECT U-2579B
—L— POT STA. 692+32.98
NO TE: DRAWING NO T T O SCALE
NCDOT GPS STATION U2579B-7
LOCALIZED PROJECT COORDINATES
N = 8618180742
E = 16668750763
ELEVo = 893030
�
� HASTINGS HI
LL RD.
BEGI11l C0IVSTR UCTI0111
-YS- POT STA.16 + 00.00
PROJECT REFERENCE NO. SHEET NO.
U-2579B 1C
Location and Survevs
BEGI11l COI�TSTR UCTI01�
-Y4EB POT Sta. 26 + 80.00
-Y4WB POT Sta. 26 + 80.00 �
NCDOT GPS STATION U2579B-6
LOCALIZED PROJECT COORDINATES
N = 861q35o209
E = 16718170303
ELEVo = 891085
B US. 40 WBL
TO KERI�IERSVI.
US. 40 EBL
��
NCDOT GPS STATION U2579B-5
LOCALIZED PROJECT COORDINATES
N = 8613410266
E = 16730300785
ELEVo = 918090
DATUM DESGRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1 " TO —L— STAT I ON 478+00. 00 I S
S 71°38'00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
GPS Calibration Report
Project : U2579B FieldCalibration
TIP Number
User name tbovender Date & Time 12:41:06 PM 12/11/2007
Coordinate System US State Plane 1983 Zone North Carolina 3200
Horizontal Datum NAD 1983 (Conus)
Vertical Datum Geoid Model Geoid03 (Conus) NC Sub Grid
Coordinate Units US survey feet
Distance Units US survey feet
Height Units US survey feet
LOCAL SITE INFORMATION
Localized around U2579C-1
Latitude 36^09'08.35562" N
Longitude 80"10'48.38377" W
Site Scale Factor 1.000045472
Height 870.594
The North Carolina Department of Transportation uses a Localized Coordinate System
which is very similar to North Carolina Zone 3200 from which it is derived.
Please take care in utilizing these coordinates to eliminate confusion of the two systems.
This file is to aid in the use of Real Time Kinematic (RTK) GPS during construction layout.
Datum Transformation Parameters
Datum Transformation computation not requested
Updated Default Projection (Transverse Mercator) Definition
Updated default projection not requested
NOTES:
1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN
(HIGH ACCURACY REFERENCE NETWORK) NAD 83✓95 ADJUSTMENT. THIS CALIBRATION
WILL ALLOW THE END USER TO WORKWITHIN THE SAME COORDINATE SYSTEM WHEN
USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER
SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES
MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES.
2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTP://WWW.NCDOT. ORG/DOH/PRECONSTR UCT/HIGHWAY/LOCATION/PROJECT/
THE FILES TO BE FO UND ARE AS FOLLOWS:
U2579B LS_GPSCALIB_071217.HTML
U2579B LS WGS84 071217. TXT
U2579B LS LOCAL_071217.TXT
U2579B LS CONTROL 071217.TXT
THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE
THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT.IF FURTHER INFORMATION
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
S UR VEY C01�TROL SHEET
FI1�lAL
Horizontal Adjustment Parameters
Northing coordinate of rotation center 864170.124sft
Easting coordinate of rotation center 1664837.355sft
Rotation about the center point 0°00'00"
Translation north -0.529sft
Translation east 0.589sft
Scale factor 1.00004635
--------------------------------------------------------------------------------
Vertical Adjustment Parameters
Northing coordinate of origin point 875565.201 sft
Easting coordinate of origin point 1659876.674sft
Vertical separation at origin 0.158sft
Slope north 1.193ppm
Slope east -0.561 ppm
Geoid Model Definition
Geoid03 (Conus) NC Sub Grid
--------------------------------------------------------------------------------
Residual Differences Between GPS (WGS84) And Local Coordinates
Summary
Maximum error Root Mean
Horizontal 0.137sft 0.025
Vertical 0.119sft 0.020
Three-dimensiona10.155sft 0.032
Square error Point
U2579B-4 GPS
U2579B-10 GPS
U2579B-4 GPS
DATUM DESCRIPTION
THE LOCA�IZED COORDINATE SYSTEM DEVE�OPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876q19.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
�OCALIZED HORIZONTA� GROUND DISTANCE FROM
"U2579C-1 " TO -L- STAT I ON 478+00. 00 I S
S 71 ° 38' 00" E 6933. 9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICA� DATUM USED IS NAVD 88
U-2�798
Point U2579B-1 GPS
Latitude 36°09'00.87235"N
Longitude 80°09'07.26064"W
Height 812.331 sft
Point U2579B-2 GPS
Latitude 36°08'46.36004"N
Longitude 80°09'22.53339"W
Height 803.624sft
Point U2579B-3 GPS
Latitude 36°07'48.69349"N
Longitude 80°07'40.32920"W
Height 840.897sft
Point U2579B-4 GPS
Latitude 36°07'42.35263"N
Longitude 80°07'51.71822"W
Height 839.746sft
Point U2579B-5 GPS
Latitude 36°06'41.70853"N
Longitude 80°06'24.95413"W
Height 812.800sft
Point U2579B-6 GPS
Latitude 36°06'42.50385"N
Longitude 80°06'39.75439"W
Height 785.713sft
Point U2579B-7 GPS
Latitude 36°06'45.74473"N
Longitude 80°07'40.02458"W
Height 786.818sft
Point U2579B-8 GPS
Latitude 36°06'46.90138"N
Longitude 80°08'00.7171 1 "W
Height 778.296sft
Point U2579B-9 GPS
Latitude 36°06'49.78833"N
Longitude 80°08'55.41020"W
Height 714.479sft
Point U2579B-10 GPS
Latitude 36°06'50.58887"N
Longitude 80°09'10.54199"W
Height 729.478sft
Point BL-21 GPS
Latitude 36°06' 13.76877"N
Longitude 80°08'00.73239"W
Height 800.390sft
Point U2579AB-1 GPS
Latitude 36°05'35.79056"N
Longitude 80°08'08.30858"W
Height 832.735sft
Point Residuals
WGS84 Coordinates Calculated point
FOR DISPLAY ONLY Local Coordinates
Northing 875565.201 sft
Easting 1659876.674sft
Elevation 919.540sft
Horz error 0.068sft
Vert error 0.010sft
3D error 0.069sft
Northing 874112.260sft
Eastin� 1658607.033sft
Elevation 910.820sft
Horz error 0.075sft
Vert error 0.060sft
3D error 0.096sft
Northing 868184.488sft
Easting 1666923.146sft
Elevation 947.570sft
Horz error 0.108sft
Vert error 0.050sft
3D error 0.120sft
Northing 867553.926sft
Easting 1665981.571 sft
Elevation 946.428sft
Horz error 0.137sft
Vert error 0.072sft
3D error 0.155sft
Northing 861341.303sft
Easting 1673030.811sft
Elevation 918.962sft
Horz error 0.045sft
Vert error 0.062sft
3D error 0.077sft
Northing 861435.294sft
Easting 1671817.327sft
Elevation 891.926sft
Horz error 0.089sft
Vert error 0.076sft
3D error 0.117sft
Northing 861818.786sft
Easting 1666875.807sft
Elevation 893.236sft
Horz error 0.063sft
Vert error 0.064sft
3D error 0.090sft
Northing 861955.088sft
Easting 1665179.317sft
Elevation 884.783sft
Horz error 0.101 sft
Vert error 0.067sft
3D error 0.122sft
Northing 862298.609sft
Easting 1660695.139sft
Elevation 821.142sft
Horz error 0.071 sft
Vert error 0.088sft
3D error 0.113sft
Northing 862393.955sft
Easting 1659454.533sft
Elevation 836.189sft
Horz error 0.074sft
Vert error 0.119sft
3D error 0.140sft
Northing 858604.732sft
Easting 1665139.800sft
Elevation 906.741 sft
Horz error 0.049sft
Vert error 0.001 sft
3D error 0.049sft
Northing 854771.500sft
Easting 1664474.164sft
Elevation 938.953sft
Horz error 0.041 sft
Vert error 0.013sft
3D error 0.044sft
PROJECT REFERENCE NO. SHEET NO.
U-2579B 1D
Location and Survevs
Point U2579B-1 LOCAL
Northing 875565.142sft
Eastin� 1659876.641 sft
Elevation 919.530sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-2 LOCAL
Northing 874112.277sft
Easting 1658607.106sft
Elevation 910.760sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-3 LOCAL
Northing 868184.593sft
Easting 1666923.175sft
Elevation 947.620sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-4 LOCAL
Northing 867554.058sft
Easting 1665981.533sft
Elevation 946.500sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-5 LOCAL
Northing 861341.266sft
Easting 1673030.785sft
Elevation 918.900sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-6 LOCAL
Northing 861435.209sft
Easting 1671817.303sft
Elevation 891.850sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-7 LOCAL
Northing 861818.742sft
Easting 1666875.763sft
Elevation 893.300sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-8 LOCAL
Northing 861955.185sft
Easting 1665179.344sft
Elevation 884.850sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-9 LOCAL
Northing 862298.542sft
Easting 1660695.161 sft
Elevation 821.230sft
Utilized Horz and Vert
Quality Survey quality
Point U2579B-10 LOCAL
Northing 862393.881sft
Easting 1659454.537sft
Elevation 836.070sft
Utilized Horz and Vert
Quality Survey quality
Point BL-21
Northing 858604.777sft
Easting 1665139.780sft
Elevation 906.740sft
Utilized Horz and Vert
Quality Survey quality
Point U2579AB-1 Local
Northing 854771.471 sft
Easting 1664474.194sft
Elevation 938.940sft
Utilized Horz and Vert
Quality Survey quality
B�
POINT DESCa NORTH
13 B�-13 87448�05922
2 U2579B-2 8741120277(�
14 B�-14 8738130187(�
15 B�-15 8735�5031��
16 B�-16 8733410�28�
1 7 B� — 17 87318�J o 1 78�1
18 B�-18 872875075�(�
1� B�-1� 8725580�16(�
2(� B� — 2(� 872234 0 768�
21 B�-21 872�6807�4(�
22 B� — 22 87192 J o(�36(�
23 B�-23 8718360819(�
24 B�-24 8716340453(�
25 BL-25 871468o812QJ
26 B�-26 871276o�54�J
27 BL-27 87111�o�44�J
28 B�-28 871�310(�73�
29 B�-29 87Q1857o486P
3(� BL — 3f� 87�57� 0 1 13(�
31 B�-31 87�4230��5�
32 B�-32 87(�23�o724P
33 B�-33 87�1260815�
34 B�-34 86�934o3�5QJ
35 B�-35 86�4780431(�
36 B�-36 86�1350�94(�
37 B�-37 8686670175�
38 B�-38 868112028�(�
3� B�-3� 8677410422(�
4f� B� — 4�1 8672�7 0 182(�
41 B�-41 8663690224�
42 B�-42 86554�0711(�
43 B�-43 865�2�o177�J
44 BL-44 8643470185�
45 B�-45 864���0888(�
46 B�-46 863878o87PJ�
47 B� — 47 8637(�8 0 71 7�J
48 B�-48 86342�0465(�
4� B�-49 8629560626�
5(� B� — 5(� 862783 0 552�
51 BL-51 8625780831�
52 B�-52 861914013�(�
53 B�-53 8614720328�
54 B�-54 86�9(�60�53�
55 B�-55 86�165�01377
56 B�-56 86P�35o6198
57 B�-57 85�69607794
58 B�-58 85945205755
5� B�-5� 85�16606533
6(� B�-6� 85877304176
61 B�-61 85826�02881
62 B�-62 85792103035
NOTES:
S UR VEY C01�TROL
ERST ELEVRTION � STRTION
1657767 a 3f�61 859 0 16 473 � 26 o f�6
16586�7a1(�6� �1�a76 482�350�2
165886�a382� �33a23 486��6078
16592��a912�1 �43a67 49��18063
1659648a915PJ �11o4f� 495�25038
165���1a439� �2205(� 4�8�25018
166�386a837� 8�6a12 5�3��80(�8
166PJ�22a863PJ 898e68 51��2Po70
1661459 a 262(� �4PJ e 28 516 � 47 0 44
1661733a881PJ �17022 51��68036
1661�78a287� 887a72 522�54043
1662112a561PJ 894a62 524�12o4PJ
1662451 a 822PJ 881 a 2(� 528 � PJ7 0 4 1
166271�a267�1 �140�4 531�210��
1663 J53 a 235� �38 0 3(� 535 ��7 0(�3
16633�2a1���J �24a41 538�(�1032
1663445a946PJ �18a87 53��7�032
1663735a174� ��4058 543�PJ7o62
166414(�a�28� �25042 547���082
1664375 a 8(�2� ��6 e 31 55f� � 8P o 31
1664583a718PJ 889e�5 553�63034
1664746a5(�8PJ 8690�3 555�52072
166488(� a 8(�9(� 847 0 26 557 � 82 0��
1665275a8�1� 877a45 563�86o�J
1665515 a 977�1 887 a 3� 568 � PJ6 0 44
1665805a7370J ��1081 573�57069
1665�76a�62� �3607� 57��360�0
1666381a6�4� �45a66 584�21042
1665�46 a 135PJ �55 e 28 587 � 33 o PJ 1
16661 33 a 163(� 943 e 06 597 � 43 0 94
1666485 a 142PJ 8�� 0 27 6�6 �(��J o(�5
1666467a869� 877026 611�11087
166647PJa�43PJ 852e86 617��303�
1666471 a PJ88(� 839 a 68 62(� � 4P o(�5
166647�J a 1���1 861 0 93 622 � 6Ql 0 26
1666437a261� 862a94 624�31087
1666376a61�� 824a44 627�230��
1666344a959�J 832a85 631�88077
1666288a685(� 84802� 633�67062
1666211a537� 858044 635�81061
166637�a852� 8�3a6� 642��806�
1666P6�a6751 �25a28 646��907�
1666�J66 a 1526 �334 0 37 652 � 51 0 91
1665��3a7797 �1�08� 655�38058
166575�a2873 872a�9 661�690�9
1665682a72�7 865a82 665�1606�
1665636a2271 84PJa15 667�6Po65
166557(� a 3378 87f� 0 5� 67� � 44 0�5
1665478a8(�68 892a61 674�2404�
1665453a6752 �35e33 678�42046
16653(� 1 a 1 74(� �21 e 71 682 � 14 0 73
1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN
(HIGH ACCURACY REFERENCE NETWORK) NAD 83✓95 ADJUSTMENT. THIS CALIBRATION
WILL ALLOW THE END USER TO WORKWITHIN THE SAME COORDINATE SYSTEM WHEN
USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER
SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES
MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES.
2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTP://WWW.NCDOT. ORG/DOH/PRECONSTR UCT/HIGHWAY/LOCATION/PROJECT/
THE FILES TO BE FO UND ARE AS FOLLOWS:
U2579B LS_GPSCALIB_071217.HTML
U2579B LS_WGS84_071217. TXT
U2579B LS LOCAL 071217.TXT
U2579B LS CONTROL 071217.TXT
THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE
THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT.IF FURTHER INFORMATION
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
BY�
POINT
411
522
523
BY1�J
POINT
524
525
412
526
527
BY 10JC
POINT
528
413
OFFSET
�Je PJ7 LT
121o4�J LT
2a 6� RT
7a 3� RT
4aPJ4 LT
3 a �7 RT
11a 17 RT
3a 6PJ RT
2a (�8 RT
1 a 4(� RT
1a53 RT
2a 93 RT
f�a 3� �T
2038 RT
7a �8 LT
2018 �T
f�o87 �T
20 91 LT
30 22 RT
16a �7 LT
4a 52 LT
38a 6� �T
3a 15 RT
4a �8 RT
1(�a8� RT
3a 98 RT
88031 RT
165a 32 �T
376a 5� RT
345a57 RT
(�a 35 RT
1 a 17 RT
23a 83 �T
33a 98 �T
45e 16 LT
23a 63 �T
13057 RT
3a PJ3 �T
31 a 5� RT
8(� a 3� RT
1�2a 4� LT
26a 15 RT
95a PJ7 �T
5a 61 RT
7 a 4(� RT
12a 37 LT
5(�a 7� �T
1�1067 LT
1 �� a 3� �T
444a 74 LT
512a 82 �T
FI1�lAL
SHEET U-2� 79B
BY1
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
5P� BY1-5�� 87642�o863J 166�6P�o34��
40�J U258�B-1 87556501420 16598760641�
5�1 BY1-5�1 874918o7�4P 165934Po202�
4�1 U257�B-2 8741120277� 165860701�6�
5J2 BY1-5�2 873�450712� 165772103�9�
503 BY1-5�3 8721300203� 1657PJ(�7o�34�
BY2
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
504 BY2-504 8739700837� 1659�P4o2PJ�0
402 B�-15 8735�5o31PJ0 16592�90912�
5J5 BY2-5�5 872636o688J 165835�0��8�
5P6 BY2-5P6 8724�207�6� 165737205�7�
BY3
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
507 BY3-5�7 873877o61�JP 1662PJ29o337�
508 BY3-5�8 8726310211� 16618560227�
4�3 B�-2� 8722340768� 166145�0262�
5P� BY3-5�� 871757o691PJ 166�8880535�
51PJ BY3-51PJ 87PJ936o296PJ 166�56�0765�
BY3B
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
511 BY3B-511 8715240�94� 166�8440577�
429 BY3-5�9 871757o691QJ 166(�8880535�
BY4
POINT
512
513
405
514
DESCo NORTH EqST
BY4-512 8735(�60��8� 16624J�o855�
BY4-513 87214�o41�P 1663143o486P
B�-26 8712760�540 1663PJ53o235�
BY4-514 87072305810 16631840393�
BY5
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
515 BY5-515 8702610111� 1664��40��6�
4�6 B�-31 870423o��5J 166437508�2�
516 BY5-516 870477021�0 1664PJ8�o717�
BY6
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
517 BY6-517 86�2�904550 16657820315�
407 B�-37 868667o175P 16658�50737�
BY7
POINT DESCo NORTH EqST
———————————— ———————————————— ———————————————— ————————————————
518 BY7-518 868682e7��1� 166745�0811�
4�8 U257�B-3 8681840593� 1666�230175�
40� B�-3� 867741o422PJ 1666381o6�J4�
519 BY7-519 8675�30�21� 16655300141�
52� BY7-52f� 8676710��1� 1664�6205�1�
BY8
POINT DESCo NORTH ERST
———————————— ———————————————— ———————————————— ————————————————
41� BY7-52f� 867671o(��1P 1664�6205�1�
521 BY8-521 86�24�o182�J 1664��60618�
DESCo NORTH E�ST
BL-39 8677410422(� 1666381o6�4�J
BY�-522 8672�1oPJ23� 1665364o118P
BY�-523 867�6�0(�16(� 166485�0514�
DESCo NORTH E�ST
BY1�-524 868746066�� 1668213o�J31(�
BY1�-525 8681540395� 1667362o293P
B�-39 8677410422(� 166638106�4�
BY1�-526 867154o532�J 1665453016��
BY1�-527 8669840815� 1664726o�8PJJ
DESCo NORTH E�ST
BY1�C-528 867�580257� 1667�3�o311P
B�-39 867741o422f� 1666381o6�4P
E�EVRTION SRR STF�TION OFFSET
945066 33�47027 17e73 LT
946089 44�98038 11o2PJ �T
9420 (�1 5�� 180 56 1�0 6PJ �T
E�EVRTION Y3 ST�TION OFFSET
95�036 OUTSIDE PROJECT �IMITS
94�o3�J 1��36029 56a31 �T
945066 2��94083 52029 RT
�4�064 31�89063 21048 �T
9390(�5 39�3203� 18031 �T
E�EVRTION � ST�TION OFFSET
93�0�5 584�15047 857a82 �T
945066 584�21042 165032 �T
NO TE: DRAWING NO T T O SCALE
PROJECT REFERENCE NO. SHEET NO.
U-2579B 1 E
Location and Survevs
ELEVqTION Y1 STRTION OFFSET
———————————————— ———————————————— ————————————————
�4603� OUTSIDE PROJECT �IMITS
919053 13�57a45 24a24 LT
893o P7 21 �97a 42 4�a 83 �T
�1�076 32�86076 3062 LT
8��065 46�73025 2a6�J �T
88� 0 69 58 � 33 a 62 2f� a 74 LT
ELEVRTION L STRTION OFFSET
———————————————— ———————————————— ————————————————
946014 494�16e98 674aPJ7 LT
943 0 67 49PJ � 18 0 63 7 a 39 RT
�1403� 487�82031 1272a6� RT
8650�� 48PJ�2�a88 1��3072 RT
ELEVRTION Y2 STRTION OFFSET
———————————————— ———————————————— ————————————————
955077 OUTSIDE PROJECT �IMITS
942011 14�64015 37a15 �T
�4�028 2��1701� 15a�8 LT
�43 0 28 27 � 57 0 36 22 a�7 RT
939083 OUTSIDE PROJECT �IMITS
ELEVRTION Y2 STRTION OFFSET
———————————————— ———————————————— ————————————————
941 0 06 29 � 86 e 66 4f� a 2� �T
943 0 28 27 � 57 0 36 22 a�7 RT
ELEVRTION L STRTION OFFSET
�4�043 517�9�023 1578a72 �T
�25025 531�35a78 7�1a86 �T
�38 0 3� 535 � PJ7 e�3 7 a PJ8 �T
925015 539��6a47 397073 RT
ELEVRTION L STRTION OFFSET
———————————————— ———————————————— ————————————————
859034 556�34062 3�7e43 LT
�(�6 0 31 55� � 8P o 31 16 a�7 LT
�1706� 548�11a5� 121aPJ(� RT
ELEVRTION L STRTION OFFSET
———————————————— ———————————————— ————————————————
904012 568�17a44 3�1a88 �T
�P1o81 573�5706� 3a�8 RT
ELEVRTION Y2R ST�TION OFFSET
———————————————— ———————————————— ————————————————
�56027 OUTSIDE PROJECT �IMITS
947062 OUTSIDE PROJECT �IMITS
�45066 16�69e77 85a23 LT
937099 25�24a97 2609� �T
�24054 OUTSIDE PROJECT �IMITS
ELEVRTION L STRTION OFFSET
———————————————— ———————————————— ————————————————
�24054 57��61051 1193a55 RT
��J5o�1 563��6a28 365a28 RT
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE P�ANE COORDINATES ESTAB�ISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1 " TO -L- STAT I ON 478+00. 00 I S
S 71°38'00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
S UR VEY C01�TROL
BY1�D
POINT DESCo NORTH ERST E�EV�TION L STRTION OFFSET FIl tAL
529 BYIPJD-529 86689PJa760PJ 1665115o8f�1� 946098 589�7PJo43 1278a65 RT
414 BY1QJ-526 867154o532QJ 1665453o169f� �49064 587�49064 889a57 RT
BY11
POINT
531
53�
415
BY12
POINT
532
416
533
BY13
POINT
417
534
535
537
BY14
POINT
418
536
BY15
POINT
419
538
539
54�
541
542
42�
BY15q
POINT
421
543
BY15B
POINT
422
544
BY16
POINT
5
6
545
546
547
7
133
8
548
549
55�
551
9
1 �l
BY17
POINT
552
553
554
423
555
556
557
558
559
56�
561
DESCa NORTH ERST
BY11-531 8644670453� 1666��40169(�
BY11-53� 8643180�23� 16666�1o�32f�
B� — 44 864347 a 185PJ 166647PJ o�43f�
DESCa NORTH ERST
BY12-532 863832e542(� 16668�80194�
B�-46 863878087�� 166647�Jo1��PJ
BY12-533 8638�20738� 1666255066�(�
DESCo NORTH ERST
B�-4� 862956e626� 16663440�5�(�
BY 13 — 534 863�J85 a 979PJ 1666097 0 1 f��f�
BY13-535 863�36o934PJ 16657640292(�
BY13-537 86284708�8� 1665373o62��J
DESCa NORTH E�1ST
B�-51 8625780831� 16662110537�
BY14-536 86262�a463�1 166576PJo396f�
DESCo NORTH ERST
BY13-537 862847e8�8PJ 1665373062(�(�
BY15-538 862f�13o448� 1665775o638f�
BY15-53� 862(�480547� 16652850327(�
BY15-54� 862136a111� 16645230522(�
BY15-541 862159e989PJ 1663843o�J32(�
BY15-542 86227405570 166276�054(�(�
BY17-55� 86226�Jo343� 16625280131(�
DESCo NORTH EqST
BY15-54� 8621360111� 16645230522�
BY 15�1— 543 862241 a PJ40�J 16643PJ 1 o PJ87f�
DESCo NORTH ERST
BY15-542 862274e557PJ 166276�0540(�
BY 15B — 544 862261 0 71 70 1663673 0 7Q19(�
DESCa NORTH ERST
U257�B-5 8613410266� 1673�3(�0785(�
U257�B-6 86143502��� 167181703�3�
BY16-545 861531e567PJ 167f�683o488f�
BY16-546 861616a846PJ 166�575o741f�
BY16-547 861728o735f� 166813�0465(�
U257�B-7 8618180742� 16668750763�
B� — 52 861914 e 13�JPJ 166637� 0 852f�
U2579B-8 861955o185PJ 166517�0344(�
BY16-548 862�360734� 16641650123�
BY16-549 8621520442� 166328�01�3(�
BY16-55PJ 862172a845� 16623��06�4(�
BY16-551 862249a�87PJ 16614140278(�
U2579B-9 862298o542PJ 166�16950161�
U257�B-1� 8623930881� 165�454o537f�
DESCo NORTH EqST
BY17-552 86�34605342 1667�550871�
BY17-553 86PJ538a5346 16674210676�
BY17-554 86(�684a2�84 1666736055�4
B�-54 86���6e953� 1666�6601526
BY17-555 861PJ��o6�1� 16653740558�
BY17-556 861259e36�PJ 166417�o768f�
BY17-557 861349a176PJ 16634330492�
BY 17 — 558 861624 0 98�f� 166281 1 o f��14(�
BY17-55� 86226�0343� 16625280131(�
BY17-56� 86258�e582� 1662386o365f�
BY17-561 86287�o8�6PJ 16621(�30327(�
E�EV�TION L STRTION OFFSET
883083 616�5�028 452096 �T
862075 618�180�3 154a83 �T
852a86 617��303� 23083 �T
E�EV�TION L STRTION OFFSET
876052 622�79068 475021 �T
8610�3 622�6�026 45016 LT
857073 623�5�031 164a�5 RT
E�EV�TION L STRTION OFFSET
832085 631�88077 3a�3 �T
851098 63��87091 258e�3 RT
869064 631�76097 5830�5 RT
��5034 634�24074 �47015 RT
E�EVRTION L STRTION OFFSET
858044 635�81061 8�a3� RT
88�a62 635��5078 5340�7 RT
E�EV�TION Y4WB ST�TION OFFSET
�05034 1P��02o94 878a7� RT
889041 95�37057 77095 RT
�J�o48 1���2�012 750�� RT
872027 1�7��5042 1�3a37 RT
�07062 114�75072 74a53 RT
895075 125�54085 10507(� RT
8�8066 127��4044 72085 RT
E�EV�TION Y4WB ST�TION OFFSET
872 0 27 1 f�7 ��5 0 42 1�3 a 37 RT
887e99 11��25o3PJ 19�a77 RT
E�EV�TION Y4WB ST�TION OFFSET
895075 125�54085 105o7PJ RT
�080�6 116�52o4f� 162085 RT
E�EVqTION Y4WB STqTION OFFSET
�180�� 22�52016 3PJo91 LT
8�1085 34�6�027 31013 �T
86�o5PJ 46�P7o14 22a78 �T
85(� 0 59 57 � 18 0 17 23 0 46 �T
875065 71�67077 23073 LT
8�303� 84�25067 31a�6 �T
89306� 89�27048 25a67 RT
884085 101�27056 26028 �T
88�003 111�450�5 23044 LT
8�5045 12��27031 24015 RT
872067 129�24o7PJ 25a�2 �T
832076 139�040�8 24055 �T
821023 146�24087 3�Jo88 �T
8360�7 OUTSIDE PROJECT �IMITS
E�EV�TION Y5 STqTION OFFSET
�29051 OUTSIDE PROJECT �IMITS
9350�4 13�51o5PJ 25a23 RT
�41016 2��50042 21021 �T
�34037 27�550�6 260�7 RT
�230�8 34�51021 18022 �T
�2701(� OUTSIDE PROJECT �IMITS
�14o7PJ OUTSIDE PROJECT �IMITS
8��076 OUTSIDE PROJECT �IMITS
8�8066 OUTSIDE PROJECT �IMITS
881081 OUTSIDE PROJECT �IMITS
855077 OUTSIDE PROJECT �IMITS
SHEET U-2� 79B
BY18
POINT DESCo
424 BY17-553
562 BY18-562
563 BY18-563
564 BY18-564
NORTH
86�J538 0 5346
86�88504838
86141406149
861 426 0 (�247
PROJECT REFERENCE NO. SHEET NO.
U-2 579 B 1 F
Location and Survevs
ERST ELEVRTION Y5 STRTION OFFSET
166742106769 9350�4 13�51o5P 25023 RT
166740408146 937071 14�62027 354046 RT
166751007937 898033 15��4048 8�2044 RT
16682J7o�326 87�086 OUTSIDE PROJECT �IMITS
BY18R
POINT DESCo NORTH ERST ELEVRTION Y5 STRTION OFFSET
———————————— ———————————————— ———————————————— ———————————————— ———————————————— ———————————————— ————————————————
425 BY18-562 86P885o4838 16674�408146 937071 14�62027 354046 RT
565 BY18R-565 861�(�307781 16674990031� 926065 14�PJ3o85 4�3095 RT
BY19
POINT DESCo NORTH E�1ST E�EVRTION � STRTION OFFSET
———————————— ———————————————— ———————————————— ———————————————— ———————————————— ———————————————— ————————————————
566 BY19-566 860784of�11� 166425102450 9PJ5o20 657�78053 1646010 RT
426 BY17-556 86125�036�� 16641790768� 92701�1 653�3102� 1822031 RT
BY2�
POINT DESCo NORTH ERST ELEVRTION � STRTION OFFSET
———————————— ———————————————— ———————————————— ———————————————— ———————————————— ———————————————— ————————————————
427 BY17-556 86125�o36�J 16641790768� 927010 653�3102� 1822031 RT
567 BY20-567 861723o(�S�P 1663�5�0216� 91301� 64��240�2 2141015 RT
BY21
POINT DESCo NORTH ERST ELEVRTION Y4EB STRTION OFFSET
———————————— ———————————————— ———————————————— ———————————————— ———————————————— ———————————————— ————————————————
568 BY21-568 861499o755�J 16624840696� 8680�1 127�78o�PJ 634082 �T
428 BY17-558 861624o�8�P 1662811o�PJ4� 8�9076 124�63026 484073 �T
���**������*������������������*���������
BM#1 E�EVRTION = 884a23
R/R SPIKE SET IN BRSE OF 18" ORK9
27' OFF OF WEST EP OF O�D BELEWS
CREEK RDo
N 872364 E 1656715
Y1 STRTION 58�42 354 RIGHT
���������������*��,�����������*���*�����
����������������*��*��������*���*����*��
BM#2 E�EVqTION = 942032
R/R SPIKE SET IN ROOT OF 28° FORKED
MRPLE 17' OFF OF NORTH EP OF US-158
N 876236 E 166PJ36�
Y1 STRTION 1��PJ�
N 35° 38' 3402" E DIST 468059
���*����������*,��,�*�����,�*�����������
����*�**��*�**�*�**���*�������***���*���
BM#3 E�EVRTION = �5304�
R/R SPIKE SET IN CONCo CURB RND
GUTTER RT ENTRRNCE TO GOSPE�
�IGHT BRPTIST CHURCH 14' OFF OF
WEST EP OF WR�KERTOWN—GUTHRIE RDo
N 873632 E 1661924
� STRTION 513�19 1433 �EFT
��������������**��*������������*����*���
�**����*������������������*������*�����*
BM#4 E�EVRTION = 935a13
R/R SPIKE SET IN BRSE OF 24' 0(K
12' OFF OF WEST EP OF MORRIS RDa
N 872942 E 1662678
� STRTION 523�22 1235 �EFT
����������������������������������������
���������������������*��*�*�������������
BM#5 E�EVqTION = 866068
R/R SPIKE SET IN BRSE OF 42" FORKED
ORK 1�' OFF OF NORTH EP OF WESTN
�RKE TRRI�
N 87�288 E 1665137
� STRTION 557�12 427 LEFT
����������������������������������������
�****����*��****��*�**�*�**�*��**�*��*�*
BM#6 E�EVRTION = ���049
R/R SPIKE SET IN B�1SE OF 18" ORK
38' OFF OF NORTH EP OF ROBBINS
PERCH TRRI�
N 86�271 E 1665�48
L STRTION 564�11 311 RIGHT
*****�����***��*�****�*��**�**�*****�***
*���������������������*���*�����������*�
BM#8 E�EVRTION = 881042
R/R SPIKE SET IN BRSE OF 24" BURCH
24' OFF OF NORTH EP OF REGENTS PRRK RDo
N 864512 E 1666936
� STRTION 616�14 483 LEFT
�*��*�**��*����*�*��*.�����**��*�����*�*
NOTES:
����*��*���*���*��**������*���*�����*��,
BM#9 E�EVRTION = 8��076
R/R SPIKE SET IN P�VEMENT OF
RRCHEL STo —BY14— � INTERSECTION
OF GERRY RDo
N 8625f�(� E 1665571
� STF�T I ON 637 � 58 7(�2 R I GHT
���*������������������������������������
1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN
(HIGH ACCURACY REFERENCE NETWORK) NAD 83✓95 ADJUSTMENT. THIS CALIBRATION
WILL ALLOW THE END USER TO WORKWITHIN THE SAME COORDINATE SYSTEM WHEN
USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER
SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES
MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES.
2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTP://WWW.NCDOT.ORG/DOH/PRECONSTR UCT/HIGHWAY/LOCATION/PROJECT/
THE FILES TO BE FOUND ARE AS FOLLOWS:
U2579B LS_GPSCALIB_071217.HTML
U2579B LS_WGS84_071217.TXT
U2579B LS LOCAL_071217.TXT
U2579B LS CONTROL 071217.TXT
THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE
THE SITE CALIBRATION FOR THE END USER'S GPS EQUIPMENT.IF FURTHER INFORMATION
IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
��*�������������������������*����������� *���**������*�������������������*�����*�
BM#7 E�EVRTION = 956089 BM#1� ELEVRTION =�3508�
SE PRINTED BO�T IN R/R CROSS BRR R/R SPIKE SET IN ROOT OF 3�" WI��OW
ON WEST SIDE OF BRG�EY RDo � ORK 1(�' OFF OF E�1ST EP OF HRSTINS
INTERSECTION W/ WEST MOUNTRIN STo HI�� RDo
N 8682�5 E 16673�3 N 86�48� E 16676(�QJ
SRR ST�TION 22�73 21 RIGHT Y5 ST�TION 11�66 26 RIGHT
x x x X x Y��� x M% x X x� x x x x x x X� x X s x� x X x x x x Y x x x x k Y*% Y k% x x X x%% x M M M X x x k x M Y*%* k% x M* x M* M k x k Y
NO TE: DRAWING NO T T O SCALE
DATUM DESCRIPTION
THE LOCA�IZED COORDINATE SYSTEM DEVE�OPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTA� GROUND DISTANCE FROM
"U2579C-1 " TO -L- STAT I ON 478+00. 00 I S
S 71°38'00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICA� DATUM USED IS NAVD 88
16' 18'
6'
H N
Z�
�
Ov
ORIGINALI � o
G RO ? Z �
ORIGI�NAL ' � _
GROUND 4��
6:�
VARIABLE
SLOPE
6 :1
10'
H
13'
W/G R
�
,08 ,02
12'
4'
E-
FDPS �
T 6,� E3 �
INSET FOR LEFT TURN
-Yl- US 158 REIDSVILLE RD�
15' 15'
I
I
18' ' 12'
0.75' 0.�75'
GRADE �
POI NT I
R1 � R1
12'
�
,.�2
D5 1 8ir
TYP I CA
EOP
-Yl- �US 158 REIDSVILLE RD�
�
7 V'
� EOP
�, � �, 12' 12' 10' 3 0'
5 -�- 5 - - �-
�
0. 75' � 0. 75'
� GRADE
� PO I NT
R1 ,.�2 � .�2, R1
6" �I I� 6„
6„ 6„ 18ii
GRADE TO THIS LINE
L SECTION NO.
.•02 .02, PARTIAL TYPICAL SECTION N0.4A :
.:T � � � � � � � T.
USE IN CONJUNTION WITH N0.4
-Yl - STA. 21 + 71. 5 9 TO STA. 2 6+ 5 7. 71
PARTIAL TYPICAL SECTION NO. 4A
16'
6'
z�
� �
�
ORIGINAL w �
GRO ?,� Z o
O RI C1N�L_ = 4: �
GROUND 6: �
VARIABLE
SLOPE
18'
10'
H
13'
W/G R
VAR.
�
0'-12'
4'
�
FDPS
02
6 :� ,O$ ;
-
T 6„
12'
C3
,.02
13'
W/G R
4'
�
C3 FDPS
.02 , 02 .08
J
�
�6„
T
6�� ORIGINAL
VAR. G UND
?'I ORIGINAL
GROUND
USE TYPICAL SECTION NO. 4:
-Yl- STA. 21 + 71.59 TO STA. 32 + 69.50 +/- (BEG. APPR. SLAB)
-Yl- STA. 39 + 57.26 TO STA. 42 + 25.00
I NSET FOR DUAL LEFTS
-Yl- US 158 REIDSVILLE RD�
�
15' � 15'
VAR. �
28•5� VAR. � VAR.
TO 0'-12' � 0'-12'
0.75' , � �
0.75 �
R3 �
4.5' , . 02 � . 02 ,
• � ► �
GRADE
POI NT
L TYPICAL SE
PARTIAL TYPICAL SECTION NO. 5A:
USE IN CONJUNTION WITH T.S. NO. 5
-Yl - STA. 3 4+ 2 7. 2 6 TO STA. 3 9+ 5 7. 2 6
CTION NO. 5A
-Yl- �US 158 REIDSVILLE RD�
�
VARI ES 78'-90'
� EOP i EOP � � �
12 15� � 15� 12 12 10 3r�
MONO. CO'NC. ISLAND
VARIES 4.5' TO 28.5'
0.75' � 0.75'
� GRADE
R 3 � PO I NT
, . 02 � . 02 ,
� J 2 D5 18i� -� 8��
GRADE TO THIS LINE
3
TYPICAL SECTION NO. 5
.02 ,
4'
F S
H
13'
W/G R
�
.02.08
J2 D5 6" T
�
6�� ORIGINAL
VAR. G UND
?'I ORIGINAL
GROUND
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2 -B
HYDRAULICS
ENGINEER
l�]E�IEIL][�INAI�� l�]L�1�T�
�� N�°Il° US� ]F�R C�NSTRUC'1CI�N
USE TYPICAL SECTION NO. 5:
-Yl- STA. 32 +69.50+/- (BEG. APPR. SLAB)
TO STA. 3 9+ 5 7. 2 6
A1 13.5" JOINT CONC.
A2 VAR . JOINT CONC .
C1 1.25"SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I19.OB
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.OB
E2 4" B25.OB
E3 3" B25.00
E4 5. 5" B25 . OC
E5 7" B25.oC
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J1 6" ABC
J 2 s" aBc
J3 10" aBc
J4 4.25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R1 1'-6"CONC. C&G
R2 2' - 6"CONC . C&G
R3 5"MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
►�►► W E D G I N G
MSE
WALL
1. 5'
45.5'
���
�2'
12'
_ ...--- , �
--------�
I
9.5" � �
GRADE TO
THIS LINE
CROWN
POINT
ORIGINAL
GROI��
O RI G_��I.
16'
6'
Zcn
O�
� U
/ W �
` � O
2•J = �
GROUND 6; � 4: �
�
VARIABLE
SLOPE
PARTIAL TYPI CAL S ECTI O N N O. 3 OA
USE IN CONJUCTION WITH
TYPICAL SECTION NO. 30:
-Y3- STA. 21 + 03.71 +/- TO 24 + 32 .43 +/- LT.
1.5'
BRIDGE PIER
-Y2 A-
�%.Jr� I
4'
12'
I
i
D1 �
E2 C21
EXIST. �
-� ------ �
I
9.5" �
GRADE TO
�THIS LINE
CROWN
POINT
PARTIAL TYPICAL SECTION NO. 31A
USE IN CONJUCTION WITH
TYPICAL SECTION NO. 31:
-Y2A- STA. 17 + 47.09 +/- TO 19 + 13.54 +/- RT.
12'
8'
11'
VAR. �N�GR
0'-4'
FDPS
D1
• �_:
T
�
2 4'
12'
-Y3- �WEST MOUNTAIN RD�
12'
CROWN
C2 � POINT
� EXIST.
EXIST. ,
---------� -------
� „
9•5 �
GRADE TO
THIS LINE
8'
11�
W/G R VAR.
0'-4'
FDPS
�
.�$
T
TYPICAL SECTION NO. 30
USE TYPICAL SECTION NO. 30:
-Y3- STA. 18 + 2 5. 00 TO 2 6+ 2 5. 00
ORIGINAL
G RO 1�1��-
O RI G�N�1
GROUND
��%
6:�
�
VARIABLE
SLOPE
8'
��
MIN.
3 0'
6'
_�
9'
W/G R
4:� 08
�
T �
�
VAR.
ORIGINAL
G1�6UND
ORIGINAL
G OUND
CROWN
POINT
-Y3-
�
�
i
i 12' 8'
i
i
i
I
1C2 E2 �
� EXIST.
.
�--------
I �
� 9.5" �
GRADE TO
THIS LINE
1.5'
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
BRIDGE PIER
SHEET NO.
2-EA
HYDRAULICS
ENGINEER
l�l�]E][,���1�TA�� ]�]La�1�T�
➢)� N�T US]E F�fft �NSTIBUC'Il°I�N
PARTIAL TYPICAL SECTION NO. 30B
USE IN CONJUCTION WITH
TYPICAL SECTION NO. 30:
-Y3- STA. 21 + 84. 89 +/- TO 2 3+ 54.3 8+/- RT.
-Y2A- �PISGAH CHURCH RD�
I
i
2 4'
12' � 12'
I
i
i
' CROWN
D1 C2 I POINT D1
EXIST. I EXIST.
-------�-------`
------I -----
9 5" � E
) � �
GRADE TO
THIS LINE
6'
9
W/G R
1:
T
TYPICAL SECTION NO. 31
USE TYPICAL SECTION NO. 31:
-Y2A- STA. 16 + 00.00 TO 22 + 00.00
3 0'
�
VAR.
ORIGINAL
Gl�6UND
ORIGINAL
G OUND
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5�� I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I19.0B
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.OB
E2 4" B25.0B
E3 3" B25.00
E4 5. 5" B25 . OC
E5 7" B25.oC
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 6" ABC
J 2 s" ABC
J3 10" aBc
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R 1 1�- 6"CONC . C&G
R2 2' - 6"CONC . C&G
R3 5„MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
w WEDGING
•'
GROU
1 ��
VARIABLE
SLOPE
6'
O RI NAL
GROUND
ORIG NAL
GROU D
'1 �'1 I
30'
6 :1
VAR.
�•1
TYPICAL SE
vAR. -Y4EB-
� A/ A�/ I
2 0'-4"
PROP
NOISE
WALL
13'-9"
min.
12'-3"
PDF S
min
.04
�
ii
6" �� � 2
GRADE TO
THIS LINE
TYPICAL
CTI O N N O. 12A
USE TYPICAL SECTION NO. 12 B:
-Y4EB- STA. 130 + 26.37 TO 143 + 00.00 LT
(NOISEWALL -NWY42-)
7n�
SECTI
-Y4- �I-40 /US 421 BUSI N ESS�
N
N
-Y41IV B- VAR.
I � A� AA�
. 12
7n�
USE TYPICAL SECTION NO. 12:
-Y4- STA. 2 6+ 80.00 TO STA. 143 + 00.00
(-Y4 E 6- & -Y4 W B-)
GROUND
O RI I NAL
G OUND
NOTE: SEE TIP PROJECT U-2579G
RESURFACE EXISTING (CONSTRUCTED UNDER TIP PROJECT U-2579G)
-Y4- STA 127 + 93.50 (BEGIN WALL) TO STA 130 + 26.37 (END WALL) LT.
-Y4- STA 129 + 53.10 (BEGIN WALL) TO STA 131 + 63.57 (END WALL) RT.
2 0'4"
13'-9"
min
12'-3"
FD S
min
• 04
�
PROP
NOISE
WALL
ii
� 2 i i 6„
3 0'
6:�
/ � �J VAR.
— GRADE TO THIS LINE ?•�
TYPICAL SECTION NO. 12 B
USE TYPICAL SECTION NO. 12 B:
O RI NAL
GROUND
ORI INAL
G OUND
-Y4EB- STA. 63 + 43.06 TO 64 + 91.92 LT. (81 + 62.11 -Y4RPBD-)
(NOISEWALL -NWY4RPBD2-)
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2 -F
HYDRAULICS
ENGINEER
l�]E�IEIL][�INA\�� l�]L�1�T�
�� N�°Il° US� ]F�R C�NSTRUC'1CI�N
A1 13.5" JOINT CONC.
A2 VAR . JOINT CONC .
C1 1.25"SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.0B
D4 4" I19.0B
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E 1 3" B25 . OB
E2 4" B25.0B
E3 3" B25.00
E4 5. 5" 625 . OC
E5 �" B25 . oC
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 s" aBc
J 2 s" ABC
J 3 10" aBc
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R 1 1�- 6"CONC . C&G
R2 2' - 6"CONC . C&G
R3 5„MONO.CONC.ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
W WEDGING
3 0'
2 0'-4"
P R O P 13'-9"
NOISE min.
WALL 12,-3"
n FDPS
II min.
.04
�
ORI NAL 6'1 „ i i E5 D5 �
GROUND VAR. T 6 ��2
�•� GRADE TO THIS LINE
ORIG NAL
�Rou � TYPICAL SECTION NO. 21A
USE TYPICAL SECTION NO. 21A:
-Y4RPC- STA. 31 + 09.32 TO 33 + 89.86 LT (NOISEWALL -NWY41-)
10'
�
ZN
� ~
� �
V
� �
Z �
ORIGINAL = �
?'I
GRO 6. �
VARIABLE
SLOPE
3 0'
,
15' 12'
15' W/G R
10'
FDPS
�4 , 04
6 .1 � _
O RI I NAL
GROU D
ORI INAL
G RO D
-Y4 C D-
� VAR.
� ��-�2�
12' � 12'
C3
�02
12'
4'
FDPS
GRADE
PO I NT
. 02 , .� .�
6 :1
VAR.
�•,`
6 „ �'/ ►
8� VC T � 2�.5�� E4 J2 D5 6�� T
�
GRADE TO THIS LINE
22'-4„
PROP
NOISE
WALL
15'-9"
min
14'-3"
FDPS
min
.04
�
�R� N/��l 6�1 „ I I E4 D5 \
GROUND VAR. T 6 �r� J2
�•� GRADE TO THIS LINE
ORIG NAL
�Rou � TYPICAL SECTION NO. 22A
USE TYPICAL SECTION NO. 22A:
-Y4CD- STA. 19 + 22.07 TO 30 + 55.29 LT (13 + 73.64 -Y4RPA-)
(NOISEWALL -NWL3-)
10'
6:�
3 0'
46'
RAM P�-Y4 R P C-�
�
i
�2� �6' � 12' 15' 6' 10'
15' W/G R ,
12' j _ 4' Z N
4'
FDPS
GRADE
D4 POINT
,� OZ ,.�2
y I
T 6�� J3 17ii
GRADE TO
THIS LINE
4'
FDPS
C2
.�? .�8
�
6" I I � T
O �
°- U
W �
� O
Z �
= O RI NAl
�•,`
6� 1 G UND
6 :1
8' VC VARIABLE
SLOPE
TYPICAL SECTION NO. 21
� ��
6 :1
14'
12' 12'
FDPS
SEE TYPICAL SECTION NO. 1
FOR PAYMENT DESIGN
TYPICAL SECTION NO. 22
3 0'
2 0'-4"
PROP
NOISE
WALL
13'-9"
mm
12'-3"
FDPS
min
[c�c�1
ORI NAL 6'1 „ i i E4 D5 �
GROUND VAR. T 6 r�J2
�•� GRADE TO THIS LINE
ORIG NAL
�Rou o TYPICAL SECTION NO. 22 B
USE TYPICAL SECTION NO. 22B:
-Y4CD- STA. 67 + 87.59 TO 72 + 82.89 LT (NOISEWALL -NWCD2-)
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
USE TYPICAL SECTION NO. 21:
-Y4RPC- STA. 13 + 88.00 - 35 + 56.52
-L- �WINSTON-SALEM
NORTH ERN BELTWAY� �
3 6'
12'
12'
95'
12'
� FDPS
GRADE
PO I NT
11'
SHEET NO.
2 -/
HYDRAULICS
ENGINEER
]�][$]E]L��l[IN�I$� l�]LA�N�
II9� N�'d' US1E ]F� C�NSTRUC'J['I�N
USE TYPICAL SECTION NO. 22:
-Y4CD- STA. 19 + 22 .07 TO STA. 32 + 49.05 +/- (BEG. BR.)
-Y4CD- STA. 33 + 92.90 +/- (END BR.) TO STA. 45 + 76.53 +/- (BEG. BR.)
-Y4CD- STA. 47 + 84.70 +/- (END BR.) TO STA. 85 + 65.67
* PAVE TO FAC E O F G UARD RAI L
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.0B
D4 4" I19.0B
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.0B
E2 4" B25.OB
E3 3" B25 . oC
E4 5. 5" B25 . OC
E5 �" B25.00
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 s" ABc
J 2 s" aBc
J3 10" ABC
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R 1 ��- 6"CONC . C&G
R2 2' - 6"CONC . C&G
R3 5,�MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
W WEDGING
USE IN CONJUNCTION WITH T.S. NO. 22
FOR -Y4CD- MEDIAN GUARDRAIL LOCATIONS
RETAI N I N �
WALL
ORIGINAL
GROUND
3 5'
11_�_ 1$�
4'
FDPS
. .06 L
3� �
.
.06,
ORIGINAL
GR 2,�
ORI
GROUND 6: �
VARIABLE
-YSA- SLOPE
�
�
�
_-- ' �---------- __�
,, -
,-
.' T J 2 D 3
, u
i
,
' PARTIAL TYP I CAL
,
" SECTION N0.23A
USE IN CONJUNCTION WITH T.S. NO. 22
-Y5- STA. 59 + 25.00 TO 60 + 25.00
16'
6'
z�
O�
� U
ORIGINAL Z o
GR ?,� _
ORI� 4:1
GROUND (: �
VARIABLE
SLOPE
ORIG
GROU
) RI NAL
GROU D
?'I
�
�'�R.
6:j
18'
-YS- &-Y5A- �HASTI NGS H I LL RD�
�
VARI ES 24' - 36'
VARI ES VARI ES
8� 12� - 1 V�� 12� - 1 V� 8�
11' i 11'
W/G R � W/G R
I
4, I 4,
FDPS C2 � w � FDPS
D3 � D3
,08 .02 ,.02 � .02 , .� .08
�
T J 2 14�� GRADE T
� POI NT J 2
6�� GRADE TO 6„
THIS LINE
TYPICAL SECTION NO. 23
18'
6 :1
8'
H
»�
W/GR
.08 ,02
, -Y5- & -Y5A- �
VARI ES 2 4' - 3 6'
VARI ES � VARI ES
O�IGINAL
GROUND
O�IGINAL
GROUND
USE TYPICAL SECTION NO. 23:
-Y5- STA. 16 + 00.00 TO 17 + 50.00
-Y5- STA. 32 + 00.00 TO 33 + 30.00
-Y5A- STA. 54 + 00.00 TO 61 + 50.00
-Y5A- STA. 79 + 75 .00 TO 81 + 2 5.00
HASTI N GS H I LL RD�
12' - 18'! 12' - 18' 8' 3 0'
I ���
� W/G R
�
� I 4�
FDPS C2 I D3 FDPS
,.02 � .02, .02.08
�
14�i GRADE
PO I NT � 2
6" GRADE TO THIS LINE � 6"
TYPICAL SECTION NO. 24
3' g�
10'W/GR
3 :�
2'PS
.08 02
T 6„
11'
,.02
c
-Y5 D ET- �
�
3 8'
6:�
VAR.
ORIGINAL
-G�CS-U N D
ORIGINAL
G�CS-UND
USE TYPICAL SECTION NO. 24:
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2-J
HYDRAULICS
ENGINEER
]�][$lE]L��l[IN��� ][�]L�1�TS
�� N�T US1E F� C�NSTIBUC"d°I�N
A1 13.5" JOINT CONC.
A2 VAR . JOINT CONC .
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I19.OB
D5 4�� I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.OB
E2 4" 625 . oB
E3 3" B25 . oc
E4 5. 5" B25 . OC
E5 7" B25.00
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 6" ABC
J 2 s" ABC
J3 10" aBc
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R1 1'-6"CONC. C&G
R2 2' - 6"CONC . C&G
R3 5"MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
-Y5- STA. 17 + 50.00 TO 22 + 95.35 +/- (BEG. BR.) W WEDGING
-YS- STA 24 + 06.99 +/- (END BR.) TO 26 + 62.28 +/- ( BR.)
-Y5- STA. 30 + 97.13 +/- (END BR.) TO 32 + 00.00
-Y5A- STA. 61 +50.00 TO 66+78.58+/- (BEG. BR.)
-Y5A- STA 69 + 53.11 +/- (END BR.) TO 79 + 75.00
HASTI N GS H I LL RD D ETO U R�
i 11' � 8'
GRADE
PO I NT
.02,
� �>>"
GRADE TO
THIS LINE
�
10'W/G R
2' PS
•� � 08
6" T
TYPICAL SECTION NO. 25
oRi �
GROUND
O RI I NAL
GROUND
USE TYPICAL SECTION NO. 25:
-Y5DET.- STA. 10 + 00.00 TO 32 + 32.54
-Y4 W B-
VAR. 2 4' - 3 6'
12'
� GRADE
� PO I NT
.02,
------�
_ - - ."
GRADE TO THIS LINE
%
12'
VAR.
12' 0'-12' 10'
FDPS
.�2,
[�
�
STRE�►M
�
3'
* VAR.
16.075 to
28.446
-, \
J2 �'� E5 E7
`� _ _ T
ORIGINAL ---____
GROUND
�
RETAI N I N G WALL
STREAM
� � /_ - '
� I_/
RETAI N I N G WALL D ETAI L 1:
-Y4WB- FROM STA. 50 + 50.00 TO STA. 55 + 50.00
*-Y4W6- FROM STA. 64 + 11.04 TO STA. 64 + 58.33
ORIGINAL
G RO l��Rf 6
SHOU LDER BERM GUTTER LOCATIONS:
-L- FROM STA. 500 + 99.79 TO STA. 509 + 49.88 LT
-L- FROM STA. 501 + 50.00 TO STA. 510 + 35.00 RT
-L- F ROM STA. 521 + 50. 91 TO STA. 52 8+ 74.91 LT
-L- FROM STA. 522 + 00.00 TO STA. 528 + 46.90 RT
-L- FROM STA. 554 + 22.53 TO STA. 555 + 49.01 RT
-L- FROM STA. 604 + 99.94 TO STA. 607 + 18.45 LT
-L- FROM STA. 609 + 68.44 TO STA. 610 + 30.00 RT
-L- FROM STA. 626 + 34.75 TO STA. 626 + 87.06 RT
-L- FROM STA. 640 + 49.58 TO STA. 641 + 32.08 LT
-L- FROM STA. 640 + 50.42 TO STA. 641 + 54.76 RT
-L- FROM STA. 666 + 25.45 TO STA. 668 + 99.96 RT
-L- FROM STA. 686 + 49.89 TO STA. 692 + 33.01 RT
-L- FROM STA. 687 + 89.99 TO STA. 690 + 83.52 LT
�'I
�•
4 :1
2� � Li
V
08 ,.02
-Y4W B-
�
i_
� �2,
�
�
i
� GRADE
j POI NT
� .OZ
,
50.214'
12' 12'
10'
FDPS
R4
�3 n i �
i -----�
- -.,�,�„�/- - -�
GRADE TO THIS LINE
• 04
- �
14.214'
STRE�►M
?'I RETAI N I N G WALL
� E7 I
�� J2 �
� I
��� T �
ORIGINAL���� '
GROUND `� _ _ STREAM
� I /---
�- _/
RETAI N I N G WALL D ETAI L 2:
-Y4W6- FROM END OF RCBC (46 + 59.65) TO 47 + 75.00
-DR5- �WI LSON PROP. DRIVEWAY�
6' 2�
.02 , .08
_,
i
8 �� G RAID E
PO I NT
GRADE TO THIS LINE
USE TYPICAL SECTION NO. 32:
-DR5- STA. 10 + 00.00 TO STA. 22 + 96.07
TYPICAL SECTION NO. 32
-Yl- FROM STA. 18 + 49.91 TO STA. 24 + 00.00 LT
-Yl- FROM STA. 35 + 41.68 TO STA. 35 + 76.19 LT
-Yl- FROM STA. 41 + 29.69 TO STA. 42 + 50.00 LT
-Yl - F ROM STA. 2 2+ 74 . 5 5 TO STA. 2 8+ 10 . 00 RT
-Yl- FROM STA. 35 + 57.53 TO STA. 45 + 00.41 RT
-Y2- FROM STA. 18 + 60.62 TO STA. 18 + 99.02 RT
-Y2- FROM STA. 18 + 60.91 TO STA. 18 + 99.05 LT
-Y3- FROM STA. 20 + 70.00 TO STA. 21 + 04.07 LT
-Y4- FROM STA. 39 + 50.02 TO STA. 55 + 50.18 RT
-Y4- FROM STA. 40 + 99.99 TO STA. 45 + 99.99 LT
4:�
O IGINAL
GROUND
-Y4CD- FROM STA. 44 + 66.31 TO STA. 45 + 49.34 LT
-Y4CD- FROM STA. 92 + 56.00 TO STA. 95 + 50.15 LT
-Y4 RPA- F ROM STA. 10 + 00.00 TO STA. 15 + 34.3 8 LT
-Y4RPA- FROM STA. 19 + 26.35 TO STA. 24 + 49.37 LT
-Y4RPBD- FROM STA. 10 + 00.00 TO STA. 24 + 82.31 RT
-Y4RPBD- FROM STA. 42 + 25.35 TO STA. 42 + 86.34 LT
-Y4RPBD- FROM STA. 23 + 99.96 TO STA. 25 + 43.04 LT
-Y4RPBD- FROM STA. 54 + 90.96 TO STA. 55 + 20.43 LT
-Y5- FROM STA. 31 + 30.17 TO STA. 31 + 60.01 RT
-Y5- F ROM STA. 31 + 14 .4 8 TO STA. 31 + 5 9. 81 LT
-Y5A- FROM STA. 69 + 54.66 TO STA. 69 + 79.94
-Y5A- F ROM STA. 70 + 07. 94 TO STA. 70 + 16.9 7
EOP VAR VAR
VAR
FDPS
R4
vAR
T
J5
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2 -KA
HYDRAULICS
ENGINEER
����,������� ��.���
➢)� N�T US]E F�fft �NSTIBUC'Il°I�N
SEE TYPICALS
FOR FDPS
PAVEMENT DESIGN
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I19.OB
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.0B
E2 4" B25.0B
E3 3" B25 . oC
E4 5. 5" B25 . OC
E5 �" B25.oC
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 6" ABC
J 2 s" ABC
J3 10" ABC
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R � 1'_ 6„CONC . C&G
R2 2' - 6"CONC . C&G
R3 5„MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
W WEDGING
6:�
VAR. �
ORIGINAL
?.� GROUND
SHOULDER BERM GUTTER DETAIL
`�
r�s�r,
r��n
LAIi/1vL 1 V I I 11 aJ L 1 IV CJ
MEDIAN SHOULDER DRAIN WITH GUARDRAIL
TRAVEL LANE
.02
1
2'-p��
3'-6��
RECOMMENDED LOCATIONS:
STA. 542+00 TO 555+45 (LT, MEDIAN)
OUTLETS: 545+65 (2GI), 548+53 +/- (2GI),
551+00 (2GI), 554+22 (2GI)
STA. 558+30 TO 564+00 (LT MEDIAN
OUTLETS: 558+30 (2GI), 56�+50 (2G )
STA. 667+00 TO 679+00 (LT MEDIAN
OUTLETS: 669+65 (2GI) 67�+00 (2G )
673+22 +/- (�GI), 676+00 (�GI)
12'-p„
OUTSIDE SHOULDER
.04
STAB I L I ZED #5�
SUBGRADE E1 3'-0" STONE 1�_p" J4
C1 FABRIC �i
4" PERFORATED PIPE ��` �-��,
2'-0" _I_ 3'-0"
�T T �
1'-p��
SHOULDER DRAIN WITH GUARDRAIL DETAIL
RECOMMENDED LOCATIONS:
STA. 478+20 TO 484+35 (RT, OUTSIDE)
OUTLETS: 478+20 (2GI), 483+00 (2GI)
STA. 617+00 TO 626+00 (RT, OUTSIDE)
OUTLETS: 620+78 +/- 623+00
STA. 552+62. TO 554+20 (RT, OUTSIDE)
TRAVEL LANE
I�1
.02
2'-p�,
�
12'-p„
OUTSIDE SHOULDER
SSUBGRADED 3 0 #5�
E 1 r_ rr STONE 1,_ �„
C1 FABRIC �
4" PERFORATED PIPE 11_'-O��I
SHOULDER DRAIN WITH
.04
'�'
2'-4" _I_ 3'-p„
1'-p„
R4
� T
��� d A`,� ee L e o � Qe �— ---
°O � °.�s d°�
�
1'-p„
J5
SHOULDER BERM GUTTER & GUARDRAIL DETAIL
RECOMMENDED LOCATIONS:
STA. 501+50 TO 510+00 (RT, OUTSIDE)
OUTLETS: 501+50 (2GI), 504+85 (2GI), 507+00 (2GI)
STA. 558+30 TO 564+00 (RT, OUTSIDE)
OUTLETS: 558+30 (2GI), 560+50 (2GI)
STA. 667+00 TO 679+00 (RT, OUTSIDE)
OUTLETS: 671+00, 673+22 +/-(2GI), 676+00 (2GI)
STA. 522+00 TO 528+49 (RT, OUTSIDE)
OUTLETS: 525+50 (2GI), 528+45, (2GI)
STA. 554+20 TO 555+45 (RT, OUTSIDE)
OUTLETS: 554+22 (2GI)
TRAVEL LANE
1
.02
2'-p„
3'-6„
STABILIZED �-
SUBGRADE E1 3�-���
C1 FABRIC-
4" PERFORATED PIPE-
12'-p"
OUTSIDE SHOULDER
.04
�
PROJECT REFERENCE NO.
U —2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
lt" � 1Ls' lle 1l 1� 1l 1L 1�l !",i ��
➢)� N�T US]E F�fft �N
STA. 504+85 TO 510+37 (LT, OUTSIDE)
OUTLETS: 504+85 (2GI), 507+00 (2GI)
STA. 521+50 TO 528+75 (LT, OUTSIDE)
OUTLETS: 521+50, 525+50 (2GI), 528+75 (2GI)
�
1'-p„
SHOULDER DRAIN DETAIL
RECOMMENDED LOCATIONS:
STA. 486+55 TO 498+42 (RT, OUTSIDE)
OUTLETS: 486+55 (2GI), 490+75 (2GI),
494+75 (2GI)
STA. 512+00 TO 522+00 (RT, OUTSIDE)
OUTLETS: 515+30 (2GI), 520+50 (2GI)
STA. 528+49 TO 552+62 (RT, OUTSIDE)
OUTLETS:534+22 (2GI), 534+50 (2GI),538+00 (2GI),
539+72 (2GI),542+70 (2GI)545+63 (2GI),
548+53+/- (2GI), 551+00 (2GI)
T
STA. 478+20 TO 485+60 (LT, OUTSIDE)
OUTLETS: 478+20 (2GI), 483+39 (2GI)
STA. 487+50 TO 495+00 (LT, OUTSIDE)
OUTLETS: 487+50 (2GI), 490+75 (2GI)
STA. 510+37 TO 521+50 (LT, OUTSIDE)
OUTLETS: 513+00 , 516+00 (2GI),
520+00 (2GI), 521+50
STA. 528+75 TO 542+70 (LT, OUTSIDE)
OUTLETS: 528+75 (2GI), 534+50 (2GI),
539+72 (2GI), 542+70 (2GI)
STA. 617+00 TO 626+80 (LT, OUTSIDE)
OUTLETS: 620+75 +/- (3GI), 623+47 (2GI)
SHEET NO.
2 —KB
HYDRAULICS
ENGINEER
���1�I �
:UC'Il°I�N
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I19.OB
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.0B
E2 4" B25.0B
E3 3" B25 . oC
E4 5. 5" B25 . OC
E5 �" B25.oC
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 6" ABC
J 2 s" ABC
J3 10" ABC
J 4 4. 25" ABC
J 5 VAR. ABC
K SUBGRADE STAB.
P PRIME COAT
R � 1'_ 6„CONC . C&G
R2 2' - 6"CONC . C&G
R 3 5„MONO.CONC.ISLAND
R 4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
EXISTING PAVEMENT.
WEDGING
PAVEMENT SCHEDULE
A1 13.5" DOWELED JOINTED PORTLAND CEMENT CONCRETE PAVEMEN
A2 VAR. DEPTH DOWELED JOINTED PORTLAND CEMENT CONCRETE
PAVEMENT WITHOUT DOWELS AND A MINIMUM DEPTH OF 10.5"
PROP. APPROX. 1.25" ASPHALT CONCRETE SURFACE COURSE,
C1 TYPE SF9.5A AT AN AVERAGE RATE OF 137.5 LBS.PER SQ.YD.
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE
C2 S9.5B AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN
EACH OF TWO LAYERS.
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE
C3 S9.5C AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN
EACH OF TWO LAYERS.
PROP. VAR. DEPTH ASPHALT CONCFiETE SURFACE COURSE,
C4 TYPE S9.5B, AT AN AVERAGE RATE OF 112 LBS. PER SQ.YD.
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
2" IN DEPTH.
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE,
C5 TYPE S9.5C, AT AN AVERAGE RATE OF 112 LBS. PER SQ.YD.
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
2" IN DEPTH.
D1 PROP. APPROX. 2.5"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.OB, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
D2 PROP. APPROX. 2.5"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.00, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
D3 PROP. APPROX. 3.0"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.0B, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
D4 PROP. APPROX. 4"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
D5 PROP. APPROX. 4"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.00, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,
D6 TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN
2 1/2" IN DEPTH OR GREATER THAN 4" IN DEPTH.
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,
D7 TYPE I19.00, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN
2 1/2" IN DEPTH OR GREATER THAN 4" IN DEPTH.
E1 PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE
B25.0B AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
E2 PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE
B25.OB AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
E3 PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE
B25.00 AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
E4 PROP. APPROX. 5.5" ASPHALT CONCRETE BASE COURSE, TYPE
B25.00, AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD.
PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE
E5 B25.00 AT AN AVERAGE RATE OF 399 LBS. PER SQ. YD.
IN EACH OF TWO LAYERS.
ORIGINAL
10' 6' 18' 14'
�IC 17' W/G R
� 12'
o j PDPS
�U
w
t� �
z�
_
<' I
GROUND 6: �
VARIABLE
SLOPE
8� VC
6 :1
� _.04
T 1;
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE
E6 B25.OB, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PER 1" DEPTH TO BE PLACED IN LAYERS NOT LESS THAN
3" IN DEPTH OR GREATER THAN 5 1/2 " IN DEPTH.
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE
E 7 B25.00, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PER 1" DEPTH TO BE PLACED IN LAYERS NOT LESS THAN
3" IN DEPTH OR GREATER THAN 5 1/2 " IN DEPTH.
J1 PROP. 6" AGGREGATE BASE COURSE.
J 2 PROP. 8" AGGREGATE BASE COURSE.
J 3 PROP. 10" AGGREGATE BASE COURSE.
J 4 PROP. 4.25" AGGREGATE BASE COURSE.
J 5 PROP. VAR. DEPTH AGGREGATE BASE COURSE.
SUBBASE TO BE TREATED WITH LIME TO A DEPTH OF 6.5", AT
A RATE OF 21 LBS PER SQ YD AS DIRECTED BY THE ENGINEER.
OR
SUBBASE TO BE TREATED WITH CEMENT TO A DEPTH OF 6", AT
K A RATE OF 56 LBS PER SQYD AS DIRECTED BY THE ENGINEER.
OR
SUBBASE TO BE TREATED WITH AGGREGATE AT A RATE OF 250
LBS PER SQYD AND CEMENT AT A RATE OF 56 LBS PER SQYD TO
A DEPTH OF 6" AS DIRECTED BY THE ENGINEER.
P PRIME COAT
R1 1'-6"CONCRETE CURB AND GUTTER.
R2 2'-6"CONCRETE CURB AND GUTTER.
R3 5" MONOLITHIC CONCRETE ISLAND.
R4 SHOULDER BERM GUTTER
-� EARTH MATERIAL.
U EXISTING PAVEMENT.
W VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL)
NOTE: PAV. EDGES ARE 1:1 UNLESS SHOW OTHERWISE.
3 6'
12' 12' 12' 12'
FDPS
(FUT. LANE)
GRADE
POINT
A1
,.02 ,.02 �.02 .02,
... .. . . ... . o ..a. .....o. o....
o.
Q. '.p. 4 p .4� � p � '4� 4.Q. ' p: ' 4.Q. ' �p: ' 4.Q. ' �p: ''4.4
� C1
2' K
GRADE TO
�� 17.75�
THIS LINE
11'
6:�
E8
E9
S U RVEY
I
I
�
Detail Showing Method of Wedging
�- - - - - - - - - - - - - - - - - - - - - - !���� �. - - - - - - - - - - - - - - - - - -..._ .. - - J
U
Wedging Detail For Resurfacing
�c USE 4:1 CUT SLOPES
-L- STA. 513 + 50.00 TO STA. 520 + 50.00 RT
-L- STA. 514 + 00.00 TO STA. 519 + 50.00 LT
-L- STA. 530 + 50.00 TO STA. 538 + 50.00 LT
-L- STA. 542 + 00.00 TO STA. 554 + 00.00 RT
-L- STA. 547 + 00.00 TO STA. 552 + 50.00 LT
-L- STA. 670 + 50.00 TO STA. 685 + 50.00 RT
-L- �WINSTON-SALEM
�
i
�.�� � 36'
6 :1
12'
FDPS
(FUT. LANE)
GRADE
PO I NT
,.02
o:a:� o: o
/ I �
2� T T 2�
TYPICAL SECTION NO.
1
12' � 12'
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2
HYDRAULICS
ENGINEER
l�]E�IEIL][�INAI�� l�]L�1�T�
�� N�°Il° US� ]F�R C�NSTRUC'1CI�N
USE TYPICAL SECTION NO. 1:
-L- STA. 478 + 00.00 TO STA. 555 + 73.00 +/- (BEG. BR.)
-L- STA. 557 + 98.01 +/- (END BR.) TO STA. 582 + 85.67 +/- (BEG. BR.)
-L- STA. 585 + 60.73 +/- (END BR.) TO STA. 627 + 13.78 +/- (BEG. BR.)
-L- STA. 630 + 18.74 +/- (END BR.) TO STA. 641 + 70.82 +/- (BEG. BR.)
-L- STA. 643 + 82.64 +/- (END BR.) TO STA. 692 + 32.98
NORTHERN BELTWAY�
12'
A1
.02, .02, .02,
4� � . p . ' p: ' p . Q . ' p: ' p . ' �p: ' '4 .'Q . ' p:
_ 14'
17' W/G R
12'
PDPS
.04
�
�
J
J
LL
�
O
�
��
�
\7.75�� E1 C1 A2 T
� K 2� ��
GRADE TO THIS LINE
3 0'
6:�
VAR.
?'I
22,_4„
15'-9"
�
min.
14'-3"
PDPS
min
�
��
_` � �����������/// �
2, K (
�
G RAD E TO
�
6'-7"
P RO P
NOISE
WALL
, --
��
�� ,
4 �.1 � T
THIS LINE
TYPICAL SECTION
30'
RIGINAL
UND
GROUND
USE TYPICAL SECTION NO. lA:
-L- STA. 557 + 97.95 TO STA. 582 + 84.39 RT (NOISE WALL - NWLI)
-L- STA. 885 + 81.40 TO STA. 609 + 68.44 RT (NOISE WALL - NWL2)
-Y4CD- STA. 11 + 18.96 TO STA. 19 + 22.07 LT (NOISE WALL - NWL3)
ORIGINAL
G UND
� � � � �
� � .
� RI NAL
GROUND
O R._, � �
GROU
3 0'
b:l
VAR.
�•1
TYPICAL SE
2 0'-4"
PROP
NOISE
WALL
13'-9"
min
12'-3"
PDF S
min
.�
6�� �� J2 E4
� �
T �-
GRADE TO THIS LINE -
CTION N0.16A
USE TYPICAL SECTION NO. 16A:
-Y4RPA- STA. 19 + 26.04 TO 22 + 72.70 LT (NOISEWALL -NWY4RPA-)
-Y4RPA- STA. 13 + 73.64 (30 + 55.29 -Y4CD-) TO 15 + 36.20 LT (NOISEWALL -NWL3-)
10'
z
�
�
w
�
z
ORI INAL =
?'I
GROU D 6:�
VARIABLE
SLOPE
6'
15'
6 :1
8� VC
12'
E�
15'W/GR
4'
FDPS
.08 02
6 ►►
T
VAR.
�'-�Z�
c
, .02
ORI INAL
GROU D
O RI I NAL
GRO D
RAMP �-Y4 RPB D-�
� �2,
� **VAR 12'-24'
i
�
I
i GRADE
i POI NT
.02
.
' �20.5"
J2 �
,GRADE TO
THIS LINE
12'
� 15' W/G R �
Z
1��* �
FDPS W
�
z
_
.04, .04
TYPICAL SECTION NO. 17
J
J
�
�
�
6 ►►
T
3 0'
�
VAR.
�
3 0'
�
VAR.
?'I
USE TYPICAL SECTION NO. 17:
-Y4RPBD- STA. 15 + 65.91 TO 25 + 15.01 +/- (BEG. BR.)
-Y4RPBD- STA. 27 + 80.00 +/- (END. BR.) TO STA. 30 + 60.00
-Y4RPBD- STA. 66 + 11.85 TO STA. 81 + 62.11
* PAVE TO FACE OF GUARDRAIL
12'
� 15' W/G R
ZN
J
� � 10' *
W � FDPS
�O
z ,�
_
,04 ,.04
T 6 ►►
VAR.
0'-12'
GRADE
PO I NT
.02
�
RAM P (-Y4 R PA-)
� 12' 12'
� 15'W/G R
(C3
20.5�' '
E4 J2
GRADE TO,
THIS LINE
.02
,
0
4'
FDPS
.02 .08
- ,
6 ►►
T
TYPICAL SECTION NO. 16
15' � 6' � 10'
6:�
8' VC
USE TYPICAL SECTION NO. 16:
-Y4RPA- STA. 13 + 73.64 TO 16 + 44.34 +/- (BEG. BR.)
-Y4RPA- STA. 17 + 79.22 +/- (END BR.) TO 36 + 24.33
* PAVE TO FACE OF GUARDRAIL
O RI I NAL
GROUND
O RI NAL
GROUND
2 0'-4"
13'-9"
min
12'-3"
F PD S
min
• 04
�
Z
O
�
W
�
Z
_
PROP
NOISE
WALL
/ D5 � � �
E4 J2 � � 6��
�
GRADE TO THIS LINE
ORIGINAL
�'�
6 .� G F
VARIABLE
SLOPE
TYPICAL SECTION
UND
3 0'
6:�
VAR.
?'I
N O. 17A
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2 -G
HYDRAULICS
ENGINEER
���' ����N��� ��.�i N�
ID� N�'J[° USE F I8 C�NS'J[°IBUCTF�N
O RI NAL
GROUND
O RI I NAL
G OUND
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.0B
D4 4" I19.0B
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.oB
E2 4" B25.OB
E3 3" B25.00
E4 5. 5" B25 . OC
E5 �" B25.00
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 s" aBc
J 2 s" ABC
J3 10" aBc
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R 1 1'_ 6"CONC . C&G
R2 2' - 6"CONC . C&G
R3 5"MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
N► WEDGING
USE TYPICAL SECTION NO. 17A:
-Y4RPBD- STA. 70 + 23.32 TO 81 + 62.11 (NOISEWALL -NWY4RPBD2-)
10'
Z
O
�
W
�
z
ORIGINAL =
GROU
?'I
� 6:�
VARIABLE
SLOPE
�
U
�
O
6' � 15'
6 :1
8' VC
ORIGINAL
GROUND
O RI NAL
GROUND
12'
4:
4'
FDPS
C2
.� ; �2
T E1
6"
3 0'
6 :1
VAR.
�•,`
RA►MP �
�
I
12'
� 5'W/GR
ZN
OJ
��
w � 10' *
Z0 FDPS
�
= 4
04 ,.0
6 ►►
T '
12'
PO I NT
, .OZ
R�AMP �
.,.
PBD-�
-�- � 2 � -�-- � 2 � � 15'
(C3
� 2�.5��� J2 E4
GRADE TO �
THIS LINE
.02,
15'W/GR
4'
FDPS
.02 .08
�
� 6►► ..�(T
TYPICAL SECTION NO. 18
' � 10'
�
Z�
O�
�U
� �
Z � ORIGINAL
_ •1
6• 1 �.
6:� G OUND
,
8 V VARIABLE
SLOPE
USE TYPICAL SECTION NO. 18:
-Y4RPBD- STA. 30+60.00 TO STA. 43+04.00+/- (BEG. BR.)
-Y4RPBD- STA. 45+17.13+/- (END BR.) TO STA. 51 +70.14 +/- (BEG. BR.)
-Y4RPBD- STA. 54+72.30+/- (END BR.) TO STA. 66+11.85
* PAVE TO FACE OF GUARDRAIL
-Y4 R P B-�
i 16' 12'
15' W/G R
12' �
ZN
OJ
4' �
�
FDPS � O
GRADE Z �
POINT D4 =
.02 , .02 .�
18 . �" J2 T
GRADE TO 6"
THIS LINE
TYPICAL SECTION NO. 19
USE TYPICAL SECTION NO. 19:
-Y4RPB- STA. 13 + 78.61 TO STA. 28 + 66.16
3 0'
6:�
VAR.
�
.�
O RI G NAL
G OUND
ORIGINAL
G OUND
10'
ORIGINAL =
?'I
GROU 6:�
VARIABLE
SLOPE
6' i 15'
6 :1
8' VC
12'
4'.
4'
FDPS
C2
.08 ; 02
RAMP �-Y4 RP D-�
�
i
i 16� 12'
„ J3 �
T 6
15' W/G R
12' �
� J
O�
4' � �
FDPS � O
GRADE Z �
POINT D4 =
.02 , .02 .08
- ,
� 17.0" 6„
GRADE TO
THIS LINE
TYPICAL SECTION
T
NO. 20
USE TYPICAL SECTION NO. 20:
-Y4RPD- STA. 13 + 97.64 TO STA. 29 + 56.27
6'-3"
FDPS
min.
C2
14'-4"
7'-9" P R O P
min. NOISE
WALL
.02 . °: .08
4 . p . �
J3 6�� �
T
3 0'
3 0'
6:�
VAR.
�
.j
6:� �
O RI G NAL
VAR. G OUND
PROJECT REFERENCE NO.
U -2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2-H
HYDRAULICS
ENGINEER
]�][$]E]L��l[IN�I$� l�]LA�N�
II9� N�'d' US1E ]F� C�NSTRUC'd'I�N
ORIG NAL
G OUND
ORIGINAL
G OUND
� GRADE TO THIS LINE ?'I ORIGINA�
TYPICAL SECTION NO. 20A G OUND
USE TYPICAL SECTION NO. 20A:
-Y4RPD- STA. 26 + 02.53 TO 29 + 44.53 RT (NOISEWALL -NWY4RPBD1-)
A1 13.5" JOINT CONC.
A2 VAR. JOINT CONC.
C1 1 .25" SF9.5A
C2 3" S9.5B
C3 3" S9.5C
C4 VAR . S9 . 5B
C5 VAR . S9 . 5C
D1 2.5" I19.0B
D2 2.5" I19.00
D3 3.0" I19.OB
D4 4" I 1 9. OB
D5 4" I19.00
D6 VAR . I 1 9. OB
D7 VAR . I 1 9. OC
E1 3" B25.0B
E2 4" B25.OB
E3 3" B25 . oC
E4 5. 5" B25 . OC
E5 �" B25.00
E6 VAR . B25 . OB
E7 VAR . B25 . OC
J 1 s" aBc
J 2 s" aBc
J3 �o" ABC
J 4 4. 25" ABC
J 5 VAR . ABC
K SUBGRADE STAB.
P PRIME COAT
R 1 1'_ 6„CONC . C&G
R2 2' - 6"CONC . C&G
R3 5"MONO . CONC . ISLAND
R4 SHOULDER BERM GUTTER
T EARTH MATERIAL.
U EXISTING PAVEMENT.
W WEDGING
�
W
W
�
�
�
V
N
�
`I
�
w
T
�
i
I
�
�
�
N
�
/
h
V
�
L
t
V
� L.
� N.
0 �
r �
i
M Q
O �
N3
V�
W p
0 O
I L
� /
r L.
�
�
J
W
m
Z
�
w
H
�
�
Z
I
�
W
J
N
W Z
� Q
�N
� Z
3
U -�
� J
�� W
�' >
vI �
0
� Q
��
� w
IJ
�
N
0
w
�
�
�
�
�
�
�
�o
,I
�O
X
o�
�n �
��
� . N
j �-- - o - �- �--
� ~ �Z
�`r'�O
� ��
�
� �
, o
�O
M � o�
�aZ
�
. NJ`o 0
C
X
0
Z
� ~
� Z
w �
W
oz
W V
m W
o�
~ W
� j
d V
w =
� N
0
m m
X
�
Z
�
c�
Z
�
� W
mW
Z
� �
Z Z
W
� J
w V
w Z
� �
N w
w �
�
O �
��
�
W
�
U
�
�
Z
�
Z
� O
� U
Z W
� N
N J
WQ
V
� �
V �
Z
O
U
V
_
H
J
0
Z
O
�
:
�
�
0
� r
� � �O
� -�- -
J�----- - � _ --- ---
� ^
�
�o
O
� o�
Z
� O
C� �
�
0
z
O
ZV
O
U F- N
J
�G ui Q
W3Q�
�>��
I
�
mZ �
I
� � � �,
0��0
3ooQ
N � N N
W W W W
Wwww
2===
N cn cn cn
w Wwww
� W W W W
p �,�, �n v� �n
Z �NM�'
w
�
V
�
�
W
�
Z
�
Q
3
Q
�
Z
O
z
�
V
w
J
U
�
�
�
Q
�
J
w
m
Z
�
w
H
0
Z
I
W
J
W N
� z
� �
� Z
U3
� J
� �
� W
� �
O
� �
N �
� W
�
I H-
�
V
Z
3
�
�
w
�
Q
3
�
N
�
I
� ;o
0 ,I
U�
�--
W
J �
� II � Z
J U Z =
� Z �Z Z
� d W� -
� w w w
� V OZ mZ
O J mN ��
W W
� Q � V 0� Z W
�o 0o I � �— u, � J
�.0°0 � cn j J� W V
O N � � Q—� W—
� 0� r o V� dU GH
Q II � II � � W� NU
a
o � II J II U� QN �H
r M> Q �— II Z Z O
� � 0 0 0 �' � � mm �w
N �- > cn C�
X �
N
�
� N10
N � 01�
N �
� �---- M --- -----
• � NI
� �J
� N
� �J
�
H
W W
��
�, O
� �
,� °-
��
o�
W
W Z
zZ
"' � O
o V
O �
� Q�
� W I
N j �
W ��
W ,� ,
�
� �
W
�
�ZU
�o�
�� �
�
Z
--- O
Z
O
�
w
J
V
�
H
Ji �,------ --
� �
00
�
�o
M N
� O W
�
� Z �
�O �
� �� �
t�
W
N N 0
� o Z
�
� � Q
.� � o
: �---^ --- o
� . �
�o
. Z
N N O
� O
z
0
U
� �Z N
� � Q
� °- V
� �
M � p � �
. �
�
�
0
U -2579B
ILW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
HYDRAULICS
ENGINEER
]�][$IEIL��I[�N�][$� ]�]LA�N�
IID� N�T US]E 1F� C�NS°Il°IBUC'Il'I�N
Z
O
z�
_ � w
H UN
J
v�i N V
�_
w3��
0>��
�
m Z � N
� J J �
O� � �
�00�
3��W
NI�NN
W W W W
W W W W
_ _ _ _
. N Vi Vi ui
W W W W W
� Wwww
p �„ v� v� v�
Z �- N M �
Z
O
N
w
�
r L
J
�
�.�..�
w
V
J
J
�
N Z
W �
��
� �
�w
>
U°
� �
� 3
� J
Nw
m
J �
� W
�H
�
0 0
z
�
� �
J LL,
I -'
�
Z
0
Z
3
J
�
M
N
� �
J �,! ----------
� '
M
N
�
�
�
�
�
O
Z
0
�
0
�
�
�
�
X
0
W �
�Z
��
c� �
O
x
I--�
Z
�
C/�
U
J
�
�
�
Z
O "'
V ��
w w�
� N m
N J
W3ao
C�>UZ
�Z��
m ��
w
� � J W
O��p
��2
� �
N � N �
Z
W W W J
W W W W
. N c� c� C�
�
W W W W �
� W W W �
� Ncncnm
Z � N M �
w
�
V
�
N
Z
0
Z
�
V
W
J
U
�
H
0
Q
�
�
=Q
UD
��
_
�Q
H
N Q �
W �O
� ��
���
�
� NW
,- 3
U�
�
� W �
� � i
� O�
�
N ao
3Q
J WO
Q m J
� Z�
Q WZ
_
�W
I O�
� ZoI � t/)
�
� �
a�
N N
Z
0
Z
3
�
�
J
�
w
�/'i J
J
� Q
z3
c�
N
�
J �
� �----------�
M
N
m ~
Z
0 �
w
Z Z
� �
W W
� W
�~ m Z
�
W� W z
m Z ,1,
J
Ov � Q
~Z � U
�_ � �
3W N W
"' O � O
<I^ O W
< �.� cn C�
� v
�
X
O
�
Z
O
�
�
O
. X
�
�
r--
� v
�
�1
0
o�
Z
�
U V
� w
w N
N3J
w Q
C� � �
0 Z �
�
m��
� I
�
O O 0
�
N � N
W W W
W W W
=,2^,2^
N V / V I
�,�„� W �.�..� W
�— W W W
� N��
Z � N M
w
�
V
�
�
z
�
z
�
U
W
J
U
�
�
� ~
� F'
z � `�
�z �
�a J
� Y I w J
� m �
� Q
� � N �3� � ��
c~n� � LL�3 � �
w = I
��
33 Z Z�
` � .
�z � � W �Z �m �
Q � � � U 0 �o
�� �
Z �,M - - - - � r� �
Z ' �'
N I� � `
Zo r .� W1 � �
Q_ I
HM . ------- ----------
Z3� C�' -- - --� -�--
I �
�W `
0� W � N
�� �
H Y
J
� � Q �
N� � ��� W I o0
W ��3 �
3 '
V
�
2Q
UN
_�
�
�
�'I I I—I
� � N
w
I "� �' �
��
� �W 3�
� Z� wcn
I�Vm�w �
I •
� �
� �
� V I
�Z��''--- �
. /
� �
r- �
� -- -- -------- - ;- -------
1
, J
� �
i �
:� � o .
Z U N � o- I�
iQZ � � 0°
I �
�E_-� � --���I �
M W � LL�� I
c� > V �
� �
I
� ��U I
LL�� I
� ---
�
�
�
�
------- — N
�
�
�
�
N
i
N
x
w
• � Z �
`n � 3 Z
�
i �O
I U �
1
� 1
. �
N �� W � � �
�
� N
�„�------------ --- �--------
� ��W �
� � � �
WJ, p�
� � �
"' x1
,� W ,
o�
�
W Z
� �
= z
V�
� J
� a
J
� �
�Z
W �
0 �
Z �
� i
` J
r �
Q
0 z
Qo
a
� �
w
�
ZN
� W
�
Z w
OQ
VZ
w O
N N
J w
Vo
� �
� O
'�'
U -2579B
fLW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
�_o
HYDRAULICS
ENGINEER
]�I�]E]L��][�N�]E�� ]�]LA�N�
Il�� N�'d' US]E 1F� C�NS'Il'RUC'1CI�N
, PROJECT REFERENCE NO. SHEET NO.
� U -2579B 2 -S
X Z
. = R�W SHEET NO.
�- ROADWAY DESIGN HYDRAULICS
Z Vi ENGINEER ENGINEER
' c� V
� � O J
cn �
V Z �
Z � O � ]�][�]E]LI�I[IN ]E$� ]�]LA�N�
O� ��� dD� N�'ll' USE F� C�NS'll"RUC'fl'I�N
U� �� OcWnW
N2 = H�H
J W
Q2 ~ c�iUm
� V �~ o �o o c�n3J�0 pw
Z � W � �O �,r� � WQHW Z
� — � m "' � t� �
iZ
w� z �3 � o W o��- �z
� � � W W � W � � Z � � � H � �
I �' Q ���z U Q�— °o� J�� p � w
Q N Z 0 �� Z � � W m N�Z
� w m� �Z�i W 2 � �p ����0 � W wC�
� � W m��� � t�` �0�4= � � mv,
� �i' o o � p o ��Op N N x'�— � o o Z o
�O 00 � � W � � � W N � N N� � �O 00 � O
HM� �- N J�, �O = Z � W � HI—HW H N M <� tn �
0 � � � � N - � x � � � ~ � � N � W W W W � Q M � � � �1 < N J H
H H � p �� V N�'NZ �Z � 0 � � 222W 0 �-- H O � ��V
Z Q Q � � � I I � � � U w� W W W J ��� �� c� V N c�i� cn cn cn 0 Z Q Q I I � I I � V �
� J (� v I-- W W W � W � Q N � W W W W W- II W H
o � II p N ==W cr� �z 3 � H u.,www� t� � o �� J V�cn
�, �M> a� �� z = ���m > a� �� o
W o o = �� � �>- cij N cn cn Q W W C� � J , X cn �`�' .. W O O = �"' �� i_
0 N N 0 � 0 H� � GD GO � LwW W� I p � Z�W �/ m � Z �NM��A
J Z 0 N N 0 � 0�� I L m m
X o�, t � t � m �� 00 0 0 � � o i C
Z�- N M d' Q M O� � c� �� v� W J(�-� ----- ------ -----------------
< N J� Z
Q � � � � N < QH � � �
� � � � dU � r ~ �
o Q Q o U J
Z Q Q I I � I I II � W� Q O U
J Z . w
C� J U � N � N J
��> �� Q �— I I Z V..�
t� � M= � N Q X
` Q O O � 0 ���� m m w � p (aj � �
W � N
.
�/ X � X � vQi r � W o o H
� � � J � � � u., . V
� w �J U I � U V �
� U � �— w � I—
t/)
� U . o � .� N z �? � . o Z �
� � � Z � �/ � o � oo � � _ o z
� - � � O z 3 �' °- � N o
� a c� � m M � o 0
� N � ----------------- - O J � W �' -- ---- ---------- - Z
~w �� co Z p > � � �
C/> > i c� . p �o �o � O � . �-
O N � �o ,_. "' � p Q i � � � N ,v
I � � W � m � �'
Q �, m � J
� � � N Q
� ��.. � �o a � � � �
� I � � V � I �
� X � � � X
� � �
� � j
I W
cn �
�
OQ N o V
z3 � zJ
0 �
H �
0 X w �
w W cr� _
Z J
-� � Q W
w �Z � W V �
Q w � � � � U }- �-
� c�i� 0 Z U U X � W ~ m
V � m� �� � o� V N3m�
w
� 0 p Z 0 � � 0 � � � � � Z
� � � _ � � W � � U �-------- -- -- ----------- - c,~i� Q Z � �
~ �° � � N � � W � `° 0Z Z m� � H
Q O �O N� N J� % � �' � W
� 0 H H r � � �� �U I � Q � ��QD O O� � 0
� 0 0 ,p U � � c� �� .
� Z Q Q II �� �� � W� Q 0 O u' � _
��
�' N O o� II Q� II Z 0 N � H �I �n � C�
�� Woo= �� ��� U}- � t�rNZ
� 0 N N � 0 � H i� 00 CO �' •
? O O t/� W W W J
V X � J W W W
�
N
� � U N �NN �
��
o� X � �Www�
r o � O N t/� v� m
M Q , ,
O � Z .
N3 �NMd'
v�
W p
� O
I `�
��
� i
�
�
�
�
�
�
��
N
�I
�
L
�
�
�
�
N
�
N
V
�
V
�PI �
r �.
O�
� �
�
M Q
O �
N 3
U -o
w p
� O
I�
�O ..
� L'
J
�
�o
,I
�O
tN
W W
�Z
N
� m
�o
U�
� N
��
� �
� �
�
� �
� w
U'
O
��
�V
��
I
X
0
� N
0
0
X
0
W
�
V
�
N
Z
�
z
O
H
w
J
V
�
�
N
�
O
�
J
Z
O W
~ W
��
�w
w m
cn
W W
OQ
O>
�W
N W3
� zw
o �Q
� � C�
o Q�
� �
N
N H�
0 �
�
�
(.L
.
�o
�O
�
tN
W
Z
�
�
m
�
i
v� �
W �
� �
� j
� �
U '�
� W
� �
�O
�
vI Q
�
J J
� w
m
� Z
Q W
�
I O
J Z
I `
w
J
ui
Z
O
�
Z
3
�
�
J
�
•
�
X
�
Z
0
�
W
�
V
�
N
z
0
Z
0
V
W
J
U
�
�
Z
�
�
�
�
�
O�
�
PROJECT REFERENCE NO.
/ /-��7C]�
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
.� X W
z
�a �
SHEET NO.
2-T
HYDRAULICS
ENGINEER
]l�][$]E]L�NI[�N�][$� ll�]LANS
ID� N�T USE F� C�NSTRUC'Il'I�N
�l'
0
� N
M �jZ O
a�
m ~
� � -- — -- —
� N
�
1�
(,1� -------�-
.
.
� �
❑M
�
.
� W ��
xZ
~a �
��0
�
i
❑c�
U
, w
�(i N
J
0 Q
U
�
�
PROJECT REFERENCE NO. SHEET NO.
U -2579B 2 -U
fLW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
]��$]E]L��][Il�T ]E�� l�]L�N�
_ _ -Y4 R P B D- S T R U C T U R E �� N�� US� F� ��N��RUCTI�N
Y4 RPB D STRU CTU RE
-Y4RPBD- OVER -L- (WINSTON-SALEM NORTHERN BELTWAY) -Y4EB- & -Y4WB- (US 421 /I-40 BUSINESS) -Y4RPBD- OVER -L- (WINSTON-SALEM NORTHERN BELTWAY) -L-, AND -Y4CD-
DESIGN DATA -Y4RPBD- DESIGN DATA -Y4RPBD-
2010 ADT 32,600 2010 ADT 32,600
-Y4RPBD- 2030 ADT 43,800 -Y4RPBD- lOA 2030 ADT 43,800
� DHV = 11 � DHV = 11
40' ' D= 60 40' ' D= 60
DUAL = 6 i DUAL = 6
12' 12' � 12' 4' 12' 12' � 12' 4' _
TTST = 12 TTST 12
! V= 50 MPH (SEE NOTE 6) ! V= 50 MPH (SEE NOTE 6)
! FUNC CLASS - INTERSTATE ! FUNC CLASS - INTERSTATE
I MINIMUM VERTICAL CLEARANCE = 16'-6" i MINIMUM VERTICAL CLEARANCE = 16'-6"
i
X i X X BRIDGE RAIL TO BE DETERMINED X i X X BRIDGE RAIL TO BE DETERMINED
.O6 .06 .O6 .Ob BY STRUCTURE DESIGN UNIT .O6 .O6 .O6 .O6 BY STRUCTURE DESIGN UNIT
, -
. , , , , -
@ SLOPES DETERMINED BY @ SLOPES DETERMINED BY
GEOTECTNICAL ENGINEERING UNIT GEOTECTNICAL ENGINEERING UNIT
i GRADE i GRADE � SEE STD. 610.03
POI NT
0 SEE STD. 610.03 POINT
TYPICAL SECTION ON STRUCTURE * THIS AUX. LANE PROVIDES SEPARATION TO TYPICAL SECTION ON STRUCTURE * THIS AUX. LANE PROVIDES SEPARATION TO
MITIGATE WEAVE AREA BETWEEN LOOPS. MITIGATE WEAVE AREA BETWEEN LOOPS.
NOTES: NOTES:
1. SEE SHEET 2-Y FOR BRIDGE SKETCH l. SEE SHEET 2-Y FOR BRIDGE SKETCH
2. SEE SHEET 16 FOR PLAN VIEW 2. SEE SHEET 16 FOR PLAN VIEW
3. SEE SHEET 2 FOR -L- TYPICAL SECTION 3. SEE SHEET 2 FOR -L- TYPICAL SECTION
4. SEE SHEET 2-H FOR -Y4RPBD- TYPICAL SECTION 4. SEE SHEET 2-H FOR -Y4RPBD- TYPICAL SECTION
5. SEE SHEET 2-I FOR -Y4CD- TYPICAL SECTION 5. SEE SHEET 2-I FOR -Y4CD- TYPICAL SECTION
6. DESIGN SPEED OF HORIZONTAL & VERTICAL 6. DESIGN SPEED OF HORIZONTAL & VERTICAL
ALIGNMENT MEETS 60 MPH. STOPPING SIGHT ALIGNMENT MEETS 60 MPH. STOPPING SIGHT
DISTANCE MEETS 50 MPH DUE TO THE DISTANCE MEETS 50 MPH DUE TO THE
WIDTH OF BRIDGE _�_ WIDTH OF BRIDGE
-Y4 W B- -Y4- -Y4 E B- -Y4 C D-
� � � �
�
i '� i ' !
� i � ,
, ,
'i 15 i 15 i 23' � 23' 24' 22' i
i i
19 . 5' 2 4' I� 12' � 9� i 9� � � 2��� 2 4' 19 . 5' 13 . 5' 4 8' 12' 11 ' i 11 ' 12' 3 6' 14' 10' 10' 12' 2 4' 11. 5'
6 6 ,
�i i �i i i
� '' 4' �� 1 1 1 1 ' � � � 12' ' �' �
1 1 � 1 � � � � � P S
AUX * � I � AUX A U X , P S �
@ LANE � � 'I LANE @ LANE I I
.04 .02 - - - _.02 _ 02 5:1 � 5:1 .02_ _02 � _ .02- .04 @ .04 .02 .02 � .02 .02 � I @
< - 6:� i 6:1 .04 6, .02 .02 � .02 .04
6:
❑2 GRADE i GRADE � GRADE � GRADE GRADE �
PO I NT POI NT 0 PO I NT , POI NT PO I NT
i i
�i i
70. 5' �� 70.5' 84.5' � 83' S 7.5'
�
TYPICAL SECTION ON ROADWAY UNDER STRUCTURE TYPICAL SECTION ON ROADWAY UNDER STRUCTURE
�
�
V
�
L
LI
�
�
�I
�
L
�
�
�
�
N
�
/
N
�
�
V
ln L
�--� N
� �
� �
L
M �
O >.
� 3
V�
w p
� O
I L
� �
� L�
DESIGN DATA -YSA-
10 ADT 5,2 60
203 DT 8,300
DHV = 1
D = 60
D UAL = 2
TTST = 1
V = 40 MPH
FUNC CLASS - RURAL LO
MINIMUM VERTICAL CLEARAN =16'-6"
X BRIDGE RAIL TO BE DETERMINED
BY STRUCTURE DESIGN UNIT
@ MSE WALLS DETERMINED BY
GEOTECTNICAL ENGINEERING UNIT
* THIS AUX. LANE PROVIDES SEPARATION TO
MITIGATE WEAVE AREA BETWEEN LOOPS.
-YSA- STRU CTU RE
-Y5A- (HASTING HILLS ROAD) �-Y5A-
OVER -Y4- (US 421 /I-40 BUSINESS) �
� 35.5' �
@
MSE WALL
19'-11 " 2�4'
TO FAC E ; 6'
I SHLDI
12' ' 12' 4'
FDPS
�
CONCRETE �
BARRI E R �
w'
.04 .02 �� .04
___:- ___------- -----------
___________--- - --- GRAb�---�
TYPI
7.5'-
X
; 02
12'
1
; 02
12' 4,
�
X
.0 .02 �
�
PICAL SECTI ON STR UCT URE
EE TIP ROJECT U-25�9G)
- - (I- /US 421 BUSINESS)
. @
� MSE WALL
i
30' � 36' 19'-11"
9' 9' 6' ; TO FAC E
SHLDR
, � 11' 4' 12' ' 12' 12'
� FDPS � FUTURE
i �� AUX.
� � LANE CONCRETE
BARRI E R
I ��
w
! .04 .02 � .02 .04
i- ------------ -----------------
-____f___-- �----------- - GRA��------------ ----
� u P I T
i
SECTION ON ROADWAY UNDER STR UCT URE
NOTES: (SEE TIP PROJECT U-25�9G
1. SEE SHEET 2 FOR BRIDGE SKETCH
2. SEE SHE 29 FOR PLAN VIEW
3. SEE S T 2-J FOR -Y5- TYPICAL SECTION
4. SE HEET 2-F, 2-FA FOR -Y4- TYPICAL SECTION
NOTES:
1. SEE SHEET 2-Z FOR BRIDGE SKETCH
2. SEE SHEET 16 FOR PLAN VIEW
3. SEE SHEET 2-J FOR -Y5- TYPICAL SECTION
4. SEE SHEET 2-I FOR -Y4CD- & Y4RPC TYPICAL SECTION
5. SEE SHEET 2 FOR -L- TYPICAL SECTION
0
2❑
11.5'
04
� -Y4 C D-
i
i
I
-�I
I
12' ' 12' 2 2'
i 12,
�l
� , 4 P
S
.02 � .02 .02
GRADE
57.5'
-YS- STRU CTU RE
-Y5- (HASTING HILLS ROAD) OVER -Y4RPD-
-YS-
�
�
i
�
�_ 35.5' _�
7.5'
�
�
12'
12'
1 �
x
.02 .02 .02 .02
, , � ,
TYPICAL SECTION ON STRUCTURE
-Y4 RPD-
�
�
I
7.5' �16� 7.5'
4� i �2�
��
i
2❑ .02 .08�0.08 0.04 0
- _
4'
PROJECT REFERENCE NO.
U -2579B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2 -V
HYDRAULICS
ENGINEER
����.���N��� ��.�N�
ID� N�T USE F� C�NSTRUC'Il'I�N
DESIGN DATA -Y5-
2010 ADT 7,600
2030 ADT 13,600
DHV = 11
D = 60
D UAL = 2
TTST = 1
V = 50 MPH
FUNC CLASS - URBAN COLLECTOR
MINIMUM VERTICAL CLEARANCE = 16'-6"
X BRIDGE RAIL TO BE DETERMINED
BY STRUCTURE DESIGN UNIT
@ SLOPES DETERMINED BY
GEOTECTNICAL ENGINEERING UNIT
❑2 SEE STD. 610.03
/ NOTES:
@ 1. SEE SHEET 2-Z FOR BRIDGE SKETCH
2. SEE SHEET 16 FOR PLAN VIEW
3. SEE SHEET 2-J FOR -YS- TYPICAL SECTION
4. SEE SHEET 2-H FOR -Y4RPD- TYPICAL SECTION
rc� i N i 31'
rE ��
TYPICAL SECTION ON ROADWAY UNDER STRUCTURE
-Y5- STRU CTU RE
-Y5- (HASTING HILL ROAD) OVER -Y4CD-, -L- (WINSTON-SALEM NORTHERN BELTWAY) , & -Y4RPC-
-Y5-
�
i
i
i_ 35.5' _i
2 4'
, o- , o� , 4� 1
12'
6:1 6:1 � .04
7.5'
3 6'
1
.02
1�
,.02
12' � 12'
1
,.02
I X
.02 n
TYPICAL SECTION ON STRUCTURE
-L-
�
i
I
I
23' � 23'
4'
3 6'
12' 11' � 11' 12'
1 , t � �
.02 i .02 .02
6; � i 6 :1
;ADE � GRADE 4.60'
POI NT � PO I NT �qN E
, TAPER
� � 63.60'
TYPICAL SECTION UNDER STRUCTURE
�
i
6'1 _-
� --
30' MI N IMUM
I ` \
,,
i ��
, �
I
DESIGN DATA -Y5-
2010 ADT 7,600
2030 ADT 13,600
DHV = 11
D = 60
D UAL = 2
TTST = 1
V = 50 MPH
FUNC CLASS - URBAN COLLECTOR
MINIMUM VERTICAL CLEARANCE = 16'-6"
X BRIDGE RAIL TO BE DETERMINED
BY STRUCTURE DESIGN UNIT
@ SLOPES DETERMINED BY
GEOTECTNICAL ENGINEERING UNIT
0 SEE STD. 610.03
� -Y4RPC-
�
I
I
I
I
15' 12' � 16' 7.5'
4' 4', 12'
� �
��
.Ob •02 .Og .08
b �� � �
30' MINIMUM
23.5'
❑2
�
N
Z
0
N
i
W
�
_
�
�
V
�
L
LI
�
N
�
�
LI
�
�
u�i
N
�
�
V
�
L
�
V
� L
r N.
O�
� �
M �
O T
N �
�
U�
w
a
� o:
�o!
P-� L '
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR -Yl- OVER -L-
��
—Y2 — BEGIN BRIDGE
—Y2 — BEGIN APPROACH SLAB
2� , - � - - - T YPE , lll �
—Y2— �24'
:�
0
V ARo PS
B-77 ❑2 3'
1905'
—Y2 — Stao 20 f20o2/
—L— Stao 5/6 f3/o30
0 =IOS°03'S9067"
L'�
905'
/905' I
T YPE lll
❑2
PROJECT REFERENCE NO.
ii_���no
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2-W
HYDRAULICS
ENGINEER
]�][$]E]LI�I[�N�ll$� ]I�ILA�N�
II9� N�'J[' U3E F� C�NS'Jl'RUC"d"I�N
—Y2 — END BRIDGE
—Y2 — END APPROACH SLAB
B-77
�—
••-►
�
V ARo PS
NOT Eo
2❑ SEE NCDOT ST Do 6/Oo03
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR -Y2- OVER -L-
\ \ �J L V// V / V V�./ L. V Y / ILL l V Y Y Ll
� 1
-L—
NOTES:
SEE SHEET 2—Q FOR STRUCTURE lO TYPICAL SECTION
SEE SHEET 2—Q FOR STRUCTURE 2OTYPICAL SECTION
SEE SHEET 2—R FOR STRUCTURE 3O TYPICAL SECTION
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP FOR -L- (D UAL BRID GES� O VER MAR TIN MILL CREEK
—Y4RPA — BEGIIV APPROACH SLAB
\ —Y4RPA — BEGIIV BRIDGE
VARo PS
4,J �\� � _� — B ..77
END lVOISE WALL ON BRIDGE
n.�.=:z.�
—Y4RPA— EIUD BRIDGE \ �
—Y4RPA— END APPROACH SLAB
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR — Y4RPA— O VER SMI TH CREEK
PROJECT REFERENCE NO.
U -2579B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2-x
HYDRAULICS
ENGINEER
���' ����N��� ��.���
llD� N�T U91E ]F� C�N3°Il°RUC'Il'I�N
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR —L— ( D UAL BRIDGES� OVER —Y2A—, —SRR—, AND —Y3—
Y4CD
' APPROACH SLAB
/2' /0'
—Y4CD — «-- N
VARoJ �
—L—
BEGIN
APPROACH SLABS
—L—
BE�IN APPROACH SLABS
Y4CD
NOTES:
SEE SHEET 2-R FOR STRUCTURE O TYPICAL SECTION
SEE SHEET 2-S FOR STRUCTUREO5 TYPICAL SECTION
SEE SHEET 2-S FOR STRUCTURE bO TYPICAL SECTION
� --_�-.,_�
�� / _._.�-_
�� ��.
r�1t.m,—�1�1��1.1t�
—Y4CD —
END APPROACH SLAB
-L —
END APPROACH SLABS
—L—
END APPROACH SLABS
—L—
ElV D BRIDGES
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR — Y4 CD— AND —L— (D UAL BRID GES) O VER SMI TH CREEK
NOTES:
SEE SHEET 2—S FOR STRUCTUREO7 TYPICAL SECTION
SEE SHEET 2—T FOR STRUCTUREO8 TYPICAL SECTION
SEE SHEET 2—T FOR STRUCTURE 9OTYPICAL SECTION
SEE SHEET 2—U FOR STRUCTURE 10 TYPICAL SECTION
t
—Y4Rf
�
�
—Y4RPBD —
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHI�
FOR -Y4RPBD- OVER SMITH CREEK
-Y4RPBD — STAo 43 f79o19
—Y4WB— STAo 98f14o65
0 =l12°54'20e55"
.
�
—Y4RPBD — � 1905' �
BEGIN APPROACH SLAB
—Y4RPBD — BEGIN BRIDGE /
/0'
2❑
/0'
1905'
� ��
P
,
/y � ��
y ��
��� .
—Y4CD — POC ST Ao 46 f87o16
—Y4 — POT ST Ao 90 +OSo9/
� =83°54'07097"
—Y4CD — POC ST Ao 46 f60o0/
—Y4W B— POT ST Ao 90 f06o05
� =83°59'47004"
�
—Y4CD — BEGIN BRIDGE
�
—Y4CD—BEGIN APPROACH SLAB 1905'�
__ _ r _ _ _ _ —77 �
�
—Y4LPA — —� �,�,
—Y4CD — �..
36'
/2'
36' �
—L—BEGIN APPROACH SLABS �
—L—
•••►
� 48'
—Y4LPB — --►
m m�X� —Y4CD — POC ST Ao 47 f14o3/
� ' w —Y4EB — POT ST Ao 90 fllo82
�- ?— � 0 =83°48'28a85"
6' —Y4CD —END BRIDGE
1 1 � � j —Y4CD —
� END APPROACH SLAB
�ni
36' o �
� _�� �
�•
.
— � 1 -� �- y yB —77�2,
—L — BE�IN APPROACH SLABS i9o5�—
—L — BEGIN BRIDGES ❑3
—L— POC STAo 642f54o27
—Y4WB— POT STAo 9/f23o70
NOTEo � =83°57'12033"
� SEE IUCDOT ST Do 6/Oo02
/ � � /0'PoSo
�
—Y4RPBD — ST Ao 44 f38o39
—Y4EB — ST Ao 97 f90o4/
0 =l15°27'2/046"
2 /9o5'PoSo END APPROACH
�'>> —Y4RPBD — ST Ao 45 +44069
; ,- �2'_
� u B\,, —
19a5'PoSo END BRIDG
—Y4RPBD —
ST Ao 45 fl7ol3
/0'PoSo —Y4RPBD — ST Ao 44 -f-OSo64
—Y4 — STAa 98 +02089
NOTEo � =l14°l0'28007„
2❑ SEE NCDOT ST Do 6/Oo03
4'
0
�
�
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR -Y4RPBD- OVER -Y4EB- & -Y4WB-
0
/2
E— /905
❑ U �
PROJECT REFERENCE NO
v —��i yrs
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
��� �� � . � , .,
��%/� ' I
—77� /2'
72'
36;
•••►
48' ""''
-••►
•-•►
����,���Na���
ID� N�°Il" USE E� C�
ND APPROACH SLABS
—L —
❑3 B 7� � l2'
�905' —� — END APPROACH SLABS
—L — END BRIDGES
—L — POC ST Ao 643 fO8o58
—Y4EB — POT ST Ao 9/ +2905/ �=83°45'49025"
—L — POC ST Ao 642 +8/042
—Y4 — POT ST Aa 9/ f26o60 �=83°5/'30082"
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR -Y4CD- & -L- (D UAL BRIDGES� OVER -Y4-
3EGllV BRIDGE
Y4RPBD — STAo 5/ f70o14
3EGlN APPROACH
-Y4RPBD — ST Ao 5/ f43o58
0
o^ B�
v / _ T
—r��r�u— 5 i ua .���y�o��
—L — ST Ao 649 f19o78
L� =70°4/'S6o30"
—Y4RPBD — STAo 54 f16o42
—Y4CD — STAo 53 f77o69
SHEET NO.
2—Y
HYDRAULICS
ENGINEER
y ���lr �
vS'JCIBUCTI�N
.
•
,—Y4RPBD — END BRIDGE
NOT Eo
20 SEE NCDOT ST Do 6/OoC
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR - Y4RPBD- O VER -L-
�
�
�
V
�
L
LI
F
N
�I
�
L
�
�
�
�
N
�
/
N
V
�
V
� L
�
� N
o�
ro
�
M Q
O �
N3
��
W
� O
I
��
� i
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR -Y5A- OVER -Y4-
(TIP PROJECT U-25�9G�
2-V FOR STRUCTURE TYPICAL 11 SECTION
2-V FOR STRUCTURE TYPICAL 12 SECTION
2-V FOR STRUCTURE TYPICAL 13 SECTION
-Y5 — BEGIN APPROACH SLAB „�j
PROJECT REFERENCE NO.
U -2579B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2-Z
HYDRAULICS
ENGINEER
]��$]E]L��l[�N�][$� ]�ILAtN�
ID� N�°Il" USE E� C�NS'JCIBUCTI�N
—Y5 —
NOT Eo
2❑ SEE
NOT E ST Do 6/Oo03
—Y4RPD — ST Ao 23 f7/o54
0 =5/°03'34093"
�
DETAIL SHO WING PAVEMENT & BRID GE RELATIONSHIP
FOR - Y5- O VER - Y4RPD-
NOTEo
2❑ SEE
—Y4CD — ST Ao 57 f0/ol4
L� = 90°02'OOol3"
NOT E ST Do 6/Oo03
DETAIL SHOWING PAVEMENT & BRIDGE RELATIONSHIP �'OR -Y5- OVER -L-, -Y4CD-, &-Y4RPC-
L
L
L
—YILPA— TS Stao IO+OO°00
—L— POT Stao 484+24a00
(59' L�a�
4'P.S.—�
l0'P.Sa
�
\
�
�
hh
�.
l2'PeSe
//'
—YILPA— SC 12+31088
. � •
�� ���
% �P
P�
�� �
.•
�
�■ " " ■�
�� 80
�■ ��
—Yl LPA— &—L— GO RE D ETAI L
(SEE PLAN SHEET 5 FOR PLAN VIEW�
—Y4LPA— SC Stao 12+IOo00 (12'00 LT)
3S-�
��c
�
� ���� • / � �
!, ` �—
� � �
���
J J M
���
���
N00=
� �
�N
� O
M 3
� �
���
N '—' O
� � C�
� Q
O �
U J
� �
��
� '
—Y4 LPA— &—Y4C D— GO RE D ETAI L
(SEE PLAN SHEET l6 FOR PLAN VIEW)
N
4' PoSo
/2' PeSo
-L-
l2' PoSo
—Y4LPA— TS Stao IO+OOo00
—Y4CD— POT Stao 44+44026
�G��.J< \ I �' L I a /
4'P.S.
�
w �-YILPD
30' 0' 30' 60'
�5� BAR SCALE
—YILPD— TS Stao IO+OOo00
-L POT J�Qo 482+93aoo
(59' Rto)
—Y4LPA— ST Stao 24+20a62
—Y4WB— ST Stao 87+99097
(12' Lto)
35' lNC
6'P.S.
-Y4LPA -o N o
Y4WB �
,
.
�
PROJECT REFERENCE NO.
U —2579 B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
l�]E�IEIL][�IN
�� N�°Il° US� ff
����
• � ���
�'�
.� • .
.
���1►.� :
SHEET NO.
�_r_r_
HYDRAULICS
ENGINEER
�� l�]L�1�T�
C�NSTRUC'1CI�N
/2' PoSo
l2' PoSe
� .� 4' PoSo
��i'+' �
` ,• � /
�
�
� �`
—YILPD— 12+IOv0
—Yl LPD &—L— GO RE D ETAI L
(SEE PLAN SHEET 5 FOR PLAN VIEW)
—Y4LPA— CS Staa 22+IOo62
ITAPER
8��
��
�
�
�
0563
��
� J �
B�^
B � �
��N
N"
LC'l =
� � O
B ,__,
B � 3
� +
+ N W
�p N �
00 � O
a�
m�'
3 J
�- �
� �
i �
�� ��
� J � J
B �
� �l9 0 mc`�
� � m l4 � M
� � m � � �
N m N �
.r � .--� .� � .--.�
00 N = � � _
� B H 0 m H
� � O � N O
,._, + +
+ N 3 @ N 3
CD Nw �p Nw
� i � � � �
� ¢o , ao
m n- c� m n- c�
3 J � J �
� a- 3 �
� } � }
i ' } �
i
—Y4 L PA— &—Y4 W B— G O R E D E TA I L
(SEE PLAN SHEET l6 FOR PLAN VIEW)
� J �o� 4'P.S.
0 � �
m � �
d- 00 d-
N CD
�-'�N
� �
00 C.0 �
C.0�0
^ '-' 3
+ N
LC')
i W
� Q �
��o
mJ(�
3 � �
� �
� �
L
L
L
�,
�
3
c
�
�
m
�
�
N
�
�
�
�
�
0
+�
�
�
0
�
�
�
3
N
�
�
O
i
�9 �i t
o�
O�{
LL
� i
O��
N�
��
UNL
W
0 �C
� /�
� O{
L<
�{
/
�
�
3
�
PROJECT REFERENCE NO.
U -2579B
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
� � � � � � � � � �
' ' ' '
/
SHEET NO.
2JJB
HYDRAULICS
ENGINEER
� PROJECT REFERENCE NO. SHEET NO.
�
� U -2579B 2 -XX
� R�W SHEET NO.
ROADWAY DESIGN HYDRAULICS
I , �.`. "�-` - - -- �� „
\ ENGINEER ENGINEER
�
+/1.00 -Y4EB- I XI �� \� / �
123.00' � � �
___-----� � � .
�� ��\ �,
, — . \ ]��]EIL��I[�NA�]Eg� ]�ILAIN�
� � �
� ��--____ ��� �
� X � • ID� N�'J[° USE F�R C�NS'J['�BUCTI�N
X� x x X X—�_ % ,�� �� �x y X�»' y y —� ____X_ � X F X X F x_�' �— X----X----�--
— ------------- ----� �' �-� �-� �
EGIN W. ���VL�E�- -L��—�� �'� _���'� ti-� -- - _ — — — - �—� - ��L�—�� �� �_ _ — —
— -- --- — � —
300' PER /300' FULL LANE
� I /0' P.S. -
�. l0 P.S.
� -- --- -- --- _- - -- —�� �� ��—��— ��- ` -- --- — --- --
�-_ --- -- - - --- - -- --- _- -- -- --- -- �.�-� -- ---
------- — —
� � �..- �—
�—� — ----- — ------------- ------------------- --------- -------� --- ------
—Y4EB — �-4o e�s B� �S 42� SB� 26� BST N 85° 33' 45.8° W —Y4EB — —Y4EB — � � � �
� �� 4' P.S. «� ��
---------------------- -------------- ------- ----------------------- --- ------------ ------------
--------------------- ----
-Y4 - • -Y4 - 4' P.s. -Y4 - 4� P.s. 4� P.s.
4' P.S. 30'
-Y4W B- i-4o eus we� us 42i Na� 26� esr N 85' 33' 45.8" W -Y4W B-�► -Y4W B- �� �
- - � � � �
�� �1 d' �/ d'
� �
- �-��-�� ------------ c`�� X ��--_��_ -�_-�E-��----�---� � ----�----------------- .--_-__ - - - - - - - -X _ _ - _��� �-�
_ � _ F X - - - - � � � �_��� �—� . �., �s�- W��� ' — - — - - — _ _ _ _ _ _ _ —`-n"L���-�—r��-,�_s ��-�
— — �---� - �- _ �,— - - _ - - — - --��— - � � � �1� - - �__ �,_ �, — — — — — _ _
- \ � �' `J`� � �Zv'������`� � / ---� " - -�_ �- � F k�-'-�-v�' � �-� �����- --��,- -
� �- �-- ' �v€�- ��� � - �' �
��Z-U.� - - - — - - � , , � , `�-- --�-�__ _ � ' ___------- -- ------------- \�_ --- =__ -- – -
-��-� � c�, - _ ---- -------- �-- �— -
-- � � � -��� --- ------ ���� ---- ----------- ----_ _
----�_� �� . � ��----- __ _—�_--- _ - -- -- _� '-- --�_� - ------- ------------------
��� ---� 300 APER -------- ------
/ � � �-- �-
N � /�/ _ _�_�—
o ____-- _ � � �/ ,
Ni� ���
� � � ��— __ �� � � �
� i ��'/ � � �,
/ �� // \ \\ �'Z �\.
� � \ \�
� i \\ � �
�i � � / \ \ � \ . �
V
m
U
�
� � '-' �
� � � � �
� N � � d'
Z O N N
� t� O N
J II II �? II O II �
�
3�� or`�i o�n �o"�
o M a M �
��+ o� �0 3�� o ~
Z+o ++ +� ++ � o � � � � � � � � �
�o o � o i. + C� �'- �
Z � � � � � O Z � r M � O O p � � � �
Q Q a� ZQ Q� J II `� M Q, O O � � I� I� I� �
�� I— M � F' O � Q ap � H�o � O II -- II M M M Q, � � et �
�N� c�j NNM NNM ,�l,N�n� 3opoo oDo 0o II �� II M �� � II � II �' II � II �
00 J� 00�00 00 �pp �o0Jo0 �� O� �� 0� �� � O O� JO(V
C�va � va II �Q II ��Q II Z+o o+ �o o�o op� oa o0 00 0� or Q�o
u� �� J ��J } � Zi'�J O� + + lC) �i p� � p OO OO p O OO
m i i �,., i i �,., i 3 �,., �,., i i �,., z �n a _ �n � + � + + + + + + � + o �n �n o o �n 3 �n +
��NM Qa' �� `�r �nr �r �''>� vM v',d.' �� C���
�N IN yN�D �NO' Q � M Q . Q � � �r �� � Z�Q
ZmJ� �N � NN � yN O NN N Nt~ O H N I� �� �l' �N � la—N � QyN�O
C �� I I J m J� I � m-� 00 00 J 0p � N� N� � N N � � J
C� � � J I I J m J 00 � N l(� � N� I O� � O� � O� w N O�
W>- i J �t a 3 Q II 3 J �� J J m J ao m N oo m J oo m J ao Q m,� �t
� m � w �3 J � � Q �Q �� � �� J J J J 3Q�
�
� � u., �3W �3-� vQ va u �a �� va �� �Q ° �3
v
� � W }3W �3W �3w �3 W �3W �3W W� �W
�
�
c
c
�
+�
�
�
�
� ii
� 4
�
�
Q
�
�
�
�
�
�
�
�
�
�
�o
_L
o�
� 2
��
03
N�
�� - -
o� 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
�� (-Y4 W B-) (-Y4W B-) (-Y4 W B-) (-Y4 W B-) (-Y4W B-) (-Y4 W B-) (-Y4W B-) (-Y4 W B-) (-Y4W B-) (-Y4 W B-) (-Y4 W B-) (-Y4 W B-) (-Y4 W B-) (-Y4W B-) (-Y4 W B-)
� PROJECT REFERENCE NO. SHEET NO.
�
� U -25798 2 -QQ
� R�W SHEET NO.
l RRl / 1 ROADWAY DESIGN HYDRAULICS
� ENGINEER ENGINEER
J
�
�
�
11 �
N C� �
Q �O �� ���' �..���N �� ���i N�
N � ID� N�'J[[° USE F� C�NS'J[°IBUCTI�N
�� J 0 �
� a' � o
= � o v'
o � ��
� � o�
� a �a
o�X9� o o � � �
�S N
�o� -NWCD2-
� � S 22' 25' 56.6' W S 25 /9' 47.4' W
. F,
N "���
i n �- �n ��
o $ � � ,�b
� g� $ g $ � �o �
� ON p $ p O O O
O N � �'
J p � y, � .�, �1- �1- `1
3� N N N �1 M Q o
W O� � _ � N � �
� N � N �
Z NQ � � a � �
Z o� s 2r 50� n.�• w
� �' S 20' 45' 0.9' W $ 23' l6' 42�' W �
m�� -NW C D 2- 5 2r 28" 2 6.�" W �
S 2P 53' 49.7' W S 20' 35� 27r w -Y4CD -
-Y4RPD - � o
N 21° 53' 49.7" E �O
0
N
Z
� O
N <O
� -�- W/NSTON SALEM OUTER LOOP �
�
�
�
�
-NWCD2 -
-NWCD2- DES/GN DATA
PANEL N0. l 2 3 4 5 6 7 8 9 /0 /l l2 /3 /4 /5 /6 /7 /8 /9 20 2/ 22 23 24 25 26 27 28 29 30 3/ 32 33 34 35 36 37 38 39 40 4/ 42 43 44 45 46 47 48
TOP ELEV. 89i� 89iA10� 89iA0� 89i� 89iA0� 89.46� 88.46� 89.46� b8� 2.45 .50� 5.87� 7.36� 3 8995r ,b8� 9�pi,85� 9�03✓0� 3 9�0457� 9053r 9q6A4� 9q6.7r 7.38� A5� .7r 3g 9i0A3' 9/0.70' 9//36' 9/0.70' 72' 9/Ob6� 9ii.44� 9i29r 9i4„� 9i4,�0� 9i4,�00� 9i4Ar 9i435� 9i4„68� 9i5A0� 9i5A� 9i5A0� 9i5Ar 9i5�35� 9i5b8� 9i6Ar
rH � � � � � �o� �a � �o� 4 4 � � � � � �o� � �
10 11 12 13 14 15 16 17 18 19 20 21 22 23
� PROJECT REFERENCE NO. SHEET NO.
�
� U -25798 2LL
� R�W SHEET NO.
/ ARR/ / 1 / ROADWAY DESIGN HYDRAULICS
L ENGINEER ENGINEER
]�RIEIL��I[�N ]Eg� ]�IL�N�
ID� N�'J[° USE F� C�NS'J['IBUCTI�N
� I
N �
o -L - W INST ON SALEM OUT ER LOOP ;� � �
� �
+ � ,
d-
N
Q
�
I
_1 O
� M
z � S 26' IO' 08.6' E 5 25' 09' 27.7' E S 24' 08' 46J' E S 23' 08' 05.8' E S/9' S3' 44,7• E
� `V S 28' 11' 30.4' E S 2T 10' 49.5' E
w 5 29' ►2' II.� E -NW LI - s ia�4�` 20.8� E
S /9' 03' 5/.8� E-
z S ig ig
�
_ -NWLI - lVO/SE �
Q �STl�(/ w L �N BRIOG
,
SEE CjU PAY �TEM
� � STh'U 7-(//,'E ,�LAN
g � s� -Nw�2-
� 1
z N � � � � � ' �� �
p p�
O N � O o N N � � o � � M� i �2
> � $ � N o 0 0 0 ,N � � � o� .Ni ��
� �n N o in c`n c''�n � "'� � 3 N� `
O �
p N N � � � � N ,,�0 ^`j �.1 O c� v��
N � �
� � a � � �i = �� 3 ��
�� �h
y Z�'i � ►�o
W � � _ � h
� v �
i
� � v
-NWLI-
-NWLI- DES/�N DATA
PANEc N0. 7� 72 73 74 75 76 n 78 79 80 8� 82 83 84 85 86 87 88 89 9�0 9� 92 93 94 95 9�6 97 98 99 �00 �0� �02 �03
TOP EtEV. 9�66� 9�66.6T� 9�6T.34� 9�68Ar 968b7• 9�695r 9705r 97i5r 72.34� 973Ar 973.67• 97434� 975Ar 975.67• 976 34� 977Ar 9n,67• 78.34� 979Ar 979�67� .34� 98iAr 98i,G7� 2 3 4.50� 5 .50� 987.50� 8 .50� 99�0.48� 99ir0�6�
LENGTH 20' 20' 20' 20' 20' 20' 20' 20' 20' ZO' 20' 20' 20' 20' 20' 20' ZO' 20' ZO' 20' 20' ZO' 20' 40' 60' 60' 60' 60' 60' 60' 60' 80' 60'
�
�
�
�
�
N
3
�
i-�
�
�
�
�+-
�
�
�
�I
�
�
�
�
�
�
/
�
�
Q
3
W
Cn
O
Z
/
t9 O
aL
O�
— /
��
O 3
N�
U �
W �
�� 24 25 26 27 28 29 30 31 32 33 34
��
� PROJECT REFERENCE NO. SHEET NO.
�
� U -25798 2 -00
� R�W SHEET NO.
/ ARR/ / 1 ROADWAY DESIGN HYDRAULICS
L ENGINEER ENGINEER
]�RIEIL��I[�N ]Eg� ]�IL�N�
ID� N�'J[° USE F� C�NS'J['IBUCTI�N
� $ � � g g g � �
; � � $ $ g g g � � o .� * � g
� g � y' ao � N N N N a
�, � g � .� + � ; � N N
� � �, � a, � o 0 0 0 0 0 0
� � � N '"� � d N cn tn tn v� � � o
� � � o �
�g � N o � � � � � � � � � � � �
N - �
� + � � � � �
�� ; �
0
0
3� �
o� � O
O
�� � O
W� � �
m i �
S P 02' 04A' W S 0' 33' l7J' W S 0' 04' 3/.4' W S 0' 24' l5A' E S 0" 53' 01.3' E 5 I' 2l' 41.4' E
5 P/9' 38.0' E S 0' 53' 17.7' E S 0' 26' 57.3' E 5 0" 00' 36.9' E S 0' 25` 43.4' W 5 0" 52' 03.8' W S l' l8' 242' W S P 44' 44„5' W N
-NWL3- N �
� -NWL3- � o � Q
`� -Y4CD- N �
� �
z
�
N �
O O J
Z
r 50' 32.a� w �
v
� , „ � � _ o Q
S r 50 32.o W
-L WINSTON SALEM OUTER LOOP � �
-NWL3 -
-NWL3- DESIGN DATA
PaNEc NO � 2 3 4 5 6 7 8 9 �0 �� �2 �3 �4 �5 �6 n �8 �9 20 2� 22 23 24 25 26 27 28 29 30 3� 32 33 34 35
TOP ELEV. 9/8r0�0' 9/8d00' 9/8r0�0' 9/8.0�0' 9/8.00' 9/8r0�0' 9/8�0�0' 9/733' 9/6.66' 9/6�0�0' 9/5.33' 9/4.66' 9/4,r00' 9/333` 9/2.66' 9/2�0�0' 9/l33' 9/0.66' 9/OA�O' .33 9�08.66' r0�0' T„33 9a6.66' r0�0' 533 9b4.66' �0�0' 3.33 2.66' 2 9�0/29' S9' .9�0' 27'
LENGTH 20' 20' 20' ZO' 2U' 20' 20' 20' ZO' 2U' 20' 20' 20' 20' ZO' ZO' ZO' 20' 20' 20' 20' 20' 20' 20' 20' ZO' 20' 20' 20' 20' 20' 20' 20' 2U' 20'
�% � O -NWC3- DES/GN DATA 9 � 0
PANEL N0. 36 37 38 39 40 4/ 42 43 44 45 46 47 48 49 50
TOP ELEV. r63' r0�0' 7.33 896.66' .0�0' 533 .66' A�0' 3.33 2.66' 2 2 2A0' 2 2
TH l l l l
900 900
890 890
880 880
870 870
860 860
850 850
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
�' PROJECT REFERENCE NO. SHEET NO.
�
� U -2579B 2 -T T
� R�W SHEET NO.
l ARRI / 1 Y4 ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
I I I
I I I
I I I
I I I ����.���N ��' ��.A�N�
I I I ID� N�'1[° USE F� C�NS'J[°IBUCTY�N
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � � •
I I I J
I I I °�
� ..
�
I I I � �� � $
I I I ��* � �
I I I J�M � N
I I I � 3� c��n � cn
�
I I I \�S �o �� �
I I I ��
�2 N �
I I I �W �� �
�u m i � O
i i i Qy� r� Tr. e , „ � o
i i i �L►1 �1 uZ'` N 85 33 45.8 W N 83° 29' 0%9" W \ _ _
NWY42 N 85° 33' 45.8" W `v
i i i � � o o Q
i i i �� ��` �' _ `� � c�n
i i i � N 85° 33' 45.8" W -Y4EB ' ' �
I I I �` `� ` � e ' I, 1-40 BUS EAST US 42/ SOUTH 24' BST � � �
i i i � � N 85 33 45.8 -Y4- � �
N i i i �� �? � e , , r� o ?
o i i i � � N 85 33 45.8 W -Y4WB-
tn I I I � � 1-40 BUS WEST US 42/ NORTH 24' BST �
W I I I �� � Z
�
� I I I �
♦
I I I `�� �` Q
� �
i i i y� r� �.
i i i 11�1 u ui,.
� � �
� � �
� � �
� � �
i i i
i i i
i i i
; ; ; -NWY42 -
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
� � �
-NWY42- DES/GN DATA
PANEL N0. l 2 3 4 5 6 7 8 9 /0 /l /2 /3 /4 /5 /6 /7 /8 /9 20 2/ 22 23 24
TOP ELEV. 76A�0' 76A�0' 76,r0�0' 875J9' 875✓Z' 74.45' 3.T9' 873✓2' 72.45' 87/.79' 8T1.12' 70.45' 869J9' 869✓2' 68.45' 867.79' 86712' 45' 5J9' 865.12' 64.45' 379' 863✓Z' 2.45
rH 4a �a
-NWY42- DES/�N DATA
PANEL N0. 25 26 27 28 29 30 3/ 32 33 34 35 36 37 38 39 40 4/ 42 43 44 45 46 47 48
T P V /J l.l 60.45' 59J9' 8 5845 857 7.l 5645 5 855�12' 5445' 53.79' 853.12' 5.4 / l 5045 84 849J2' .4 ' 4T79' 847.12' 4'
LENGTH 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20'
10 11 12 13 14 15 16 17 18 19 20
� COMPUTED BY: Casey Harris DATE:11-8-10
�
� CHECKED BY: DATE:
�
�
�
�
�
PROJECT REFERENCE NO. SHEET NO.
�-2�_7��__ ���
W N CO 00 � O O �— �— �— � � O� `0 M
� �A �O N p� �O �O O� � O � � 00 � M M � � M �A
t/'� M � O � O O 00 N � O O I� N 00 � d' N 00 � .
� � � O O .p O O O � � O � O O O O O . O . O . ` � � � O O� � O
Q O� p I� p� N N � . � �O �O M N N � M �A ` � �
�D � � �O �O � � M O N M
d' N � � �O �O N N O� � O� �O � M
� N
3 M O� �O M OMp O� N �O M � � � N N �
� M N I� � �O � 00 .p � N �O N 0 � 0 �O �O d., M I� O
� O O O �rj d. �O � p� � O o0 M O O � .p � �` � O � ` �` O O O O �` � � �
O � � M o0 � N � � � � � 00 � N � O O � O O � � N
� � � ` .
m � N M r � � � N �
o .O � M � �O M M M O M �
+ � � M N � N � N � � N 0 `� `� � (V N Gp 00 �O M O� N N `O O
� � �1" M . �. � �O . N N . � N N �p r— � � ,— M � 0p � �O �` `� p� N � � M � �
� 0 . � � � � O� � � N � � O� pp O . . ' N . ` � I� O M N • CV O� O� CV (v �`
G� � �O � � � � p O� � � 00 �O � �= O � �A � ' ,_ � . � N . � �A
� N a� � � � I� M � N p� � r— M �, � � � � N � �` N O '_ '_ �"� O
.
W � N � � �A
�
V
w I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
0
Z
�
� Z
W N r M
N O M � �' � �O � O � �,r� O� M � � � � � � � M O M �O O� N �
t/') Q O� O M O O �A � p � M � � � � � O� O M M N � � � � N N C p �' � C p I� � N •
�> O � M N r `O p� �O � �A I� � M � O� O � . � � � N N � pp p I� � �
Q O � M � � � O '— � �' I� � M � �O � p� 0 '— G� M M �— N M d' �
U � J � r� � � ,— � o� �— cv r �o �„�
� w
H H H H H H H
� � � � � � �
O O O � O � O N O 00 � � p 0 O � � 0 O O � 0 p O p � N p N � � W
p O t/� O 00 O O� N O � 0 O N O � 0 O 0 N � p O O• N p• � O• �j N w
O O I� � O O O �A N O O O 0 =
N O �A I� �— M 0 + + + O O� O + + + -�- -I- -I- + + -�- + tn
+ + + + + + + + +
00 00 �A �+r� �O I� � � N � � � � + + + �N � J ap pp O i— ap � op p�
O M �A pp � N � �O p� M CV I� a r � M M � N � N
Z �c' �c' �r' `�' `� �° •o �o �° O O O O N M� O O O O O p O O p O p
� O O O p O p O O p �� O p O W� � �
Q ����� F- �� E- o 0 0 0 � o o � o 0 0 0 0 0
0 0 0 0 0 � o 0 0 0 0 0 0°r o°0
p o 0 0 0� o o� o 0 0 0 0 0 0"? o o �°o ��� o� o�
0 0 0 0 0 •,o 0 o w�
J O O O �` � p � 00 � + + -I- -I- O � N -I- + Q + -I- + + + -I- -{- +
-I- -F- -�- + -I' -�- + -I- + O I� O I� + -}- + N N � � � � � � N � N
I� � � � r � �O M � � M I
� p M �A 00 � N d' �O H � H � r' N M I � I I I � J J � �
� �A �A � � �O �O �O �O J J � � , � , I I W W � � � � �
I I I � I I I I I r I � I � � � � Q � I I � I
J J J -J J J J J J '., � � i" � � � � � � � � � � ii' � �
� � � � � �
NOTE: Earthwork quantities are calculated by the Roadwa Design Unit.
These earthwork uantities are based in art on su�surface data
rovided b the Geotechnical En ineerinp Unit.
p Y 9 9
* Quantity includes material used in shoulder construction.
� COMPUTED BY: Casey Harris DATE:11-8-10
�
� CHECKED BY: DATE:
�
�
�
�
�
�
PROJECT REFERENCE NO. SHEET NO.
�-2�_7��__ �QQ
� � p � .p O� O� M .p � � � � I� I� O M � � � � � �
Q N d' N � O� � r- 00 � N �O p I� d' I� (V N � r � �
� � p � �- O� �O �: � r' M � O � O � N �A O � N o0 � O O M O O M O O O O �`
3 � � � N � 00 N � N � � N N N � 00 �O � N N M N N �
3 � � ,� �
I� I� � N p N p �` O� 00 �p M
� O O O O O O O O O O O O O O O O O O� O O O � � o O�`'� °0 0�� � �
� � � p� N � . .
. . � 0 O
m � � � �O � � �N �O N � � �
+ � �— � N � � .p � � � � � p �D p � � N � `� .�p O
� N � � O� 00 � I� �,r) O� M '— �O d' 0 00 N O � � � �O I�
m � � � � CV �„� r O O N � M p � � � O �O �A O� M � � O N I� ap � . M � I� . d,
�O N O r '— �"� �j 00 � O ` � �O � p ' � M O M �A � I�
W r M � � �"� r � � M �' � 0 I� � � � � M I� '_ N N I�
�
V
w I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
0
Z
�
� Z
�� � � O 00 Op � � O� O �O � � I� I� � � Q� � I� 00 N M M � � M
N~ 00 � � O� N �t' O� p. O� � � O� �A �1' � N � O� M O� � I�
c/� ; p� N 0` N � c+� 00 O� .p N N tn � �A O� O � '_' � `o �A � � � � O O CO � N � O � �O
� d' . . . � � � � � � � I� . . C`� �p . � . . � M � . O� I�
� � r � ' M N N �O � `� • Cv �O � • �O I� • I� � � � � � N
U U N � N `O r � � N N 0p � r �,•� �O � � � N � �` �'
� w
H H H H H H H
O O o O O O O O O O
0 0� o °~° o 0 0 0 0 °~° o 0 0 0 o m o 0 0 0 0 °~° o 0 0�� °~° o 0 0 °~° �
O O � O O � p O O � O O � p O O N � _ � � � = W
O O � � N �A O � �A O N `� O � �- �- N �O � � �A O N d' � I� Q� M N �O � O N 2
N N � �
M � � r
N CV + + + + � � M � � O �A M + + + � M + + -i- -I- + -I- -I- -f - N
N N `0 �O �A �A � M � d' � � � � � � �p M � � pp �- �A � �O O 00
N N �' � � � � � � � � � N � N r M N M N
Z � � 0 � � � � � � � � Q � � 0 � � � � � � � � 0 � � �
Q H H I- 1- � H H 1- 1- � I- I- H I- H � H I- H I-
Q O O � O O O p O O O O p O O O O p O O O O 00 � O O O O
U O O o O O O p O O � � O 0 � o o p o 0 0 o M � � O o O
O 0 0 � � O �A � O O 00 �O � � �A O � p O O N O� � � O � CO CO
J N N o0 �O � �A �A -f- -f- -f- -f- 00 �O � � � r N N O O O� t�
� � + + -I- -I- + -I- -I- �O �n � j �n �n + + + + + + -F + + + -f- + -I-
� � 00 00 N d' � O M N � � � � N � � O M �— M � � O` � � `O
r r r r r
J � � � I— I— � � 0 � � H H � � � � � � � I I I
J R� J J ~ I- H � 0 � � ~ H H Q m � a m V �
Q Q� i i i J J J ����� i ���� � � ��� ���
M M d' d' � � I I � � I I �' �' d'
N N � � i- i- � � � � � � I I � � � d' �' � � � � � i- � i-
� � I I I I � � � �- �- � �' �' � � � � � � I I � I I I I
I I � � � I I
NOTE: Earthwork quantities are calculated by the Roadwa Design Unit.
These earthwork uantities are based in art on su�surface data
rovided b the Geotechnical En ineerinp Unit.
p Y 9 9
� COMPUTED BY: Casey Harris DATE:11-8-10
�
� CHECKED BY: DATE:
�
�
�
�
�
��
�
�
� N N I� � � O � � � 0 � �
Q O O O O M N O O N� � O N N O o O � O N op O O pp �
� . .
3 � � M � � � r � �o
O c+� N � ,—
� �o � � � � �
d' �' I�
O � M M � O O N `� O � � O � �A O � O �O O O p�. O p�. ap'
� � � O �"� � N N� � � tc� �A O �p �p `O
m � '— '— d'
o O �A O � �A I� � pp � d'
+ O� � M O� I� N �O O� � � � � � � M � N � � N � � pM.
� p o0 O� p � �
H . . . � N M `� � . � p� � � �' � � �A
Wm � O� M � � � M p. � � � � � N p I� 00 � � �
� � � � �N N � � � N N �
�
V
w I I I I I I I I I I I I I I I I I I I I I I I I
0
Z
�
� Z
N O M N �O � M O M � M �"� � � O M O
t/') ; p d` �A O� � M � O �O � � O � � d� �O N M � I� � � �O �O
U U �O O� �A r M � � ` � � � N M N N O lCj N � I�
� N �' � r N M �I' 00 �
� W
H H H H � �
0 � � m m m � � 00 p m � m O
� � H
O �1' �M v�i � � � � � u � u op � 00 � c= � � � � u w
� O �O N N �'? N � O � � � �A �A �A O O W
+ + + O� O� � N O �A + N + N N N � p N
� M � -�- + O� `� M + � -i- � + -}- + �A O
N � I� I� I� -I- + -}- � J � � N N �- �-
� � N N M M � � � � � N N M M
Z � � � � Q O � O � O O O O O O � �
Op O O � � F-- I— � � W p � O � H H
Q p O M p O O � O O • O O
U � 0 N O �` M . M M O O O O
.p pp I� O O O O� � p � � � � � � � O O
� -� + + O O N `p I� 0 w + + + -� I� I� O O
-f- + O� O o` �-- p
� N � `p `p + -�- -I- � � t� �O � �O O O O -I-
�
� r-
� 0 0 J � � N M W i'C J J � � J � O O
� � � I I � �A � � I Q I Q � � � O�
� � � � � %' � � tc� Q � Q � �p �p � �
� � � � � � � � � � � � � � � I I
PROJECT REFERENCE NO. SHEET NO.
�-2�_7��__ �EE
NOTE: Earthwork quantities are calculated by the Roadwa Design Unit.
These earthwork uantities are based in art on su�surface data
rovided b the Geotechnical En ineerinp Unit.
p Y 9 9
� Quantity includes material used in shoulder construction.
� COMPUTED BY: Casey Harris DATE:11-8-10
�
� CHECKED BY: DATE:
�
�
�
�
�
�
�
�
00 0� �
00
� � � �
F- � p d' N O� .
Q � � � N I I I � I M O I I I
3 M � � � O� �
N N N
I
3 ,— "' o � o� � � i. o
O M I� N � O O� �A � M �O N �
� � � � O� � I� M � Q� � � �
� N � � � � � �` � � 00 d' O� O�
N O
GO �j '� � � `� � I I N N � N N
o � r � � O. �
+ 0 � M � � � �
m �` � � � � I I I M I � I I I
� � � � � � � �
w � �p �p
H
U
w I I I I I I I I I I I I I I
Z
�
� Z
� � `'� o � � o � � o
� o � � o
�Q `n � .00 � �, °° °° o
��O � � O I � I I I I � I � N
U V � � � � � � � �
Z X M r M � M M M
� W
r N M J J � J �
W W W O O � O N O
W
2 = _ � � 3 �
N � �
F- p o 0
� � � 0 Z � � Z a
� � � � m � m �
� � v � � � �
a�
'� J J = � � Z �
� Q Q �� � O a
� � N �
Z � O O Z Z � O o
� �
o � Q W 3
W � � �
U p Z � N � � a�
� � �
O � � V w 3 °O° W �
� W W � � � V
� U� � U O � a
� ? i- O� w � s
O� Q N� J � �
J j Z Q 0 Z F" �
a o � 3 � � �
�.�..� (n ~ � _ � � ,�
�~ O �p VO p a N aoi
J a� a 3 W c�
PROJECT REFERENCE NO. SHEET NO.
�-2�_7��-_ �FF
NOTE: Earthwork quantities are calculated by the Roadwa Design Unit.
These earthwork uantities are based in art on su�surface data
rovided b the Geotechnical En ineerinp Unit.
p Y 9 9
COMPUTED BY: T. CAO DATE: 5-11-09
CHECKED BY: J. BRAXTON DATE: 5-12-09
� " I � �� " I � I : (�> I � \ C�> 1'� " I � I I � � �� I'� (�) I . I \ ��
II)I� I�IC�)\ C�)I III��II`�'�l�
REMOVAL O F EXI STI N G
ASPHALT PAVEMENT
SURVEY STATION STATION LOCATION YD2
LINE
-Yl- 52 + 58.40 53 + 56.83 LT. 208.28
-Yl RPD- 25 + 80.81 26 + 31.33 LT. 155.41
-Yl RPA- 21 + 53.46 21 + 72.84 RT. 87.89
_�_ 533 + 84.85 534 + 10.29 LT. 31.71
_�_ 536 + 66.32 537 + 27.37 RT. 123.95
_�_ 553 + 20.16 554 + 87.90 LT. 361.37
_�_ 565 + 02.96 565 + 98.69 RT. 261.98
_�_ 622 + 66.83 623 + 04.11 LT. 189.45
_�_ 623 + 66.77 624 + 82.90 RT. 716.37
_�_ 630 + 91.75 632 + 50.68 RT. 911.03
_�_ 635 + 68.51 638 + 83.77 RT. 1300.45
-L- 649 + 78.32 650 + 87.26 RT. 204.49
-Y4- 102 + 50.00 106 + 64.27 RT. 740.02
-Y4- 122 + 00.00 123 + 50.00 RT. 91.49
-Y4- 125 + 76.28 127 + 12.62 RT. 197.61
-Y4- 127 + 79.54 128 + 82.85 RT• 353.53
-Y4RPBD- 67 + 09.76 71 + 70.03 LT. 1428.23
-Y4RPBD- 74 + 70.70 75 + 34.04 RT. 305.15
-Y5A- 63 + 17.00 65 + 22.39 RT. 385.71
-Y5A- 77 + 45.00 78 + 94.81 RT. 301.60
-Yl DET- 11 + 74.27 48 + 13.76 LT.&RT. 10,514.08
-Y5DET- 11 + 59.72 30 + 81.71 LT.&RT. 5,552.42
TOTAL SY: 24,422.22
SAY: 24,500 CY
BREAKING OF EXISTING
ASPHALT PAVEMENT
SURVEY STATION STATION LOCATION YDZ
LI N E LT/RT
-L- 567 + 00.00 RT 431
-L- 570 + 00.00 583 + 00.00 LT&RT 2,889
-L- 623 + 50.00 LT&RT 667
-�- 630 + 30.00 LT&RT 471
-L- 636 + 00.00 RT 596
-Yl- 16 + 50.00 32 + 93.77 LT&RT 5,114
-Yl- 35 + 26.34 47 + 00.00 LT&RT 3,651
-Y4RPBD- 71 + 10 74 + 50.00 LT&RT 756
TOTAL SY: 14,574
SAY: 14,600 YDZ
SUMMARY OF SHOULDER DRAIN SUMMARY OF SHOULDER DRAIN SUMMARY OF SHOULDER DRAIN
SHOULDER SHOULDER OUTLET CONCRETE SHOULDER SHOULDER OUTLET CONCRETE
SHOULDER SHOULDER OUTLET
LINE STATION TO STATION DRAIN PIPE DRAIN PIPE PADS BOX # LINE STATION TO STATION DRAIN PIPE DRAIN PIPE PADS BOX # LINE STATION TO STATION DRAIN PIPE DRAIN PIPE PADS BOX #
(FT) (FT) (FT) (EA) (FT) (FT) (FT) (EA) (FT) (FT) (FT) (EA)
-L- 542 + 00 TO 555 + 45 LT. MED. 1345 1345 -L- 520 + 00 LT. 18' 2 GI,#85 -L- 504 + 85 TO 510 + 37 LT. 552 552
-L- 545 + 65, LT. MED. 9.5' 2G1-A,#109 -L- 521 + 50 LT. 40' 1 -L- 504 + 85 LT. 2GI,#71
-L- 548 + 53 LT. MED. 9.5' 2GI, #112 -L- 528 + 75 TO 542 + 70 LT. 1395 1395 -�- 507 + 00 LT. 2 GI,#74
-L- 554 + 22 LT. MED 9.5 2G1, #117 -L- 528 + 75 LT. 2G1,#93 -L- 617 + 00 TO 626 + 80 LT. 980 980
-L- 558 + 30 TO 564 + 00 LT MED 570 570 -L- 534 + 50 LT. 18' 2G1,#96 -L- 620 + 75 LT. 12' 3G1-A,#174
-L- 558+30 LT. MED. 9.5 2G1, #119 -L- 539+72 LT. 18' 2G1,#101 -L- 623+47 LT. 12' 2G1,#176
-L- 560 + 50 LT. MED. 9,5 2G1, #121 -L- 542 + 70 LT. 18' 2G1,#104 -L- 521 + 50 TO 528 + 75 LT. 725 725
-L- 667 + 00 TO 679 + 00 LT. MED. 1200 1200 -L- 501 + 50 TO 510 + 00 RT. 850 850 -L- 521 + 50 LT. 40' 1
-L- 669 + 65 LT. MED. 9•5 2G1-A,#278 -L- 501 + 50 RT. 2G1,#67 -L- 525 + 50 LT.
2G1,#89
-L- 672+00 LT. MED. 9,5 2G1-A,#283 -L- 504+85 RT. 2G1,#73 -L- 528+75 LT. 2G1 #93
-L- 673+22 LT. MED. 9.5 2G1-A,#285 -L- 507+00 RT. 2G1,#75
-L- 676+00 LT. MED. 9.5 2G1-A,#289 -L- 558+30 TO 564+00 RT. 570 570 TOTAL: 2257 2257 64 �
-L- 478+20 TO 484+35 RT. 615 615 -L- 558+30 RT. 2G1,#120
-L- 478+20 RT. 19.5 2G1-A,#3 -L- 560+50 RT. 2G1,#122
-L- 483+00 RT. 15.5 2G1,#10 -L- 667+00 TO 679+00 RT. 1200 1200 3-SHEET TOTALS: 19,037 19,037 890 7
-L- 617 + 00 TO 626 + 00 RT. 900 900 -L- 671 + 00 RT. 32' 1 SAY: 19,050 19,050 900 7
-L- 620+78 RT. 4g' 1 -L- 673+22 RT. 21' 2G1,#286
-L- 623+00 RT. 48' 1 -L- 676+00 RT. 19' 2G1,#290
-L- 486 + 00 TO 498 + 42 RT. 1187 1187 -L- 522 + 00 TO 528 + 49 RT. 649 649
-L- 486+55 RT. 1g' 2G1,#36 -L- 525+50 RT. 2G1,#88
-L- 490+75 RT. 18' 2G1,#39 -L- 528+45 RT. 2G1,#91
-L- 494 + 75 RT. 53' 2G1,#48 -L- 528 + 49 TO 552 + 62 RT. 2413 2413
-L- 512 + 00 TO 522 + 00 RT. 1000 1000 -L- 534 + 22 RT. 18' 1
-L- 515+30 RT. 21.5' 2G1,#83 -L- 534+50 RT. 18' 2G1,#95
-L- 520 + 50 RT. 23' 2G1,#86 _�_ 538 + 00 RT. 18' 2G1,#98
-L- 478 + 20 TO 485 + 60 LT. 740 740 -L- 539 + 72 RT. 18' 2G1,#99
-L- 478+20 LT. 20' 2G1,#IA -L- 542+70 RT. 18' 2G1,#105
-L- 483+39 LT. 20' 2G1,#6 -L- 545+63 RT. 18' 2G1-A,#110
-L- 478 + 50 TO 495 + 00 LT. 750 750 -L- 548 + 53 RT. 18' 2G1-A,#113
-L- 487+50 LT. 29' 2G1,#20 -L- 551 +00 RT. 28'
-L- 90 + 75 LT. 17' 2G1,#38 -L- 552 + 62 TO 554 + 20 RT. 158 158
-L- 510 + 37 TO 521 + 50 LT. 1113 1113 -L- 554 + 20 TO 555 + 45 RT. 125 125
-�- 513 + 00 LT. 34' 1 -L- 554 + 22 RT. 2G1,#117A
-L- 516+00 LT. 18' 2G1,#79
TOTAL: 9420 9420 488 3 TOTAL: 7360 7360 338 3
PROJECT REFERENCE NO
U-2579B
SHEET NO.
3-GG
N
�
w
�
5 /
\ ^ �� ,
� MATCHLINE - Y2 - STA. 15 + 61
DETA #4 SHEET 22
� 'V' H GOSPEL LIGHT END C/A �' � ' �
� c Not to Scale) APTIST CHURCH +50.00 -Y2- � � � � � o
�// I � 7 42.00' - m � N �� , �� � � I
Fill DB 1244 PG 471 +50.00 Y2 I m . r
Notura Slope DB 1342 PG 115 `�
ound 2,y D 2� �'/Ft DB 1560 PG 1136 67.00' I ' � � �� � � � O i ��� y
�
� DB 1684 PG 2508 io. - - - - - ,
� Min. D= 2 Ft, pg 1684 PG 3098 � � 1 �R i
� b= 5 Ft.� DB 1872 PG 3238 SPECIAL DITCH GRADE � � °�2 � I � � �i - � _ _ _ _ _ _ �
f DB 194$ P� 287 SEE PROFILE FOR GRADE � � � -pB-26$0- P� 1572 f�
���`� FROM STA 11+75 TO 512+50 -- LT DB 2044 PG 320� ��� `� � EMMA M. WHISENHUNT � �
� FROM STA 12 + 50 TO 513 + 45 - LT / � �
-Y2 -PT Sto. l7 +68.78 , � �, � 6 ,q . � � 21 �,.,�'� -Y2 -
� , � I � ��
�,--,` � ►�'� END c�A Pl Sto 14+90.64 Pl Sto 27+32.39
S - �� ���o os , � � +50.00 - p= 44° 24' S2.1° (R p= 27° 06' 16.2" fLTJ
,-��\ � ROBERT �. o�� s �` � ^� � � 42�`'' p= 7" 33' 3/.7„
,�-�� , ILENA B. DILLO �, � , D= 7° 33' 3/.7"
, S° -'� � DB �37 Pc ��52 ,� `� �� 04 �� � N L_ 587.5� , L= 358.58'
1 y�, D 7 4 P G 9]� 5 5! + 6 8. 7 8 - Y 2- '� � T 3 0 9. J� � �- _� 8 2. 7�
� �
� � '.`� B 1�74 G �'T8 42.00� ` / � k6 �°� `� R = 758.00' ,
_ , � ' � _ _ , J3 � i �9s4 j o,� � 3 • � R = 758.00
- � � � � SE _ .08 SE _ .08
� " � � � �,� �� +23.54 -Y2- � � ' l � ,� +bs.�s YZ- RO = SEE PLANS 0 = SEE PLANS
�� �� �-�- � 42.00' �� 02 � 42.00 -BL-21
�� \'---------_ +33.33 -Y2- � � '\ / +96.14 -Y2-
� ' - - - - - __ _ _ _ � � � 72.00' � � TOE PR TECTION W/
� LATERAL 'V' DITCH \�� BEGIN APPROACH SLAB ,� ��`, `� 02 �0i l � 42.00' EST. 51 TONS
C SS "B" RIPRAP
SEE DETAIL#4 � � � � / / � +88.64 -Y2- ST.139 SY FF
� � -Y2- POT STA.18+74.�� / �/ �2 / � 65.00 SEE DETAIL#b�
� � �
� .
� � � c�/ � ° R C
� � / % /
��� 2a� '�,'� � o � o, � Q F c w -8�-22 '4
�"` Aa e�' ,�,` . BEGIN BRIDGE � � � �Q � BEGIN HEAD DITCH
� �N� °0 �� \ � , \ � , -Y2 - POT ST A. l8 +9 .25 Fs � gp 2 02 � ` � w.w. FENCE �
-/ SEE DETAIL #9
�,aS�'� LATERAL 'V' DITCH �''�� �, END W.W.FENCE � S��. "�CP IV _��_ - � � \ EST. DDE 6CY �
P��ESS SEE DETAIL#4 ` so�� . � - � � � � � � B � � � � BEGIN SHOULDER BERM GUTTER `^
�� �6 � � � � _ � o��e�% , _� � � \ � � STA 521 +50 -L- LT
� � ` � ` � 1 ' CSP W/ �0' � - 8A � �
/� � � � 2 OWS PSEM � � SB �� I
� � SS � , � � i A 18 + 60 -Y2- LT&RT �
C � � � �\ � � � \ �b P�c � ' � -BEGIN BRIDGE � \ C _ - - _ _ � � �HW
---- ----------��/ `�'`^ � � �
� �� � _�
� , � - - - � � , , � 3 �S � NOR CAROLINA DEPARTMENT oF 991 2G1 ' - - F � �
N �2G1 i
�j TRANSPORTATION
PROJECT REFERENCE NO. SHEET NO.
U-25796 7
R�W SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
]��$]E]L��l[�N�][$� ]�ILAtN�
ID� N�°Il" USE E� C�NS'JCIBUCTI�N
-BL-23
� FS - - � .
� , � yT�' O ,� - - 79 �� ' l �S- DB 2825 PG 866 85 � - _ l2 P.S. _ _ _
/2 P.S. � � � � /2' P.S. CAT -1 00
� � � `7 S �� i / �i � � W
W - � � c� � W
W =
2 � ' / O / � � f�`_ � _ cn
�
� i° , W � � � / �v; � o C�,c i� �� 87A � �
p � S g,p i ��� � i � �� �-
N/2'P.S. � 84 �sF� JB /MH � 87 /2'P.S. l2' S. `N
� 3" RC III � 2" RC III 2G1-A �� R P ��, 2 � 18" CP-II 18" P-III � •
' N
¢ -- Fs � � � 5°4 " -- �
N /2'P.5.2G�-A �n �, � � l2'P.S. l2'P.S. �
I � � � �
� � � � I
-� � " PR POSED 0 RHEAD � ~ \ � � � - ; j� � � , \ o = � � � � �
' �' SlG SUPPOR OCAT lON �' �' ` � � � , � � � �' �' W
w i �� �,,so; , � � � � Z
� � ' \ � \ ' � °� ° � _
2 � � \ �, �, � U
~ -���ti,�s�� l2'P.S. 2G1 � � / � \ , � � 2� / ��/� � +50.00 -L- I-
� � GRAU-350
1 P � 83 �v; J � \ `1 � 2G1 � /2'P.S. � \ �� � 110.00' l2'P.S. �
� ��\ 5 CS W/ O� l� o � BEGIN ' � 86 FS ------ ��
� � F � \ 2 ELBOWS � Q c� W.W. FENCE ' , O � � � - F �� � � �
�� �� \\ 300'TAPER � �, RONALD H.WALKER ,' ______��� C �� \\ y \/ ���_____
C �, WILMA D. WALKER _ �
�� O FS � DB 1621PG 3161 ,' � _--�- �/ � � �\
�- // WLB �- \r
\ � � � , � END W.w. F�vc-E� � 2 � � % � � - -' � , 2 3 -L - POT ST A. �5/6 � .�8 ' � � � V _ .� � �
82 � � \ � � -Y2- P�� �„4.20+20.2� � ��GIN SHOULDER BERM GUTfER �
� + 44.28 Y2- / � S / � � - -��-�1� _ /Q�.0666� >> g �� STA 522 + 00 -L- RT C PS �P \ �/
,�
42.00 / „h C�/ �g �� EST 17 TONS WEy878.�'
Q� � � POND � , ��
� 81 i � EST 38 SY FF
�/ �� � C � R ' y / C
i � i � 2 oRs A W � R�p P
� ll � � l �� E T��a,OFYT H � NT y � THE TABOR /
+65.0 -L- C � � � � � +oo.00 -�- � � � wA�KERT��,N � � FAMILY TRUST �� �
; rn I � //� 200.00' \ ��' \ ' � - _ 7�oS - DB 1851 PG 2236
2 � � i` � �f ��-, '----
DB 2528 PG 77 s�
+90.00 -Y2- I �• /� �/ 3j. 9, �
� � � � TOE PROTECTION W/ +50.00 -L- � „_
60.00' �/(p � + 6.88 -Y2- CLASS "B" RIPRAP
I � //� � 42.00' EST 69 TONS
� �� � �C EST 185 SY FF
/�O � SEE DETAIL#6
N N � I /� O � L�
m � rn i /�� �M /
� H 0 0 � '� �/ ROBERT JEFFREY BAR
T= � �20 �
DB 2862 PG 382
ROBERT J. DILLON � 2 / #
o / 3 6 �� � DETAIL 9
ILENA B. DILLON �� � � C STANDARD BASE DITCH
DB 1373 PG ��52 �, � �� o � � �� END BRIDGE `"°t t° S�°'e'
DB 1574 PG 975 p a` Naturo� Natural
DB 1574 PG 978 v"' � � � ROBERT JEFFREY BaRBER -Y2- POT STA.Z�+4�.I8 2,y p 2:
END C/A rn � Ground \ Ground
DB 1574 PG 984 +00.00 -Y2- / ��2 END ('/A DB 2598 PG 3575
42 .00' C � � / + 00.00 -Y2- DB 2632 PG 3923 2 5 + 3. -L- M i n. D= 2 F t, g�
� DB 2632 PG 3938
= 3 F t .
� p� 02 / l 42.00' DB 2632 PG 3941 200.00'
� � / FROM STA.522+42 TO 522+45 -L- LT
/ � �c BEGIN APPROACH SLAB �
� °2 � s, 20 -Y2- POT STA.2/+66.42
�T�ti�,A' l ' � � +35.00 -Y2-
'v� � Y 65.00' �
? � STA
?4�8�SH \ �
��r ?3
, , �
192.80'
DETAIL #6
TOE PROTECTION
c Not to Scole)
�
Naturol 2��'��� Slope
Ground F�,P'
d
Filter
d= 2 Ft. Fabric
Type of Liner= Class 'B' Rip-Rap
FROM STA 522+00 TO 523+20 -L- RT
FROM STA 522 + 60 TO 523 + 50 -L- LT
0 PAVED SHOULDER
�TE.
R-Y2 - PROFILE, SEE SHEET 49
R-L - PROFILE, SEE SHEET 33 -
� \� �� -' ,' = CO 1 II I PROJECT REFERENCE NO. SHEET NO.
-�- EG/N 3" RE AC/�/ ONYA G. MABE
� X - _ _ - � � PISGAH METHODIST�HURCH DETAI�� #7 �2 � � \ � q�_P� -� o,- � IIII -Y3- STA.18+25.00 D� U-2579B �2
P � � DB 1834 PG 4� 3 �- TANDARD '' DITCH �� I \� I- ioo o � I II CLASS OBO PG 048
/ ��' � DB 927 PG 34�1 I c Not to Scoie) I � � i V Q+00.00 -Y3- R�P �P R�W SHEET NO.
/ � R. ROBBINS �� � LL
M EL S. ROBBINS � DB 74i PG 20 � � � � I� � �, 30.00'
� � I� �� � I�o � '►- EST OTONFF ROADNGIN DERSIGN ENGINEERS
� DB 516PPG20 �- m - �� � I 71.00'
I � '-
� �v Noturol � � � � � � ' W � � +98.� -Y3- x
�, � Ground \ round � �
/� � �' �11 Iy `' j�N �� R MOV� a�,� ��.00� �soo
��, �`� c�, � � _��� _ Min. D= 2 Ft. � ��I I ��8� �� I�� ��\ o p� TAIL DITCH ?� `l-�,
P x � � - � � _ �o � � _ �, o .
� �, 6O ��I � �}- II� �� � � SEE DETAIL#7 'p0-
� h k� FROM TA. 584 + 8I1 TO 585 + 13 -L- LT � �� I I gST� ��'' �\� �
^ , �I � EST. DDE 9CY
� �' v,"' � � � I SPECIAL DIT�i GRADE �~� I ` �+ \\ I \ CLASS 'B' RIP RAP ][��]E][,][�][][N ��' ��L.A�N�
� X `�' � � � � SEE PROFILE FOR GRADE � I I I I// � � R OVE�\ EST 3 TONS
�� �� ID� N�'J[° USE F� C�NS°JC�BUCTI�N
I \\ � o E_.EST 10 SY FF
� k � � � I � 1 � � � � �� I �I/ ° ` 2" � � i, � N + 74.62 -DR5 o g-22�E
X o � I � I� I �, _ 27.77 5 10 CO
k �� � I � I c� � �� ��I � ���'�� _ +4 � 375,43' R�P p C�
LATERAL 3' BASE DITCH � Q I I � � � I �� REM V � I I 148 \�F ���� PE 3� 55 E1 �
SEE DETAIL#11 � °- I � _I ��I I15 O � r � UNK OW � �� � �ra�e�t €ese�"�t-� DR5- to. 11+365 CLASS 'B' RIP RAP
k � - - -� -Y2A- PT Sta l5 +18.49
� ol � � �\ TY E/ 1 �� EIP „ for Access �� F 60.00 -L-
`„�,, � II I � � �� o , o o� �, 4 38. E �, R- P to. i+i �7 300.00�
k� kISGAH METHODIST CHU H � � � � I Q B E G/ N C O N S T R U C T I O NI 3 � �� 1 I� ��� � �; 2 � - D - P C S t a / 3+ 0 9. 6/ '�'
k DB 1834 P G 4 2 9 3 + 3. 0 0 - L- � � I- -� -}- w B E �/ N 3" R E S U R F A C/ M G � � I I I I� i 1 0 � � I I + 87.77 -L- Q
�-`�'"'�-� �j � �- - + �, � � A I � � _ +36.00 -Y3- � 92'61� $ �-L'� S 'B' RIP P �W
DB 927 PG 347 260.00' I �� � � � � I 1 I � �, � �1.A0� �,` o x�,jST 1 TO =
pB 741PG 201 a w Y2A STA.l6 00.00 TAPER z ,-
-{- w 0 EX/ST. � I I go.00 i � I � x � � , \ � .� c�
� I G 20 � w I . I + 4.73 -Y2A- W � � � � I � _ F 90.00 C �, � ���r\� 8.O `o
� DB 516 I �� � �a.fi�- fiIQ I � 1 I� � � -° v A Tt � '�S �
60 - _ _ _ _ _ � � TAPER � � � OBERT SHIPLEY and wife � � �
,6 END aa � I TO EXIST. I I d � � � I MONETTE SHIPLEY �`� � �!y �^
CH�RD C H O R D S� 6�S 9�' +00.00 -�- � \�_$�--�� � f �� � I I I� � 1 i � �I �� � \ D� � 6 4 6 P 2 0 6 q � �� B R I� E� R . L. � Q
C /P 2 S�°�y 200.00' � -�__-_��-� t .� J��-� � 2 G 1 W ~ F a � � I N ��� I 6 7 x� 3� o -L OC S'�585 7 �'
-i� POT Sto. l8 +29.�6 � 5�+75.00�L -+`.28 -LN W O � I Ex T. � � � 1 I N � � � 1 ,�g� � X �i
A w -L - P� O 83+49.6/ 200' 200.00' � �� �� o W� � � �� � � � � BEG/N W.W. FENCE �� `��� 4
, , C / I _ � EI BEGI�BUTME�WALL - - - 8s� �p�
A � I = , \ ~ � w � C � � � � � It - �-& S/A/ _ FAC ARRIE� - ' � � �'s� u+
I � �
" - `� � �' � � 144 � � � I � � Q ti o �I �� o � i � ��-�}- ( Y3 RS,T ?�1+03.39- - - - - - _ ND �PROACH SLAB �T. �
______----� DANNY RaY BaYs -- ----_M� �--- ---------_____ BEGIN BRl E RT.& LT. � � � I ol�� � �E � � 45. . _ -L- POC STA585+82� _ v
�-- P 842 P I744 �• _--- _PQ STA.582+85.67 _ _ --F ---- -_ �Io�- � � �I � --- --- ti
- - 2 c a 61 �~�-, � =L- _
� B 42 PG 179 =� l30 ' FU L LANE T�' II �� � � Z I�, I \ �
� F 2G1 W/NARROW S�O END APPROAC SL R
I ~ N� z I I W �-F�T G�,TE -� - Pp� ST 6 f0 .�6
° 63 �`�`' s ��8 BEG APPROACH SLAB RT. `� `� I , � W I � I _ - - - - - _
�`� ENDELL B ADNAX �63�- ��� o � I 1 � 2, �3$ 5 BL-39 - - ---
� � `�,,s,. -L= POC STA.582+62.32 � i � i + �o _�
°'ti �^� GLENDA BROADNAX �y END W.W.FENCE � I � LARRY EDW RD JONES nd wif
� o`� • "� `� DB 2301 PG 838 ``� BEGIN APPROACH SLAB LT. - I �� �� �� � c�oo�
x `^� � I I I � I �� I ���� ; P AOPOSED R B�N . JONE 2
S, 3�0, �� � Pa a2 Pc �7s � S�6 - L- P O C S T A. 5 8 2+ 5 6. 8 5 I W � N �� �� �� w«
RICHARD . ROBBI��, � B-77 I I � � I�� �j 8 �
�s• � � �, � � I I � � I �
BONNI . ROBBINS w � 9.�
� o � � � I B-77 �2" P.S �
FJ7 i � � I � � ��-� �
,� � ���,
� /°' 9• a, I � �� � o I �� 195. i� Riw DB 1459 W
W � / rN - 334.26' � I ' � ��� �- - - - - - - - _ � COR �- 2
�
= o -� h � � IIII� _ ---�l�___,,, o
`_ co
�o «� ` c� � TA EY TIG L _ � I � N � «� �� � �
� � ��
M � �� � B 77 � 35 i � � - - �
+ `� � i , PB 2 P �7s Fs � 2 ~ 'P, d
B ``' o I B 77
�
� � _ m� 14 REI�M VE = RE N 1 � I C OL A LD PA � � FS e N
M � �
2G1 EIP � �► I
� 138 / I Rc� � � I gb.00 4 � �
N12'P.S• �, � � - � � � � � n � � � d' rN � I � � �'•S ' ' w
�r E -� � EM VE ��I _l =,
J C� =i � �� TE 6"DI q ��� � _--
i -w =� � � � � 2
� �
� M �R - < � i _ 5" R P-IV � I � -� -�4^ W - - - - �
Z�� �� �_ � I L-AT_ • C- _ ---
/ , i ROBBINS PERCH TR 0' BST ��� B-77 �� OISL w LI Q� B ��� � _ -236- IP T p OR _�3 �C k �
� i
_ _ - = 5 ��/FLAT U � I ° �� � �\ � � � RE VE / � � � � � I 14 N I 1 � � �3 � GRATE _ _
� -L�LWLI I . - ' -
� � � ir
~ TO � 139 1� ' � ��� Q EXISTI G R/W 8" P 1" RCP-III � � m � � I� L2- ,� � GR
PAVE �, i�� I lO ,, � E COLLAR AN a I ___-- p �
gqRRIER REMOVE // -\ �, � = I TAPE c� � = I 1 I � , �R _ ��?_F �
� FACE � � � � � � �, ,�, 4� � H EXTEND � � I ��� BARR/ T� '
� M 18" CSP W/2 ELBOW� \ � �i m N I REMOVE I � I � 00' � � o I � �� -- E�D NOl , wA �E --�- --
� �, AND ROD qQ,� U � REMOVE bF BE('i Lc- �� 0/V
� �N� � � �- � ' EXIST. 18" R I I r ULL LANE � F � M �� j� � N0� LL -,ywR2�'� �
EDWARD RICHARDS�ON � � CONNE � _ \ � _ _ � ,
DB 2349 PG 198 _ �- - ; - �. ' � -
PB 42 PG 178 � c°� �' _ - � z " i � �"'C� �W/� ELBOWS �' 146 I II � I I I I� GA.R�iF' ttS (� --
CLASS 'B' � / �SFD I --�� � a I i� AND ROD�„At�7B- �JCZ i END W.WFENCE O � I �O � I '
RIP RAP ;` _ - i CONNECT�RS �'- --' -��� � o I I� 1 I I o- ,o M R201 PGI 3�92 .
� 5 � EST 1 TONS "' _ - - - � � i � ,' - - - - - � �, H M� pp � � C � I � � � � `i!� C IAL DITCH GRAD
��N�F / /- - N IWD DK �� ' i ' i CHORD _ � � �I C O, � I I �I � I � I I I I SEE R FOR E
�-�/ % L� I-' �o i �1" Q � � � �' � �
_ - - � CHORD o � , � � � „�cP-iii � i � + + I I �6 N 1�� I � ►=
Q M ' �� 4^' �, � c� � I I� I � N o�p � I �� I� � 1 � I� � 4�
SOUTH POINT. INC. iO �, - - - - - - ' ' � � � � I � r � I � I -�
w 1 v, , + 50.00 -L m I p I � z -
DB 2584 PG 3896 , � �, I Q � p Q I � v
/ ��� PB 42 PG 178 � � ,� ��' 200.00' - � � � V1 *- I I I�, z II � � _ � 211.
+56. - � � LATERAL 2' BASE DITCH � �q� I V� I R�MD�I� � � - - - - - M - - - - - - - - - -- - ,
� �
WD DK200.00' � 62 �� - � �--- -�� � 0 0 � SEE DETAIL#3 I I�I � I � 1 � � � � � � � � � - -� wZ� -------U -- �
�' + . 0 L- 0 36 � „ y�y� � � � � � � �, '� � � `� N z �
-Y2/� �� � 200.00' � 3 �9�33, S w END NOISE WAL�N B�DGE z J'� ��I � � ,�, � I � � I � ��l"� �,� ��- �-tQ-� Q �I
� -BL-38 �j o C�ASS 'B' BEG NOISE WAL � o � NI I J� � I N C � ,� I � I � �, � a° N � I
Pl Sto l3 +90 67 Pl Sto 22 +28 9/ �� � �� � �- �� I N � i � A Z � �
_ a .. „ e ,' „ `� �� o rn RIP RAP �-�� N� � i- I �� 1 � I �,� � o�� NORTH C OLINA
0 0 � �' E S T 2 T O N S � I I � I r I �t I I >-
�- 2 0 4/ 0 7. 1 � R T 1 p= 2 5 0 2 2 0. 2 f R T I �, � o � �R �� �_ � � W Z , D E P A R E N T o F
Q= �" 00� 07.C�" D= 8� o o� 0 7. g� + �� ,= EST 7 SY FF S 1 9° 2 9' I E +51 p O I �I � i ��IP� O � I � I 2' I� '5 cnw as DB A 2� PGQ(�254
L- 2 5 8. 4 9 L= 3/ 2. 9 0' N o R I C H A R D H E R R I C K q, I�, �, , w i�� � � i � o� �
7- _/ 3 0. , 036. DB 2776 PG 2948 154.4a� iw To COR I I / Q� '� o I � I M
�' j 7 T= 158.99• S T A N L E DB 2079 LPG SO 3 Q L L �8'ss� s"W -y2%�- PC StO. 20+69., 1 5 6 ' E I P r o C�TAP R I � I I � /��' a o a wI'F I � I'�` _ �
R= 7/ 6. 0 0' � + 5 0. 0 o Y� a- I Q � � � �
�= 7/ F' j. Q Q DB 1929 PG 249, � N I z a ~ o � ,
D B 1 8 9 5 P G 1 0 �� / � I� �� J I I �
� �� 0 36, P B 4 2 P G 1 7 8 E N D U A � � � � I � � o� , p � I � O ~ � � � �
/ - L - i�q 66 2S• w � PE CIAL DIT C RADE �� � �i EX 7- �~ �, � I � \� I \ END �A
� C
� Q� N E PROFILE F�3 RADE � = I +50.00 -Y3-
� Pls Sto 543+50.33 Pil Sto 576+22.74 Pls Sto 603+37.20 ��, �� 39 S� .-� � a `'°"� �� �� � ��' � I ' Q��ESS 32•29' a
� � I � EASEMENT DB
�' 6s = l° ll' S2.2° d= 58° 09' 46.4° fRT� 6s = l° ll' S2.2" �"' 368.0,. `" ,,��`'�'-`J`'� � T�g o��sT � � 1 � END CONSTRU TION � i�� �� �� 20� �
� Ls = 240.�0� �_ �° 59' S3.Jr�� Ls = 240.0�� `� RONNIE DEAN WGLE. JR. ,;:�' 1� DITCH � ° I I� END 3" RESURFAC/NG � � I I �sr��
�'� LT = 160.00' L= 5.826.87' LT = 160.00' N �� � -r2a- sra 22 00.00 � _
LOLITA MONTES INGLE � o � � I �- -
r' $T = 8�.0�� T=,3,192.4/� ST = 8�.��� �� 36 2S� -�', DB 2020 PG 1675 � � Q P ° ° � � END CONSTRU T/ON � I� II I II � �
� f� = J�,740.�0� 3�' �S' w �' �y � �� e� �// � j 4 E N D 3" R E SU R , F A C/ N G �� � I I� � I � �
� _
S - 4 `� 2,q� . � l � -Y3- STA26+ 5.00 �I �I�
L E .O �0�. � � � �/ � R SELL I = I \ � c�
� s' �/� a / STIG L ��Q �,
� # # ` 23 � � Q// DB 1895 PG , I 5 0 � � P I a�
N - 5- DETAIL 3 DETAIL II x8 � Q �/�� � � � os 1929 PG �24 ��� I� � 4�3
2. � Q� i s`� � i � '� � 0 PAVED SHOULDER
LATERAL BASE DITCH LATERAL BASE DITCH 82 � Q � e Q=
� $� ( Not to Scale) ( Not to Scale) o �� �
Pl St ll +77 33 Pl Sto l3 +38 58 � �� J i �� i �� I ��
�� 0= 44° 20' 22.0" �RTI �= 32° l9' 0/.0" fLTI �Ib -II F��� �I-.- b -II F,�� 2,��� ��� z�� o� , i �! ��i ���
o�� a , n � n 3-Q�, t r I I � SIoPe Naturol I � SIOPe � C� \/� l c� � � I o
D= 57 /7 44.8 D= 5% l7 44.8 F und �. � ,•�Ft. Ground z. � ,•�Ft. � N� �� �� „�� � N � � I I�- �
�' L = 77 39' L = °' ' ° 2� ' ° z' �'3 � � � . � ir ii � � � i ~
_ ' B Min. D= 2 Ft. B Min. D= 2 Ft. �, �� /� , / o�� �� I I�
�� T _ 40.75' � T _ 28.97' � � . . - r B _ 2 F t. �---� . � � � � � �! I I
> r� IQ -��Q.O� R �0�.0� b 5 Ft, b- 5 Ft. � �� �� � I I
� i
o� �'-�;.1- FROM STA 581 + 70 TO 83 + 20 -L- RT FROM STA 57 + 50 TO 57 60 -L- LT � � � I � I
/
o� 4:,. , � , � l i lli i� � �, I� � i
N
�
w
�
� � -' - � ��
� -Y/ �
` -DRl - �� Pl 0 6 + .l9 N
�' � +30.02
1N3W3SV3 a3M3S Aad11NVS,0'OZ � P� Sto l6+19.�7 R� Sto 20+57.`f� P�
_ � , -� � T� � = 3 08 /9.0' (RT l L`� = 3 08 /9.0 (LT 1 = 25 Z " a (LT �� 0 �� 5 5 27.3 (RT )
` I Pl Sto l0+14.44
� � 0_ l0 59 53.6 L � p= 0° 42' S8.3" D= 0° 42' S8.3" - 5° 43' 4� �'S s P�^ 5° 4 46.5" '
I D - 38 // 49.9 P � � � _ � M,a �N,lsd� _ ' - 452J7' 45 ./7'
v~i � L - 2U.79� lii M � 1N3W3SV3 Alllllfl �Il9fld ,0'01 - + � � � 3W3Stl oo � � �%�O.O�' � = O.O�' ,
N � T=/4.44' q' - �n �nend ,o•oi v
P P
. � SONNY R - 1�Q�0.0 � ,o � Z , O.Q�' �R �y�0.00' ,,`', °o ,000.0 ;
R = lSO.00 BOUTpq VON� � � ,� W '•�N N �''�o � � °'ti' z
I D8 3083 p �
�, SE _ �N SE _
� Q � PB cJ9 Pc' 3647 o IQ� �� � w� IQ� =m� W `l��s'� � y p'o- � ��i
a
� 1O o `t' 82 � � = a o- "' � � "' - " �0� `� s' o ,- c- 6` '�
I 1 Z O� O �j'�� ��9, � O� y' � 01 N�= a C7 vwi r � a �' �� d% N �Z O� � ��cr
� �;' � °� �-� ��, �9, i.n W p tf� p�} a r� W � p Q 7'�� p � r' c^ Cy� � `V P Q-���
I O m � � `r `9G �i�`_ Z � M 0] � l+J � Q� � w 'h � � O, Z p = ,Lv �v
� W ��EGI1� C01�STR UCTI01� �- �' 9 s � o Z � � � z a � W �' , ``�
I � .� ma � aW a o '>n� v�h
I W o Go�� F W � m m o 0 o v�o °�P /
� � 0 4Y1 POTSta. 10 + 00.00 � � � o b � �
� �� _ � ,� ��-�Q o - ,6b'8S 3 �,9Z.S�o 3 N a� E N Z � 8Z
� ` � � oo'oZ 3 ��L0,8Zob� N �st �
� `t-�, -YIDET PC Sta. 0�00.00 ��. �-�. qpPR �
� O � 3 �9Z,S�oL� N �Z'Sg
PROJECT REFERENCE NO. SHEET NO.
U-2579B 20
R�W SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
I � ^ � A \ OX. LOCATION ,b0'91930. - J I �8'b-_ p -+'J4 w - -
3 SEwER EASEMENT � 261.00� �9Z yE �L��� -8z=b� N �. f3U.23 , soo:oo�
.,.� � , ,
� �'-���� � - o.11 +88.8,�sM o,�, Qo �� �
�f O� `'' BEGIN SHOULDER BE M G � -�- POC S�.�BfSS.O7
io �
�� �� �� � S _/� �.-, Q. STA 1 50 -Yl- LT
I � ,.�- \�'�� _, � , , �� o � M � ,� �� -D - POT . ll +90J4 -Yl -PT
w ~ '�°'� � TD TDE TDE E �Q� $t0. 22+76.47
I iw S__� � � M, o� 25' �gEMENTEWER p o - �
� 0.00 -Yl- S� � � Q � N �-� o ,,.-, �s9, - - s� "
� , � A1� -Yd �'CSto.14+00.0 �� . -- - %
I 49.16 =--� a�' Jc C �, - �- E E E E
3
2 ROBERT REYNOLDS E�, � ROBINS WALK SUBDIVI ION HOMEOW RS ASSO IATIO INC. T- PT Sto. 19fO4..3J�
I io+oo.00 N -
VAN MAULDIN & -Y -� 7 �/���4. 8 ,r ��-
I 75.00 ��0��' KERI MAULDIN � � f c
� � __ � y - PO o. 11+7 .l6 �.�o�%� � 7 -Yl- POC Sto.22 3/.9r
- �,ss �B� �,� �� 25 PR- ACCESS & � �s � � �� -Y7- POT Sto.13+93.72
� RIP RAP �p' ��i P�BUC UiILITY EASEMENT ➢�' �' END CONSTRUCTION
I EST 3 TONS QF ,��, �' O ����� - DET
� 550'T,q,qNS/T/pN �r pUT EST 11 SY FF ��� �Sy � +93.00 -Y�- DR�ANNE STY � a
� -� SIDE LANE � F� 85.00' D 29 PG '"��T StO. l4 f . BEGIN W.W. FENCE 5 S `� ���, o
� � E _ + 55 p{�,�g BEG. C�A ], � + o o-Y�- END PAVEMENT MARK/N �� . ��
, 5 � R{� 0 -Yl �
I 756 +70.00 -Yl- 0 1.00' BEG/N RA/SED �RASS M P �,�, -BYI-501
� 4'P 75, PB 52 P� 98 125.00' �� -Yl- STA.2/+7/.59 '� °'o��
E 49.23' 53.93' �'G �� y�M lH SS '�
.S. -_ J` O,� g 3s �r y y
� � F 5A W�LLIAM REYNO L D S & � �/ r
i ��18" RCP - - - - - _ _ E►P _ _ _ia. JAM►E REYNOLDS �ti � �'����s ��s� '0oz
2 0�� r r i- � 0 T � V E A C C E SS &
I� -- - _ G � P Q P E�MENT c DB 2787 P� 3764 9
- - _ -� � � � �-��� �8 � \ \ IS F �0 <'�
��--
D -
�� � Ia„8 �M- - _ _ _ _ - - - 20FT � � --- � � _ �- O � �
� O � -r � � �
�L PSH �s
II N� � -- N M- 18" RCP � -�� NEGA E SHEET 2-TT A �
� VE ACCESS
� L � o N� o � REMOVE o o - __ -_- _- iP w� wa�� �� 313 � `��� \AS PER SE 52 PGP BVATE) F ���- -�� � 675"MED/qN TR
II w�� - - - - S 39 4 20.3„ �/ � - -- - - - � -'_ ESS B R��P � � �� � \ ANS/T/pN �J- S��E
-- �� " T• 3 TpNS � �P ��_ 15" CSP W/2 ELBOW F
� - _ _ � REMOVE � - - _ _ _ _ _ - �.
AND ROD AND LUG
-� �
, � _ __
4�f'•S 20'R 2G1 /O'R� - �, REMOVE � N � � �� 18" RCP �� CAT-/ \ C N1�1EET8R,S._ - - - - - - - - - - - _
� ---�� � --_
�8" RCP_j �L T F _ - -1-REM9YE � d- �j «� � � - - _ _ _ 320 T� N
�- - �_ �' 309 - _ • �� - - �i � 311 -� - � _ _ _ �S isa esr � - - - -M- W OF Wq�KERTOW
�� 24" CSP - � p�� ' RC oGIO ��`� _ � i _ _ _ � � � Q �8:/ � - _ GI 319 FOR$ TH � � �;-�
� �W/ELBOW BDO 2G� 1 /5'R � � �7 i � � - �// TAPE/ �� CP_� 2G1 EXISTING R/W -
� ` / � � W�� r - i � -
310 ' � \ . , - _� � REMOVE �
� 09 1 � l R ' l5'R \ --- � NARROW SL � 5"
� A`� OW SLOT � _ _ � � - � -
� � �� �
� � 4p�� TRANS/T/0 RA ES \ � - _ _ 312 � � _ - - - � - � �
� � R OUTS/p AN \ � �O ' 8' ��, - � � �
\ - � - - _ 1�I�
P °° � -1 -
pU IP�,EIP ; �_--___ \. � �\ -- �-
� E �P � � ____ �, 7 , � - -
HEAD DITCH �UE � 2 F 4I�� � 8:/ � _ _ �
� ORSY�' C U�VI� - _ - - ��\ . TApER
67 � ---- \ l5 R � � � , ,5, �
SE�ETAIL#18 '_���w��T P� s%� OWN 5 MED/AN � a 7.5' R
EST. DDE=24CY ��' ��y �,9 � `�'9 �WA� E�rowN T �S/T/ON
� +00.00 -Yl- o � PU�^ R � � \ � � \
� , � � � ➢ � � PUE � � RT s/DE' � 4 �� � ^° � M
� 100.84 P��j \ o'��z� �.. �s F-o�i �' E � 314 �. l R ��
� 116.00' � / \ �, c� - � � ° � P -� � r _ _ 7.5' R G� EMOVE o �
� �99 PG 1719 � )��'��' 48" coN� ��� o��,o � E�EG/N MED/AN VE PUE EIP � ` � 315 0 -
350 �l o
� , KRYSTAL . OD BST o�� PAVEMEN . ARK/NGS +37.00 -Yl- E � � O� � \ , �
\ � �. �
� �'� ,s- , 1Yl - ST A /4+32J1 $ � �E%' �00 TqpER
� s � 2 2SFD � � x , � 93.63' � � R � _ � �
� �r �'- _ 2SB ' , +37.00 -Yl- � ° �p � � _ �`R
J��
]�R]EIL��I[][N�IEg� ]�ILAIN�
ID� N�'J[° USE F� C�NS°JC�BUCTI�N
3
� • .,• •
. � �•
_ � �',-!
� •, \ �
'� v -
\ � ` /
, , � � -::
"I .• , •
� , , •••
� ��� � �
�' `�1��� ' - - - _.. �
�� '� � �'_` •
�,� � �-
�_
� lC'1�\� _
�
� -�� .
�; �� . .
r� � ° \
��
I • .� ► �
� �� � 1a�t.
� �-��� ���G�;
��� � �-
-�i'r:1i� � � :'���---,.,�
t�� �� -�����
��
,
s, �; ���►. '�' � "_.•. �'��7
�� �� !`-�a �'7
' � ` � ��✓ � _�����
��
�^-� �' X ' � -- _
� o J 48„ W� � 2sF� DB 2 75 p �� vE N `�
\� s��s� ��,o w �K Ow DB 1557 �- .� G 1238 � � � I 8, STA 22 + T
�, o,p� � �� �. SPECIAL 2 CUT BASE DITCH � x �\ � m C
� � SEE DETAIL#19 `aS� � B N , 09 m CLASS ''.
� �`�' gK A�� JAMES R. MYERS. III+ �� � � G 339p , DB 2390 P HW 316 � x R
� � \ � MARY MYERS �� - °- ?, ��� ` �\ I�UE 487 PG � � EST 11 TONS
� � e � � + REBECCA A �\ �, �� a, PB 197 � � p_ EST 28 $Y FF
?, � u2.�6� E s . 6, ti�� 3A NN FREEMAN � \ \� � W• � a�x � pVE F � � � � ►►► �- _ _ �
� ��, \ N 2q°44'30 N 40°I5'48° E � JAMES N. WHICKER � ��\ ��
� FRANCES B. WHICKER 4A � � �"� � �' \` � � � � I PB/�7 �
� \ S �- s � � ,9 ��� � � `��� 9� + 40.00 -Yl- � ,� • R
1 A � \ � � �o �� �o � DB 2075 PG 1235
E1 � � o �o ' � 149.00'
JAMES R. MYERS III & � R� ov c� +6 .22 -Yl- ,, I
� WiLT � ��� � `'' +53.00 -Yl- � s 3.72' Y�i
\ 9s�s?, � 9 9 � �" ��� � 135.00' -c I � .W.FEN - -pRl-
\ MARY B. MYERS �l- 9 � �r�^ \ �
/ ' C I s ' � PC St
� DB �585 PG �0�3 `�
� � � m � �
9� �� SF � ISFD �
� TERRY K. C ST R R/
F PB 27 PG 138 + S �' 2� � �
� PB 31 PG i67 0o S 69° 30` 22.1° ��. .99 �`\ JACqUELINE CUSTE �� /` � ��
\ / I
� � � �55. � � � R � � -
,�24•� S �,� Z ` �� . � �� � l - Ri E
�82.3 � y- -� - - iy � " � ` � � � � i S " � p I
N s �� � W � DR3 POT Sto. l0 +00.00 � �, , , ❑ 9 �� l Pr s�o l .�9
�s �s � 43 3i ��� E / � � �' s�' � � � � � - - - �vIAR�HALL S. BROWN I j I I �°I
`� 9s��, EIP � \ � �� - - \� � � O �� I� I ► � zl
�3 6- �'- -: DR2 POT Sto.10+00.00 \��, �-DRI-� P�T Sto. 11+02. -� I W � 2s
� ( � �
�� � � -��r� POT Sto.12+30. � r'^ �L I � �I / +00.00 Y - BK
9� ti 30.58
� Y E. PHILLIPS. JR. ��,� � 9� �9 49° 22 56.� E I �F I \I �. 50.00'
RY ANN PHILLIPS s � � O
DB 1953 PG 2287 ��� � `� LATERAL 2' BASE DITCH 9�j �1 I �
o � A �� � �
B- �O W/CLASS 'B' RIP RAP F� � �� I F O �
PB 31 PG 167 __� \ s�, RQ OND F, HARDY �o°��ti �Q
EST. 165 TONS QR� E HAR N ,� I � EITH E. STRAUS�
�- W/432 SY FF DY� TRUST �qTERq� 2' BASE DITCH � I R BECCA C. STRAUS
� EIPQAAO� `N SEE DETAIL#12 S E � W/CLASS 'B' RIP RAP o � �
� o� Aa� � EST. 151 TONS C � I � W�TERAL 2 BASE D H
� +� S 2 �-X X �C I EST. c
W/3 7� FF r^ � �N�CLASS B� RAP
d TONS
� 62� �� � SEE DET L#3 ( I W/ 00 SY FF p�0
�, ,� o� QA �\,��,2,a +oo.00 -Y�- x J Z
� E DETAIL#12� 1
� S ��� 28'97 I ZO � +00 00 -Y7-
�
�
�
L
�
6'
�
L(�
N
�
�
# # � � 44.00' � ' ,
DETAIL #19 DETAIL #6 DETAIL 12 DETAIL 3 A / 31.03
SPECIAL CUT BASE DITCH TOE PROTECTION LATERAL BASE DITCH LATERAL BASE DITCH �•`'� �' I�� /
( Not to Scale) ( Not to Scale) c Not to Scole) b ( Not to Scole) b 31.pg- I NC, �� �� �
Front O� Noturol � I F��� E "�c>,E„5,
Fill 9°I9'36"
Naturol C \ F,� Fill 2. Slope t r I Slope -Y7- POT SfO. � 0�.0
O � Ditch Noturol 2' "� Ground / � I'/Ft, � �/8'
Ground 2/ A\ 'c�e Slope � d �P'� Slope d p Ground 2y p Z: I'/Ft. �
3
p F�o roun F Min. D= 2 Ft. �, BEGIN CONSTRUCTION
d Filter
B Max. d= 2 Ft. B Min. D= 2 Ft.
� Min. D= 2 Ft. Filter Fobric �----� 6= 2 Ft. � o E�P 0 PAVED SHOULDER
B= 2 Ft. d= 2 Ft. Fobric 6= 2 Ft. b= 5 Ft. �; o � P g 3 P" 5 9 8
•Wh en B i s < 6. 0' b= 5 Ft.
L FROM STA. 11 +31 TO 11 +51 -Yl- RT o 0 97
� FROM STA 17+00 TO 19+00 -Yl- RT Type of Liner= Class 'B' Rip-Rap Type of Liner- Class 'B' Rip-Rap FROM STA 10+65 TO 12+90 -Y7- LT �, � �Q� RRY K, cusrER
� FROM STA 23 + 00 TO 26 + 00 -Yl- LT \ � � E � � N E cus rER 3 �
FROM STA 19+35 TO 21 +80 -Yl- RT � Q
� FROM STA 22+90 TO 24+60 -Yl- RT Z �
� \ X .00'09 z
� ,Sb'90Z W N
� X
W
� �� c \ ,. � 3 .�i o� ,-� .. -
NOTE:
F O R - Y l - P R O F I L E, S E E S H E E T 4 3
FOR -Y7 - PROFILE. SEE SHEET 92
FOR -DRl - PROFILE, SEE SHEET 93
FOR -DR2 - PROFILE, SEE SHEET 93
FOR -DR3 - PROFILE, SEE SHEET 93
=1
� I 1NTNpWY CURLEY I
�\ I £I
I I I DB i6i�PG i8i5
� m w� mf � � I
f ABNAK : I I I I
PG 82T W� o SADIE S.IIEAN0. I I I
�� m os n. Pc as F ��
I I
BRiAN D. Sn/40N5 d N I I I
� iAM41Y 11. I I I a � / yo �
�y pBdT� i � m
i h
. 4 1 A � P�� � I I L\ ��
'o W o � \� p i m I � S TAI , v7 i i C H M42StlOL 5�����N��+ 3 I I
1- �� �+�'� w I m�' I � Nor ro Scds� ��9 S,`,y+�'1� �'1'�
W ISFD � _ DK ❑ I I I p<�� �+Td .���
'I' � I � � � 1SF� �q�f��i� � � I o I I i � �� S�'-��,{��*��" Ol � I I
y � �vcf�enf i�u�� ��n ss��� -� � ax�G p ovW 'S i^'"I
� .� 54 M 36'CONC I S�5'SI'09• E 6 9. 47• „ •:�•A���'.7��`�'V�"'sa�176�i�i�YpV �B = I� 4 I o I � I
� Z�� t� 1 � � - B Y i 7- 5 5 6 MI r y D= 2 Ft. I
+ -Y5A- PoT Sto.45+00.00 LA
�_� P�} �� � �} p�, o i i Q � Q I� - B Y 1 9- 4 2 6 i
M __ _���_ � �� �I m I �BY20� 427 FROM STA. 36+42 TO 36+67 -Y4RPC- LT
= =_ - __ n � � � I o � `�R� u � i' " I ! � I BEGIN CONSTR UCTION I ' '
{Q � -�� ____ -W/LT�- I \ see'Z xII� I II I .I AI . .. .
`� - -- "L =�� =_ _ - - -�z_R�P�� - 6� - - -' I� noYc� & sw�Tx �'n -YSA- POT STA. 53 + 48.46
} '---,�-_ --- -- - -'z' ecP � � E%�-L�NG RiW 00'09 � LNA LS l. MAM�NG d M�FE OB f2� PC 96 I� I �} iez.7o
tlld.eb �P'��_� a� _ a a N 89'02'01'W
,Z� R�P �_ �_ = = _ _ = 2� � y Ker�N w. �.�.Nc 08 �iB � '�0 CONSTR UCTED UNDER
� � . . X- �� - - M � � � � � � _' - - -�-�i�;y.�. �- - � EIP � ' DB 3058 PG 328� � �j�j P� � ?SµiX I�RS � � 190.09' S 89 716'S2' E
W , � �-x_ ��.91 - - � - - - -- - _�y_� - �_ _- = = _ _ z� _ � fi t oe a+ Pc .x _ TIP ARO ECT U-257 r , Porchased " � 0 5 a 3��5z•
Z j���y 48'P�r�� RAI�-X � 5 RCP __M_ ���-- �LT /�' /������__ � _ ld_b � t ��33 P� �3 ' I +50.00 -YSA- �� �p 187 Under U 2579G N V�+ . I ; I +18.00 Y5A- 2 04' 9 2� E.. 5'g9'3i'S2`E �� . .. WO
� s�i I� - _ � _ PB 22 PC N i 75.00' > e a X 'd.e' ap��
� _ , . � O / I � � _ � �� _ - - '" i z o I - Pvrchased 191 m I /�%vh .. o
� _ _ I 4f �� � EIP 48, _ �� � � - -��= - ° - _ � _� 60.00' 95 0 . is-
2 y � P�a r� �z• - _ _ _ ___�- � _ _ _ _ - OB d esr. a roNs +�a.aa -vsn- �n Q ,, AS E..IO�NSO
_ � _ _ t � Under U 2579G
V 370 � RA1L RCP � ' i _ 2'�_ EX. RhV OB _CLA55 B' RIP RAP -
� Xy"3 � I I k Gur [zisrx�c niw - __� ��- -j- ���_� �___ _ ___�� PB N EST. 11 SY EX. RhV nr T m o o FiFIQ1�A F AYE .N
_�
� � �X I I E�' \ I �- ��-� _ _ �� __ ---'�-�--�-�-----'F-�,- .��P - I R m
I I �� �E,�-�p � ,,., � _ i9 .Qi 1- _ _ _ � _ f_ _ _ lY� � - _ _ � � � I oo•os I RET FUNING WAI.L ��P P ^ : � � � i
�� � `� '�LT'� _ _ _ � _ -� - _ � ���9 p pp�zQ�p �� '
' x f'� ��\_N\\ 3'NECdTryE nCCESS [qSEyENi- � � ��- - - �1��'�- - EN�SiiNC RiW ,I�gpwR��
, / k htf - _lo- - - _ -����- - _ �_�_ _ ___ -_ _ _ � � � - WN�LUS PG 36+25A0 %�,� . X Af
� I� �\ ISBKo I I � �(si �/J - - - - - - - _�_ _ --__ - - _-_ _- 4�P \ DB 2930 28 1 pao� � � na (+� 1J^
�"- - '-
�'y / �y +32.65 -YSA- ��s o
\� 4J ❑ \ � / x x \ \ _¢a� p �NI � S C-1" --= _ _ _�R 265� HA=TING�HILL RO 22'B57 _ �-_ __ _ _. _ _ _ t �ks � � C C .. I I 4f EX. RNJ . �' e\� \ £ 4I
S
/ � � e ' / I \ �G]` -_._ . �_ _ � _ _ _!- \ \ _ _ , _
\ cazE�_ �� I \ N _ � �' I II� � � � ��o�� _ _ _ N 7g�y_�y � _ - - - az o0 9i oo '
� � ['� OW/LT qpPROX \ - S��G4iiVE 4CCES5 E45EMENi EIP-� L7 �,�1�/ - - -_- ld.i OIP 1 . - .
Q 3dRl I F +60.00 Y5A +41.00 YS y���� �������LL�N X �
o � �-`► \ � � '�o. / PB i5, PC M S a N�
�� \\ x., S, �iJ � X \ � � 20'=ONC I � I - X - Sr - - - - - -- _ _ Y � p4 ' � �� � �30 � o +t9.oa -vsn- ��a. p � / , - 4 �
� �J �X �� I o.n a I I } EIP�� �� 4 �i sr CLAss '� ' s \ o ,�-�� _
X � � I I I = 71 Exi5i1NG RiW - _ �� M Y / RIP RA /FF 6 ( O S
�� � k o I \ o� o i i � - � __ _ ��� 42.00' TON o. \ B� N � z 13b. .
� 37.6 � ��Qf QEIP � � <T ' . � p N o0
I . � x � I t - I I >'� � z�zo� RT g 24'/NC � ic � 10.91 � �? X�' BEN 1NLLER ��� $v
. W0� k X � �. N �. 3� � C + TYP. �'^!�' :�_� \ �' O EST 11 SY 1 9 0\� � 4 t+n 1� �
M� M•�i� � I \ iAIOTMY D.LYNCX p m II I �, I � ow_ s.;,� w T� LT S/DE E �'� � � /c ��
� � k MA� �NI P.SYiN K�ERLY J,IYl�N , a o p sm'o ER i0 EX/ST/N �4�PS. p �� �%S i� �r AN P.1,KLER �\ / �oN . ip 33-t .
�
9� � Z�J �i i070 � m o� p �� ��ME{, A. �1(E�IE +48.46 -YSA- G '�� O r "�' � � 3076 PG 36 � 4a R` 4�
I� � XF wW k� � C� � \ �PB� 0 PGiM9 �'y � m I � I �RRI1Q BLACK 4 DB 232�PG 25,2 °(n EX. RNJ � � o� EIP �\ �S�H � �DE �� rchased ��� \ '9-\ i�19. �'62.
I I k�k p� : � � • 6 254.25� `i/ -LT II v I o A BLACK o 0 0 � 22 Pri � , � c�sea� � �n� �� S R � F -YSA- def U-2579G � o R:'S\�p?
� ' +50.00 -YSA- G V�der (�_ \� � Q 42.00' 8�.. � ?, /'
I I I a _ n l � 2�'f PG 3�� ' N 2579G p _
I I x � I �. �� 5 B7°5658 E I PB �� PG M 4 Ps �n 70.00' •OZ.L0.2 _' .. . .. �1 \ ��� � � / /
� N � �' 3. � 4 � +19.75 � S" 1
I 16' CONC I I r \` �
� YSA_ 4i 1
I I CAROL 5. � B U SK � no,�ra � ° � . I z 1 'n� EDNARD WINiER N� 8zo• x� e GB A1C �� .\ �� � a Ex ww � +ab.aa �P /� �M �}
I * I o � FB I �n ll W . . � �)�T � \ �+ RE N �c. -YSA- � � `-J / 'I
� SUE 5. ROUTN I fiaxa � v II � J `"� � �j r\ .� , '�L �I \ � � /
o +35.58 Y5A- 1 4 B•p X £ 6 i- p C �� '� � / / /.
SWD� � f' �� O 65.62' ' �
I I OB 9�5 PG 188 a �� � � o 0 0 � �
I I I . N I I I = I m I ZL N%� 247.8� � COLLAR �\ �\ � � 0\ a p o� �/y� //
� RAII g � ^�
�+y Ww k ,S ` /ti'/ /'
I I ��� X I�I ' 2 F •� I I ODrYt o 1I91 �- E � .. .. .. .. l 0 7 Purchased Q � n� /py/ LT t �\ � � c Eas ENi� Q.,S�'\ • /� W/LT t
/ I � � �•i0'S5' � y. 4f ` k r 2 z ' REMOVE a� � .y9• /
I I � O I z � I ( T Y� of d- ss 'Ra D Io I� II �%c,_ �� �.. p M S`"1 OUnder U-2579G � / y„} �92 Porchased�.. � . .� � V�.� ig � Q �� \� � � � 3 54
\ F 5T�9+.,1� I� 1 2�Y)4- LT � � N W . .. 4f 4f � � k�O der U 2579G FR � � � %� \�• / �/ � -� gF
1 l � n � � \-XT�"": � I � �I�� � \ � i OJ`,r,�'� � ALEJANDRO ROCMA � � ] \��1(%Z +sso2 vsn- H '� ��\ � �/'h'i �` /� .. � 5
\ \ x �I � - � - - m , � � � o DB 229 PG � sE`"�" � . .
�� v ' 12'CONC �C`n 18 . g' �+y PB �O PC M� k �D� � EXIST a�,n � ���� ��_��� � // /
\\ N x"' -�, I �� c� \ /� O�O �x q.2 N 20'S6' W � 41 '. '� __ K .I�fL �. Tx EASEMENT pN 5 N/ a � �M 0� M \
\ 1 1 �x� y \ o � 'S8• W St+�. 79' � ZS 2579G � EASEMENT // Q ��019 YSA-
t �e- �\ �'• � o O �+y r f �rfhased Zas EXIST. �„�' R� OVfi ��'
F �n� I S � pORISYUDD1yA$ \ \ \ A<^\ �Z�- S � � � / l \ � WD D � I � / @K � � SPECIAL DITCH GRADE � � Q - EX. RhV
y ( � \ I z `i�' I D /� \ p \ TIE TO EXIST Purchosed �
\ �;} _ -1 � oe asn vc u�e � \ �� �o � / x I ci�-- r ( _ � � � y
T O O ��X PB�OPCM
x�. {� � Xf _ Zbp2 \ j - _ SEE PROFILE FOR GRADE ��9� DITCH UnderU-2579
} Pe .o Pc w z Rs 11 � �ti2 'N/�
� REMOVE �� � 3�M 4 ►
� � � _ N 16.29�9 E 9B� \/`\ y�l` \ ` � I II 4� I �48'CONC �j � '9 �q � P� Qi
����\�'X\� � � L>` o. '�� � m �v k W� CONC _ o I I �'�y �'�' n�' �+ �.�� � \ ,0� 2 196 ���
\ X x M / o \Y' (,� �D \ L?.t` JQS� PN F. fia1z�LEZ 48° X �ASTI-C R�AI{L DK x � �.' I 4 4/ /� y'L�'/ `�J�SP " \ �q �b' O C��J/�'
po � � �} `�' �Gp� OCs\ `' \\\ YYp1E L.CONZOIEZ va � 4! `� 68 PC �228 � I�I 193 � '�O RETAIN AND � �� p �� �,`
LATERAL 2' BASE DITCH W/CLASS '8' RIP RAP k� �� � �� Di '�� .(,�� OB �6�T �m � M l48' � j / �nPurchased y'� �h EXTEND \ � � �(�
k �p '�2� PB � der U-2579 5 �1� +78.97 -YSA- \ � . �
Q EST.121 TONS � �y �+y _ / F,\ \\\ 25BK� I � � "�, � �O 6 � �
� X� 10.00 -Y4RPC- � W/318 SY FF X� 60• 4f 4Y� _�. � BC / � \ "' I �� 70.00' � \ \\ X O
+10.00 -Y4RPC- SEE DETAIL#72 k� DON� ORLAI�V FI�T N� �/ -� ` �I z � � C CM� ��� ,�-� v� \ � �'Q�
� zas.oa k� 0 Cp - �• coNc n wo RACOUEL WCRAAI �
245.00 �} �} c�a�� oes��zo �ar � \ �' I �} o �}
� �} �} x � � 23T9 PC 20K � ��'�� � \ \ � � � � � � �, Q�, �� �Y
TD I \ � N �`'y PB � PG i4 �} $%�_5/ pe`� \\ \ � \ TE, pF5M�1 TYSON� -� \�oe �a p 5900 \;s. �T o oK� OB 2�% nC 70l5 � �
I I zl oao
� 79 � � �`, t,."s � n\ v�, � P8 �0 PC W��e d� ', .
O M� �if ^aI F/ 48' CONC LT � � ��3 v EPSEMErvi Q fS0 � . �� y���Q
E M �} � `J +\ m' � � �} 0� �° S�tio� \ OB 2i36 PG 37i9 I � - � iING P/ - ,15 "ld •Z�� eyo. Ns��rIP coroc oa�'�� � / / .� � \ ����\ � � Q��
� �� �o o �e �o �c w
. + DE-WATER PpVD � I 5 � + LJ � �Se�o Q �2/� ��k } � � \�- - _ - - �d.Zl �� � � � .
� P',2� f �,• � � f / � , J�
s s
N O SbG BO � � 4. N h a c,o � 0'Uia�lv EiSE� i2 PLIDflfl=� p FES / / �r (�i
/ � o - - H � � ^ " s �it�� i � \ \ 3 � '��
-�. AY�/1 51�° / \�Ht/ � IB' RC ERSH � � IB' RCP E 7/,'p 0.27� 3 O. / �!
Q � �'�i X � �d pA O,� ,...[] sf \ � -F� ��� PM C7 21' BST �p <. / _
23 ?. 6 �
,F�t^RJ ` P �u+ � � n"is H r \ / ` � P'Q'� � / � y���i
d �� r ���,• �/ ,.,� �[ _�_ 21'BS=����-- o FE� IP go0"L N 2g8' W 9?
. +� . 0 -Y4RPC- . /\
41.00� Vi �INi .. /. � ` --� yUEFSH� L= E%151iNG P/W 10'U1iLITY EP EA�EN1� � 52 _
� � �!'� .X � TOE PROT TION W/ 0 � HEAD DIT�� � \ � , . � � ' ' ' ' ' `
+70.00 -Y4RPC- � ��� � �5 � � do � � � E� � � I{� � / / \ Q�
F O OO � CL455 „8„�AP y IQCM4EL �. FISCME SEE DETAII#9 T R�P �-`
�"� � 148.47' � EST 63 TO��� DI IS' RCP FES IS' CMP �r�urY EaSEMENE- \ao R=S� �
2 � +19.53 / �HAfil$$A. 1$�FIE EST. DDE SC + � \ _ � I ,.,, O - 6432 `'6 � � G
O m 'I EST 170 SY FF / � � ��� �T � N y�}- �� \\ pNG 2 0 Y
� � � � 141R00' � SEE DETPQCYF6 � � � . �-. ^ � . +/ 2SBkp // �?o `C\N�iy�F I i I�48' �oN� \�� _�\ -gY2i-428 s°'.3 o'°c � � ��''� T
4f o
Q tiXf � . / - - � _ - \ 2 �op� � Purchosed \ I
� ^ BEG NO�SE W � � � � o � � ,� R Under u zs�a� � �
� +55.00 -Y4RPG �L � m B.
�'� -NN7ql- � �I � � �p7 tl`�O ALD N. RAY C��k 1 O LP.TE L 2' BASE DITCH W/CLASS '8' RIP RAP -- N 1 -
� f t' �- EST 27 TONS z� ROBERT w. ROBBMIS ��
� x T�ENgO � i �mti 183 AiHY P. RAYL �� z5g / O �� o wi312 sv FF A Lf o ti 26 SNERESE R. ROBBNS O(� �
1 �+y "� e.-} BERM DITCH k k0 � H5 w m w WD 9j9y. ��. �PB 0 PG,M� � 7� �--
O �1 STA 110+91 TO 2+7 -Y4- LT � SEE DETAIL#12 vf � -
ts Rc -i V1 c�nss �e � wo � / DONALD R.NEII501/ _� �� � oo � p� �%. ss
RIP RAP 405 QB i��l PC IOf(f $/� 2 �K Av 4�
as y Esr s roNs PB �p PG w oq+ ,ti r' � C�iMSTWA R.NEQSOM � zmo sf RELVN L.4�vFELD �N��
� 2GI - � EST 14 SY FF �y 466 4�\ y k .IOW'� H. NOOD TA�EONA �. MAYFrt�D BERi'�' CH BERM DITCH �tif �'
� y .. .. .. + ,N� k / � � � ,0 � M pg y197 PG i200 \ srn izz+oa ro 125+90 -Y4- LT �
k �,�T�i.00 Y4E6- OB 2�0 PG l596 srn iie+ . 0 119+20 -Y4- LT
Fs � i o 4RPC- STA35+ � ,� 98.38' PB �� �+ W - � K
463 F �_ � �� � �� . .. � g
� D -Y4RPC- PAVEM£NT � �
u" csP iz e�eows �� �-. G/N -Y4EB- PAVEME c x �} '�f P�p �+I_WqV, a6s BY16-549 �. . +�/+
-�- AND RO AND LUG F 15" RCP-III I . I ; �X O X- � 4 p � �
NN TOR$_� --_ � EST 3 O �
�-- -- 'aRGR- - -------- --�n4� ---- �`- -_ Eb� a.3 _ - ----€sfii��r� -�-------- - ------��G----- --- --------- -------- --- - ---0�------- --- - -------- ' - ----a� ------------- -
T
, 8i 467 .. , . . - "
.. .. . .. .. . . .� .�L`_ .. „ ..-._ . .. . . IP. .. .. .. .. .. �. .. . .. .. . � _ o•ww IS . ae� . .- .. . .. .. .. .. _ O�
ae i
E P EIP _ -- eo•cH� isaw C E�
. . . .. .. . 2GI W/ 5 GI � � 2GI 4RPC- POT Sfo. �'F0.3� - ��� � 1�Y4�' �_ CN
�a o ai _Y4 - TYPE B-77 465 GRAU 350 7L-3. 4P5 399 -Y��iyEyB- POT S�O. ��4f�„a% � � � �� � � _ � F � �- - -- - -- - -- - -- -- _- - _-. - -- W
REMOVE FE �\ i � PLUG .. .. FS O /IZ,y{/ RT. �� � � � � � \ W
246 \��^ � . TMfR .. .. �� � C /� ..4. � i =
� . . PLUG . � � .. . - � N
� .. .. . .. . .. . .. �� �� COLLAR
- 2GI-A REMOVE FES %O�PS.
400 ��
N 8r RE OVE FES
w -----raPs. o------- ---s94--------- � � ------ _ro�Ps. � ---- ---- -3 45.�W- - ----- ---- -- ------- rnPs. ---------��--� --- -- ---MT�z ,. ------------o,�----- --��-------- �
�
,
-OirN r- � � L 1 Li �1� _t s _- t _ - - - - --- - --- MTL�� ----- - -_ ^
0� 1 �J 1
W _ - - - - - - - -
� � - L -T L �_ -T - _._------___ +
_ __ REfA1N AND XTE LL4R ��' IO'B57 �
N � N 85�.3.3�45.�W 2 SBL 24' BSi RETAIN AND EXTEND M VE -!QEB- -� N
O RETAIN N� Conv.OTCB To 2G1 REMOVE N 2G1 REMOVE 4'B5T N �v R aT- ~�5T \ p O Q
U -
+ - � -- - - - _ - - - - tn
� � . . . T T � T � T � T-
T � . i . . .
. i
N_ _ _ ---- - - - - - - - - -
0 � - , . , , - - L , . . . r r , , -� I
� _ �
. - ------ --------- }
Q � 395 0. RETAI 393 � 9� �� p��G -Y _ G� �
•
F � z�
o F
1n � � ,� �'-^ PLUG PLUG � � PLUG �� �► ��n� W
� ---- - C NVERT TO - - --- RETAIN AND EXTEND -- � ------------ -- --- --- - -- --- - -- --- Z
� �-- - - -_ - -- - � � � ---- --- - -- -
- � - --
-- �� - _ - � � _- _ �UPS. � IO'B5T �
- - --- --_
, -- _---- ----___-_- ----- - J
} o, • D ,8 a 8i �� MTL REM VE
T N q .. .. .. . . . .. .. .. .. .. .. -� � REMOVE - - _ _ - .. .. . �
Z . .. .. .. .. .. .. .. G� R�o� SCRUCONVE . ' � .. . .. .. .. .. ���REMOVE �g .. .. .. .. .. .. .. .. .. . .. .. .. .. .. . .. . .. .. .. . .. .. .. .. .. . .. � .. .. . .. .. . .. .. .. ..
� . .. � .. .. .. .. . .. .
--�X �- -. X X k X- X X X X X X x X X X�--X-X- 60'XHL&ISewx-X
X X X X 8 X X, X �- �� X- X X X X X X�- � p y[� ' X X 6U"WW ISBW X X X- , , , �� '� X R XE X X- X X , X
J \ X .
./. . - � � �. \ '� ' � . p� � .
X EMO II
U-- 39 --- � REMOVE -- - - - � --- . .. ---.-. ..----. .-. ..--- - .. .. .. .. . .. . .. 3i6 F..\ �� � �� ��'\\_ .. - GRADET�DRP. 2GI 09.. .. .. .. .W/lT �. In. ..321W/L
� �� T 4 4 � �' ------- -----�� - �� ILL W/FLOWABLE �- �� N
� --�r.� REMOVE FES �4���� A - --_- - ----- _- "' --- - -_ _-
In a __� I0.9 I4.8 �-
W / L T _ T � � =12' RCP _ I - - - EST 2 - S _ y� � P - I , _ _T - - - - - _ - - - - - y - _ _ - - - L T 311 I P - y - - - _ - - - - - - - -_ _ - - _ - _ - - P \ - i - M - _ - - - _ -_ - _ - -� _ - � - _ _ - - - - y - - _ - - - I P 15' R C P- - y - - - - jai %QPER - _ W
_ --- a-- - _ _ _ _ -- -- �� - -_ _ _� - - " -- _ �> _ " � _
- - - - - - - - - _ -itEA�ENE'T-ES^a - I�/- �-Y -� - � -GR"AV".350- - - � '" \ � - � IS' RCP Tifi/i(�550 - - �- � COL�aR � _
� W/LT REMOVE FES � IB' d O R�M 3 318 320 g �
�\.� PLUG SCRl18 � L<iivE dCCE25 EaSE �
r
X�X �' ' `� ` '� F r �, 04 aSEMENT 5'NEGn*ivE 4C E55 E<SEMENi
x--x 1 x REM VE� I� 'Vjs 4 \ . - - • �
x o E � � �+Q'q`,'� - REM VE FES
GATE� � / 03 3XWW8ISBW P UG 401 +3 'Y ' . ' � Q �. - .. . . . . SXW�X� .. � 406 I 408 -i6- . �
I�,I � p 4 .00' ` ' . . . . . . . . . . . . 3, O�
.. o , � � " � . - � � 4 - �r cH�x w _ M GR�- R .. . ^i t
1� �%] s 2a'CSe % ' . ATSON BROTME .NC"' \ 9 wi�T N� 350 y le - ^�
� �H . \ ; . �.. N .� � �
� LATERAl2'LN�CM�i�BO o � � F18FJV . .. 'n . I i ' ��, -� 5 ,_ . � F � • o,p 15" CSP W/2 ELBOWS � � `6j,�,°'_- N
. X y x
Im +50.00 -Y4RPB- PB 3T P� 46 1 I �� � �� 4 ��? sN AND ROD AND LUG �� y''�p?'
/ wicrtl65x�Sr c7.K53M x m s` �. z 7 iai.00� i► +ao.ai -vaRPe- �~ � pP Of�/� _ 15T �d F� NORTN CAROL pEPARi�pD,, \ .o ' Fa-
EST. 94 TONS 1 SO I +55.64 -Y4RPB- � �W � � `�" \ CONNECTORS /�
�� wna� SY PF / ' ��44.6T � 145.63' � I r�-r i I � o � � �pgR26 PG 2801 g" ��6' p i PUE �
\ - SEE DETAIL#12 .IS' NAT$� BROfM�RS.N'IL. �� 1 L 9=d0 � _ +54.43 -Yb- � I o �� � I � � � , � +6 � I
� �� s 6'07' E Je 4„ RCP-III OB �624 PC 2903 i ��.oa � �. x c�se �I�� P o PUE P �_ __� �-� � - PUE - �
/ \ PB 37 PG �6 `- END 4R�RPB rP�f� t�/1 •� � � '�EON1ER5 AS C1AT � coNc - E cuss B' F- E
"✓n" � i
.\
'1 � � ln +66.9 -Y6- CjQL GH GR PUE RIP RAP pUE SPECIAL LATERAL 'V' DITCH I
,i� �� . � � y�o. PUE y Q�.o DB iT90 PC 2 30 1� �% � � T�y6 PUE - w
/ \� P� e +36.8 4RP BEG/N -Y4WB- PAVEMEN � � p PB j7 PC � 33.00' 2��• R SEE DETAIL#15
(BANKS ONLY) N 86'S4"��'E y pUE O p� HOUSE � + 4-Y6 E5T 21 SY FP
21227' wAT5�1 BROTMERS. NC. O Z
� ii / � E DETAIL#32 ��� � ' \ � PUE �� .� � o W 33 00' \ .. � � I�f2� �i Z�3 J
� EST. D E+/- 15 CY +� � � =n 'o q d N � . .. �� 5 gq•Si'�4' W +52.00 -Y6- p� 3T PG 46 194 =
�`'� � W �F o • X +61.41 -Yb-
� � � . 33 TONS � 14, �� (� / 0 p g 'F '� t %� p 33.00'
/ LAR�L S. �EBUSK 5T. 62 SY Y8� 5 lo,} +'- �" _ \ + � 04 � ^ X 0j � \�,• �EIP 69.14' F
/ wE s. ROUTH G�N Sta. S i� Jm a • � � \ 1�; �
/ � / NO RECORDED DEED E Y8� � c�t0.3 �� N �'' \ i�fi� � ° � +iz.zo Yc= �� ioa.00•
+97.44 -Y4RPB- i • .00 -Y6
+90
\ � / PB .. ,�f � i`� Pt w \ \ \ \\ �. 214.73' � c� � s \m +70.00 -Y6-
/\ �1 � N� � 0 \ 0 o j .. � Zf N ps, 69.14' R�Y�p �p1�j4EZ 104.00'
/ ��s � � 41 � NORTH CAROLiN� DE TI�N�( a \ � �\ � � WRix� v. GONI��EI
� � �G � OF iRANSPORf � i�ON II ,� � � i v ` � / � �. �P �37 PPGG A6� p 2b' E3.00'
/ / � � \ �} 162 DPB 3 � PC �- \/ / ' \ \\ � +� / .. EIP \ • 6H=AN1 N
�� � � s s - / 83'2 175.00•
/ 5. " ' ' \ � � 202.48' � \ \ s �Y �' � • 4 � o� � /� 10 N/ 6=d01 5 8335'13' E
� QP .. ` . 6g93 E�P t�N�525�i . C \ TO ��H 2O.00' S 83'35'13'E
� . � N 87'04'O7' W � 2 // 2522�4' EP 10 COR 265.00' �'J�
. s . ���\:� �'' � -- „T-- jry0� X � _' / � \ws is6 \ 25�.�26' E t .
/ � \i� \r N 83°2� . / /
�o E , \s T. �N �%' Yi�� 2� �,� _,� Q%\n � 6 s4
/ 9 � `` s `=- Zic56'33 di � ", �Na� �' STEP�ffN PEGC \"N H� � to�" co�` " j � ^ \ �'e `s
� o N '; JN07 , 6� � R ,�d � IP .. 3.rp'h' E
/ � ' 0� `;� 5�fifil�.����i X 266y3�� � A4'� o'K N � CRpq
/ J, s• � ��^ -BY15A-543 DB 24i0 PG 832 o z�o�' �� �_ �y SE+�N
0.e/ / LATERP.L 2' 6ASE oITCH ;9 DB�25�f P( �761 \ o PB 37 PG +6 j� 38 AIICMA A. ST 6� : \\ `� N o T TX A.CRAN \F J pp .
s N �'�y r \\ 9
' / SEE DETAIL#3 m ' ,r � PB 37 PC �6 ''2\ im � .. v� �i1 � � � � EIP ^ �N D' A .0 �. � _ _ \ IV
/ o�- �N6El J. rtqJiN - o sN 5 i5•z5' �, P8 7. g4'0 �� St�c \ O n`� . 46 PG .
� 95 p� �89 �, � \ .m\� �p2e X � O� � �ns'P / �, 37 PG 46 ALLAN NATKMS
m
. / � � vB p'16 � 'N o a� \ �\ � x/ - o � / ��Nc \\ \� f . o f i` ar r1NPG 232 S o
1 70 of^ ;� \ y '%����%%s���; m �s � K
� y�J� • s
� o0 9 �'S w o: � 266 g��3' E</ P v y � PB Pri ,i1
_ ti ,
W \ f N
'\ �j \ � �}�� � �� i CAROL M. NESTMORELA N �} �'`e�o � &
. m.
X�s Z�o Eg �I/ \. \\ \ . c� . �\� o Ntz' ,� \\ OB �3� PG i937
� � \ -�, � \ • \
/ 19720' � � � N'12�3'\2 \ \ � . � � \ \ A
� o PB 3i PG �6 0 �� �o"��,�
-6�t9��40 :,� Wm,o / � \ �� � Q ;� NLUAN L.1AlRR Y � � \,��� N \ s �%� 1 z i y" //y S"'/� � \p9�:
"�`� � -BY15A-421 N a 0S2 3 ly L. CASMwELL' 1Y\ � \ m ���oHc z\ I / �s .�iFREY D�LE
v�' END CONSTRU��' \ °" DB 2W4 PG 550 Nm d)Q �\\ `� � � . c�'��zo"o Pc
�Q' / \ \ � � PB 3i PG �6 x -. f to �C� �\ \ � � \ / �� �'."} �} \ FB 3T PG
-YS- POC STA. l �rc��� c. o � � � o y ° � / � �
� s 1 \ \�� � 'BY�,J . 4I KELLY TH SON� -- �� � € � "s \ 41 �0� � '�'�� \
Y'
� ,�+" ,.��7��,? , oe g+o rc� �e d� / \ �\ mta �t �y �o°°<�� �j �
�! / - � \• \ �\`"�'" �' ,�t��Z N / g PB !7 PC � pNc � \ �if ¢=h00 `so ac 1s
ti �- � � '��� 5 � � � (o /� 9;°0 �a /� � \
J � '" \'° 25.SZ° � Z 5. E /� n 569= Ni S' o�,� a 1��r
� 'IpO� ' � %0 3� ,+ `T 266e ��2 v \ ' 06= \ / � �'y
� 2 ,�4,�2 E � \ 0 0' s� / W o 'I2°39 �� - \ > � `i/ � �
N \\ � s\ . / N �' `' 0 0
12' o o C o
N�__ ¢9 � 4 �' p0 /N�// T Pv�y/ yoy^ Q== N 89o7q2-�v � .
wo dl3 ' Y�y \ -� �� / �-
�^ �: .b1�090=AN1 -� 544 \ � . �IP // 22gst j�` CONC - �- � ��\Y33EPLp41�5EMENT .
\ - PSEMEj � �K �IP /` -}- �,'
.bZ'£LB=d01 f S.Ut���t� f R R � E
NATSON BROilERS. MIL . dl3 NW'o � � DEE EIP `�o� � I, �
�
s
PROJECT REFERENCE NO. SHEET NO.
U-25796 28
R�W SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
����w��d•11���� �L ��d]��V
ID� N�' Il" U S E E� C� N S' J[° g B U C T d� N
Y4RPC
l5 r0 + Pl 5/0 +�2�7� P/5 Sto /1+5p;(�
9s = 5' 43' 465' �= 8 0' c.� tLT1 gs = 5' 43' 465•
Ls = 240.00' D= 446' 28T Ls = 240.00'
LT = 160.�' L� 173953' LT = 160A8'
sr = so.o� r= i,as2�az sr = so,o�
R = 1,200„00'
Y4RPB
Pis S�o 15+4732 P� Sto 23+ l Pls S►o 3/+2086
6s = 429' 37S �� 5256` 04.3 fRTJ gs = 429' 37.6'
LS = 240A0' D= 3' 44' 4/. 4 LS = 240A0'
LT =/60A5' L= 44/3.54' LT = 160A5'
S T = 8 0 A 5' T= 7 6/ 7 4' S T =� A 5'
R = i.530.00'
Y5A
Pi Sto 58+1625
o = 3s2r �r rRr�
D = E 30' 392
L = 543.39'
T - 280b��
R = 880,00'
SE = O.Q6
RO = SEE PLANS
Y6
Pi Sro 2i+3427 Pl S�o 36+8822
�= 48' 34' 2/.9' (LT! p= l0 45' 54A' !LT!
o = �o��r �a o = �or o5.r
L = 45/B5' L = 266.80'
T = 2405r T = 133�q
R = 533.O�D' R = 1420,00'
SE = O.fi1G6 SE = OA4
RO = SEE PLANS RO = SEE PLANS
ia
P/ sro bfnB3 Pi s+o n+23.06
p � /S25'041fLT1 p = 444'//SfRTI
D+ 95T' 52l D= 5'43' 465'
L = 1547.�' L = 82b7'
T � 7783' T = 4/.36'
R � 575A0' R = 4000.00'
' / ERIC J. rAR8R0UCH �1' .3 �o //� �`.�- \
�� �i ��s 2 LOB 7 0� / EIP s Ex� t
SSM�
PB 37 PC �6 /EpSEUEN ,pM� AVERY CAppY
s o�' ° E � Nt� �yQpp� F1YE G�ODY \ PERAMENT DRA/NAGE/UTILITY EASEMENT TO BE PURCHASED
� J` N2,2'iq,\Z i w o /
0 0 0 2663g, E $. EIP / 5` \ ���, � 3�9 �DUE-� UNDER TIP PROJECT U-2579G
0 0 / s 5�,ae ai w PB 3r PG �6
`" • +e��� /N ,5 S Ex�SZ�/ PERAMENT DRA/NAGE EASEAIENT TO BE PURCHASED UNDER
a �'� �PDE� TlP PROJECT U-2579G
i iv SIO•16 �Oy0662 a�,�0�'•
-YS �"� r ai • i T AIL • 3 a � R�GHT OF WAY TO BE PURCHASED UNDER TlP PROJECT U-2579G
LATERAL BASE DITCH $PECI L�V' DITCH �. � AL A DITCH �
FROM STA.,o�+so To STA.,o�+b, ��* *� x�� ��* *o s�.� ��* *o s�� s,, O P�CELS /MPACTED UNDER T/P PROJECT U-2579G
sb„ ."' _ � ;,•s,._ N�� O ORAINAGE TO BE CONSTRUCTED UNDER TlP PROJECT U-2579G
vn N m "'"�
�r x et ed ��n�� D MIn.D- 2 Ft, �b ��� A taB` °soos °�'° ° �"' N9 mq\ TO BE CONSTRUCTED UNDER TlP PRO,IECT U-2579G
Q��� � Mox.O= 2 Ft, D MIn.D= 2 Ft, F`
�w�s 3ns F��� U \ \ 0(GRADING.PAVING.DRA/NAGE,& STRUCTUREI
B= 2 Ft, B= 2 Ft, ,�RRY Gw,� G�OQS$S5ARD PAVED SHOULDER
•Fnen B 1s <&0' D= 5 Ft, M1�.0= 2 Ft, b= 5 Ft. � K4REN F�EWNG �� 2jj5 PC 17�� .�;�
'^• iwn� y MiCNAEL LEIANG
TyDe Of �Iner- CIOS3 'B' Rlp-ROp FROM STA. 25+60 TO 27+85 -Yb- RT FROM S 19+�Nj�9j,�tPB- LT��'oo �� �,� \ ��T �,6 \/ � PAVEMENT TO BE OBLITERATED
ELW18ETx H.,p1E5
FROM STA.117+65 TO 178+25 -Y4- LT f
FROM STA 22+50 TO 23+90 -Y4RPB- LT ��3 ��
FROM STA 105+30 TO 107+10 -Y4- LT � 3f P� �6
NOTE :
FOR -Y4EB- PROF�LE.SEE SHEET 52-53
fOR -Y4WB- PROFILE.SEE SHEET 57-58
FOR -Y4RPB- PROfILE,SEE SHEET 7/
FOR -Y4RPC- PROFILE,SEE SHEET 78-79
FOR -Y6- PROFILE.SEE SHEET 89-9/
FOR T/P PROJECT U-2579G SEE U-2579G PLAN SHEET 4
N
Z
O
>
w
�
,, uM NONNdH�
� ��
�� `�-� � ��� � = � � � � ` � �� / "09 PROJECT REFERENCE NO.
2 �9 � �' � (� �
� N r°��\ � Q-
� \
�9 `'s z AM . SELLARS WIF /Go c � -`� � �c,e � / ��� U-25796
o_ �
s RUTH � SELLA `� � �'L / / �,}� WW SHEET NO.
� ,�o DB 223� PG �ESUSAN D.T E RYWIFE /
�L � E T A I L # C ROADWAY DESIGN
��'�'62� TOE PROTECTION � �� PB 2 4 \ DB 2535 PG 230� %� /�c,e ENGINEER
�tlr \
\ o �-
� �o� � \ �
�✓� �
�O
+ 54.01 -Y5A � ��/
s �
;�� 70.00' J J � 0
�� C
- NORTH CA� �d D� R`TMEtJ���c
� OF TR PORT� 0
r
c N o t t o S c a � e� � � \ \ �\ PB 25 � 114 y /�� � GE
i
� �
Natural ZP���� Slope � �,\ � � // /' � %
Ground F�, \ � � \
d o � � / -� \
� � � � �\ � � �
SHEET NO.
29
HYDRAULICS
ENGINEER
d= 2 Ft. F be � S \ EIP /// \��� \ S ip ���' �.I��N��� ��.�i N�
��p� �' � / / �� 9S �,9 ID� N�'Il' USE F� C�NS'Il'IBUCTI�N
`9^ '�' _ - �� \ „ R�P � �\ �9
�o D Type of Liner Class 'B' Rip Rap \ ��2 �% ^
`s� FROM STA.129+00 TO 130+00 -Y4- LT �j ��/ /�� EIP `� s��s o
„ ��e / � / °%� ���
�2 � / . F`
o B 30 PG 196 Purchased Purchased � /���
� Bn 2 G$�� �-c�� Under U-2579G Under U-2579G 199 ���
G � �� �� ,� 22' � � �
� � q� �4 \ � �o A�c,O �� / (�EMIER STORES
;� P' �, �oN� N 6� 5 �, � OB 2954 PG 19:
�^ � �p� o \ �- NORTH CAROLINA DEPARTMENT � �9 � PB 25 PG 114
��`� ` � � / � � OF TRANSPORTATION J'
� � �90 • 9�S
�
`�'--` � p�, / �� , �i� f� GE � `� �, �%� �
r F
� �� �` � �� \ \ , ,ad\69 N -Y - ST A. 67 +07.0/ � �� °�°�, l
70.00' �O- �\ � � � \ � � ��\ �\ � • � °�°� �\
/� i i ��� � s CONSTRUCTED UNDER
145.00 �o� � � � \ � � �� � . / � / BEGIN APPROACH SLAB T lP PROJECT U -2579G � �'
� `ro_ � / \ `�� ,� � � -YSA- POT STA.66+83.J�2 TOE PROTECTION W/ �
� � �
j / - ' -� � \ \ ���9' � > k6°� p0' � � CONSTRUCTED UNDER CLASS "B" RIPRAP �
\ � � 05' \ F- � EST 149 TONS
_ _ -r � � _ , _ - - � � � \ � � y\ � TlP PROJECT U-2579G EST 401 SY FF �
_ _ ��' � C s':o � � � � SEE DETAIL#b �
f_� v � -� � \ \ � �`r �C � � ` � � G,� � � + 13.49 -Y5A- �'
+54.01 -Y5A- \ �d13 � G � Ex. tt�w END MSE WALL �
� 9 7 70.00' � ��� �-� . �� � �so \� END W.W. FENCE BEG NOISE WALL -NWY42- C�,4SS ,B,
J. R +78.07 -Y5A- - \ 9'0��� � `� � � TlE TO EXISTING � B +27 RIP RAP �
d � � F G � -Y4- STA. 129+50.00 C SS '' 0518 � �
595 PG 1797 EX. WW `'i \ F�� ��, � � � RIP RAP �bp� EST 2 TONS
��(�0 $'�5A � � � u' � ��- � \ -BY16-550 EST 8 TONS EST 7 SY FF
` �- 15" CSP W2
+45. Y5A- \\ \ \ SO � \J`�� � \ EST 21 SY FF "
145.00' Purchased o c� � � ���-
Under U-2579G EX. -9\� � � . . �� . �- ` . � A f ki��-:��-:����� AND ROD A
�_ . �- DO ��� OBLI C�l��� AN � � �� b0
� CON
00 1- Mia �wlsix3> - - - - -� - - - -6,�f4� �0 ORAIN � � o� 1 0 - - - - - - - X' �W - - - - - EX. V� - - - STi�b�� - - - - - - - - - - - - - - - = - - - - �� -
- E +sa.l �
- - - - - - - \ - - - 99
:. � \ �
_ _ _ EXI /W 22' �
� + \ � IN R X X X.. X X \\ x � X X �-� R/W MON
N � �
18" CS + 81 5�'5A � 69.69 �- F � �C ` x X -y4-_ POT A.129+64.J� 0516 0517 Le�\ �'
�
W - �' � EX. � ��" � � 42.�0' � � �+67.34 Y4 � � �` � PROP NOISE WALL
= END NOIS WALL W l- \ � + l2/.46' � � � -Y5A P� STA. 68+06.5/ 2 „ �°/ �� -NWY42-
N BEGI W.W. FEN � `� � � �e�� �iii F - - - - - - - - - _ _ - - - - - � = BARR/ER FACE
TlE 0/SE WALL /0' P.S. FULL. E T�l PA �MENT � �',o C � �
� \ ON RU i €D U QER � BEGIN � - � �- - ��� . . - - - - - � � � F
� 05o W.W. FENCE 5�
� � �--� �2 � � G� T P PROJ X U-2979G1 60° coNc � � W.W.FE CE � REMOVE FES RCP ��`� �-` �- � W
�_78.. __�_8 _ �� / � ----------- W
+ - � � o� 1- - - - - ?-�I- - FS o� 5 . _ _ - - - o� i - - - - - - - - - - - - - -
�- - - -� - T - - - - s - _ ��l€R�J��`TMk� � - r =
� EM L----�'�sj-- - -� - - -- -- ---- -- ---- - -- N
N 18" RCP-III 0501 �\ „ � � 0503 TO 2G1 W/FLAT GRATE /� 2G1 W/
Q \ ,� REMOV � co��,R -Y4EB- �� ` N 85° 33� �l J�.B�� w l�� RETAI 472 FLAT GRATE -Y4E _ �~
N
N � �3 �� � ��A� 050 REMOVE �� �� 0 0509 �g �,�,�MH �� REMOVE �-a0 eus EAST US 42� SouTH 24' ST N 1�
Conv. OTCB To 2G1 +
� - - - - - - - - - - C� - �
� i � T =n3�a � - - a6 -�-- - - - - - - - - � - - T T � - - Z - T T � T 1 � .JT �2 1 T (�
� � r
� � - T � , L T - i � L T - - L -T - � - - Z - � - � - T T- S T- � - -F. - -
I � G Q
H
Z� N � ��/ % XObdF�cLSE SUMP -Y4WB ♦� �♦ N 85° 33� 4J�.8�� w ���// RETAIN ND EXTEND o -Y4WB- � �� N
��q p ��TgE��g � 1-40 BUS WEST US 42/ NORTH 24' T � �R A v� �
,� r � �� A \ %� RFTAiN�ATI D� EXTEhI6 ET ♦ ♦ BEGIN W.W. FENCE �
� � � � COLLAR 0514 �_ � �
U= 2�i-L a ' oL�aie=rc�-e�'�u COLLAR 1 � T I
--- � , __ ___
� 15" RCP-III REMOVE ��� 0506 � END W.W. FENCE ♦� � ���� REMOVE FES 2G1 W� � �g„ R W
� ��\ \ SHOULDER BERM UTTER ♦ � 5" RCP-III FS _
�r�-' _�r��]- G \ �r`-� �. �2� ����-,����-, REMOVE FES Z
+4 67 -Y - / GRAU 350 TL-3 � TYPE B-77 �M �r•-,
REMOVE � 6 � 0513 AND ROD AND L G � 18" RCP-111
� 00' FA� E S 1�1P � +75.00 Y4 0510 � l0 P.S. 2G1 =
�� ��� X �� �� \ � X�-- + /24.00' FLAT G /TE �AF 11 T 51 CONNECTORS (CONS�RUCT � UNDER l - 42' � U
+00.00 -Y4- 050 �� . P-II� +4 .35 -YSA- ` ) � SHOULDER BERM GUTTER T/P ROJEC U-2579G1 _ _ � - -'f8" RCP-III ~
TO 70 + 17 -Y �
N� 471 1- y_--�25.39 ---�- C � 4.��+ _ C R �� " F��� ��5�55 Y5 .W.FENCE _________-----
/ C � . � TlE TO -�- - -� � x
�-- J� R/W MO EXISTING R/W � �� �
W = -1- �I- _, _ � GRADE TO ORAIN � � � � R _� � x �� ��� - 60� ww&isBw
W 00' TAPE /, l�,,, � o \ N� E E E � 0511 �� 051 � 1000' FULL --�"'��� �
_ '° ��� �' � I ARRO S'bOT
N M a �wlsi � ;�� \ +41.17 - 5A- +20.75 -Y5A-
, � � � � + 9 .48-Y5A- � �` �/ T GRAT � E EN APPROACH SLAB -YSA- POT ST A.69+24
� '� , � ���T � � � � � � � , b'.'s� �' \ � � ��� -YSA- POT STA.69+47.75 ONSTRUCTED UNDER 2��.�0'
� MOV� -Y6,'/ . � \ ��� � � \ �F � � G, SHOULDER �RM GUTTER � .q�•i � `\ � � �, �� �
,�, �,� \,�� \�1 �� D RIDGE TO b-+ 80 - A- RT F�, �� � � �\ F CONST RUCT ED UNDER T lP PROJECT U-2579G
� �\ a�, �� �, � I � - B Y I 5_ 4 2�' TB GI W ARRO SLOT �� � � �� T lP PROJECT U-2579G
+ � _ , � �o- � � Y17 559 �� � a
M _ � / ` �\ \_ �� o � D FLA GRATE �S�o. ��\ ��` ��/ �� +20.00 -Y5A,
N F c � ' � R REMOVE �, i�� �� � o �"� `,o \\\ ��\ \ �.� �\ 71.00
Q � o UE � � �� , �.. ,8 �� �� \ � 20� 0 Pnrtial Pu� hase ,9� �� \ �6��`E \
H EC� - - � , .p � �� � � U de U 579G J, �� �- \ \ � �
N X� p,. , i �' �'� �',o - _ � �s J� �� �
,� � _ _ � � LARRY D. THOMPSON � � �� � ,�� �
o ° c, �9 v'
I � � � � + 0.00 �' . p , � � � � JANE T THOMPSON � � � �� � �� �
� Iv-� �� � 53.�' ��� ,'�E � � REMOV � `�;s �� � DB 2113 PG 1940 C ��, � �� � �
�
� � R � � + 50.00 -Y� / �� �
� �i39 N +53.00 � 6- +35.6 ;Yb;' ° k32• � �R�w �(� ��� � � \� J' n�'�
So, � • 37.0�' � , , $ . - s, g11 2, w e \ � �45.90� � \ / � � \ ,! ��1
W � ; p � 33. � � � �p�. o q0" � s�. \ � � �� � '� �
Z g p2e ''� + 45.62 -Y(�- \ �' � � � � � D���� JC' � ` S � � m � , \ / / + \ / � G � \ �� ��
Y6
Pl Sto 2/+34.27
p= 48° 34' 2/.9" (LT l
D = l0° 44' S8.8"
L = 45/.85'
T = 240.5/'
R = 533.00'
SE = 0.06
RO = SEE PLANS
J � 33.00� �, � b8 Jd,zz sd�� � � . ,�- �; � -� �T � +93. 7 -Yb- �s� s`Y' F � P �`� `�� �;� � J PERAMENT DRAINA�E/UTILITY EASEMENT TO BE PURCHASED
_ � �£9�I J�I 5£�Z 94 �Z = 1 F � \ '� R M VE 40 0' � � � �\ .s �� o-DUE�+i
v � s \ "�0��� �n,H13�a ��� � - � � \� � � � � � �� � �� � � �p�C� UNDER T lP PROJECT U -2579G
� , `�� � � ; ap�•4� 9.16 - - � �- , � \\ � T -� � � � `�� �� � X O� PERAMENT DRAINAGE EASEMENT TO BE PURCHASED UNDER
� � � 198 �" �1�� . i ��' .00T � � � � � _
�"' ,'�,+ 1z p�s �� �-- � R� vE \ o� L�X A`� ` ' 1�Q� o- P°E -�' T lP PROJECT U 2579G
� o � Z � � � � ��� � � � � "�'� � titi F � 'P s.�/` ��P��Q _
Z � $ ,L b L S O � � � � / + 93 J -Y6- � F�� � � � �� \ � \ \ � � � �� $ RIGHT OF W AY T 0 BE PURCHASED UNDER T lP PROJECT U 2579G
o M � �� � -� 36 C0� 33.00� A � \�� ° ' \ `� ,, �,�� � \ s� . � ��Q'�O Q PARCELS IMPACT ED UNDER T lP PROJECT U -2579G
o ;� ❑ W��T � -,� \ ,� o , -so6� � � J -
�� � 18 + 93.77 ��N X3 ,�/ ds� ,o ��9�,�' �, O DRAINAGE T 0 BE CONST RUCT ED UNDER T lP PROJECT U 2579G
L ,00•os � -BY15-542 � s3.o � � q� ��\ � \ � �
'''- °35-�3• E w Z - B Y I 5 B- 4 2 2 �, N + 93 -Y = \ � � �°°�,°°� � .�,`�C�'��' T 0 BE CONST RUCT ED UNDER T lP PROJECT U-2579G
J w �, 0 53.00 ,�� A� ��P �' ,���J 0 fGRADING, PAVING, DRAINAGE, & STRUCTUREI
� � � . �
�`;' TIMOTHY A. MONTGOMERY `� � � o � �k� o�i F yb �� PAVED SHOULDER
z o CINDY B. MONTGOMERY � �' � ° � . �� �. � �(�O �
w �- DB 3035 PG 4335 '^ � � � .l� �j'�� , � ��'
� z PB 22 PG 84 �ENNIS W. CARTER � �, Gj� c,o ���
�- � SUSAN CARTER Q �° G
z o DB 1755 PG 2672 2 O-� �� ,�� ��� �
� 2 �2 PB 84 5 ��� �2 �
o r �A
�� s �
U �-
Q_
00
��
� s
� PAVEMENT TO BE OBLITERATED
NOTE :
FOR -Y4EB - PROFILE, SEE SHEET 53 -54
FOR -Y4WB - PROFILE, SEE SHEET 58 -59
FOR -YSA- PROFILE, SEE SHEET 83-84
FOR -Y6 - PROFILE. SEE SHEET 89
FOR T lP PROJECT U-2579G, SEE U-2579G PLAN SHEET 5
N
�
N
>
w
�
c�C
�
Purchased
2 05 Under U-2579G
CITY OF W� ON-SALEM �
DB 2183 PG 3156 �
�
E11tD C01�STR UCTI01� �
(TIP PR�JECT U-2579G) °
�
-YSA- STA. 81 + 25.00 �
REVISE FILL SLOPE �
TO 4:1 Q
STA. 80 + 00 TO 80 + 50 -Y5A- RT �
+ 91.15 -Y5A- �
EX. RiW
ioo� raPER ro Exisr.
+ 50.00 -Y5A RT. & LT. SlD
EX. fLW
�
�\
y
ELIMI ATE CUT DITCH,
STA 79 + 50 -Y5A- RT
+ 73.83 -YSA-
75.43'
�
rn
-Y6 -
Pl Sto l3 +9/.60
p= 7/° 04' 40.0" (RT l
D = ll° 48' 48.8"
L = 60/.66'
T = 346.44'
R = 485.00'
SE = 06
RO = SEE PLANS
rnl� � D�gs� �
N � � � � X � `�/UC
Purchased �I �- �� � � �
Under U-2579 I 70od O /)
RPP DIVERSIFI� INC. � L� I � w� ���\0 �"
DB 3095 PG 0068 �-_� w� o M� . 9�j
p 2 PG 84 � o�� Q� �' /�
206 '" � oZ" �'�
� �� Q� N 2 I
a Sz Z �
mo
\ � � � = r M �rchased I
� � O Z�der U-2579G /
/ � � �� � � Z m
` � � � �.
. �
� � _ +18.42 Y6 � ��
\ �No � � I � � 53.00' �° N N
_ Y � 7 _ � \`�-F'i �J ` + 46.82 -Y6- � I
B 56
� � 5 0' + 14.15 - b-' �; W�
EX. RrW
1ti ,PP� � \ , J S 6° 55` 34.8° E � =v
��' ° �`° UE DUE ~ N�
o� pUE �.
� 0519 �Q
� �`�rREMOV� -- _------ - M�
� � �
v�� �� ��� ���d�� ��z� - 2 a�R��yv s� s d�� �,z� - � ��
0 . w_' _ � � � _ 16'_�� y- - - W - i2fbFOV€- -
��
�`-�� �� � w- � � «� � u�, w N o � N N iv Q
�
�/ ��� ' � 6�1 �\ A G'� N N N N N O O F" W
�
MELVIN LEE SWISHER �/ � or � � � ,�� - � N
� Q
/ / ?uT� , aur�
JAMES LAWRENCE SWISHER �� �/� � _ �81 2i'iNC. � I Z
DBPB�22 PG 8406 � �/� � T i � REMOVE -� � _� � �
�/� �� 6 zo' g%' _ �-
�� ii � � Y DR/ � �
GER�i� -- W�
2 O4 O�i ���� 825/� � GI W/NARROW SLO Z W
i i � H
/� /� j � i FS 521 � i. c� E + 46.8 - 6- J U
Purchased // / �\� / . �
� � � / �� CHRISTOPHER DECOSKEY 40. o U�
Under U-2579G / � GI W/NARROW SLOY3 �
� EY �
�, ���o � .�5 � CARLA J. DEOSK I-N
� / � / �� + 7.0 -Y6B6 2���� 877 �Z
J� �� � �s� / ��� � / � b .00' Under U-257 g 17 - 5 0
O�/�� /�� s ���� �� I �NO� ��9� w �
U
�.� � , /� � '�,��e � � � 2 03 �' � --
�i i� �5 � � M. o
, / �� o� , �' � / � M \ � � � �� f
� i�/ �o � � 0601 �^'S i ► � � � a�sz �' -
,/ �
�; S � �,`° � � - �
� / / �o � TS , „ �
/��; I W/NARRC�/ Q �P
� \� /� � /`!�� � -i�c � � i AA /�A VG A
� +63.00 -Yb- ��36�� �- Q �z5.uu'
40.0,r� ^' / � � �� Q �
1� > /
�// E � ____--
S�` / '
-�,� �
/� `� �-- 11
/ � + 55 17 -Y5A-
L�a aM�
� + 13.00 -Y5A-
100.00'
E � E
----- �
S 36°05'25" E
-�'-"�_ �� 209.��r,-,s�
� L I W/IVHKKI�W L.BT'S�
P / _ G + 63.00 -Y5A- � � O� j�
+ 50.00 -Y5A- O� 59.05 -Y5A- m_ i �/ s� � � 42.00' N�
54.00' - � � �� 9 � / so 120.00'
42.93 DRAIrJ' �lg 2- � v 2GI W/NARROW SL �N
+ 48.99 -Y5A- � + 40.00 -Y5A� . �.I � i '` � 90 � 6 � � � W �
� v.i / 90 + 50.00 -Y5A-
� 28.61' �s- �- EX, / � y6` /� / I / �SR ^ 42.00' ��
��.
��" SEAT ELEVATIONS
- � W� � L T --__ 1
-� - \ - - - - - - �
_ 810,92' 810 g' �
N 35° 34' 11.3" W aRi�cE� zo� �
_ SR 667 HASTINGS HILL RD� I
1___I
810,91' 1 \810,89'
�
WOODS
�
SEAT ELEVATIONS
`�'s � �- _�'oR 8 �/ �� i obo R 4�P 5 052 __= o
SA5 � - -
��',� .6Z � � � � � � 2G1 SLOTS w 24' �NC _ � - _ - _ OQ
� � �-FS� �GI�W/N�,RRO�LOTS � \ _ - - - = o �o -I' CG
� � � �� ������� �� N p � N ('��
W � � / � � � � � � � � � O
16"DI - -P-��-� / 60 � �� // \� ____--__ � N o � � - __--- I�d.
N ---__ _ --- � =---- y- �// a „1A/ p � � �� �- � � Q�
� o o - c,� Q` - '- � ��`�' � N 44_06� 33.7 �► _ - - _ _ - �4,P.S. 052 N�
o -- -=N M - - -�h ��-- -------- ------- __- -------- 15" RCP-III FS I 0
W/LT -- --- --- - -------------- QZ
, y� �-,��� bo Fs 15�� �� `n7
, � „
24 RCP-III �'
� \ 4 P.S. w 2G1 W/NARROW S �
+ 55.17 -Y5A- W �
E w - - -�`` a2.00�
„ GQ 2GI-A �. -----------_ O60 2G1-A W/ ��
� �- �tc�r� � � E E - - -PIARR.QV�L SLOTS _ _ _ - - - � � a � V
obo r __ ________ ��
� + 50.00 -YSA- E - � V pG
a2.00� E E E �- N
�OO Q �\� ��� 64.00' + 50.00 -YSA- + 75.00 -YSA- �Z
+50.00 -Y5A- � Q� FALSE CUT e , „ 97.00' 114.00'
EX. RiW ��J���" ss '�r SEE DETAIL#1 N 7/ 59 45.2 E O
42.00' ENERGY f���ATOR BASIN # 1 Q`�� y
D E E NCE EST. SS I RIPRAP +/- 70 TONS' ,� �
+ i4PS4�R -Y5A . DDE +/- 80 CY � �6 TyA � - Y S A- P O C S T A. 7 7+ 6/. 4� = 2 � 4
CIT ,WINSTON , ST. FF +/- 70 SY �.
SH� I� SALEM WAT�ip HED � �ti -Y6- POT STA.IOfOO.00
CITY OF WINSTON-SALEM ,, ��'oiy,y +50.00 -Y5A- Under U�.^�o79G
� Purchased � 4. � 65.00' c7
' Under U-2579G 205
� � �. �
� �,
FROM STA. 78 + 50 TO 79 + 50 -YSA- LT
�
_�
PROJECT REFERENCE NO.
U-25796
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
31
HYDRAULICS
ENGINEER
���' �..���N���' ��..�i N�
ID� N�°Il" USE E� C�NS'JCIBUCTI�N
-Y6- STA.17 + 25. 77 -Y6- STA.17 + 25. 77
C01�STR UCTED U1�DER C011tSTR UCTED U1�DER
'TIP PROIECT U-2579G) (TIP PROIECT U-2579B)
o- ouE-0 PERAMENT DRAINAGE/UT lLITY EASEMENT T 0 BE PURCHASED UNDER T lP PROJECT U-2579G
o- POE -� PERAMENT DRAINAGE EASEMENT T 0 BE PURCHASED UNDER T lP PROJECT U-2579G
� RIGHT OF WAY T 0 BE PURCHASED UNDER T lP PROJECT U-2579G
� PARCELS IMPACT ED UNDER T lP PROJECT U-2579G
O DRAINA�E T 0 BE CONST RUCT ED UNDER T lP PROJECT U-2579G
0 T 0 BE CONST RUCT ED UNDER T lP PROJECT U-2579G
�GRADING, PAV ING, DRAINAGE, & ST RUCT UREI
� PAVED SHOULDER
� PAV EMENT T 0 BE OBLIT ERAT ED
NOTE :
FOR -YSA- PROFILE, SEE SHEET 84-85
FOR -Y6 - PROFILE, SEE SHEET 89
FOR T lP PROJECT U-2579G, SEE U-2579G PLAN SHEET 5-6