Loading...
HomeMy WebLinkAbout20030509 Ver 1_Triage Comments_20030420Date _% ; G ? ?. T1WO# Triave (ln_PnlAT attar )rl C4 r"LZ. on the site plan. _ -?L , s overlays on the site plan. Jn VVWC II M IVOi1UVi i O1 any proposed stormwater management practices as required by GC ? Please provide detail for the stormwater management practices as required by GC ? Please specify the percent of project imperviousness area based on the estimated built-out conditions. ? Please indicate all stormwater outfalls on the site plan- c3 Please indicate the diffuse flow provision measures on the site plan. ? Please Indicate whether or not the proposed Impacts already been conducted. $$) Avoidance and/or Minimization Not Provided ? The on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why It Is necessary .for this project o? ?Ua4 1w o o, n `seo? ? This Office believes that the labeled on the plans as Y can be moved or reconfigured to avoi 4he impacts to the Please revise the plans to avoid the Impacts. This Office believes that the 1 on the plans aw can be moved or reconfigured to minimize the Impacts to Please n revise the plans to minimize the impact P x lo• , 'AX t ,n eu c 4-s' C & Vt n o-f 6e N utSe I C,( ?a 5 r K 13'40 ? y ? The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because . Please revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If It Is not possible to achieve. diffuse flow through the entire buffer then. it may be necessary to provide stormwater management practices that remove nutrients before the stomiwater can be discharged through the buffer. $$) Other ? The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetiand impact was requested. Please provide $ This additional fee must be received before your application can be reviewed. ? Please complete Section(s) on the applicaflon. ? Please provide a signed copy of the application. Please provide - copies of the OPIEU]s supporting Information. $$) Mitigation E1 of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements in 15 A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. ? Please Indicate which 404 Permit the USACE would use to authorize this project.