STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
LYNDO TIPPETT
SECRETARY
March 14, 2008
O
U
S
A
m
C
f E
i
~ .
.
r
y
orps o
ng
neers
. Regulatory Field Office
~
~ Post Office Box 1000
C~ Washington, N.C. 27889-1000
Attention: Bill Biddlecome Nv~O~
~ Subject: Request for a ARC-3'4 permit for pipe replacements on SR 1329 Woodville Road in Perquimans
County.
t
S The North Carolina Department of Transportation is requesting a NW 14 permit for pipe
~ replacements on SR 1329 (Woodville Road) in Perquimans County. These pipes are located in an
~ Unnamed Tributary to Deep Creek, which is classified as class "SC". Site 1, the existing pipe is 1 @ 40'
X 36" Corrugated Metal Pipe that will be replaced with 1 @ 40' X 48" Corrugated Metal Pipe with rip rap
shoulders. Site 2, the existing pipe is 1@40' X 18" Reinforced Concrete Pipe that will be replaced with
1 @ 40' X 24" Corrugated Metal Pipe with rip rap shoulders. These pipes are being replaced in conjunction
with aroad-widening project, which increases the asphalt road surface from 18fr. to 20 ft. wide. The
roadway shoulders and drainage ditches will not be widened or realigned. The PCN form, vicinity map,
and permit drawings are included with this letter. If you need any additional information or have any
questions concerning this project please call me at 252-482-7977.
Sincerely,
Jerry Jennings, P.E.
Division One Engineer ~% /~//
Clay Willis ~/~ ~/
Division Environmental Officer
Cc:Garcy Ward, DWQ
Sonja Gregory, DWQ
I
Perquimans County SR 1329 Woodville Road
pipe replacements
-- - ~ - ---- - - - - --~ -- ' --- --~- ~ T., --I ,~~,
p5 /'
J~ i ~ ~R ;:
/ t4 '
r1 ~3d ! ~ ~ ~ Nlilscn ~ : `~"'"
;` ~ ' ~ ~ Cerra r~
~.
.,:
~ ~ ~~ %-~~ ~~1 .G'en - r ~.
~-
-- - -- _ - ---- ~ =_ - . _ _~ - - _ - t I
. M ~ ~-dam G~sm ~ .l~
{ C' ud 4 e'y
f
,~ Site 1 t I}
N 36.167 ~;~`~ ~'. ,; .
~,`~( W 76.3154AJ ' j _. . r , ~.s
~~
~'
_ ~ ~ °,- ` 5
- . ,,~ 'rte 2 a' ~ __ =- ~ ~, ~~.~ ~
:.~. N 36.:16068 I' _ . -~.y, rt~ .. ~-~~'`' ~,+ ~ ~ ~,. I
~'~ ;W 76.31479 N; ~~r~.,.~;,,,;;.-,,, y~
..
,, 1
~, _-
Y:
{ •F,`,
,kt"',~ i s 1 ~ I I
t7~SP'~ `1._
.,~:*. -
/~ _
~ ~ - - -
_ _ _ _ - --~ --- , `3-~ I
..: s;
} BM 21 ~_
~s ~_ ~
;, I ~;'~ew Hop ~ 'P
..rr ~ .:> -°~ f pis - .- 1 I
5 J ~t
~' ,.
L I• £
~, - .
. ~ ._ ., ~ ~~ I,
,, y,,-
,
.w _ -
..
. ~_
. , _ ~.., '
.,
__. `~. y -
~.
__,____ _
~-'~- ,
~aun°' i
. ~ ~ -
..
c3, .~
;~
t~ .' ~-~ a
l
4 ~ r~ ~ r' ~ -
3.t;,z ~. ~ ~ ~' ~ ~ ~ pi ~` ?:399 ,rzs ~ 7, ~ I
i4,- .eft ~' ,i k ~ _ +}, ~
fit.}sir ~:, ~ ,
1 f
`,j ~ 11~ _~ ~ ~ ~ 1 i 3.t~ ~~
.. o
:2.u - ._ I d ~t
~i i '
USGS Quad - Nixonton
Pasquotank River Basin
0 0.25 0.5 1 Miles
I 9 9 9 1 9 9 9 I
N
W E
S
C Department of Transportation
Division of Highways
)LINTY: ~ ER 4 ~ ~ r-.ws
IAD:
SIN:Ct.~o w w..~
PROJECT:
DATE: Z 1 ~ 310 e
VICINITY MAP
Office Use Only: Form Version March OS
2 0 0 8 0 5 1 6
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certi1fication
2. Nationwide, Regional or General Permit Number(s) Requested: N~-1'4" ly w G
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: [~
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: Clay Willis, NCDOT Division 1 Environmental Officer
Mailing Address: 113 Airport Dr. Suite 100
Edenton NC 27932
Telephone Number: 252-482-7977 Fax Number: 252-482-8722
E-mail Address: tcwillis(a,dot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Updated 11/V2005
Page 5 of 13
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1329 Woodville Road, Perquimans County
2. T.I.P. Project Number or State Project Number (NCDOT Only): 41683
3. Property Identification Number (Tax PIN):
4. Location
County: Perquimans Nearest Town: New Hope
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.): Take US 17 North from
Hertford to the intersection of US 17 and SR 1300 (New Hope Road). Turn right on SR
1300 and travel 8.5 miles to SR 1329 (Woodville Rd). Turn left on SR 1329 and go 0.36
miles and this is the location of Site 2. Go another 0.53 miles and this is the location of Site
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): Site_1, 36.16770 °N, 76.31540 °W, Site 2, 36.16068
N, 76.31479 W
6. Property size (acres): 21.8 acres
7. Name of nearest receiving body of water: unnamed tributaries to Deep Creek. Deep Creek
is classified as "SC".
8. River Basin: Pasauotank River Basin
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Updated 11/1/2005
Page 6 of 13
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Surrounding land use is residential, woodland and
agriculture row crop.
10. Describe the overall project in detail, including the type of equipment to be used: Site 1,
Replace the existing_pipe 1 na 40' X 36" Corrugated Metal Pipe with the proposed pipe 1(a,
40' X 48" Corrugated Metal Pipe Site 2 replace existing_pipe 1(a, 40' X 18" Reinforced
Concrete Pipe with the proposed pipe 1(cr~ 40' X 24" Corrugated Metal Pipe. Both pipes will
have riprap shoulders on both ends on their current alignment. The current pipes will be
removed entirely ProRer fill will be used to bring road to existing height. The proposed
pipe diameter is larger to help restore the tributary to more natural flow regimes. Once the
pipe replacement is complete the roadway asphalt surface will be widened from 18' to 20'.
Heavy equipment used will be an excavator backhoe and dump trucks.
11. Explain the purpose of the proposed work: To replace structurally deficient pipes.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. NONE
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
NONE
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
Updated 11/1/2005
Page 7 of 13
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
Provide a written description of the proposed impacts: This project will have 0 linear feet of
stream impacts.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding. NONE
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
(yes/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
Total Wetland Impact (acres) 0
3. List the total acreage (estimated) of all existing wetlands on the property: NONE
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Number
(indicate on map)
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Im act Impact
Length
(linear feet) Area of
Impact
(acres)
Updated 11 / 1 /2005
Page 8 of 13
Total Stream Impact (by length and acreage) ~
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill_ excavatinn_ dredt?in~. flooding. drainase, bulkheads, etc. NONE
Open Water Impact
Site Number
(indicate on ma) Name of Waterbody
(if applicable) ..
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
Total Open Water Impact (acres) ~
6. List the cumulative im act to all Waters of the U.S. resulting from the pro'ect:
Stream Impact (acres): 0
Wetland Impact (acres}: 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the. wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
Updated 11/1/2005
Page 9 of 13
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. Pipe replacement is going to
stay on the existing alignment and traffic will be detoured around the site by an offsite detour.
This will reduce temporary impacts to wetlands and the stream by not using an on-site detour and
keeping the road open.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
ham://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
Updated 11/1/?005
Page 10 of 13
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
No mitigation is posed for thisproject.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Updated 11/l/2005
Page 11 of 13
~ ~~
,i I 7
14mplrit'~'t ~ ~ ~
Sift I ~../lc: t. ~`', ` ~ ~ ~
J/ I y.
~: - ~ ~ ~ X
F-~
t. . 1'` f-. ~ tilj -'
,s r _
\, ~~}
rr
• ~.
M
~ r
. o to
1 ~
{~~ yLM
~~ ~
~ ~,
1-2aPastl~ ~ e `~~~~ ~ Nvl ~~`^~
Sc~1~ t,.= 1 U~
~~ I ' {~ l-NGT~S Sj lttA ryl
~. PA t`{ ,
C~.ouayl323 c (~~SrUn~~A
r`~c+< ~~
~ 3G, 1 ~vC~b°
W bra. ~i4~`i°
L~JD vlL~ (FIAT To Jtr~~,
4x y o'- G/`~
..~ / • _~.~_v (~a°p°s~ v I e ~y' x ya ~],To f3~ f3~a~L~~ ~~
.'•
v M~.s
c+ -----
~(- SLC`r~ orJ
C DoT -~ a ;<~ ti~ ~
~~L~~~~~ ts~Pl`'`P
--~(ZcPasep
•'
1~ ~• ~
• ~'• _
w, _
::~
S,'~c ~
NC Department of Transportation
Division of Highways
COUNTY: 1_ER~i,-~rl ~.~ $
QUAD:
BASIN: C FI o ~,J ~~ ~J
PROJECT:
DATE: ~~ t 3 l c a
w