HomeMy WebLinkAbout20081317 Ver 1_Table 2a 2014 Flow Summary_20160314Table 2a. Summary of monthly 2014 visual observations (see Table B-1) from upper Scott Creek
and its headwater systems (UT1-UT7) and a tributary to Smith Creek (UT8). (Numbering of flow
stations starts with the most downstream station at each tributary. No flow monitoring station was
installed at USC12B and 13B.)
Flow station Number of months with Flow station Number of months with
visual observation of flow visual observation of flow
USC -1 B
USC -213
USC -3B
USC -413
USC -5B
USC -613
USC -713
USC -813
USC -913
USC -10B
USC -11B
3
5
5
8*
1
0
1
0
8*
7
1
UT4-1 B
UT4-2B
1
1
UT3-3B
UT5-1 B
0
UT3-4B
0
UT6-3B
UT6-4B
UT6-513
UT6-613
2
3
4
3
1
UT7-1 B
UT7-2B
UT7-3B
2
1
1
UT3-7B
UT1-1B
UT1-2B
UT1-3B
UT1-413
3
0
1
0
UT3-8B
1
UT8-1 B
UT8-213
UT8-3B
UT8-4B
UT8-5B
7
3
4
1
2
0
UT2-1 B
0
UT3-1 B
UT3-2B
3
2
UT8-6B
3
UT3-3B
2
UT3-4B
0
UT3-5B
1
UT3-6B
2
UT3-7B
3
UT3-8B
1
UT3-9B
0
*One flow event is excluded when data collected during above normal rainfall conditions are
excluded. All other sites stay the same.
Hell Swamp/Scott Creek T-4 PCS Phosphate Company, Inc.
Fifth Annual and Summary Report February 2016