HomeMy WebLinkAbout20081317 Ver 1_Annual Photos_20160314The photos represent a range of conditions on the site. A 10 -ft pole marked with one -foot increments is in
each photo for a height reference. The fifth annual photos (bottom photos) are paired with the baseline
photo (top photo) from the same location.
HS8 photo station; view is to the east. 13 July 2010.
HS8 photo station; view is to the east. 28 October 2014.
Hell Swamp/Scott Creek Mitigation Site D-1 PCS Phosphate Company, Inc.
Fifth Annual Report February 2016
HS34 photo station; view is to the south. 14 July 2010.
HS34 photo station; view is to the south. 28 October 2014.
Hell Swamp/Scott Creek Mitigation Site D-2 PCS Phosphate Company, Inc.
Fifth Annual Report February 2016
UT1-3 photo station; view is upstream (west-northwest). 14 July 2010.
UT1-3 photo station; view is upstream (west-northwest). Planted oak is visible in the
right foreground and other trees are visible in the background. 28 October 2014.
Hell Swamp/Scott Creek Mitigation Site D-3 PCS Phosphate Company, Inc.
Fifth Annual Report February 2016
HS112 photo station; view is to the north. 13 July 2010.
HS112 photo station; view is to the north. 29 October 2014. Several planted trees are visible
that are almost as tall as the pole or as tall as the pole.
Hell Swamp/Scott Creek Mitigation Site D-4 PCS Phosphate Company, Inc.
Fifth Annual Report February 2016
,fir �.—,.�. ;•'P61�'. rx . "T >'t''
-:h
ol
UT8-6 photo station; view is downstream (southwest). 13 July 2010.
UT8-6 photo station; view is downstream (southwest). 29 October 2014.
Hell Swamp/Scott Creek Mitigation Site D-6 PCS Phosphate Company, Inc.
Fifth Annual Report February 2016
fr�i
N+Q* l
Ji
��.77
a y
NO
rr�� � •y ,1 ,1 � r
t! � • ' � 6'� 'SII i v, �1, v I II �^ � �h
ria
��
4
f. i _ � ..
i /
q 1
1. _ i..
� / y I .�' _
J � ,�
>! ,
_.
( a�• f
/� l- , � ^.
_i
r ,��