Loading...
HomeMy WebLinkAbout20140090 Ver 3_Aug 12 Inspection_20160819Wetland Inspection Report Project Num: 20140090 Version: 3 Status: Issued Project Name: NCDOT- US 158 (U-2579B) Project Type: Road County: Forsyth Region: �lanston Salem pair/improvemen Location: NCDOT- US 158 (U-2579B) Latitude: +36° 07' Longitude: -80° 07' 55" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 8�12/2016 Reason for Inspection Follow-up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Title: Phone: Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: Personnel issues appear to have contributed to this most recent sediment losses. That person was let go and a rapid response plan for the grading crew was drafted. This should help to solve recent EC problems. page: 1 Site Number: 20140090 Owner: Thorpe, Gregory Inspection Date: 8/12/2016 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up Unpermittable Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surface waters on the site free of illegal discharges? Yes No NA NE � ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ � ❑ ❑ ❑ Comment: The proiect was revisited to review the extent of cleanup and repair of EC measures. Crews were still in the process of cleaninq and repairinq measures because of more recent storm events. DOT and contractor prepared a rapid response plan for qradinq crews and proiect staff. The plan will help crews be prepared for storm events qivinq them time to install diversions alonq qradinq/fill areas adiacent to Site 10 and other areas. It qives them authority to cease qradinq/fillinq and install EC devices prior to the storm event. page: 2