HomeMy WebLinkAbout20140090 Ver 3_Aug 12 Inspection_20160819Wetland Inspection Report
Project Num: 20140090 Version: 3 Status: Issued
Project Name: NCDOT- US 158 (U-2579B) Project Type: Road
County: Forsyth Region: �lanston Salem pair/improvemen
Location: NCDOT- US 158 (U-2579B)
Latitude: +36° 07' Longitude: -80° 07' 55"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 8�12/2016
Reason for Inspection Follow-up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Title: Phone:
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: � Compliant ❑ Not Compliant
Program Areas: Standards/Sediment
Question Areas:
� Unpermittable Activities
Inspection Summary:
Personnel issues appear to have contributed to this most recent sediment losses. That person was let go and a rapid
response plan for the grading crew was drafted. This should help to solve recent EC problems.
page: 1
Site Number: 20140090 Owner: Thorpe, Gregory
Inspection Date: 8/12/2016 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up
Unpermittable Activities
# Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining
wetlands, etc.).
Is stream(s) free of unpermittable impacts?
Is wetland(s) free of unpermittable impacts?
Is open water(s) free of unpermittable impacts?
Are other standards being met (turbidity, pH, etc.) in all surface waters onsite?
Are surface waters on the site free of illegal discharges?
Yes No NA NE
� ❑ ❑ ❑
❑ ❑ � ❑
❑ ❑ � ❑
❑ ❑ � ❑
� ❑ ❑ ❑
Comment: The proiect was revisited to review the extent of cleanup and repair of EC measures. Crews were still in
the process of cleaninq and repairinq measures because of more recent storm events. DOT and
contractor prepared a rapid response plan for qradinq crews and proiect staff. The plan will help crews be
prepared for storm events qivinq them time to install diversions alonq qradinq/fill areas adiacent to Site 10
and other areas. It qives them authority to cease qradinq/fillinq and install EC devices prior to the storm
event.