Loading...
HomeMy WebLinkAbout20150811 Ver 1_Inspection_20160817Wetland Inspection Report Project Num: 20150811 Project Name: NCDOT - Pave SR 1369 County: Caldwell Location: NCDOT - Pave SR 1369 Latitude: +36° 02' SW Plan Location Site Owner Name NC DOT Division 11 Inspection Date: 8�9�2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Pave road Region: Winston-Salem Title: ❑ Not Compliant Longitude: -81 ° 38' 35" Phone: Phone: 336-776-9703 This project is not complete. Several more pipes need to be placed. Overall the project is in compliance but followup will be needed over the next few months to monitor culvert placements. page: 1 Site Number: 20150811 Inspection Date: 8/9/2016 Owner: Pettyjohn, Michael A. Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: We reviewed several culvert placements that were completed. Some additional work was needed at the inlet and outlet at 116+11. It was noted the the channel at the inlet side needed shapinq upstream to prevent headcuttinq and the outlet needed a riprap dissipater pad per the permit. This work was to take place over the next few weeks. page: 2