HomeMy WebLinkAbout20150811 Ver 1_Inspection_20160817Wetland Inspection Report
Project Num: 20150811
Project Name: NCDOT - Pave SR 1369
County: Caldwell
Location: NCDOT - Pave SR 1369
Latitude: +36° 02'
SW Plan Location
Site Owner Name NC DOT Division 11
Inspection Date: 8�9�2016
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Pave road
Region: Winston-Salem
Title:
❑ Not Compliant
Longitude: -81 ° 38' 35"
Phone:
Phone: 336-776-9703
This project is not complete. Several more pipes need to be placed. Overall the project is in compliance but followup will
be needed over the next few months to monitor culvert placements.
page: 1
Site Number: 20150811
Inspection Date: 8/9/2016
Owner: Pettyjohn, Michael A.
Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑
Are the culverts and/or filled areas installed properly? �❑❑❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑
Comment: We reviewed several culvert placements that were completed. Some additional work was needed at the
inlet and outlet at 116+11. It was noted the the channel at the inlet side needed shapinq upstream to
prevent headcuttinq and the outlet needed a riprap dissipater pad per the permit. This work was to take
place over the next few weeks.
page: 2