Proiect Information
Inspection Date: 08/05/2016
Project #: 34839.3.GVS4
Division #: 9
Project Type: Contract
Evaluator
TIP #:
County:
Engineer:
Phil Suggs
U-2579B
Forsyth
Winston Salem Res. (Cragmore)
Project Length: 4.00 Disturbed Acres:
River Basin: Yadkin HQW Zone: NO Trout Zone: NO
Location Winston Salem Northern Beltway Eastern section US 158 to Bus 421 and I 40
Description:
Proiect Evaluation
Report Type: ✓❑ Routine
❑PCN
Length Section
0.1 Site10 and 2,
approaching slopes
3.9 Remainder of Project
OF NORiH �qR
� `" �`ti
9
* *
o =
0
9�r��NrOF iRANSQ��P
❑ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO
❑ ECPAR
Installation Maintenance Effectiveness Plan Overall Project
of BMPs of BMPs of BMPs Implementation Evaluation
7 7
8 8
7
0
7
0
Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent
Remarks and Recommendations:
Reviewed project with Dave Wanucha - DWR, Jeremy Guy - Resident Engineer, Lindsey Panek - Asst.
Resident Engineer, Scott Wyrick- Lead Project Inspector NCDOT, Amy Euliss - DEO, Scott Gallman
(Dragados)
Follow up inspection for the ICA report issued on 8/5/2016. The ICA status can be lifted at this time. Project
work has been suspended by the Resident.
Additional rainfall has hampered some repair work, but crews are continuing the cleanup and installation of the
EC devices per the ICA report.
-Crews are refurbishing drop inlet protection along the toe of slope approaching Site 10 after rains subsequent
to the sediment loss.
-Discussed the EC for the roadway section approaching site 10 to clarify what is required by the 8/5 ICA report.
Define the TSD parallel to the perimeter berm and install silt checks per the ICA report. Extend the diversion
out across the grade to direct runoff to silt checks between slope drains. This applies to both right and left of L-
line.
-Discussed slope drain inlet protection and the need to keep the inlet of the slope drain open with small amount
of protection to prevent scour.
Insure berm over and around the slope drain is well compacted to prevent undermining of the drain.
-Per previous reports and discussions, install two large Type A sediment dams above both drop inlets along
the rock lined ditch. Weir height should be at least 3' high.
-Along the haul road to the field office, reinstall silt checks and type b silt basins to handle slope drain
discharge. Clean out skimmer basin at pipe inlet. Con Remove all excavated and accumulated sediment from
the basins and ditch and remove it from the area.
-Continue cleanup of skimmer basins both right and left side of the project.
-Met with crew leaders and foreman onsite to discuss the EC principles and site application for this work.
Emphasized the need for
7
0
8/05/2016 1:32 PM Page 1 of 2
Level II supervisors and crew foreman to direct EC work and be responsible to see measures repaired and
installed.
Contractor should bring this roadway section to a static grade, install the EC devices per report and onsite
discussions. Seed/mulch this section to stabilize it and reduce the erodible area.
All "UrgenY' items on the NPDES list need to be addressed.