Loading...
HomeMy WebLinkAbout20050071 Ver 2_Other Documents_20070412of wAr, Mr. J. B. Setzer, P.E. Division Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment. and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality ® U 6 ?vC)7 ? ? q C-A %s? v 2 <oo qN ^Tr ,> DsTa???? ?R® Subject: Inspection NC Highway 281 DWQ Project No. 3498 Transylvania County Dear Mr. Setzer: On April 4, 2007, I visually inspected the construction work on NC Highway 281 in Transylvania County. The construction work is getting underway with the area being grubbed. Sediment and erosion control structures appear to be in good shape. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office - North Carolina ?irtura!!r? 'rr,...r..r-:,..,,r...,.n ,:..:i... ,.Fxxr.,ro• n.. l;- ')Ann TT c v:mT.....,.. ,n c .............?.. TT!"? ?ovao- DL.. -- fo?ON' n4 ncnn ? .. ?.....;.._e_ci,...:;<„ DWQ representative: i lichael R. Parker Date: ?Apn14, 2007 County: Transylvania Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other NW Permit #: EP #: 3498 DWQ 401;.#: 1 Project Name: N C Highway 281 Road Widening F Location of Project: Project starts at the intersection of NC Highway 281 and NCSR 1306, Slick Fisher Road and goes north to the Jackson County-Transylvania County Line. Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation X? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: October 2007 Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 ' Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited UT's to the West Fork French Broad River Basin/ Subbasin: FBR 01 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB XClass C ?ORW X[]Trout ?WS-III []NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert []Bottomless Culvert []Bridge []Bottomless Arch ?Riprap Inlet/Outlet Stabilization X[]Fill Authorized Wetland Impacts: ?0 -1/10'' acre ?1/11d'to 1/3rd acre ?1/3rd to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: X< 150 linear feet ?> 150 linear feet Additional comments: Inspection on April 4, 2007_ Project is well underway. Both contractors have the area grubbed from top to bottom. Contractors are waiting to start major construction until after the April 15 trout moratorium. Sediment and erosion control devices look good. Some brush barriers have been installed on the USFS land. Also, plastic pipe has been installed at the stream relocation site to prevent sediment from entering the stream while construction is taking place. Name of Waterway(s):